ASSEMBLY INSTRUCTIONS

Similar documents
Assembly Instructions

ASSEMBLY INSTRUCTIONS 5PC Storage Dining Set

NORTH STAR 4-PANEL PATIO DOOR ASSEMBLY INSTRUCTIONS

670 Freestyle/Style Door with In-Line Panel

GREENHOUSE EXTENSION 6 X4

GREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.

TUR DOORS SHOWER DOORS

Series Door with In-Line Panel (GIH / AHD)

Canopy Bed Frame. Date: 8 Jun 15 www. potterybarn.com Page 1 of 12 Rev:

* * 33/3549A CS 33/3549A. 2-Point Latch includes these additional parts. 1-Point Latch (LBL) Customer Service. Installation Instructions

NORTH STAR 2-PANEL PATIO DOOR ASSEMBLY INSTRUCTIONS

DRAWING TABLE SYSTEM

UPTOWN CANOPY FRAME T/F/Q

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

Multi-Point Astragal Prehanger Installation Instructions

Ultimate Flip Lever Astragal Prehanger Installation Instructions

FOR DEVICES SOLD PRIOR TO

Ultimate Push Button Astragal Prehanger Installation Instructions

Ultimate Trilennium Astragal Prehanger Installation Instructions

Gazebo GZ620H. Assembly Instructions. Systems Trading Corporation

LEXUS IS250/IS350 FRONT SPOILER Section I - Installation Preparation. Part Number: Section I - Installation Preparation.

EAUZONE PLUS EPQ - QUINTESSE DESIGN WITH HINGED DOOR

Fitting & User Instructions

EAUZONE PLUS EPH - HINGED DOOR WITH HINGE PANEL FOR RECESS

RETRACTABLE SCREEN ASSEMBLY AND INSTALLATION INSTRUCTIONS. SINGLE OUTSWING (Retro) / (Full-Size) STEP 1: REVIEW & CHECK FIG.

General Instructions 03HEL1010DDFW-V3. Please retain product label and instructions for future reference. 10x10 Helios Summer House

ET 51 EXTERIOR ROOF DRIP SIDE FINISH MOULDING INSTALLATION

Tubing Spacers. Backing Plate. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a a. a a. a a

Pergola PR100N1. Assembly Instructions. Systems Trading Corporation Customer service: (877)

Gazebo GZ3584 Aluminum Composite Roof Panels

PLANNING & LAYOUT BENCH

Aquauno Select MINUTES. (duration) FREQUENCY LED. OFF 8h AQUAUNO SELECT 5 MIN FREQUENCY. the timer is being programmed;

11 x11 Pergola. Assembly Instructions. Paragon Group USA cm cm cm

WETROOM WALK-IN AWL1500 AWL1200 AWL900 AWC850

ARK CHEVRON INSTALLATION GUIDE

* * 98/9949 CS 98/ Point Latch includes these additional parts. 1-Point Latch (LBL) Customer Service. Installation Instructions

For installation help please visit Please Do Not Return Product to Store!

IPA FITTINGS FOR REHAU NORDIC DESIGN A/S J. PETERSENS BESLAGFABRIK JACOB PETERSENSVEJ 9, DK-9240 NIBE TEL: (+45)

Easy2Build TM. 6 x 8 Easy-Grow Greenhouse. Assembly Instructions. Smart Tech solutions

IPA FITTINGS FOR ALUPLAST NORD-LINE A/S J. PETERSENS BESLAGFABRIK JACOB PETERSENSVEJ 9, DK-9240 NIBE TEL: (+45)

Gardman Lean-to Greenhouse Assembly Instructions

DRAWER BASE DRAWING TABLE

Greenhouse Assembly Instructions

8' x 4' x 5'6" Pet Kennel

660 Freestyle/Style Door with Double In-Line Panels

MATKI ONE MOSR- RECESS SLIDER

NOTE THAT THE HANDLE IS BELOW THE LOCK BASE

PLEATED SCREEN INSTALLATION INSTRUCTIONS

Assembly Instructions

GENERAL NOTES 1600 SYSTEM NOTES STRUCTURAL SEAL NOTES 1 - HANDLING, STORING AND PROTECTING ALUMINUM MATERIAL. 2 - GENERAL RULES

Gazebo GZ584. Assembly Instructions. Paragon Group USA. Customer Service:(877)

IPA FITTINGS FOR VEKA DANLINE 70 A/S J. PETERSENS BESLAGFABRIK JACOB PETERSENSVEJ 9, DK-9240 NIBE TEL: (+45)

Radiant systems 0801EN March 2016 Radiant plasterboard ceiling and/or floor system ISO /7

INSTRUCTIONS INSTRUCCIONES CONSIGNES

Steamhead Installation

Annabelle Dollhouse. Assembly Instructions. 37 x2

Gazebo JH734. Systems Trading Corporation. ~ Products Through Innovation

Whole House Fan. WHF 1500, GF 1500, WHF 3000 Installation Instructions. Parts List * Required Tools:

PROGRAMMING MANUAL MTMA/01 MTMV/01 FB00329-EN

ROOF RACK INSTALLATION INSTRUCTIONS (FOR FITMENT TO EGR CANOPIES)

MATKI ONE MOWP - WETROOM PANEL & BRACE BAR MOWV - WETROOM PANEL & CEILING BAR

TP Series - Triple PV Top of Pole Solar LED Lighting System


Student Book SERIES. Fractions. Name

INSTALLATION MANUAL. English Edition D75X ULTRA SHORT SERIES

001CK CK0012 FR-001CK0013 FR EN English

The Math Learning Center PO Box 12929, Salem, Oregon Math Learning Center

RETRACTABLE SCREEN ASSEMBLY AND INSTALLATION INSTRUCTIONS. DOUBLE INSWING (Retro) / (Full-Size) FIG. 1A STEP 1: REVIEW & CHECK FIG.

Mt. BLANC INSTRUCTIONS TOLL FREE: Mt_Blanc_11x11_Instructions_V1.0 EN " " " " " " "

GEI E INSTRUCTIONS M ULTI-CONTACT AUXILIARY RELAYS TYPE HFA53. GE Protection and Control 205 Great Valley Parkway Malvern, PA

Math Circles Finite Automata Question Sheet 3 (Solutions)

MECHANICAL RF STAT INSTRUCTION MANUAL MECHANICAL RF STAT TRANSMITTER & RECEIVER FITTING & OPERATING INSTRUCTIONS

Mt. SUTTON INSTRUCTIONS TOLL FREE: _Mt_Sutton_12x12_Instructions_V1.2 EN [3790mm] [3467mm] [3874mm]

User Guide. 10ft x 15ft JumpPOD Oval

WARNING Please refer to all safety notices in the greenhouse manual before assembling any of the sections

REVIEW QUESTIONS TOPIC 5 TRIGONOMETRY I FLUENCY

Sideboard. Assembly Instructions - Please keep for future reference. 041 xx 5535

Easy2Build TM. 8 x 8 Easy-Grow Greenhouse. Assembly Instructions. Smart Tech solutions

Renaissance. Assembly Instructions GREENHOUSE. for models BEFORE OPENING ANY OF THE BOXES PLEASE READ THESE INSTRUCTIONS 03/07

Panel Installation Instructions (Revised 2/26/10) (Page 1 of 7)

SOLVING TRIANGLES USING THE SINE AND COSINE RULES

Ohio Sideboard MADE IN BRITAIN. Assembly Instructions - Please keep for future reference 314/7128

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A

Please Do Not Return Product to Store!

How to remove BRNS/BRFS series from a PWB

846-GP. Neo-Angle Enclosure. Technical Assistance is available Monday - Friday 8:00 a.m. - 5:00 p.m. (Central Time) GP 12/05

Small Bookcase. Assembly Instructions - Please keep for future reference. 011 xx 2585

COUNT ON ME SENIOR DESIGN EXECUTIVE SUMMARY. Josh Cosper, Randy Robert, Mark Thompson, Lorelle Paulozzi, Wesley Graham

W6 series greenhouse

INSTALLATION INSTRUCTIONS

PRE-FAB GRILL ISLAND ASSEMBLY INSTRUCTIONS AND OWNER S MANUAL D(C,H)430-XX(R,D)-75XX D(C,H)790-XX(R,D)-108XX

MODEL 351 POWERGLIDE SERIES INSTRUCTIONS FOR INSTALLING SARGENT DOOR CLOSERS WITH "H" HOLDER ARMS

LAWN AND GARDEN GREENHOUSE

LAWN AND GARDEN GREENHOUSE

CM269800TX RIDDLING WINE CONSOLE. Assembly Instructions

Vancouver II - 3 Door Sliding Robe

Zero Threshold TM. Hints and Tips Handbook. Birdlip. Burford. Blockley. Bourton

463-GP. Swing Door. Technical Assistance is available Monday - Friday, 8:00 a.m. - 5:00 p.m. (Central Time) (Toll Free) 463-GP 5/06

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

Geometric quantities for polar curves

Transcription:

ASSEMBLY INSTRUCTIONS Multi Line 6 x8 255x193x203cm / 100 1 /2 x76 x80 Poly-Tex, Inc. PO Box 458 27725 Dnville Avenue Cstle Rock, MN 55010 We Site: www.poly-tex.com English - 69717 Hoy Greenhouse Service Center: 800-852-3443

IMPORTANT Plese red these instructions crefully efore you strt to ssemle this greenhouse. Plese crry out the steps in the order set out in these instructions. Do not tighten the screws of the Greenhouse until completion of the ssemly of the pnels. Keep these instructions in sfe plce for future reference. Sfety Advice We strongly recommend the use of work gloves during ssemly. Do not ttempt to ssemle the greenhouse in windy or wet conditions. Do not touch overhed power cles with the luminum profiles. Alwys wer shoes nd sfety goggles when working with extruded luminum. Dispose of ll plstic gs sfely - keep them out of rech of smll children. The greenhouse must e positioned nd fixed on flt level surfce. Do not len ginst or push the greenhouse during construction. Keep children wy from the ssemly re. Do not position your greenhouse in n re exposed to excessive wind. Do not ttempt to ssemle this greenhouse if you re tired, hve tken drugs or lcohol or if you re prone to dizzy spells. If using step ldder or power tools ensure tht you follow the mnufcturers sfety dvice. Hot items such s recently used grills, lowtorches etc. must not e stored in the greenhouse. Ensure there re no hidden pipes or cles in the ground efore inserting the pegs. Generl Advice This is multi-prt ssemly est chived y two people. Allow t lest hlf dy for ssemly process. Selecting site - choose sunny level position wy from overhnging trees. If you re fixing your greenhouse directly to solid concrete foundtion use the pre drilled holes in the metl se supplied. The component prts should e checked nd lid out close t hnd. Keep ll smll prts (screws etc.) in owl so they do not get lost. Do not tighten the screws of the greenhouse until completion of the ssemly of the pnels, unless it sys otherwise. Cre & Mintennce When your greenhouse needs to e clened, use mild detergent solution nd rinse with cold clen wter. DO NOT use cetone, rsive cleners or other specil detergents to clen the cler pnels. Replcement prts - cll our service line. For dditionl informtion plese visit our we site: www.plrm.com Tools & Equipment Tpe mesure Work gloves Plstic or ruer mllet Luricnt Phillipshed screwdriver Step ldder Drill it Lrge hmmer Scissors Spnner Mke sure the se in steps 1&2 is squre y mesuring the digonls nd level y using spirit level. Sort the prts nd check ginst the contents prts list. Crry out the ssemly steps in the order set out in the instructions. Screws re to e ssemled from the outside nd nuts from the inside of the greenhouse. Tighten screws nd nuts ( & ), 2-3 turns only, do not fsten them until completion of the ssemly, if not specified otherwise. 4 Prefix of the prts reference in the ssemly instructions: A-Aluminum profiles nd prts P5XX Polycronte pnels P3XX Plstic prts. M Metl prts 4XX Screws, nuts, disks, etc. The end of ll profiles, indicted y n rrow, is lwys upwrd. The ovl hole in the crossrs A256 should lwys e ssemled to the se of the greenhouse. The front of the greenhouse is the wll including the door, nd the ck is the opposite wll. Firmly connect the greenhouse to leveled finl position immeditely fter completion of the ssemly.

Contents Item Inc./mm Qty. Item Inc./mm Qty. Item Inc./mm Qty. Item Inc./mm Qty. Item Inc./mm Qty. A102 44.33/1126 12 A103 62.40/1585 1 A104 62.40/1585 1 A173 59/1500 2 A222 48.82/1240 1 R303 59.6/1515 2 P543 25.79x24.09 1 666x612 A111 44.69/1135 2 A112 44.69/1135 2 A113 44.69/1142 1 A114 44.69/1142 1 A115 44.69/1142 1 A116 44.69/1142 1 A174 24.17/614 1 A256 50.79/1290 8 PA351 44.09/1120 14 PA352 22/570 2 PA353 11.8/445 2 P544 17.32x24.09 2 432x614 P545 17.32x24.09 2 432x614 A136 96.73/2457 2 A182 24.17/614 1 A260 24.85/631 1 PR351 44.09/1120 20 PR353 11.8/300 2 PR356 17.5/445 2 P546 9.45x23.94 1 240x608 A141 97/2463 1 A192 24.17/614 1 A261 15.75/400 1 P540 44.69x24.09 14 1143x612 P580 44.69x24.09 7 1143x612 P547 23.62x21.65 1 600x550 A151 23.07/586 1 A203 61.5/1563 1 A204 61.5/1563 1 A271 23.07/586 1 P541 12.9x24.09 1 330x612 M243 91.7/2330 2 A162 36.1/917 1 A211 24.25/616 1 A282 21.77/553 2 P542 22.64x24.09 1 575x612 M244 91.7/2330 2

Item Inc./mm Qty. Item Inc./mm Qty. Item Inc./mm Qty. Item Inc./mm Qty. R360 2 A323 2 421 M4x0.63/M4x16 4 447 M8x0.63/M8x16 4 A283 589/23 5 P324 4 422 M4 2 4008 0.6x0.16/16x4.2 6 M285 1847/72.7 1 P333 1 423 M4 2 M307 4 P304 2 P399 2 441 M6x1.77/M6x45 1 T340 7 A306 1 M6x0.39/M6x10 95 442 0.26/6.5 1 T341 8 P328 (1 spre ) 26 M6 100 445 8x1/5/M8x7 4 P361 113

OR 255cm /100 193cm /76 18 255cm /100 193cm /76

1 2 Be sure to end in ts on the se profiles M243 into 90 ngle efore inserting the screws. Tighten firmly the screws 447 t the lower hole s seen in the lower picture. M244 M243 Attch the sides of the se (M244) to the front nd ck se pieces (M243). Use the screws nd nuts (, ) s shown. Tighten nut completely. M243 M244 M243 c M243 447 M243 / 2 M244 / 2

3 Assemle profile A162 using screws nd nuts (,) s shown nd tighten nut completely. Be sure to ssemle profiles A111 & A112 s shown elow with the rrow fcing upwrds. A111 A162 A162 A112 Bck A112 c A111 A111 A111 A162 A162 / 1 A112 / 2 A111 / 2

4 NOTE: The drin set includes two left nd two rights cups P324 nd four plugs. Assemle plug in ll four cups P324. Insert ech one of them into the gutters A136 ends s shown elow. P324 NOTE: Leve the end cups open on the side you would like the wter to drin. A136 P324 P324 P324 / 4 A136 / 2

! 5 *Insert the screws from the outside, tighten nuts only 2-3 turns nd leve loose. Assemle the gutters A136 to the profiles (A111 / A112) one on ech end. NOTE: Assemle the crossrs A256 simultneously with the gutter A136 using the sme screws nd nuts. The ovl holes should e connected to the se of the greenhouse. A136 A136 A256 A256 A256 Inside view Outside view A256 A256 A256 A256 A136 / 2 A256 / 4 A256

6 *Insert the screws from the outside, tighten nuts only 2-3 turns nd leve loose. Assemle M285 t the ck of the greenhouse to profiles A111, A112 using the lower hole of M285. NOTE: Assemle the crossrs A256 simultneously with the M285 using the sme screws nd nuts. The ovl holes must e connected to the se of the greenhouse. M285 M285 A256 Bck A256 A256 Inside A256 / 2 M285 / 1

7 *Insert the screws from the outside, tighten nuts only 2-3 turns nd leve loose. Assemle profiles A103, A104 to the se using the se inner holes nd to connector M285 in the middle hole s shown in drwing &. Aluminum profiles A115 nd A116 re to e connected t the ck to the gutters A136 on its upper holes nd to profiles A103 nd A104 s shown in drwing c. NOTE: Assemle profiles A103 nd A104 simultneously to the se, using the se inner holes nd crossrs A256 on ech side. Outside A103 A104! Inner hole M285 A104 A103 A136 A115 M285 A116 c! A104 A103 A136 Bck Bck A103 / 1 A104 / 1 A115 / 1 A116 / 1! Bck view A103! A104 A116 Bck view A115

8 *Insert the screws from the outside, tighten nuts only 2-3 turns nd leve loose. Assemle profiles A283 on the ck of connector M285. NOTE: On the sides you should slide profile A283 onto the existing screws s shown on figure (). On the other end slide the screws nd then connect it to M285 (). Follow steps () & () in sections 1&3. A283 1 () 2 A283 M285 A283 () 3 A283 A283 / 3

9 *Insert the screws from the outside, tighten nuts only 2-3 turns nd leve loose. Aluminum profiles A113 nd A114 re to e connected t the front to the gutters A136 on its upper holes nd to profiles A203 nd A204 s shown elow. Front A114 A136 NOTE: Assemle profiles A203 nd A204 simultneously to the se. A204 A203 A113 Front A204 Front A203 Outside A113 / 1 A114 / 1 A203 / 1 A204 / 1

10 *Insert the screws from the outside, tighten nuts only 2-3 turns nd leve loose. Assemle the ridge A141 under nd to profiles A113, A114 t the front, nd to profiles A115, A116 t the ck. Assemle profile A211, from the outside, to profiles A113, A114. A115 A141 A116 A211 A211 A113 A114 A113 A136 A211 / 1 A141 / 1

11 *Insert the screws from the outside, tighten nuts only 2-3 turns nd leve loose. Insert two screws in the groove of profile A283 t ech end (). Assemle profiles A283 from the outside to the corner profiles A111 nd A112 t the two ends nd simultneously to profiles A203 nd A204 nd crossrs A256 ( ). Connect the crossrs A256 to profile A111 & A112 in oth corners using the A283 lower screw. A283 A256 A204 A283 A283 Inside The ovl holes must e connected to the se of the greenhouse. A203 A256 Front A283 Outside A256 / 2 A283 / 2 Outside Inside

12 *Insert the screws from the outside, tighten nuts only 2-3 turns nd leve loose. Slide profile A102 on to the squre hed of screw (connected to the se)(). On the other end slide the hed of screw into the groove on profile A102, insert the screw into predrilled holes in the gutter A136 nd close (DO NOT TIGHTEN) with nut (). NOTE: Repet the ove ssemly procedure to ll profiles A102 on the wlls. A102 c A102 A102 Outside A102 A102 / 6

13 *Insert the screws from the outside, tighten nuts only 2-3 turns nd leve loose. Slide screw inside profiles A102 t the top connect it to the ridge A141 nd t the ottom-to the gutter A136. NOTE: Repet the ove ssemly procedure to ll profiles A102 on the roof. NOTE: The vent in the roof cn e inserted replcing one of the middle pnels. In order to ssemle the vent you hve to insert n dditionl screw into oth profiles A102 () on either side of the vent. These two dditionl screws will e used lter. A102 A102 A102 * Use only one screw in step (). A102 A102 A102 / 6

14 15 *Insert the screws from the outside, tighten nuts only 2-3 turns nd leve loose. Assemle luminum profile A260 using the dditionl screws you inserted on the previous step. A211 A222 Assemle luminum profiles A222 onto luminum profiles A211 (). Connect luminum profile A222 () nd luminum profile A261 to profile A113 (c). Note: level profile A222 on the left side with profile A211. Push profile A222 towrds the upper end of profile A211 nd nuts on profile A222. A260 A222 A261 441 c 442 A260 / 1 A222 / 1 A261 / 1

16 Ly the first profiles A173 (the second profile A173 will e used lter) on flt surfce. Connect profiles A182, A174 nd A192 on one side using screws 4008. Tighten ll screws. Slide pnel P540 etween profiles A192 nd profile A174. Slide pnel P541 etween profiles A174 nd A182, push them ll the wy ginst profile A173. A192 4008 A192 P540 A173 A174 A182 A173 P541 4008 A174 4008 A182 A182 / 1 A192 / 1 A173 / 2 A174 / 1 P541 / 1 P540 / 1

17 Assemle the second profile A173 nd ttch it to the other side of profiles A174, A182 nd A192 using screws d 4008. Tighten ll screws. Assemle the plstic strips PR351 nd PR353. PR351 During the ssemly of the plstic strips you must put pressure on them until they snp into plce. Put the c pressure t one end of the plstic strip nd continue ll PR351 the wy to the other end. Connect the wheels P304 using screws 421 nd selflocking nuts 423 (d). 423 4008 A174 PR353 423 P304 A173 PR353 P304 421 A192 A182 421 P304 4008 4008 4008 421 / 2 423 / 2 P304 / 2 PR351 / 2 PR353 / 2

18 A151 A282 19 c R303 When inserting the ruer R303 pply some luriction solution on the luminum A173 if needed. VENT SUBASSEMBLY Slide pnel P512 into the groove in profile A151(). Slide profiles A282 on ech side of pnel P512 until they fit the holes on profile A151 ends nd the two holes on pnel P512(c). Connect corners with screws nd nuts. Slide the finl profile A271 until it fits the holes on oth profiles A282 nd the two holes on the pnel P512(d). Connect corners with screws nd nuts. Assemle the hndle A306 to profile A271 nd tighten screws 421() nd nuts 422(). Tighten ll screws nd nuts. A282 c P547 421 422 422 A271 d 421 A271 422 A306 P547 / 1 421 / 2 422 / 2 P303 / 2 A151 / 1 A282 / 2 A271 / 1 A306 / 1

20 21 The rckets A323 should e connected to profile A260 using screws 445(). To instll the vent on the min em luminum profiles A141, hold it t n ngle of 45 reltive to the profile s plne () (slide it to the position etween the two roof luminum profiles A102 (). The hndle A306 should rest on rckets A323 when the vent is in the CLOSED position. In the OPEN position, the vent cn e secured in one of severl ngles, y ctching selected hole in the hndle with the protruding tip of rckets A323. A323 A141 Inside 445 A260 A260 A141 445 / 4 A323 / 2 A306

22 When you mount the pnels on the wlls slide them into the groove in the lower prt of the gutter A136. Assemle pnel P540, s shown in step 23 During the ssemly of the plstic strips PA nd PR you must put pressure on them from the inside s well s the outside, until they snp into plce. Put the pressure t one end of the plstic strip nd continue ll the wy to the other end. Use tool P333. P540 P333 Insert two pnel supports P328 in every wll section, into the predrilled holes in the se. Simply push it until you here CLICK sound. NOTE: The smooth prt of pnel holders should fce the wll pnel. P328 A136 c d e PA351 P540 / 13 P333 / 1 PA351 / 8 P328 / 26

23 Py specil ttention when ssemling the pnels t the front nd the ck of the greenhouse (P546, P544, P545 nd P543). The plstic strips (PA351, PR351 ) should e instlled only fter ALL the pnels (P546, P544 P545 nd P543) re in position. PR351 12 11 PR351 10 P545 PA353 7 P543 16 6 9 PA353 PR351 8 P544 14 13 P540 P540 5 P540 18 P544 PR356 20 P546 PR351 P545 19 P540 PR351 PR351 P540 P540 16 17 2 1 PA351 / 8 PR351 / 14 PA353 / 2 PR356 / 2 P540 / 13 P543 / 1 P544 / 2 P545 / 2 PR351 4 3 PA353 P546 / 1

24 When you mount the pnels on the roof slide them into the groove in the min em A141 nd then slide them, into the groove in A136. In this step you will need to support the structure profiles from the inside. Assemle the plstic strips s shown elow. NOTE: A stepldder will e needed for this step. R360 8 7 PA351 6 5 P580 R360 PA351X3 1 2 P542 3 PA352 4 c c PR351 PA351 PA351 R360 / 2 P580 / 7 P542 / 1 PR351 / 4 PA352 / 2 PA351 / 4

25 26 Insert the door lower trck A192 inside the specil luminum ril A162 (), simultneously with the door wheels into the upper trck A222. After you ssemle the door to its plce, ssemle screw nd nut, into the door stopper hole on profile A222(). Tighten ll screws nd nuts. The greenhouse includes specil screws nd nuts tighten them with resonle force. A222

27 28 Insert the tue T340 from the inside under ech of the roof pnels in the groove of the min em A141(to support the pnel from the inside). Insert the tue T341 from the inside under ech of the wll pnels in the groove of the gutter A136 (to support the pnel from the inside). Outside view A141 T340 307 P399 PUSH HERE Push on the top cover P399 until it clicks. Outside view P399 A136 T341 T340 / 7 T341 / 8 P399 / 2

29 30 Firmly connect the greenhouse to its finl, level position immeditely fter completion of the ssemly, to withstnd high winds effects. The pegs M307 (spikes) re ssemled from the inside of the greenhouse. Mke sure to use the pre-punched notch in the ottom of the se. M307 M307 / 4 P361 / 113