Restoration Project Photo Essay Page 202

Similar documents
Restoration Project Photo Essay

How to install backchecks

A S e r v i ce Manual

Restoration Project / Cable upright Photographic Journal Page 27

KAWAI GRAND PIANO REGULATION MANUAL

Replacing Hammer Butt Springs in the Upright Action

Dampers - number, remove, check bushings/springs, rebush or replace, if nec. Brush spoon felts and replace if nec. Lube (dry e.g.

Photographic Journal Deep Cleaning / Deodorization Project 1887 Weber grand Behm Piano Service, Boone, Iowa

The Owner's Guide to Piano Repair Focus On: Replacing Upright Hammer Butt Springs

Service Technicians Manual GRAND PIANOS MECHANISM REGULATION

WESTERN PISTOL.22 CALIBER SINGLE SHOT. Entire pamphlet Copyrighted by JACO Designs 1972

Using The Renner Flange Bushing Cloth Bill Spurlock

Ball-Joint Scrapers Steel Blade Carbide Blade 05K K21.04

Vertical Hammer Replacement...

Action Frame Inspection and Repair. DEFINITIONS action spread vertical height differential rake

The Owner's Guide to Piano Repair Focus On: Repairing a Separated Back on the Vertical Piano

J D SQUARED INC. NOTCH MASTER Tube and Pipe Notcher Operating Instructions

BUILDING A STORM DOOR

The Owner's Guide to Piano Repair Focus On: Routine Maintenance for Your Vintage Upright Piano

Set Part # Rev

APACHE HINGE REPLACEMENT PROJECT

PRO 400 M401 MFP M425 CF-280A/X TONER CARTRIDGE REMANUFACTURING INSTRUCTIONS

!! " # $ % & '! ( ) * +, -

Be sure to oil your machine as instructed below. To avoid spotting on garments being embroidered, oil the machine sparingly.

Ford Ranger / Bronco II Set Part # Rev B 5-04

SAW-PIERCING. 79. Fig. 29. Placing new blade in saw-frame.

Hand Tool Identification Worksheet. Name: Screw driver. Purpose: To turn the screws. Name: chisels. Purpose: To remove/chip away materials

Windsor Chair Online. Assembly Instructions

Kentucky 4H Wood Science Plans Notebook. Plans Level 2

The Owner's Guide to Piano Repair Focus On: Brass Rail Repair

Bowser drive assembly.

Refurbishing Your Lincoln Mark VII Dew Wipes

Pump Assembly. Lloyd Matthews September 2013

Wagon Vise Retrofit Installation Instructions. American Craft Woodworks. Wagon Vise

Big Oz. Rocket. User Guide V0313

Woodcraft, 210 Wood County Industrial Park, P.O. Box 1686, Parkersburg, WV

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

Berea Hardwoods Survival Ballpoint Pen

ARTS AND CRAFTS CHAIR

Assembly, Use and Care Instructions

MAKER LAB Safety Instructions Power Tool Training

Maintenance & Parts list for:

28 mm. 18 mm. 14 mm. 10 mm Length to fit. 7 mm. 16 mm. 7.5 mm. 18 mm 10 mm 25 mm. 3 mm.032 Brass. Wire. Figure 1: Ground Throw Components

Page 124. Restoration Project Photo Essay. Photo 251: Stringing tools are laid out and ready to go.

Darjeeling Coach 4-Wheel First/Second Class

Clocking a TD-04 Turbo Compressor Housing. Appendix A : AWIC Silicone and Tubing Fitting

BUILDING A GHOST GLOCK. Prepper Mike

Adjustable Hammered Dulcimer Stand

1 of 12 5/24/2015 9:43 AM

Practical Scrap Metal Small Arms Vol.10 By Professor Parabellum

Fig2: The Sliding Glue Block from the back.

Assembly Instructions 10 X 10 Aluminum Frame Building

Scratchbuild A Backwoods Water Tank Part V - Making the Frost Box and Hanging the Water Spout

Tortoise Switch Machines, Mounted Horizontally

Boxtrot. Tools. Materials:

FORWARD FUSELAGE SIDES & REAR TOP SKINS

Instructions: PS-2CD 4000 Model Kit Revised 7/2008

Gold Wire Paper Clip Chain Wire Jewelry Making Pattern #103

Shay Tender Frame Fabrication

Various Bolt Removal Process

CUT OUT FLARES INSTALLATION INSTRUCTIONS FOR 20017, 20018, F100-F150 F250-F350 P.U. & BRONCO CUT OUTS

The finished ornaments.

Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions

WPS crew Doors Installation instructions

Building Instructions Diva cabin boat

About.com :

G. Building the Cab, Cab Roof and Cab Boiler Extension Page 14 and Backhead.

Be sure any accessory used will fit with the soft upper doors before installing. Not all accessories will be compatible.

Building a 30 Turntable

Assembly instructions

Instructions for Lighting an S Scale Caboose

Upright Hammer Replacement

Bulle Clock Serial Number 57561

No-Mar tip conversion/replacement procedure

MOXON VISE. History. Contents: (2) Cast iron handwheel (2) acme screw (4) acme nut (2) thick washer (1) Crubber jaw liner

Solo AD Style DIY Acoustic Guitar Kit

Star Trek TOS communicator upgrade kit Install instructions Hyperdyne Labs 2002

Art Rack Assembly Instructions:

15 Dovetail Jig. Instruction Manual. Part # 3452

Car Construction E-Book

An All-Balsa Sportster

EllisSaw.com. EllisSaw.com P.O. Box Verona, WI

Make your own zero clearance throat plate.

Grinders, Sanders, Drills, Lathes, Saws, Shear, Break, Punch, And Roller

Bullet Pen Casing. Contributed by: David Bell. This tutorial was downloaded from.

HP M506/MFP M527 CF-287A/X

How I Made My Aluminum Slim Line Pen

Invisible Ivory Keytop Replacement

Dillon XL 650 Spent Primer Catch Upgrade Instructions. (Please read through all of the steps before beginning.)

Invisible Clip Tutorial

Various Bolt Removal Process

Part 2 Section 2 POINTWORK

Razr Adapter Retrofit Project by Craig Hoy, Edmonton, AB, Canada

All American Mower Blade Sharpener Mulching Blade Model Patent Pending

Greene & Greene. Mailbox. by Seth Keller. Signature details create an elegant box. 2 AmericanWoodworker.com

ADVANCED ROTARY CUTTER & TABLE EDGE ADVANCED ROTARY CUTTER

TURNING A PEN ORIGINAL BY MIKE RUDE REVISED BY GORDON PATNUDE - AUGUST 2015, OCTOBER 2016 EQUIPMENT AND SUPPLIES NEEDED

ASSIGNMENT 4. Textbook Assignment: The point, edge, face, heel, and tang are the five parts of which of the following tools?

Christmas Bell Ornament

UNPACK & ASSEMBLY. Done! CAUTION! THE MILL WILL BE VERY HEAVY - GET ASSISTANCE Pepe Tools.

Transcription:

Restoration Project Photo Essay Page 202 Photo 397: A new pile of work is ready for me to dive into. The whippens, removed from the action when it was disassembled and piled in a heap, have not been touched since. Photo 398: The first stage to the process of revitalizing the whippens is to set up a work area. The scrap piece of pinblock material will serve as a cutting board to use in slicing off the old felt of each whippen.

Restoration Project Photo Essay Page 203 Photo 399: The sticker cloth is cut off of the bottom of the sticker using a sharp chisel in a swivel motion with the point firmly planted in the chopping block. Photo 400: The backcheck felt is also removed using the chisel. The flat side of the chisel stays toward the wooden backcheck to prevent gouging.

Restoration Project Photo Essay Page 204 Photo 401: Glue and felt adhering to the wooden backcheck are scrapped off leaving a clean surface to glue new backcheck felt onto. Photo 402: A broken jack spring signals the necessity to replace the entire set of springs. Once a particular part start breaking, total replacement of that part is the best course of action to avoid problems down the road.

Restoration Project Photo Essay Page 205 Photo 403: By placing each whippen in the vise, and using a pair of needle nose pliers, the old springs are extracted. The bottom coil of each spring rests in a well. The original springs are ordinarily glued into place. The old glue in this case is brittle, and the springs break loose easily. Photo 404: A jack spring hole reamer attached to an electric drill makes short work of cleaning out well.

Restoration Project Photo Essay Page 206 Photo 405: The well cleaned and ready for a new spring. Photo 406: Before anything new is added, however, a burnishing of the bridle strap wires with a miniature wire brush in a Dremel tool is done as a final touch in the cleaning up process.

Restoration Project Photo Essay Page 207 Photo 407: Modern art. If this were 20 feet across, signed by Pablo Picasso and hanging in an art gallery, it would be worth millions. I've obviously missed my calling in life. Photo 408: The whippens, now on the opposite side of the bench, are now stripped clean and ready for refelting.

Restoration Project Photo Essay Page 208 Photo 409: The hot glue, which has been on for some time, is checked for the correct degree of runniness. Constant monitoring is required to keep the glue at the optimum consistency. The addition of a little water, or a few glue crystals are needed from time to time. Photo 410: The bottom coil of the jack spring is swabbed with hot glue.

Restoration Project Photo Essay Page 209 Photo 411: The bottom coil of the spring is then inserted into the well. Photo 412: The whippens are then placed on a rack with the springs straight up and down while the glue cools and cures.

Restoration Project Photo Essay Page 210 Photo 413: Remaining vestiges of stubborn dirt around the bridle wire and the backcheck wire is removed with a stiff bristle brush. Photo 414: Dag 154 Graphite lubricant is applied with an artist brush to the nose of each jack. This aids in the free functioning of the jack as it propels the hammer towards the strings. At the last moment before the hammer makes impact, the jack slips out from the hammer butt buckskin, so that the hammer strikes the strings under its own momentum.

Restoration Project Photo Essay Page 211 Photo 415: The heel of each jack is likewise lubricated with Dag, so that it slips freely from under the regulating button once contact is made. Photo 416: Newly coated with Dag, the whippens are placed back in the rack to dry once again.

Restoration Project Photo Essay Page 212 Photo 417: Backcheck cloth is cut from precut strips. Photo 418: Each backcheck is coated with hot glue.

Restoration Project Photo Essay Page 213 Photo 419: The backcheck cloth is positioned and held firmly in place for several seconds. Photo 420: A miniature clamp is then applied with a small rectangle of veneer used to even out the pressure over the length of the cloth.

Restoration Project Photo Essay Page 214 Photo 421: For one final time, the whippens are returned to the drying rack to allow the glue to cure. Photo 422: The last two pieces of felt are made ready. The brown sticker cloth is razor cut from a long roll. The hammer butt felts for the topside of the jacks comes precut.

Restoration Project Photo Essay Page 215 Photo 423: A square of sticker cloth is glued with hot glue to the bottom of the sticker. This is the contact point between the brass capstan at the back of the key and the whippen. Photo 424: The final piece of felt to be replaced is the square of hammer butt felt which is glued to the topside of the jack.

Restoration Project Photo Essay Page 216 Photo 425: The next order of business is to slice the old felt punchings off of the regulating buttons of the let-off rail with a sharp chisel. A light sanding with 100 grit paper finishes this job. Photo 426: Once the punchings are removed, the rail itself is cleaned with a stiff brush.

Restoration Project Photo Essay Page 217 Photo 427: New punchings are glued into place with hot glue. Photo 428: The newly refelted let-off rail.

Restoration Project Photo Essay Page 218 Photo 429: The flange screws used to attached the whippens to the action are now polished on the wire wheel. My daughter, volunteering to help, took each screw from its numbered hole in the screw holder, polished them, and tossed them in the lid of a jelly jar. Ah, well. Never criticize your children for being helpful. Photo 430: The whippens are laid out on the bench in the correct order for reattachment.

Restoration Project Photo Essay Page 219 Photo 431: The jack is held open... Photo 432:...and slid into the action on the front side of the main action rail, while the whippen flange goes in behind it.

Restoration Project Photo Essay Page 220 Photo 433: Leaning over the top of the action to start the screw for the whippen flange works well. Photo 434: The sticker flange screw is inserted into the lower action rail.

Restoration Project Photo Essay Page 221 Photo 435: The jack spring is compressed slightly with a pair of needle nose pliers, so that its upper coil may be inserted into the well on the bottom of the heel of the jack. Photo 436: The tab on each bridal strap is inserted onto the bridal wire with one hand, while a finger of the other hand trips the jack so that it's in the correct position.

Restoration Project Photo Essay Page 222 Photo 437: The bridal wire is bent slightly to the front or to the back in order to produce just a bit of clearance between the nose of the jack and the hammer butt buckskin. Photo 438: With the whippens all reinstalled, the action is returned to the piano for the time being.

Restoration Project Photo Essay Page 223 This just won't do at all. With the installation of the whippens a done deal, my attention will next turn to the keys. They are, to put it mildly, in sorry condition. Capstans will be removed and polished, and new molded keytops and new bushings will be installed, but only after a thorough cleaning of each keystick to eliminate all traces of the mouse colony which spent so many years traipsing up and down on top and underneath the keys. Not the most pleasant of jobs, I will assure you, but one that must be attended to and quickly, in that only nine short days remain before the piano is scheduled to be picked up. Yikes! Pass me the Mountain Dew! I need a shot of caffeine!