Safe and secure Dero

Similar documents
CYCL E STAT IO N. High Capacity

KO LO SH E LT E R. High Capacity and Flexibility

BIKE DEPOT Parts List B UPRIGHT BACK WELDMENT B (12) 1/4 SELF-DRILL SCREWS (4) 1/2 BOLTS TRUSS WELDMENT C

Secure Bike Parking. Patent Pending Dero

DERO BIKE LOCKER 33. Maximum Security

Next Level Security. This 2-tier locker ships flat to save on freight, comes in galvanized and powder coat finish options, and has a modular design.

Pocket Shelter. Covered bike parking earns your site LEED credits.

Bike Locker Model DBL1 & DBL2

STRATUS SHELTER. Take bike parking to new heights

ULT R A S PACE SAV E R SQ UA R E D

TO O L K IT. Public Bike Repair

ULT R A SPAC E SAV E R

AIR KIT 3. Heavy-Duty Public Bike Pump

S W E RV E RAC K. Simple Security. Simple Stability.

H O O P RAC K. Simple Security

Today s Service Station

KOLO SHELTER Installation Instructions Parts List

Today s Service Station

H O O P RAC K. Simple Security

Allow 60 from door face

Downtown Rack. Custom logo option available

Swerve Rack CUSTOM RACKS AVAILABLE

SADDLE BUDDY EASY ASSEMBLY. The Saddle Buddy is easy to install Galvanized Surface In-Ground. Rail.

ULTRA SPACE SAVER Installation Instructions

BIKE FILE (301)

Independent Containment System (ICS)

Ultra Space Saver American Bicycle Security Company

HOOP RACK HEAVY DUTY Setbacks WALL 36" WALL 42" 36" STREET 59" STREET Dero

96 (Standard Length)

Track Rack. * Track Racks are not lockable

ULTRA SPACE SAVER SQUARED Installation Instructions

May 14, Installation Manual

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

Leveling Feet, Base Plates and Casters

Instruction Guide 4A90L

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

New Product Release: October 2014 Boone Racks

Clopay Models 835/837 Sliding Door System Installation Guide

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

BISON GOOSENECK FOOTBALL 1 PAIR OF GOAL POSTS

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Pergola Installation Guide. When only the best will do.

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

H HD Adult Wheelchair Swing Frame & Hangers(perm) IMPORTANT

LPR System Installation instructions

American Safe Room. Explosion Resistant Blast Hatch with Integrated Riser

WINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS

Connect Transit Shelter

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

Modular Shelter Breezeway Assembly Instructions

INSTALLATION INSTRUCTIONS FOR SL-LB MANUAL LIFT BARRIER GATE ARMS

INSTALLATION INSTRUCTIONS

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS FOR AZTEC SHELTER

ALUMINUM POLE VAULT STANDARDS SPECIFICATIONS

Installation Instructions - Model V4JSD 1

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Bumper Sign INSTALLATION INSTRUCTIONS

Dura-Lock Roof System

BioPrism Solid Surface

BBULTRA Basketball Tower Installation

Fixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i

Hardened Structures Hardened Shelters, LLC. Explosion Resistant Pre-hung Sealed Blast Door

A 1 Vertical Pole I 1 BA47/47A/47P Backboard (2 req d on Model BA872)

DOCK WEDGE - STANDARD

40993 Parts List. Front Bow Assy.(1) Rear Bow Assy.(1)

Double Beam Freestanding Pergola Installation Guide

Introduction. Depending on your kennel project, you may have some or all of the following hardware: Part # Description Part # Description 1468

Assembly Instructions

Storage Cabinets 9000 Series Assembly Instructions

INSTALLATION INSTRUCTIONS SUBURBAN SERIES CARPORT 25 X 20 X 6 LENGTH CAN BE EXTENDED IN 4 1/2 INCREMENTS HEIGHT CAN BE EXTENDED IN 1 INCREMENTS

FXL-168 FIXED RACK ASSEMBLY INSTRUCTIONS SALES ORDER #

Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models

Qwik-Fence Installation Instructions

INSTALLATION INSTRUCTIONS

Windload Post 9100/9600/9900 Installation Instructions

Super Tube Spiral Slide Instructions

INSTALLATION, ASSEMBLY & OPERATIONAL MANUAL

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

MobileTrak5 Installation Instructions

UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS

4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS

Full Height Ladder Safety Gate

Installation Instructions for Bike Fixtation Public Work Stand and Floor Pump Manual RevH

ASSEMBLY INSTRUCTIONS

CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

STEEPLE GATE BARRIER SET INSTRUCTIONS

TABLE OF CONTENTS REQUIRED TOOLS

Horse Shelter 12 x

ASSEMBLY INSTRUCTIONS

Hardware Pkg

8 Ft Wide Enclosure Assembly Guide

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Solar Panel Top-of-Pole Mounting Kit For Panels Over 100 Watts Including CMP Panels

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Sentinel Electronic Safe Installation Guide

.84M Ku-Band Rx/O Antenna System

INSTALLATION INSTRUCTIONS 12' x 18' x 7' FRAME (12 x 20 x 7 ROOF COVERAGE) 2 SQUARE CARPORT

Transcription:

B I K E D E P OT Safe and secure Whether the project is at a transit station, university campus, or residential building, the Bike Depot s modular design lets customers easily build out to meet their space requirements. They also have the option to fully enclose the Bike Depot with heavy-duty wire mesh and double doors to create the perfect, long-term bike station, or keep it open for public accessible, shortterm parking.

B I K E D E P OT Multiple Bike Parking Options The Bike Depot accommodates most Dero bike parking systems. Here are four of the most space-efficient options. Ultra Space Saver 8 Bikes Bike File 12 Bikes Dero Decker 12 Bikes FINISH OPTIONS Galvanized SOLAR POWERED LIGHTING AVAILABLE Powder Coat White Black Light Gray RAL 742 Deep Red RAL Yellow RAL 12 CNH Bright Yellow Orange RAL 24 Beige RAL 11 Iron Gray 711 Hunter Green RAL 65 Light Green RAL 618 Green RAL 616 Sepia Brown RAL 814 Bronze Silver 97 Dark Purple Flat Black Wine Red RAL 5 Gray Brown Thermoplastic Black www.dero.com Green Red 1-888-7-6729 Dero Duplex 14 Bikes

Submittal Sheet 1 5 9 2 CAPACITY MATERIALS Varies Uprights: 4 x /16 square tube. Feet: /8 plate Truss: 4 x1/8 square tube, 1/8 plate, ¼ plate Purlin: 2 x4 x1/8 tube Roof Panels: Type S deck 26g galvanized steel Panels: 2 x2 x/16 wire mesh, 2 x14g square tube 12 (on center) 7 6 (on center) FINISHES Galvanized An after fabrication hot dipped galvanized finish is our standard option. Bike parking capacity using various configurations: Powder Coat Our powder coat finish assures a high level of adhesion and durability by following these steps: 1. Sandblast 2. Epoxy primer electrostatically applied. Final thick TGIC polyester powder coat MOUNT OPTIONS Surface Has 1 square feet which must be anchored to the ground with supplied anchors. Dero Decker 12 Bikes Dero Duplex 14 Bikes SETBACKS Consult local building codes for acceptable setbacks and placement. LOAD DATA Dead load = self weight of structure Live load = 4 psf Wind load = 9 mph exposure B Seismic load = moderate Footing: see page 4 Anchors: 1/2 diameter x 4.25 Simpson Strong-bolt 2 LIGHTING Solar powered lights are available for an additional charge Bike File 12 Bikes Ultra Space Saver 8 Bikes Dero shelters can be used in a modular fashion (shared uprights). However, when used in this manner, please consult a Dero Bike Rack sales associate for layout, as the rack spacing and bike capacity can change!

Parts List A B 5 4 C 2 1 D A (12) 1/4 SELF-DRILL SCREWS 1 UPRIGHT BACK WELDMENT B (4) 1/2 BOLTS 2 TRUSS WELDMENT C (4) 1/2 BOLTS UPRIGHT FRONT WELDMENT D (4) 1/2 DIA. SIMPSON STRONG BOLT 2 ANCHORS.5 MIN. EMBEDMENT 4 5 PURLIN WELDMENT TYPE S DECK 2.5 X.5625

Installation Instructions - Main Structure TOOLS NEEDED Tape Measure Level Hammer Drill Large Hammer Chalk Line Masonry Bits: /8, 1/2 Material Lift or Fork Lift Wrenches: 9/16, /4 Socket Wrench with Sockets: 7/16, 1/2, 9/16, /4 Drive Socket 5/16 Tall Ladder 1 Customer is responsible for preparing the slab with minimum strength of,psi as shown DETAIL E SCALE 1 : 6 HOLES FOR.5" X 5.5" SIMPSON STRONG BOLT 2 (.5" MIN. EMBEDMENT) DRILL HOLES AT INSTALLATION C C SECTION C-C SCALE 1 : 24 4-6" PAD THICKNESS 8" 5/8" REBAR 9" 5/8" REBAR 1'" FOOTING BOTTOM 11'" 7'6" '6" '" '2" 2'6" 1'9" 4 1'1", PSI CONCRETE FOOTING: '6" X '6" X 12" WITH 5-#5 X ' BOTTOM EACH WAY (" CLEAR FROM BOTTOM) D SECTION D-D SCALE 1 : 6 4-6" PAD THICKNESS 8" 5/8" REBAR 9" 5/8" REBAR 1'" FOOTING BOTTOM 15'6" 12'" '6" '" '2" 2'6" 1'9" 1'1" 4

Installation Instructions 12'" '6" 1'9" SECTION A-A SCALE 1 : 6 15'6" 1'9" 12'" A A 7'6", PSI CONCRETE FOOTING: '6" X '6" X 12" WITH 5-#5 X ' BOTTOM EACH WAY (" CLEAR FROM BOTTOM), PSI CONCRETE PAD 4-6" 12'" SIZE DWG. NO. A SCALE:1:1 28-A 1'9" '6" 7'6" 9'" 11'" SHEET OF 12 REV. A

Installation Instructions - Main Structure 2 Rear uprights Front uprights (more holes) Place uprights on concrete pad over footings (see step 1). Confirm all uprights are properly spaced and square. Using the upright foot as a template, drill (4) 1/2 diameter x 6 holes at each upright. Install wedge anchors with nuts finger-tight. See shelter assembly drawing for specific upright placement locations. If there s an elevation change at the uprights, a non-shrink,, psi. grout pad may be used. Longer anchors may be needed to maintain a.5 min. embedment. Lift trusses into place and fasten to uprights with (4) ½ x 1.5 carriage bolts, (4) lock washers, and (4) nuts at each upright. Leave finger-tight. 4 5 Install the purlins with (8) 1/2 x 5.5 bolts, (16) lock washers, and (8) nuts each. Fully tighten after all purlins are in place. Tighten all upright and truss bolts. Place the first section of type S decks and fasten with (4) self-drilling screws to the truss. Place the next section of type S decks with ridges overlapping and fasten with (4) self-drilling screws through both sections to the purlins. Each deck will provide 27.5 of coverage. Continue until done. The last section will require (8) self-drilling screws.

Installation Instructions - Panels 1 2 Place a side panel in the upper position and attach with (2) /8 x 5.5 carriage bolts, (2) /8 carriage bolt washers, (2) /8 washers, and (2) Penta nuts. Leave finger tight. Place a side panel in the lower position and attach with (4) /8 x 5.5 carriage bolts, (4) /8 carriage bolt washers, (4) /8 washers, and (4) Penta nuts. Tighten all (6) bolts. Place and attach the remaining side panels. Place and attach the rear panels with the same method as the side panels. Front Panel Mounting Location For shelters with front panels in place of doors For shelters with doors For shelters with front panels in place of doors For shelters with doors Place and attach the upper front panel in the correct position depending on whether front doors or panels are present.

Installation Instructions - Panels 4 5 For shelters with front panel in place of doors, attach rear panels in the front of the shelter. Attach (4) hinges with (4) /8 x 5 carriage bolts, (4) /8 carriage bolt washers, (4) /8 washers, and (4) Penta nuts at each hinge. If the uprights are not perfectly vertical, a washer may be placed between the hinge and upright to align the axis of the hinges. Leave the bolts fingertight. 6 7 Attach the doors with (1) /8 x 1.75 carriage bolt, (1) brass sleeve bearing, (1) /8 washer, and (1) Penta nut at each hinge. Tighten the Penta nuts. Then tighten hinge Penta nuts. Attach both upper door stops with (2) /8 x carriage bolts, (2) /8 carriage bolt washers, (2) /8 washers, and (2) Penta nuts at each stop.

Installation Instructions - Panels 8 9 Line up top and bottom door stops Anchor the lower door stops to the concrete with (2) /8 x wedge anchors and (2) Penta nuts in place of the hex nuts. The lower door stops should be directly below the upper door stops and just contact the door when it s closed. The left and right lower door stop may be placed slightly off to accommodate some distortion in the doors. Fill the (8) /8 holes in the left door with (8) ¼ x 2.5 carriage bolts, (8) lock washers, and (8) nuts. 1.25 x Carriage Bolt 11 Front Door Stop Spacer 1/4 Washer Door Lock Bar Tube Clamp 1/4 Nylock Nut Attach the door lock bar to the right door with (8) ¼ x carriage bolts, (4) front door stops, (4) spacers, (8) washers, (4) tube clamps, and (8) nylock nuts. Once bolts are tightened the lock bar should rotate freely. Attach the latch assembly and cover with (6) /8 x 1 security bolts, and (6) /8 washers. The latch assembly can be laterally positioned so the lock bar strike enters and exits the latch smoothly.