Electroimpact Supplier Inspection Documentation

Similar documents
Electroimpact Supplier Inspection Documentation

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

AS9102 Training. First Article Inspection Guide. Rev A

SECTION SUBMITTAL PROCEDURES

East Central College

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

CIRRUS AIRCRAFT FAI INSTRUCTION

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Production Part Approval Process (PPAP) Marion Body Works, Inc.

This specification describes the general requirements for Engineering Services provided to Vale.

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

Weldment Visual Inspection Requirements

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Engineering Drawing System

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION ADMINISTRATIVE REQUIREMENTS

Section Meetings Section Material and Equipment. None Required

SUBMITTAL PROCEDURES

CESSNA QUALITY REQUIREMENTS. For SUPPLIERS (CQRS)

(AMMA) American Maritime Modernization Association

MIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A

PPAP REQUIREMENTS. Revision: March Methode Electronics, Inc. G-MB of 12 Printed copies are not controlled.

TOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection

Overview of Textron Systems Supplier First Article Inspection (FAI) expectations

GPSC Academy Leaders Teach & Leaders Learn. Supplier Technical Review Training Revision 1.0

SECTION SUBMITTAL PROCEDURES

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011

MIL- B Rev NAVSEA 0900-LP

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 30 November Approved. Frank Mariot

1 SERVICE DESCRIPTION

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Report Number B0622. Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center

Standard BAL Frequency Response and Frequency Bias Setting

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Engineering Policy & Procedure

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

(R) Aerospace First Article Inspection Requirement FOREWORD

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

Inspection and Test Plan for Battery Charger

Machine Shop Processes

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly:

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

Answer: Qualification statement should be provided with the bid.

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

Thank you for your business. Sincerely, Jason Greeson

Transmission Availability Data System (TADS) Data Reporting Instruction Manual

SECTION SUBMITTAL PROCEDURES

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

J O I N T I N D U S T R Y S T A N D A R D. Requirements for Soldering Pastes J Standard 005A. December 2011

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

Standard Development Timeline

Certified Precision Sheet Metal Operator Level I

AS Australian Standard STEEL WIRE FOR TENDONS IN PRESTRESSED CONCRETE. This is a free 5 page sample. Access the full version online.

SECTION - II BID DATA SHEET

Working Drawing Manual

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

2017 EDITION. CLEARED FOR PUBLIC RELEASE Copyright 2017 Lockheed Martin Corporation. All Rights Reserved

Author Instructions FPIN Editorial Manager

INS Process Outline Requirements

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

MICROCIRCUIT, HYBRID, 12 VOLT, DUAL CHANNEL, DC/DC CONVERTER

Waste Treatment Plant Project Supply Chain Collaboration Event. QVD How To Get Started

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

BERKELEY COUNTY ENGINEERING AND

Engineering Drawing System

LOCOMOTIVE ENGINEERING DEPTT.

WP197 Capacity Market Metering Test

Jacksonville District Master

Field Tickets Frequently Asked Questions

MARKET ANCILLARY SERVICE SPECIFICATION

May 15, 2012 Hugh Anderson Legal Counsel to the Engineers Joint Contract Documents Committee

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

Commercial Infill Project Guide

Guideline for initial sample deliveries including initial sample test report to. Pankl Systems Austria GmbH. Systems

Inspection and Test Plan for Water Tube Boiler

A/E/C CAD Standard and A/E/C Graphics Standard Frequently Asked Questions (FAQ) updated 8/9/2017

INSPECTION AND TEST PLAN

a. Does a written detailed procedure exist and is it utilized for the soldering process? Identify procedure number and revision.

THE DESIGN PROCESS. for an interior design project

The enclosed information is provided for consideration in the preparation of your response to the abovereferenced

Construction Phase Project Management and Documentation

CHIEF ENGINEER PROCEDURE MANAGEMENT OF OVERLAPPING DESIGN AGREEMENT

ALLOY STEEL SOCKET SET SCREWS 1

Renewal of EC Design-Examination and Type-Examination Certificates

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Since 1919 UNION MADE PRODUCTS CATALOG. BUTTONS TABS NAMEPLATES and More... The Mark of a Professional

Cloud Based Plan Review Process (Applicant)

Preface... Acknowledgments... Glossary Introduction Management Systems and the Management of Chemical Process Safety...

Transcription:

AN AS9100 REGISTERED COMPANY Electroimpact Supplier Inspection Documentation 1. Inspection documentation may be submitted using one of two methods: a. Preferred method - Electronic - Submitting a complete document set by email or using https://qualitydocs.electroimpact.com/ b. Include a complete document set on paper with the product shipment. Use pen or highlighter only, do not use pencil. c. Details for each method are below. 2. Inspection documentation consists primarily of the following documents: a. A copy of the PO b. A marked up drawing c. A CMM report (if appropriate) d. An Inspection Record documenting: i. actual measurements of instances of all features where tolerances tighter than +/-0.0045 (0.114mm) (CMM reports are acceptable, see below) (An inspection record may not be required if no tolerances are closer than 0.0045 (0.114mm)) ii. Non-conforming features (May not be required if no non-conformances are present.) iii. Critical dimensions if stated (An inspection record may not be required if no critical dimensions are present.) e. Weld inspection documentation. (As required by PO or other contract documents) f. Other process documentation (stress relieve, heat treat, coating/plating if required by PO) g. Material certs (If required by PO) h. Dispositions of all non-conformances 3. The following information must be on all inspection documentation: a. Part Number b. Revision number (drawing and part revision, if different) c. Job#\Assy# (from PO) 4. Sampling and/or 100% inspection a. Sampling is acceptable unless otherwise specified (i.e. on PO or drawing) b. Use the following table to determine sample size : This is modified from ASQ Z1.4-1993 for level II, AQL 4.0 Normal Sample size Normal Sample size From To Sample Size 4 25 3 26 90 13 91 150 20 Inspection documentation RevE.docx Page 1 of 10

151 280 32 281 500 50 501 1200 80 1201 3200 125 3201 10000 200 10001 Over 315 c. 100% inspection is required if: i. Stated on PO or drawing ii. For all features where any non-conformance is identified in the sample. iii. For all features marked critical feature iv. For all features marked Inspection Record Required (except if Sampling Permitted is also stated) 5. Inspection Drawing Mark up a drawing of the product by doing the following: a. Any feature for which all inspected pieces are conforming, highlight the feature callout on the drawing green. b. Any feature for which any nonconformance is identified: i. Highlight the feature callout red. ii. Number the feature callout on the drawing. iii. Uniquely identify each piece in the lot (e.g. temporarily numbering each piece) Do not write on parts. Blue masking tape is easily removed and does not leave residue or damage the parts. iv. Fill out an Inspection Record spreadsheet c. Any feature which has been inspected and is acceptable but is intentionally not in tolerance (e.g. grind stock is left) highlight yellow. d. Any feature which is not inspectable by your company highlight yellow and treat as a non-conformance, that is, contact the engineer listed on the PO, identify the features which are not inspectable and ask for a disposition (Do not inspect or inspect at Electroimpact) e. Identification of the inspector by stamping or printing inspector name and signing. 6. Items to inspect. Inspection instructions have the following precedence: a. Inspection instructions on the face of the drawing b. Inspection instructions on the PO c. Inspect all dimensions on the face of the drawing and callouts d. All drawing notes (heat treat results (hardness), coating/plating) e. All features called out in the title block. (E.g. finishes, edge breaks, fillets etc.) f. If there is any conflict between these (e.g. drawing requires specific inspections, but PO requires different inspection or a difference between the drawing and the model) contact the project engineer. 7. CMM reports are acceptable in lieu of or in addition to Inspection Drawings a. A CMM report is sufficient inspection documentation if: i. It includes: ii. Part Number iii. Revision number (drawing and part revision, if different) Inspection documentation RevE.docx Page 2 of 10

iv. Job#\Assy# (from PO) v. It clearly identifies what features were inspected. The preferable method for identifying features and data is an image of the part which shows feature numbers (a road map of the part). b. A CMM report which does not clearly identify features can be submitted with a marked up drawing which clearly identifies which features are measured. This can be done by putting the feature number from the CMM report in a bubble on the drawing. c. All non-conformances and their dispositions must be documented clearly in the CMM report (i.e. highlighted red) or in a separate inspection report. 8. Complete an Inspection report: a. All inspected dimensions which are.009 (.114mm) total tolerance (for example+/-.0045, true position of.009 diametrical or flat within.009 ) or less are required to have the actual inspection measurements noted on the inspection drawing next to the green highlighting. b. All inspected dimensions which are.004 (.1 mm) total tolerance (for example+/-.002 or +/-0.05mm) or less are required to be documented in 4 decimal places for inch units and 3 decimal places for millimeters. c. Where the PO or drawing is marked Inspection Record Required or Critical Feature actual measurements must be recorded for each instance on each part. d. All information for a single Job#/Assy#/Part# should be on a single inspection record spreadsheet (i.e. non-conformance data as well as measurements which show conformance of features marked Inspection Record Required or Critical Feature. e. For any inspected feature which is non-conforming. Note the disposition documentation (e.g. email or phone conversation). f. Inspection reports may be used to document inspection related conversations with the project engineer (e.g. inability to inspect a feature or inspection tool accuracy issues.) g. Both printable and Excel Inspection Record templates can be downloaded from https://electroimpact.com/company/suppliers.aspx 9. Weld Inspection Welding is considered a special process. As such, additional requirements may apply, such as certified welders, certified weld inspectors, calibrated equipment, Weld Procedure Specification documents, as-tacked inspections or NDE). a. If no weld inspection requirements are specified, the welding the supplier is responsible for providing welds in accordance with the tool drawing, and for visual inspection of all welds, but no additional documentation is required. Documentation of this type of weld inspection may be made by highlighting the weld symbols on a copy of the weld drawing with green to show that each weld was inspected. b. If any additional weld inspection requirements exist, the supplier must document compliance with all requirements. The supplier s qualifications and the format of the documentation must be approved prior to submission. 10. Dispositioning Non-conformances. a. All non-conformances identified in the production process or during inspection must be dispositioned by the project engineer prior to product delivery. b. Dispositions must be documented. Documentation must include: i. Job#, Assy#, Part# Inspection documentation RevE.docx Page 3 of 10

ii. Project engineer name iii. Complete description of non-conformance (including actual measurements) iv. Disposition (Use as is, rework according to instructions) c. Verbal dispositions may be documented by: v. An email from the project engineer following up on verbal disposition vi. A verbal contact log which includes: 1. Job#, Assy#, Part# 2. Project engineer name 3. Complete description of non-conformance (specification, tolerance and actual measurement) 4. Disposition (Use as is, rework according to instructions) 5. Date of contact 6. Method of contact (e.g. in person, phone) 7. Supplier contact name 11. Importance of contacting the engineer. The engineer listed in the line item the PO is the primary contact for all questions relating to that line item. The engineer should be contacted for: a. Conflicts between documents b. Questions about interpretation of the drawing c. Questions about manufacturing processes d. Deviations from the drawing e. Deviations from the PO (including delivery date) (please include the purchaser in any discussions if the purchaser is different than the engineer) f. Changes to the drawing g. Changes to the PO (including delivery date) (please include the purchaser in any discussions if the purchaser is different than the engineer) h. Disposition of non-conforming parts i. Inability to inspect any feature or insufficient accuracy on inspection tools. j. Changes in delivery schedule 12. Use the Inspection Record Spreadsheet as a record of communication with an engineer. Any communication with an engineer during manufacturing or inspection can be documented using the Inspection Record Spreadsheet. a. For example, if a feature is incorrectly or ambiguously called out on a drawing, (see below) Inspection documentation RevE.docx Page 4 of 10

Contact the engineer and if they agree, enter the information in the Inspection Record Spreadsheet as follows: Feature # Drawing Zone Piece # Specification Actual Value Disposition 1 N/A N/A 3.391 Dimensioned off of incorrect edge Will change drawing see email b. If a feature is not inspectable, (see below) Notify the engineer. They may tell you to not inspect the feature or they may tell you that we will inspect ONLY that feature at Electroimpact. Enter the information in the Inspection Record Spreadsheet as follows: Feature # Drawing Zone Piece # Specification Actual Value Disposition 2 N/A N/A Perpendicular to A within 0.0005 Feature too small to inspect Do not inspect see email Inspection documentation RevE.docx Page 5 of 10

c. If your company uses the Inspection Record Spreadsheet early in the manufacturing process to document all communication with the engineer, (by entering the date, emailing it to the engineer and having the engineer enter the disposition) very little data will need to be re-entered during inspection. 13. Advice on inspection accuracy. All inspection processes and instruments have uncertainty. For example, Electroimpact s best CMM has an accuracy specification of 0.00035 (.009mm) over its length. If a measured value is within.009mm of the tolerance, the measured value can be within tolerance, but might measure out of tolerance with a different CMM. To protect your company, the best practice would be to treat any measurement that is within the accuracy of the instrument as being out of tolerance as being non-conforming and notify the engineer. They have the option of using the inspection as is (most likely) or re-inspecting it at Electroimpact. In either case, if we audit this inspection and find a different value (within the accuracy of your instrument and our instrument) the difference will not be treated as an inspection error. Document this as follows: Feature # Drawing Zone Piece # Specification Actual Value Disposition 1 N/A N/A Perpendicular to A within 0.0005.0003/.0004 Feature is within inspection uncertainty of tolerance limit (uncertainty of CMM is 0.00035 ) Re-inspect at Electroimpact see email Similarly, the example below is cut from a reputable micrometer manufacturer s catalogue: Since this micrometer can have.0001 graduations and.0001 accuracy, if your measurement is within.0001 of the tolerance limit, it could measure out of tolerance if this feature were remeasured in an audit inspection. If you have noted this on the inspection record and notified Inspection documentation RevE.docx Page 6 of 10

the engineer and they choose to accept your inspection, this will not affect your company s performance record. 14. Submitting documents via email. a. Attach all documents into a single email to supplier.inspection@electroimpact.com b. Subject: Job#XXXX Assy#XXXX Part#XXXX c. For all documents file names are made up of the following: vii. Job#XXXXAssy#XXXXPart#XXXXDocumentType viii. See table below for document type extensions ix. Email subject line must include Job#XXXX Assy#XXXX Part#XXXX and short description of subject 15. Submitting documents via https://qualitydocs.electroimpact.com/ a. You must apply for an account. This is a security measure only, all SIA participants account requests will be approved. b. When your account is approved you will receive instructions on using the site. c. The site allows you to attach documents without having to rename them. d. The site sends you and your designated email accounts and the engineer a confirmation email. 16. Submitting documents on paper. Put all required documents in an envelope in the order in the table below. A printable Inspection Record template can be downloaded from https://electroimpact.com/company/suppliers.aspx 17. Inspection Documents a. When submitting documents via email, use the following abbreviations and file types. b. When submitting documents on paper with a shipment, put the documents in the following order. Document Type Abbreviation File Type Required? PO Poxxxxxx.pdf Required Inspection Drawing InspDwg.pdf Required for machined parts Inspection Record InspRec.xls,.xlsx Required if:.csv or - Non-conformances are present.pdf - Communication with engineer is documented - Actual values are required CMM report CMM.pdf or xls Only when inspected by CMM Disposition Dispo.pdf or email Required if Non-conformances are present Inspection documentation RevE.docx Page 7 of 10

Weld Inspection Record WeldInsp.pdf Only when required on PO, drawing or Weld Process Documentation WeldProc.pdf Only when required on PO, drawing or Heat Treat/Hardness Documentation HTProc.pdf Only when required on PO, drawing or Stress Relieve Documentation StrRel.pdf Only when required on PO, drawing or Coating/Plating Documentation CoatProc.pdf Only when required on PO, drawing or Material Cert MatCert.pdf Only when required on PO, drawing or Certificates of Conformance CoC.pdf Only when required on PO, drawing or Engineer Contact (other than disposition) EngCtc.pdf or email Not required for supplier s benefit c. Sample File name Job#3641Assy#1912 Part#5751C01001G21AJ101_07-01- 002InspDwg.pdf d. Sample files are available at https://electroimpact.com/company/suppliers.aspx 18. Special Circumstances a. Combining and/or sampling lots of identical parts. If several lots of one part number are received at the same time: i. Sample the lots based on the total count ii. Document all lots on one inspection drawing and inspection record. Note on all documents that the all lots (job#assy#part#) covered by the document. iii. If submitting by email: 1. Save documents in separate folders with the correct file name for each lot (job#assy#part#). 2. Submit one email per lot. iv. If submitting on paper, submit one set of documents. b. Combining and/or sampling lots if similar parts. If one or more lots of similar parts with different part numbers are received at the same time i. Check with the engineer for appropriateness of sampling ii. Propose the following: 1. Sample the identical features based on the total count 2. Sample the individual features based on the total count of each individual part number (it is possible that an individual part number is made on more than one job#assy#) 3. Document all lots on one checklist (and if necessary, inspection drawing) 4. Document the individual features on separate inspection records Save documents in separate folders with the correct file name for each lot (job#assy#part#) c. Alternate Inspection Instructions Inspection documentation RevE.docx Page 8 of 10

i. The fine print on Electroimpact PO s has included the following language for several years: Evidence of inspection and conformance to requirements is required for all parts manufactured to Electroimpact designs unless specifically authorized by the person issuing the PO. Thus, unless specifically authorized, inspection is required, and documentation submitted by suppliers participating in the Supplier Inspection Acceptance program is to be submitted in conformance with the program. ii. If a PO or other communication specifically authorizes other inspection or no inspection, the engineers instructions prevail d. Split lots. When lots (one line on a PO, same job#assy#) are to be shipped in multiple lots, Add Lot#x to the end of each document name (including the email subject line if submitting via email). For example: i. Job#123Assy#123Part#123456Lot#1 ii. Job#123Assy#123Part#123456Lot#2 Document Changes Rev Date Section Old New B 13Jun2016 4.c.iii 100% inspect all features with Delete tolerances closer than ±0.0045 (±.114mm). B 13Jun2016 5.e N/A Write sample size on drawing B 13Jun2016 8 Unclear Re-wrote to clarify. B 13Jun2016 5.b.iii Unclear how to identify parts Do not write on parts, use blue masking tape. B 13Jun2016 14 Zip documents - Attach documents - One lot per email B 13Jun2016 17 N/A Special Circumstances C 4Jan2017 All Minor clarifications C 4Jan2017 1 N/A Added upload site C 4Jan2017 4 b Sample size above 10001 was 500 Sample size above 10001 is 315 C 4Jan2017 17 d N/A Split lots C.2 12Jan2017 2 d i Typo closer than 0.0015 (0.114mm) closer than 0.0045 (0.114mm) D 22Feb2017 8 a Unclear Changed wording to clarify. D 22Feb2017 8 b N/A Added requirement to document tolerances closer than 0.004 using 4 decimal places E 9 - Added Weld inspection - Renumbered subsequent sections. E 16 - Added section describing document upload site. Inspection documentation RevE.docx Page 9 of 10

- Renumbered subsequent sections. - Inspection documentation RevE.docx Page 10 of 10