SECTION PANELBOARDS

Similar documents
SECTION DISTRIBUTION SWITCHBOARDS

SECTION DISTRIBUTION SWITCHBOARDS

B. Manufacturers: Square-D, G.E. or Westinghosue.

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS

Power Processor - Series 700F 10KVA to 150KVA

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

UNIFIED FACILITIES GUIDE SPECIFICATIONS

This section applies to the requirements for the performance of power system studies by both the Design Engineer and the Contractor.

SECTION BULLET- RESISTANT DOORS

Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned

SECTION TRANSFORMERS

SINGLE PHASE BUCK & BOOST TRANSFORMERS INSTRUCTION MANUAL

Electrical Wiring: Commercial, Seventh Canadian Edition

SECTION CABLE TRAYS

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

SECTION MEDICAL AND SURGICAL LIGHTING FIXTURES

UFGS-16553N (Septermber 1999) UNIFIED FACILITIES GUIDE SPECIFICATIONS

DOCUMENT ADDENDUM NO. 4. Issued to all Bidders: Date: October 14, Contract Name: Electrical Installation. Contract Number: C8410

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

A. Deviation from this standard must be approved by the Project Architect.

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

Regal Series Recessed Flatwalls

SECTION MEDIUM-VOLTAGE CABLES

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost

A. Product Data: For each electrical identification product indicated.

SUGGESTED SPECIFICATION for Series 300 Automatic Transfer Switches

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

SECTION ELECTRICAL IDENTIFICATION

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

SECTION METAL FABRICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

PROJECT LOCATION SECTION PREFINISHED STEEL DOOR FRAMES

SECTION HOLLOW METAL DOORS AND FRAMES

CONTINUING EDUC ATION

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS

SECTION BUILDING WIRE AND CABLE

Wisconsin Contractors Institute Continuing Education

NEC 2014 Code Changes

American Electrical Institute

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Chapter 25. Lighting Plans

BGE STRATEGIC CUSTOMER ENGINEERING

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

DESIGN CHECKLIST INTRODUCTION

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

SECTION INTERIOR SIGNAGE

7. INSPECTION AND TEST PROCEDURES

SECTION FINISH HARDWARE

PIRANHA 3 (3-phase, Power Conditioning Voltage Regulator)

2014 NEC Changes Part 1

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

SECTION 16496G CONTACTOR BASED AUTOMATIC TRANSFER SWITCHES LOW VOLTAGE

DPM - Mesta Electronics, Inc. Low Voltage Active Harmonic Filters

Liebert Datawave. GUIDE SPECIFICATIONS kva Magnetic Synthesizer Power Conditioning System 1.0 GENERAL

SECTION 16483D ADJUSTABLE FREQUENCY DRIVE - MICRODRIVE (MVX <10-HP)

Section 16621A - AUTOMATIC TRANSFER SWITCH. Part 1 General

SECTION 16322B SUBSTATION TRANSFORMERS DRY-TYPE

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide

PRODUCT SPECIFICATION FOR A 15 AND 75 kva, THREE PHASE MODULAR POWER DISTRIBUTION SYSTEM WITH REGULATION AND CONDITIONING (Varian)

SECTION AUTOMATIC TRANSFER SWITCH

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

Liebert Datawave GUIDE SPECIFICATIONS kva Magnetic Synthesizer Power Conditioning System

Article 250 Grounding & Bonding

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

LIFE LINE PRODUCT SPECIFICATION FOR A 1 TO 3 KVA, SINGLE PHASE, POWER DISTRIBUTION SYSTEM WITH REGULATION AND CONDITIONING

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

St. Monica Food Pantry

TABLE OF CONTENT

Wiring of the Main Distribution Panelboard

Bovard Studios Inc. Section April 6, 2004 Page 1

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

COMMERCIAL AND INDUSTRIAL FITTINGS: CAST DEVICE BOXES. Applications

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

INTELLIMETER REGISTER

SECTION SWINGING AUTOMATIC ENTRANCES

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SECTION THERAPEUTIC POOL ACCESSORIES

Guide Specification Section Interior Aluminum Doors and Frames

Premium 30 Energy Efficient, Low Voltage Transformers General Purpose, Harmonic Mitigating, and K-Rated

Quality Control Checklist - Design Drawings

Transcription:

PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section and renumber the paragraphs. A. This section specifies the furnishing, installation, and connection of panelboards. 1.2 RELATED WORK A. Section 09 91 00, PAINTING: Painting of panelboards. //B. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Requirements for seismic restraint of non-structural components.// C. Section 25 10 10, ADVANCED UTILITY METERING: Requirements for electrical metering. D. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Requirements that apply to all sections of Division 26. E. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES: Low-voltage conductors. F. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible ground fault currents. G. Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduits. //H. Section 26 05 73, OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY: Short circuit and coordination study, and requirements for a coordinated electrical system.// I. Section 26 09 23, LIGHTING CONTROLS: Lighting controls integral to panelboards. J. Section 26 43 13, SURGE PROTECTIVE DEVICES: Surge protective devices integral to panelboards. 1.3 QUALITY ASSURANCE A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. 26 24 16-1

1.4 SUBMITTALS A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit sufficient information to demonstrate compliance with drawings and specifications. b. Include electrical ratings, dimensions, mounting details, materials, required clearances, terminations, weight, circuit breakers, wiring and connection diagrams, accessories, and nameplate data. SPEC WRITER NOTE: Include the following paragraph for projects in seismic areas of moderate-high, high and very high seismicities as listed in Table 4 of VA Handbook H-18-8, Seismic Design Requirements. Coordinate with the structural engineer. //c. Certification from the manufacturer that a representative panelboard has been seismically tested to International Building Code requirements. Certification shall be based upon simulated seismic forces on a shake table or by analytical methods, but not by experience data or other methods.// 2. Manuals: a. Submit, simultaneously with the shop drawings, complete maintenance and operating manuals including technical data sheets, wiring diagrams, and information for ordering circuit breakers and replacement parts. 1) Include schematic diagrams, with all terminals identified, matching terminal identification in the panelboards. 2) Include information for testing, repair, troubleshooting, assembly, and disassembly. b. If changes have been made to the maintenance and operating manuals originally submitted, submit updated maintenance and operating manuals two weeks prior to the final inspection. 3. Certifications: Two weeks prior to final inspection, submit the following. a. Certification by the manufacturer that the panelboards conform to the requirements of the drawings and specifications. 26 24 16-2

b. Certification by the Contractor that the panelboards have been properly installed, adjusted, and tested. 1.5 APPLICABLE PUBLICATIONS A. Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only. B. International Code Council (ICC): IBC-15...International Building Code C. National Electrical Manufacturers Association (NEMA): PB 1-11...Panelboards 250-14...Enclosures for Electrical Equipment (1,000V Maximum) D. National Fire Protection Association (NFPA): 70-17...National Electrical Code (NEC) 70E-18...Standard for Electrical Safety in the Workplace E. Underwriters Laboratories, Inc. (UL): 50-15...Enclosures for Electrical Equipment 67-09...Panelboards 489-16...Molded Case Circuit Breakers and Circuit Breaker Enclosures PART 2 - PRODUCTS 2.1 GENERAL REQUIREMENTS A. Panelboards shall be in accordance with NEC, NEMA, UL, as specified, and as shown on the drawings. B. Panelboards shall have main breaker or main lugs, bus size, voltage, phases, number of circuit breaker mounting spaces, top or bottom feed, flush or surface mounting, branch circuit breakers, and accessories as shown on the drawings. C. Panelboards shall be completely factory-assembled with molded case circuit breakers and integral accessories as shown on the drawings or specified herein. D. Non-reduced size copper bus bars, rigidly supported on molded insulators, and fabricated for bolt-on type circuit breakers. E. Bus bar connections to the branch circuit breakers shall be the distributed phase or phase sequence type. 26 24 16-3

F. Mechanical lugs furnished with panelboards shall be cast, stamped, or machined metal alloys listed for use with the conductors to which they will be connected. G. Neutral bus shall be //100%//200%//rated, mounted on insulated supports. H. Grounding bus bar shall be equipped with screws or lugs for the connection of equipment grounding conductors. I. Bus bars shall be braced for the available short-circuit current as shown on the drawings, but not be less than 10,000 A symmetrical for 120/208 V and 120/240 V panelboards, and 14,000 A symmetrical for 277/480 V panelboards. J. In two-section panelboards, the main bus in each section shall be full size. The first section shall be furnished with subfeed lugs on the line side of main lugs only, or through-feed lugs for main breaker type panelboards, and have field-installed cable connections to the second section as shown on the drawings. Panelboard sections with tapped bus or crossover bus are not acceptable. K. Series-rated panelboards are not permitted. 2.2 ENCLOSURES AND TRIMS A. Enclosures: 1. Provide galvanized steel enclosures, with NEMA rating as shown on the drawings or as required for the environmental conditions in which installed. 2. Enclosures shall not have ventilating openings. 3. Enclosures may be of one-piece formed steel or of formed sheet steel with end and side panels welded, riveted, or bolted as required. 4. Provide manufacturer s standard option for prepunched knockouts on top and bottom endwalls. 5. Include removable inner dead front cover, independent of the panelboard cover. B. Trims: 1. Hinged door-in-door type. 2. Interior hinged door with hand-operated latch or latches, as required to provide access only to circuit breaker operating handles, not to energized parts. 3. Outer hinged door shall be securely mounted to the panelboard enclosure with factory bolts, screws, clips, or other fasteners, 26 24 16-4

requiring a key or tool for entry. Hand-operated latches are not acceptable. 4. Inner and outer doors shall open left to right. 5. Trims shall be flush or surface type as shown on the drawings. 2.3 MOLDED CASE CIRCUIT BREAKERS A. Circuit breakers shall be per UL, NEC, as shown on the drawings, and as specified. B. Circuit breakers shall be bolt-on type. C. Circuit breakers shall have minimum interrupting rating as required to withstand the available fault current, but not less than: 1. 120/208 V Panelboard: 10,000 A symmetrical. 2. 120/240 V Panelboard: 10,000 A symmetrical. 3. 277/480 V Panelboard: 14,000 A symmetrical. SPEC WRITER NOTE: Edit the paragraph below to conform to project requirements. D. Circuit breakers shall have automatic, trip free, non-adjustable, inverse time, and instantaneous magnetic trips for less than 400 A frame. Circuit breakers with 400 A frames and above shall have magnetic trip, adjustable from 5x to 10x. //Breaker trip setting shall be set in the field, based on the approved protective device study as specified in Section 26 05 71, ELECTRICAL SYSTEM PROTECTIVE DEVICE STUDY// //Breaker magnetic trip setting shall be set to maximum, unless otherwise noted//. E. Circuit breaker features shall be as follows: 1. A rugged, integral housing of molded insulating material. 2. Silver alloy contacts. 3. Arc quenchers and phase barriers for each pole. 4. Quick-make, quick-break, operating mechanisms. 5. A trip element for each pole, thermal magnetic type with long time delay and instantaneous characteristics, a common trip bar for all poles and a single operator. 6. Electrically and mechanically trip free. 7. An operating handle which indicates closed, tripped, and open positions. 8. An overload on one pole of a multi-pole breaker shall automatically cause all the poles of the breaker to open. 9. Ground fault current interrupting breakers, shunt trip breakers, lighting control breakers (including accessories to switch line 26 24 16-5

currents), or other accessory devices or functions shall be provided where shown on the drawings. SPEC WRITER NOTE: Delete the paragraph below if not required by the project. //10. For circuit breakers being added to existing panelboards, coordinate the breaker type with existing panelboards. Modify the panel directory accordingly.// 2.4 SURGE PROTECTIVE DEVICES A. Where shown on the drawings, furnish panelboards with integral surge protective devices. Refer to Section 26 43 13, SURGE PROTECTIVE DEVICES. PART 3 - EXECUTION 3.1 INSTALLATION A. Installation shall be in accordance with the manufacturer s instructions, the NEC, as shown on the drawings, and as specified. B. Locate panelboards so that the present and future conduits can be conveniently connected. //C. In seismic areas, panelboards shall be adequately anchored and braced per details on structural contract drawings to withstand the seismic forces at the location where installed.// D. Install a printed schedule of circuits in each panelboard after approval by the //Resident Engineer// //COR//. Schedules shall reflect final load descriptions, room numbers, and room names connected to each circuit breaker. Schedules shall be printed on the panelboard directory cards and be installed in the appropriate panelboards E. Mount panelboards such that the maximum height of the top circuit breaker above the finished floor shall not exceed 1980 mm (78 inches). F. Provide blank cover for each unused circuit breaker mounting space. SPEC WRITER NOTE: Delete the paragraphs below if not required by the project. //G. For panelboards located in areas accessible to the public, paint the exposed surfaces of the trims with finishes to match surrounding surfaces after the panelboards have been installed. Do not paint nameplates.// //H. Rust and scale shall be removed from the inside of existing enclosures where new interior components are to be installed. Paint inside of enclosures with rust-preventive paint before the new interior 26 24 16-6

components are installed. Provide new trim. Trim shall fit tight to the enclosure.// I. Panelboard enclosures shall not be used for conductors feeding through, spliced, or tapping off to other enclosures or devices. 3.2 ACCEPTANCE CHECKS AND TESTS A. Perform in accordance with the manufacturer's recommendations. In addition, include the following: 1. Visual Inspection and Tests: a. Compare equipment nameplate data with specifications and approved shop drawings. b. Inspect physical, electrical, and mechanical condition. c. Verify appropriate anchorage and required area clearances. d. Verify that circuit breaker sizes and types correspond to approved shop drawings. e. To verify tightness of accessible bolted electrical connections, use the calibrated torque-wrench method or perform thermographic survey after energization. f. Vacuum-clean enclosure interior. Clean enclosure exterior. 3.3 FOLLOW-UP VERIFICATION A. Upon completion of acceptance checks, settings, and tests, the Contractor shall demonstrate that the panelboards are in good operating condition and properly performing the intended function. ---END--- 26 24 16-7