Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or ) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 200 3 04,203 $2,49,535 SITE $20,02 Campus Total 04,203 $2,99,3 Category: Building Exterior Entrance Entrance Control - Audio 2 EA $994 Entrance Control - Audio and Video 4 EA $2,0 Exterior Doors - Exterior Steel Door EA $5,2 Exterior Doors - Side lite 4 EA $,253 Exterior Doors - Store Front EA $4,39 Exterior Doors - Transom Lite 2 EA $2 Power Door Operator and Controls 4 EA Foundation Lighting Roof System Foundation - Concrete,03 LF Superstructure - Steel 04,203 SF Exterior Lighting - Wall Mounted 2 EA 5 $55 Exterior Lighting - Wall Mounted EA $5,9 Chimney - Metal Flue 3 LF $44 Coping - Metal 2 LF $,0 Downspouts - Interior Downspouts,2 LF $54,04 Roof - Asphalt Gravel Ballast 4,5 SF $4,424 EDISO Page of 5 Assessment Date: 9//205
Category: Building Exterior Roof System 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Roof - Modified Bitumen 39,390 SF $30,3 Roof Structure - Steel / Metal Deck/ Concrete Topping 43,95 SF Walls Windows Canopy - Concrete/ Stucco SF $2,49 Exterior Walls - Brick 5 SF 5 $9 Exterior Walls - Brick 44,44 SF $29, Exterior Walls - Concrete Block 3,344 SF 5 $2, Exterior Walls - Prefabricated Metal Panel Wall,5 SF $9,404 Exterior Walls - Stone-Cast 4,344 SF $29,9 Curtain wall - Glazed Double Pane 4,20 SF $5,9 Curtain wall - Louver 30 SF 5 $5,05 Curtain wall - Louver 240 SF $2,9 Guard - Guards perforated,240 SF $5,35 Lintels - Steel 03 LF Windows - Decorative 34 SF $2,344 Windows - Sash Aluminum Double-pane 3,220 SF $24,03 Building Exterior Subtotal: $,00,9 Category: Electrical System Emergency System Automatic Transfer Switch 3 EA $,224 Emergency A/C Power - Corridors and Stairs 24,39 SF $,303 Emergency A/C Power - Gym 3,9 SF $,42 Emergency A/C Power - Lunchrooms,54 SF $2,2 Emergency A/C Power - Students Toilets 2,02 SF $,042 Emergency Generator- Outdoor- atural Gas - 0 - KW EA Exit Signs - Corridors and Stairs 4 EA Exit Signs - Gym 5 EA Exit Signs - Lunchroom EA Security System - CCTV 20,40 SF $2,54 EDISO Page 2 of 5 Assessment Date: 9//205
Category: Electrical System Main Service 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Independent Electrical Service for emergency power EA Main Electrical Service - 200 to 3000 A 2/40/3PH EA PA System 04,203 SF $34,22 Power Distribution Lighting and Power Panels - Above 00 A 33 EA Main Distribution Panels - 400-00 amp 4 EA Main Distribution Panels - Greater than 00 amp EA Main Distribution Panels - Less than 400 amp EA Transformers - 2/40-20/20 EA Electrical System Subtotal: $0,9 Category: Safty System Fire Alarm Fire Alarm Panel EA $,40 Fire Alarm Strobe Lights 04,203 SF Fire Alarm_System 04,203 SF $,3 Fire Pump Controller EA Pump Room Assembly Sprinkler System Fire Pump - 25- hp EA Jockey Pump EA Sprinkler Heads 04,203 SF Sprinkler Piping 04,203 SF Wet Sprinkler System 04,203 SF Safty System Subtotal: $5,09 Category: Mechanical System Air Conditioning Chemical Pot Feeder EA EDISO Page 3 of 5 Assessment Date: 9//205
Category: Mechanical System Air Conditioning Air Handling Systems Boiler Systems Heating Devices Mechanical Plumbing Temperature Control 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Chiller-Air Cooled-Screw Type-Roof Mounted - 30-400 tons EA $4,99 Condensing Unit- Roof Mounted - Less than 5 tons EA $3,334 Glycol Feed EA $490 Pipes - Chilled Water Pipe- Copper,000 LF $, Pressure Fill System EA $,405 Air Handling Unit- Package Multi Zone- Indoor- Hot Water and Chilled Water Coils - 0-2 EA $,00 20000 cfm Air Handling Unit- Package Multi Zone- Indoor- Hot Water and Chilled Water Coils - 2000-2 EA $,00 30000 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - 4000- EA $3,3 000 cfm Air Intake 5 EA $2,23 Fan Coil Unit- Celing Mounted - Hot Water-Heating EA $0,20 Indoor Return Fans- Centrifugal Inline - 000-20000 CFM 4 EA $,429 Indoor Return Fans- Centrifugal Inline - 00-0000 CFM EA $,5 Zone Dampers 4 EA $53,34 Boiler Auxiliary- Condensing Hot Water - 00-2000 HP 3 EA $9,23 Chemical Pot Feeder EA $25 Condensing- Hot Water Boiler - 00-2000 MBH 3 EA $2,994 Water Fill System EA $, Cabinet Heaters - With Hot Water Coil 0 EA $3,543 Duct Heater - Hot Water $42 Fin Tube - Hot Water 200 LF $, Unit Heater - Electric 2 EA $55 Unit Heater - Hot Water EA $,5 Chilled Water Pump - 2 - HP 2 EA $2,45 Hot Water Pump - 0-20 HP 2 EA $2,45 Hot Water Pump - Less than 0 2 EA $2,222 Hydronic Supply and Return - Galvanized,000 LF $,320 DDC System 04,203 SF $59,04 EDISO Page 4 of 5 Assessment Date: 9//205
Category: Mechanical System Temperature Control 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Electric Thermostat 5 EA Thermostats - DDC 5 EA Ventilation Exhaust Fans- Roof Mounted - - 000 CFM 4 EA Exhaust Fans- Roof Mounted - 0-0 CFM EA Exhaust Fans- Roof Mounted - Less than 0 CFM 4 EA Type I Exhaust Hood- Kitchen EA Type II Exhaust Hood- Warming Kitchen EA Mechanical System Subtotal: $3,4 Category: Plumbing System Hot Water Gas Heater - 30000-00000 BTU/HR 2 EA $20 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures 04,203 SF Domestic Piping-Cold Water Horizontal Lines 04,203 SF Domestic Piping-Cold Water Risers 04,203 SF Domestic Piping-Hot Water from Risers to Fixtures 04,203 SF Domestic Piping-Hot Water Horizontal Lines 04,203 SF Domestic Piping-Hot Water Return Lines 04,203 SF Domestic Piping-Hot Water Return Risers 04,203 SF Sanitary Piping 04,203 SF Storm Piping 04,203 SF Vent Piping 04,203 SF Pumps - Domestic Booster Pump-Duplex EA $,9 Pumps - Sump-Simplex EA $45 Plumbing System Subtotal: $3,342 Category: Classrooms EDISO Page 5 of 5 Assessment Date: 9//205
Art Room ( room) Computer Lab (2 rooms) Fitness Room ( room) Kindergarten ( room) 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Casework 30 LF $5 Ceiling - Lay-in,5 SF Doors - Side-lite 4 SF Doors - Steel Doors incl hw 3 EA Floor - Tile,5 SF $2,5 Instructional Surface LF $29 Kiln EA Lighting - Lay-in 9 EA Marker Board 2 LF Storage/ Closet SF $33 Walls - Concrete Block,20 SF $3,23 Work Sink 2 EA $5 Casework LF $,23 Ceiling - Lay-in 2,055 SF Charging Station EA $2,90 Doors - Side-lite 24 SF Doors - Wood Doors inclu hw 2 EA Floor - Tile,040 SF $2,25 Floor - Tile/Sheet,05 SF $,0 Lighting - Lay-in 24 EA Marker Board 4 LF Walls - Concrete Block,40 SF $4,20 Walls - Plaster/Drywall 5 SF $2,39 Casework LF $,23 Ceiling - Lay-in 90 SF Doors - Side-lite 2 SF Doors - Wood Doors inclu hw EA Floor - Carpet 90 SF $,9 Lighting - Lay-in 2 EA Marker Board 24 LF Walls - Concrete Block 490 SF $,43 Walls - Plaster/Drywall 5 SF $,5 Casework LF $,23 Ceiling - Lay-in,5 SF Doors - Side-lite 2 SF EDISO Page of 5 Assessment Date: 9//205
Category: Classrooms Kindergarten ( room) 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Doors - Wood Doors inclu hw EA Floor - Tile Quarry,5 SF $2,4 Lighting - Lay-in 5 EA Marker Board 2 LF Storage/ Closet 3 SF $45 Walls - Concrete Block 40 SF $2,9 Walls - Plaster/Drywall 530 SF $,43 Work Sink 2 EA $5 Music Room ( room) Casework 20 LF $5 Ceiling - Lay-in 2,0 SF Doors - Side-lite 3 SF Doors - Wood Doors inclu hw 2 EA Floor - Tile/Sheet 2,0 SF $2,2 Lighting - Lay-in 3 EA Lighting - Pendent/Surface EA Marker Board 24 LF Storage/ Closet 49 SF $3,43 Walls - Concrete Block 2,50 SF $,53 Work Sink EA $39 (9 rooms) Casework 9 LF $,4 Ceiling - Lay-in,45 SF Doors - Side-lite 24 SF $40 Doors - Side-lite 204 SF Doors - Wood Doors inclu hw EA $30 Doors - Wood Doors inclu hw 20 EA Floor - Tile 95 SF $,39 Floor - Tile/Sheet 5,30 SF $5,4 Lighting - Lay-in 234 EA Marker Board 30 LF Storage/ Closet 2 SF $94 Walls - Concrete Block,20 SF $34,04 Walls - Plaster/Drywall,3 SF $22,45 Work Sink EA $3,032 EDISO Page of 5 Assessment Date: 9//205
Category: Classrooms Science Classroom ( room) Science Lab Level 3 (3 rooms) Special Education (2 rooms) 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Casework 4 LF $,22 Ceiling - Lay-in 90 SF Doors - Side-lite 2 SF Doors - Wood Doors inclu hw EA Floor - Tile/Sheet 90 SF $9 Lighting - Lay-in 2 EA Marker Board 24 LF Walls - Concrete Block 05 SF $2,30 Walls - Metal Panel 2 SF $2,00 Casework 40 LF $,00 Ceiling - Lay-in 4,23 SF Doors - Side-lite 0 SF Doors - Wood Doors inclu hw 5 EA Eye Wash Station 4 EA Floor - Tile/Sheet 4,23 SF $4,24 Lighting - Lay-in 54 EA Marker Board 4 LF Science Lab Elements 4,23 SF Science Lab Shower 3 EA Storage/ Closet 43 SF $3, Walls - Concrete Block 3,32 SF $0,4 Walls - Metal Panel 22 SF $, Work Sink EA $2,24 Casework 3 LF $,59 Ceiling - Lay-in,20 SF Doors - Side-lite 24 SF Doors - Wood Doors inclu hw 2 EA Floor - Tile/Sheet,20 SF $,2 Lighting - Lay-in EA Marker Board LF $ Marker Board 4 LF Walls - Concrete Block 0 SF $,993 Walls - Plaster/Drywall 590 SF $,2 Work Sink 2 EA $5 EDISO Page of 5 Assessment Date: 9//205
Category: Classrooms 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Classrooms Subtotal: $3,53 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in 4, SF $4,02 Doors - Side-lite 04 SF Doors - Steel Doors incl hw EA $30 Doors - Steel Doors incl hw 3 EA Doors - Wood Doors inclu hw 3 EA Floor - Carpet,2 SF $3,53 Floor - Concrete Epoxy/ Painted 94 SF $ Floor - Terrazzo 5 SF $,33 Floor - Tile 2,232 SF $4,3 Floor - Tile Ceramic/ Porcelain SF $3 Lighting - Lay-in 3 EA $35 Lighting - Lay-in EA Power Distribution 34 EA $2,24 Power Distribution EA Storage/ Closet 0 SF $50 Walls - Concrete Block,4 SF $9,0 Walls - Plaster/Drywall,4 SF $4,20 Work SInk EA $ Gymnasia Kitchen Bleacher Seating 0 EA $2,02 Ceiling - Exposed 3,9 SF $5,94 Doors - Steel Doors incl hw 5 EA Floor - Wood 3,9 SF Lighting - Metal Halide/Sodium Vapor 20 EA Scoreboards EA $2,244 Storage/ Closet 240 SF $,40 Walls - Concrete Block,5 SF $,92 Ceiling - Lay-in 5 SF $2,2 Doors - Steel Doors incl hw 3 EA EDISO Page 9 of 5 Assessment Date: 9//205
Category: Rooms (Other Than Classrooms) Kitchen 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Floor - Concrete Epoxy/ Painted 5 SF $43 Lighting - Lay-in EA Storage/ Closet 20 SF $0 Walls - Concrete Block,02 SF $3,3 Library Casework 0 LF Ceiling - Lay-in 5,05 SF Doors - Side-lite 3 SF Doors - Wood Doors inclu hw 3 EA Floor - Carpet 5,05 SF $0,5 Lighting - Lay-in 5 EA Walls - Masonry,20 SF $9,52 Lunch & Multipurpose Room Ceiling - Lay-in,54 SF $,40 Doors - Steel Doors incl hw 5 EA Floor - Tile,54 SF $3,44 Lighting - Lay-in 34 EA Serving Line 45 LF $2, Storage/ Closet SF $5 Walls - Concrete Block 4,4 SF $3,2 Walls - Plaster/Drywall 44 SF $,43 Walls - Structural Glazed Tile,35 SF $3,5 MDF_IDF AC Unit EA $49 Doors - Steel Doors incl hw EA $30 Finishes 45 SF $,035 Mechanical/ Service Rooms Janitor's Closet 330 SF $2,34 Mechanical/ Service Rooms, SF $49,29 Storage Room,545 SF $,09 Restroom Accessories 3,2 SF $34,3 Ceiling - Lay-in 94 SF $2,925 Ceiling - Plaster/Drywall 2,0 SF $9, Doors - Steel Doors incl hw 4 EA $,204 EDISO Page 0 of 5 Assessment Date: 9//205
Category: Rooms (Other Than Classrooms) Restroom 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Doors - Steel Doors incl hw EA Doors - Wood Doors inclu hw 3 EA $903 Floor - Concrete Epoxy/ Painted 0 SF $5 Floor - Tile Ceramic/ Porcelain 3,2 SF $, Floor Drain 29 EA $30, Hand Dryer 22 EA $5,0 Lavatory 2 EA $,29 Lighting - Lay-in 0 EA $,32 Lighting - Lay-in 3 EA Partitions 3 EA $0,9 Showers EA $3 Urinals EA $,04 Walls - Concrete Block 2,20 SF $,94 Walls - Structural Glazed Tile 5,9 SF $,00 Walls - Tile Ceramic/ Porcelain,55 SF $3,559 Water Closet 5 EA $9,5 Rooms (Other Than Classrooms) Subtotal: $43,554 Category: Building Interior Corridor Ceiling - Lay-in 2,00 SF $5,5 Ceiling - Plaster/Drywall 5 SF $4,93 Doors - Steel Doors incl hw 4 EA Doors - Wood Doors include hw EA Drinking Fountains - Double Fountain EA $,04 Floor - Carpet,025 SF $2,4 Floor - Terrazzo 2,433 SF Lighting - Lay-in 32 EA Lighting - Wall Mounted 5 EA Student Lockers - One Tier 43 EA Walls - Structural Glazed Tile 2,22 SF $,42 Safety Camera Viewing Station 5 EA 5 $4, EDISO Page of 5 Assessment Date: 9//205
Category: Building Interior Safety 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Metal Dedector EA $ Security Cameras 2 EA $5,433 Stairs Vertical Conveyance Ceiling - Lay-in 2, SF $, Floor - Terrazzo 2, SF $24,225 Handrails 200 LF $,33 Lighting - Lay-in 22 EA Lighting - Wall Mounted 0 EA Stairs - Terrazzo 4 LF $,34 Walls - Structural Glazed Tile 3,3 SF $43,45 Elevator - Hydraulic Elevator EA $9,23 Building Interior Subtotal: $2,244 Total Building Cost $2,49,535 SITE Category: Site Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin EA Civil/ Drainage - Site Manhole EA Fencing - ew Standard Ornamental,023 LF Fencing - Wood Fencing w/ Steel Frame 3 LF $,42 Benches 3 EA $,290 Landscape - Grass 2,4 SF 5 $4,55 Landscape - Grass 3,55 SF $3,4 Landscape - Hardscape- Concrete 3,44 SF $,00 Parkway trees 23 EA $5, Planting Beds/ Area 4,0 SF $,0 Trash Receptacles 3 EA $93 EDISO Page 2 of 5 Assessment Date: 9//205
SITE Category: Site Parking Lot Playground Sidewalks Signage 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Lighting - Pole Mounted 4 EA $5,0 Surface - Asphalt,29 SF $5,2 Trash Enclosure - Masonry SF $30,300 Vehicular Screening 292 LF $22,99 Equipment - School Age 5-2 EA $3,54 Surface - Poured Surface 2,05 SF 4 $49,04 Sidewalks - Internal Walks 42 LF $5,29 Sidewalks - Perimeter Sidewalks 9,29 SF $,40 Flag Pole - Flag Pole EA Monument - Building Mounted Cut Letter Sign 2 EA Monument - Sign EA Site Subtotal: $20,02 Total Site Cost $20,02 Campus Total ² ³ $2,99,3 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). EDISO Page 3 of 5 Assessment Date: 9//205
4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EDISO Page 4 of 5 Assessment Date: 9//205
4929 Sawyer Ave Chicago, IL 025 Classroom Summary Co-locating on this campus are EDISO and ALBA PARK Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Computer Lab Computer Lab Fitness Room Kindergarten Music Room Science Classroom Science Lab Level 3 Science Lab Level 3 Science Lab Level 3 Special Education Special Education Art Room Computer Lab Music Room Science Lab Level 3 Science Lab Level 3 Science Lab Level 3 st Floor st Floor st Floor st Floor st Floor st Floor 5 24 34 02 0 32 0 23 2 204 20 20 20 22 2 223 304 30 30 30 3 32 33 35 3 323 25 22 32 202 302 5(2) 29 3 29 3 A 30 30 30 24 25 2 2 2 222 24 32 33 34 35 302 3 30 A A A 22 23 A 23 3,5,05,040 90,5 2,0,5,5,5 90 90 90 90 90 95 5 90 90 90 90 925 90 55 90 90 90 95,09,33 40 40 32 4 4 4 40 2 2 2 2 2 2 2 2 2 2 2 2 2 20 2 2 2 2 20 2 20 20 2 2 20 0 0 0 20 0 20 20 20 0 0 0 0 0 0 0 0 0 234 0 204 44 44 0 0 2 2 0 2 2 2 0 0 EDISO Page 5 of 5 Assessment Date: 9//205