UPPER FLOORS TIMBER AND CONCRETE

Similar documents
Posi-Joist Installation Guide. A guide for storage, handling and installation of the MiTek Posi-Joist floor system

WALL TO FABRICATED FLOOR

BRACING BRACING SECTION 7 SECTION 7

Installation of MagFloor 100

VERSA-LAM. An Introduction to VERSA-LAM Products

NORMAL WEIGHT CONCRETE TOTAL-LEWIS-DECK GYPSUM BOARD 2 OR 3-PLY COMPOSITE TOTALJOIST TOP CHORD CONNECTION

hyjoist Options Range Installation Guide

Acceptable Standards of Domestic Construction

GlasRoc Sheathing Type X

F I X I N G B R O C H U R E

A. Rough carpentry includes but is not limited to the following:

Measuring Timber Pitched Roofs in Accordance with ARM4

3.1 General Provisions

INSTALLATION GUIDE Timber Stairs

Strong, lightweight composite structural I -Beam.

Sections & Details. WOOD SILL and FLOOR CONSTRUCTION NOTES

SECTION ROUGH CARPENTRY 1.1 DESCRIPTION OF WORK:

FASTENERS BUILDING DEPARTMENT

ISSUE Erection Manual

LVL8 H1.2 GENERAL FRAMING. Eco Friendly Revolutionary H1.2 Treatment Azotek by Zelam

Glulam Connection Details

General Installation Guidelines

BASIC ROOF and CEILING FRAMING

METSÄ WOOD SPRUCE PLYWOOD MANUAL


nineteen Wood Construction 1 and design APPLIED ARCHITECTURAL STRUCTURES: DR. ANNE NICHOLS FALL 2016 lecture STRUCTURAL ANALYSIS AND SYSTEMS ARCH 631

TECHNICAL MANUAL. TERADOWEL and ULTRADOWEL. Reliable Dowel System for Floor Joints

Chapter 33: Lofts (Or Second Floors)

Core Curriculum Carpentry 1 Carpentry 2 Carpentry 3

ROOF-CEILING CONSTRUCTION

Dave's Glossary of Construction Terms. by Dave Osborne (

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

RIDGE-JOIST CONNECTION 12/12 maximum slope

Timber to Timber - Timber to Concrete - Timber to Steel

SINGLE PIECE MASONRY HANGERS

INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4

Installation Guide: Timber stairs. A Guide to safe stair installation from the BWF Stair Scheme

Wall and Ceiling Framing

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

WHY YOU SHOULD USE TUFFLOOR. components

Ijoist floor framing book. Ijoist floor framing book.zip

Beam & Header Technical Guide. LP SolidStart LVL. 2900F b -2.0E. U.S. Technical Guide U.S. TECHNICAL GUIDE

Determine the stairway pitch based on tread and riser dimensions. For the main stairway in a house, the pitch can be no greater than 37º.

Roofs SECTION. Contents for this section: Components and Elements of Roofs

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

Expressed Hardwood Structures

Wood structures Copyright G G Schierle, press Esc to end, for next, for previous slide 1

Sections & Details VOCABULARY

Chapter 7 - Porch Framing

Timber Flooring. Introduction

Drywall, Wood and Truss Uplift

KS SERIES - VERTICAL INSTALLATION

ALPINE. Trussed Rafter Guide. MCL T-GL 005. Advancing timber fabrications through design : components : manufacture

Site Installation Guide

Strands & Standards CARPENTRY 2

Garage Design Guide. October 2018

AUSTRALIAN HARDWOOD AND CYPRESS

Cl/SfB (23.9) VALUE OPEN WEB FLOOR SOLUTION. ALPINE. Advancing timber fabrications through design : components : manufacture

SECTION ROUGH CARPENTRY

Installation Guide: Timber stairs. A Guide to safe stair installation from the BWF Stair Scheme

method of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT

YWY M08 The new VELUX solution

Experienced Worker Assessment Blueprint Carpentry

Catnic Pontypandy Industrial Estate Caerphilly CF83 3GL T: F: English version

GloEx Product List Assessment-Nail Selection

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Belmont with pocket doors. Building Size 12'x16' or 12'x20' Revised January 10, 2012

Builders Metalwork Product Selector

Joshua Woodsman

Vinyl Gazebo Instructions

Connections in CLT Assemblies

TOPSPAN 22 / 40 LYSAGHT TOPSPAN 22 / 40. Steel roof and ceiling battens for non cyclonic applications

Carpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.

Introducing AJSTM INSTALLATION GUIDE USA. 8 th Edition USA

Nepal Housing Reconstruction Programme

THE ENGINEERED WOOD ASSOCIATION

Material List for Log Complete Packages

fischer Test Report Fixing Tests for Fastfloor and Hollowcore Units

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

Forming and Shoring Product Selector

hy JOIST futurebuild structural lvl design & Installation Guide: 2.1 december 2013

Best Barns USA Assembly Book

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

LP SolidStart LSL. LP SolidStart LSL Prescriptive Roof Framing Technical Guide 2500F b-1.75e, 2360F b -1.55E and 1730F b -1.

Featuring TJ Rim Board and TimberStrand LSL

Table of Contents. e-joist Design Information Page 2. Floor Joists Supporting Floor and Ceiling Loads Only 3. e-joist Construction Information 4

AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM

10, 12 &14 Oval Gazebo Floor

ASSEMBLY INSTRUCTIONS SS2520. BASE SIZE: 2.520m x 2.020m

9.1. Door Assembly Coordination. Ÿ Architrave is not described in

H20 Beam for Elevated Slabs Application Guide

GLOSSARY OF TERMS SECTION 8

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND

Slope Floor. Measurement Methods

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

ASSEMBLY INSTRUCTIONS GL75. BASE SIZE: 2.190m x 1.520m

NewTech - CleverDeck Composite Decking Installation Guidelines

How-To-build guide Garden shed

Artificial Grass. Fitting Guide

CSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated

Transcription:

UPPER FLOORS TIMBER AND CONCRETE

FUNCTIONS OF AN UPPER FLOOR Functions: Support imposed loads Not deflect under load Strength and stability Provide restraint for external walls Fire resistance (30 minutes) Limit sound transmission Principle Large timbers known as joists span from wall to wall on which a decking is placed to form a level floor

PLACEMENT OF JOISTS Joists are normally placed in position when blockwork has reached the required level Joists are spaced at 400mm c/c Rule of thumb calculation for depth of joists Span of joist in mm + 50mm 24 Example 4m span 4000/24 + 50 = 217mm use a 225 joist

CROSS SECTION: GROUND & UPPER FLOORS

CONSTRUCTION DETAILS Secured to wall at ends Built in 90mm min. Bearing End grain treated with preservative Mortar packed solidly around joist Note end of joist is tapered

JOIST BUILT INTO WALL

CONSTRUCTION DETAILS Secured to wall Galvanised steel joist hanger built into wall

JOIST HANGERS

CONSTRUCTION DETAILS Secured to parallel walls Bridging to prevent twist

INTERNAL WALLS The ends of the joists may be rested on a wall plate on top of an internal partition although in practice the wall plate is often omitted This provides a sound, uniform bearing with maximum distribution of the loads. Where joists from either side meet on a load bearing wall, they are usually placed side by side and nailed to each other with laps of at least 150 mm

BRIDGING / STRUTTING As the span of the joists increases ( above 3 m ) there is a tendency for the joists to twist which could cause damage to the ceiling below. To prevent this twisting, strutting is usually included if the span of the floor exceeds 2.5 m. There are two forms of strutting, HERRINGBONE STRUTTING SOLID STRUTTING

SOILD BRIDGING / STRUTTING Used to to tie joists together so that: The load is distributed over a number joists To prevent joists from twisting Bridging should be in a straight line Lines of bridging should be positioned no greater than 1350mm apart

BRIDGING

HERRINGBONE BRIDGING / STRUTTING Herringbone strutting is made up of approx 35 x 35 mm timbers with their ends cut at an angle and nailed together where they intersect and to the top of one joist and the bottom of the next. The space between the first and last joist and the adjoining wall is wedged with folding wedges to take the thrust of the strutting.

OPENINGS IN UPPER FLOORS Doubled or thicker joists stairwell ope joist hanger internal load bearing wall

STAIR OPENING IN UPPER FLOOR

OPENINGS IN UPPER FLOORS The trimming joist and the trimmer joist are increased in thickness by 25 mm from 225 x 50 mm to 225x 75 mm because of the extra weight they have to carry. The trimmed joist has no extra weight to bear so its dimensions are unaltered at 225 x 50 mm.

OPENINGS IN UPPER FLOORS Floor joists around openings such as stair wells and fire hearths must be self supporting. In order to achieve this the sections of timber around the opening must be bigger to cope with the extra stresses. In having to maintain a level floor and ceiling the increases must be in the width of the joists and is usually 25 mm. There are a number of jointing methods that can be used between the TRIMMING, the TRIMMER and the TRIMMED joists. Strong and soundly constructed joints are required between the trimming members, and the tusk tennon joint is often advocated for its strength.

TUSK TENON JOINT Used to join a trimmer joist to a trimming joist

COMMON JOINTS USED IN FLOOR JOISTS Joints used between trimmed joists and trimmer joist Housed joint and dovetailed notch while very good would be very labour intensive thus costly

COMMON JOINTS USED IN FLOOR JOISTS Two most commonly used methods of forming the joint between the trimmed joists and the trimmer Note the larger section of timber used for the trimming joist and the trimmer joist

TYING FLOORS TO EXTERNAL WALLS It necessary to strap floor joist to external walls for stability L Straps to be 30X5mm galvanised steel Straps to be located at 2m c/c max Straps to tie in at least 3 joists with bridging between joists under strap Straps are placed as work is in progress

JOISTS RUNNING PERPENDICULAR TO PARTY WALL Where possible joists should always run parallel to party wall Joists should never be set into party wall

JOIST RUNNING PERPENDICULAR TO PARTY WALL Joist hangers may be used as an alternative to setting the ends of joists into a party wall

SERVICES IN JOISTS

SERVICES IN JOISTS

SOUNDPROOFING UPPER FLOORS Sound travels in two ways AIR BORNE SOUND IMPACT SOUND In order to reduce the transmission of sound between upper and ground floors a FLOATING FLOOR must be provided.

SOUNDPROOFING UPPER FLOORS To reduce the transmission of Air-borne sound the density of the floor will need to be increased. This can be achieved by including 50-75 mm of sand pugging between the joists. The weight of the sand should be carried on the joists ( and not on the ceiling slab ) by fixing a 44 x 20 mm batten to the bottom of the joist. A strip of 12 mm ply can be fitted between the joists on top of which the sand is placed. The floating floor gets its name from the actual construction of the floor. A 50 mm resilient quilt is laid over the top of the joists. 50 x 50 mm battens are laid on top of the quilt directly over the joists and the floor boards are nailed to the battens. The battens are not nailed to the joists. This in effect isolates the floor surface from the ceiling below - thus reducing the transmission of Impact sound.

SOUNDPROOFING UPPER FLOORS

CONCRETE UPPER FLOORS Two methods; BOTH METHODS WILL REQUIRE A FINISH SCREED BOTH METHODS REQUIRE EXTRA SUPPORT I.E. BLOCK ON FLAT AT GROUND FLOOR LEVEL Pre-cast / hollow core concrete slabs Easy to use Relatively lightweight ( compared to solid) Very fast to install May require drilling to accommodate services Solid poured floor Slow to install A lot of support required Easier to accommodate services Better thermal and sound insulation

PRE-CAST SLABS

PRE-CAST SLABS

PRE-CAST SLABS

PRE-CAST SLABS Concrete screed to be poured over slabs incorporating all services

POURED FLOOR

POURED FLOOR

POURED FLOOR

POURED FLOOR

FLOOR FINISHES Functions: Appearance / colour / texture Durability / resistance Hygiene / ease of cleaning Vinyls Carpets Tiles Timber