SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS:

Similar documents
SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED REFRIGERANT PIPING AND SPECIALTIES MAT. LIST & CERT. SUBMITTAL NUMBER:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED PLANTS PHOTOGRAPHS/ANCHORING SYSTEMS -RESUBMITTED 1 TIME(S) SUBMITTAL NUMBER:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

SECTION SUBMITTAL PROCEDURES

Submittal Packages Detailed with Items and Reviewers

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

Section Meetings Section Material and Equipment. None Required

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION OPERATION AND MAINTENANCE DATA

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

LETTER OF TRANSMITTAL

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

submittals 1s e c t i o n

Heat Exchanger Construction Checklist

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SUBMITTAL REVIEW COVERSHEET

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

A. Section includes administrative and procedural requirements for project record documents, including the following:

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

Ductwork Construction Checklist

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Vanderbilt University Standard Specification Revised 2/6/08

Jacksonville District Master

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

East Central College

APPLICATION FOR COMMERCIAL CONSTRUCTION FIRE AND LIFE SAFETY PLAN REVIEW PROJECT INFORMATION: Project phone: Project Address: City: State: Zip:

Facility Services Subgroup Preface for Divisions 21` through 28

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

Submittal Packages Detailed with Items and Reviewers

LETTER OF TRANSMITTAL

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

SECTION SUBMITTAL PROCEDURES

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SECTION SUBMITTAL PROCEDURES

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

Submittal Transmittal

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

This specification describes the general requirements for Engineering Services provided to Vale.

ARCHITECTURAL REVIEW COMMITTEE TOWN APARTMENT CONSTRUCTION SUBMITTAL FORM AND APPLICATION

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

Stanford University-Facilities Design Guideline SECTION Plans Review Submission Guidelines

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

C I T Y O F M c K I N N E Y PLANNING

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Answer: Qualification statement should be provided with the bid.

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

PROCEDURE FOR PROCESSING WORKING DRAWINGS

Brad Luke. Director Peddle Thorp Auckland

What Are Submittals?

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

REQUEST FOR INFORMATION (RFI)

Submittal Transmittal

Submittal Transmittal

Working Drawing Manual

REQUEST FOR INFORMATION

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Merrick Pet Care New Distribution Center Hereford, Texas

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

Letter of Transmittal

Working Drawing Procedure

GSFC CONFIGURATION MANAGEMENT MANUAL

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

10930 W. Sam Houston Parkway N., Suite 900

Section XV - PER, Design, and Construction Submittal Requirements

Commercial Infill Project Guide

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

Transcription:

OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: BUILDING REFERENCE: DATE RECIEVED: Jun 01, 2015 DISCIPLINE: Mechanical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 23 25 00 REVIEWER DUE DATE: 6/11/2015 DWG REF. DWG TITLE: RETURNED ITEMS: HVAC WATER TREATMENT CHILLED WATER PIPING TR NONE NO OF ITEMS: ITEM DESCRIPTI CONTRACTOR/CM: SUBMITTAL TRANSMITTAL SUBMITTAL NUMBER: 232500-02.00 : WILLIAMS COMPANY : BRAD KUBIN 2301 SILVER STAR RD. (407) 295-2530 FAX:(407) 297-0459 DATE RETURNED TO CM: 1 Product Literature(s) REVIEW STATUS: REVIEWED REVIEWERS: PRIMARY: SECONDARY: COMMENTS: KEVIN KING PHN: (407) 740-5020 FAX: (407) 740-0365 kking@matern.net NO SECOND REVIEWER ASSIGNED cc: OWNER : CALVIN WOOLFOLK 6501 MAGIC WAY, BLDG. 200 (407) 317-3700 FAX:(407) 317-3768 R+B FILE: : 13017-0001.X6 RHODES + BRITO ARCHITECTS INC. : 605 E. ROBINSON STREET, SUITE 750 : ORLANDO, FL. : 32801 : 407.648.7288 : FAX.648.7289 PAGE 1 OF 1

OCPS CLAY SPRINGS ES SUBMITTAL DETAILS: SUBJECT: DATE RFI RECIEVED: Jun 01, 2015 DISCIPLINE: Mechanical PRIORITY STATUS: 2-STANDARD SPECIFICATION REF: 23 25 00 REVIEWER DUE DATE: 6/11/2015 DWG REF. DWG TITLE: SUBMITTAL CONTENTS: HVAC WATER TREATMENT CHILLED WATER PIPING TR NONE NO OF ITEMS: ITEM DESCRIPTION 1 SERVICE REPORT REVIEWERS: PRIMARY: SECONDARY: SUBMITTAL ASSIGNMENT MEMO KEVIN KING PHN: (407) 740-5020 FAX: (407) 740-0365 kking@matern.net SCOTT BURCHFIELD SUBMITTAL NUMBER: 23250002.00 PHN: FAX: sburchfield@matern.net REVIEW STATUS: REVIEWED FURNISHED AS MARKED REVISE AND RESUBMIT RE-SUBMIT WITH ITEMS NOT REVIEWED REJECTED THIS SUBMITTAL IS ISSUED TO YOU FOR YOUR REVIEW. PLEASE RESPOND AND RETURN...WITH THIS COMPLETED SAM TRANSMITTAL...TO MICHELE BUDAY-URDANETA NO LATER THAN: 6/11/2015. PLEASE COMPLETE REVIEW STATUS AT RIGHT COMMENTS: THIS SUBMITTAL WAS REVIEWED BY : (please print) cc: OWNER : CALVIN WOOLFOLK 6501 MAGIC WAY, BLDG. 200 CONTR/CM: : WILLIAMS COMPANY : BRAD KUBIN 2301 SILVER STAR RD. R+B FILE: : 13017-0001.X6

Submittal Approval Form PROJECT: CLAY SPRINGS ELEMENTARY SCHOOL DATE: 6/1/15 SUBCONTRACTOR NAME: DHR Mechanical Services SUBCONTRATOR ADDRESS: NUMBER AND TITLE OF SPECIFICATION SECTION: 23 25 00 - HVAC Water Treatment Chilled Water Piping TR Contractor s Submittal Stamp Architect/ Engineer s Submittal Stamp 6/1/15

SUBMITTAL DATA REVIEW COMMENTS Date: June 12, 2015 MPE Project No: 2013-224 Project: By: Submittal: OCPS-Clay Springs ES J. Walden for Kevin King Water Treatment Data No.: 23 25 00 Submittal No.: 002 Contractor s I.D.: DHR Class: Basis of Design (1) Equal (2) Substitution (3) X A No exceptions taken. B Make corrections noted. C Revise and Resubmit. D Submit Specified Item. E Rejected. N Review not required. ACTION CODE THE FOLLOWING COMMENTS SHALL BE CONSIDERED AN INTEGRAL PART OF THE SUBMITTAL DATA REVIEW. REVIEW OF THIS DATA IS ONLY FOR CONFORMANCE WITH THE DESIGN CONCEPT AS GIVEN IN THE CONTRACT DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR: QUANTITIES, FUNCTIONS, DIMENSIONS AND COORDINATION OF THE WORK WITH OTHER TRADES. 1.Preliminary water test report. END OF SUBMITTAL DATA REVIEW COMMENTS Corporate Office: 130 Candace Drive, Maitland, Florida 32751-3331 Phone: 407.740.5020 Orlando Fort Myers Jacksonville Tampa www.matern.net Registered: FLORIDA * GEORGIA* LOUISIANA * NORTH CAROLINA * SOUTH CAROLINA * TEXAS * TENNESSEE * VIRGINIA

WATER TREATMENT SERVICE REPORT Company: DHR Mechanical Date: 06/01/15 Address: Plant Clay Springs Elementary City: Apopka State: FL Zip: Country: Attention: Billy Walton Copy to: NALCO Copy to: WP106 FILES PURPOSE: To perform an inspection visit, and issue a preliminary report. Check the chemical parameters of your chilled water loop and provide recommendations to assure the specified performance goals are being met. OBSERVATIONS: Cleaning agent was introduced in the system on and flushed for over 48 hours. System water was tested on 05-21-15. We tested the conductivity, iron and ph levels of the closed loop. All parameters were within recommended settings, the results were 301 us/cm, 0.34 ppm and 8.01 respectively and are tabulated below. We recommended the inhibitor to be added once the system is free of leaks so product is not wasted. We returned to test for inhibitor on 06-01-15 and it tested At 1000 ppm. Conductivity ph Iron Nitrite 301.00 us/cm 8.01 00.34 ppm 1000 ppm Conductivity ph Iron Recommen ded Iron Record Record < 1 ppm < 600 ppm Your input on today s visit matters to us, and will help improve our service. Feel free to contact us with any questions or concerns. Jesus Morfa, B.S.M.E., M.S.E.M District Representative. Nalco an Ecolab Company 813-394-1730 Alex Pichardo, Technical Service Representative. Nalco an Ecolab Company. 407-936-4497 Signed: Jesus Morfa Title: District Representative. District: WP106 NALCO COMPANY 2622 Cypress Ridge Blvd., Suite 102 Wesley Chapel, FL 33544