Renewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM IV - CONTRACT REVISIONS.

Similar documents
Renewable Water Resources Greenville, South Carolina. CONTRACT DOCUMENTS Reedy River Basin Sewer Tunnel ADDENDUM III - CONTRACT REVISIONS.

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

REGIONAL TRANSIT AUTHORITY PUBLIC NOTICE. IFB Rail Expansion (Streetcar) Rampart Street. Addendum IV

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

CHARLES COUNTY GOVERNMENT ITB NO ST. MARK S PUMP STATION UPGRADE

James W. Moore, PE / Brandon D. Enevold, PE / Kjersten E. Kuhta, PE Dylan J. Cunningham, PE / Jacob L. Deering, PE / Joel R.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

SECTION SUBMITTAL PROCEDURES

FAST TRACK WORKSHOP OBJECTIVES

This addendum forms a part of the Contract Documents dated: August 10, 2012.

ADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

November 16, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA. Y CH / Addendum #6 SHERRY DRIVE BRIDGE REPLACEMENT

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

A. Section includes administrative and procedural requirements for project record documents, including the following:

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

Grease Interceptor Design Checklist

Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices.

i. Shoring layout. ii. Shoring sections and details (including anchor details, if required).

City of Massillon Site Plan Checklist

KC Water Rules and Regulations For Water Main Extensions and Relocations

HUSSEY GAY BELL SAVANNAH, GEORGIA

List of Figures. List of Forms

SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS

How to provide as constructed information and interpretation of sewer plans

STANDARD BID ITEM NUMBERS

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

ROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:

Major Site Plan Application

SECTION III SUBMITTALS AND APPROVALS

DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

CHAPTER A-10 DRAWINGS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

2. The Checklists are to be filled out at each phase and provided with the submittal documents.

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Application for Site Plan Review

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

Washington County Road Engineering Plan Submittal/Review Checklist

Sewer Line Extension Permit Design Checklist

1. Land survey Work. 2. Civil and Structural engineering services.

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

DIGITAL DATA SUBMISSION STANDARDS Procedures and Guidelines

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

SECTION 2 GENERAL REQUIREMENTS

SECTION II PLAN FORMAT AND REQUIREMENTS WATER AND SEWER

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

SECTION 39 - MANHOLES TABLE OF CONTENTS

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

ADDENDUM NO. 4 TO THE CONTRACT DOCUMENTS SUPPLEMENTAL INFORMATION

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

Software Services, Section 16748, Add as an attachment to this section Attachment A enclosed with this addendum.

CITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

City of Waltham Purchasing Department Waltham, Massachusetts ADDENDUM NO. 2

TELEPHONE: (215) Addendum No New Solomon Solis-Cohen Elementary School SDP Contracts No. B-075C, B-076C, B-077C and B-078C of 2017/18

Bestall Collaborative Limited Planning Environment Construction Management Development

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

ADDENDUM ADDENDUM NO.: 01 PROJECT NO.: CONTRACT NO.: DATE OF ISSUE: January 12, 2018

Facility Services Subgroup Preface for Divisions 21` through 28

December 31, 2015 A. THE BID OPENING DATE IS UNCHANGED. B. Questions, Additions, and Deletions

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

'Non-DR' Type DRP Project Design Checklist for eplan Review'

Oil-Water Separator Design Checklist

REGISTRATION EXAMINATION, JUNE 2008 DRAINLAYING ANSWER SCHEDULE

Section XV - PER, Design, and Construction Submittal Requirements

Plan Review and Standards

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION OPERATION AND MAINTENANCE DATA

CMW DELIVERABLES SPECIFICATION Version 1.0

Town of Apex, North Carolina

UNIVERSITY OF ROCHESTER DESIGN STANDARDS FEBRUARY 29, 2012

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

Certificate of Appropriateness (CoA) Checklist

HAMILTON SOUTHEASTERN UTILITIES, INC. SANITARY SEWER COMPLETION SPECIFICATIONS

ROWAN UNIVERSITY 201 MULLICA HILL ROAD GLASSBORO, NEW JERSEY 08028

INVITATION FOR BID (IFB) IFB NO. GSWA

SECTION MANHOLES

Exhibit A Scope of Services and Deliverables West Swan River Bridge Approaches

CHAPTER 11. Plan Standards

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

ADDENDUM #1. April 29, 2009

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

FREMONT COUNTY. APPLICATION FOR ZONE CHANGE #2 USE DESIGNATION PLAN (Requires Subsequent Approval of ZC #2 Final Designation Plan) 1.

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

Charlotte County Utilities DESCRIPTION

Transcription:

Renewable Water Resources Greenville, South Carolina CONTRACT DOCUMENTS ADDENDUM IV - CONTRACT REVISIONS Prepared by Black & Veatch Corporation Greenville, South Carolina B&V Project No. 192263 October 3, 2017

Renewable Water Resources CONTRACT DOCUMENTS ADDENDUM IV - CONTRACT REVISIONS A. SCOPE. This is an attachment to the Addendum IV Reedy River Basin Sewer Tunnel RFB and consists of pages ADIV-1 through ADIV-5. This Addendum covers the following additions and changes to the Project Manual and Project Drawings. B. PROJECT MANUAL. 1. Section 01380 CONSTRUCTION PHOTOGRAPHS Page 1. Paragraph 2. Aerial Photographs. Delete the following sentences: All negatives, two 8 by 10 prints of each view, and two compact discs containing duplicate digital images shall be submitted. Negatives shall be identified with description of view and date. Prints shall be mounted on linen with flap for binding or enclosed in clear plastic binders. Each binder and compact disc shall be marked with the name and number of the Contract and name of Contractor. Page 2. Add the following paragraphs to the end of the Section: 3. PHOTOGRAPH FORMAT AND ORGANIZATION. Photographs shall be taken in color and shall be taken and submitted to Engineer in digital format. 3.01. Resolution. All photographs (except aerial photographs) shall be JPEG (Joint Photographic Experts Group) with a minimum resolution of 1280x1024 pixels and a maximum resolution of 3264x2448 pixels. Aerial photographs shall have a minimum resolution of 4256x2848 pixels. Renewable Water Resources ADIV-1 B&V Project No. 192263

3.02. Filenames. All photographs filenames shall follow a syntax of YYYY-MM-DD_LOC_DESC.jpg Where, YYYY = the four-digit year. MM = the two-digit month. DD = the two-digit day. LOC = the site location where the photograph was taken. DESC = a general description of the subject of the photograph. 3.03. Media. Contractor shall submit the photographs electronically on CD-ROM or DVD-ROM. Files may be grouped into descriptive folders as necessary. The surface of each disc shall be labeled with the project name and date range wherein the photographs were taken. 4. SUBMITTALS. Two (2) copies of each disc shall be submitted to the Engineer in accordance with the provisions of Section 01300 - Submittals Procedures. 2. Section 01500 TEMPORARY FACILITIES Page 1. Paragraph 2. Office for Engineer at Site of Work. Delete the sentence: The Engineer s offices shall be onsite and fully operational within one month after Notice to Proceed and shall remain fully functional for one month after Final Completion. and replace with the following: The Engineer s offices shall be onsite and fully operational within two months after Notice to Proceed and shall remain fully functional for one month after Final Completion. 3. Section 02441 TUNNEL AND SHAFT ROCK SUPPORT SYSTEMS Page 8. Paragraph 2-1.04. Fricton Rock Bolts. Add the following sentence after Wayne, New Jersey : or Jennmar Expandable Rock Bolt Super. Page 8. Paragraph 2-1.05. Fricton Rock Dowels. Add the following sentence after Princeton, New Jersey : Renewable Water Resources ADIV-2 B&V Project No. 192263

or Jennmar FRICTION-LOK Stabilizer System FL-46. 4. Section 02445 SHAFT EXCAVATION Page 9. Paragraph 3-2.01.a. Remove the word Pre-Excavation. Page 9. Paragraph 3-2.01.a.(1). Remove the word Pre-Excavation. 5. Section 02620 DUCTILE IRON PIPE Page 7. Paragraph 3-6. FIELD JOINTS. Add the following sentence after Restrained joints shall be extended after they are assembled to minimize further take-up. : The length of pipe having restrained joints shall be as indicated on the Drawings. C. PROJECT DRAWINGS. Drawings Y04, Y06, C11. Refer to Figure 1 on page ADIV-5 regarding the temporary easement boundary revision at the Upstream Site. 1. Drawing Y02 Demolition Plan, Drop Shaft and Upstream Connections. Add new Note 15: 15. CONTRACTOR SHALL RESTRICT ACTIVITIES ON SALVATION SHOWN ON Y04 EXCEPT FOR ROADWAY MILLING AND REPAVING ACTIVITIES. NO ROADWAY DEMOLITION OR ROAD CONTRACTOR SHALL RELOCATE OR ESTABLISH EROSION CONTROL FOR THIS WORK AT THAT TIME. 2. Drawing Y04 Site Plan, Drop Shaft and Upstream Connections. Add new Note 16: 16. CONTRACTOR SHALL RESTRICT ACTIVITIES ON SALVATION SHOWN ON THIS DRAWING EXCEPT FOR ROADWAY MILLING AND REPAVING ACTIVITIES. NO ROADWAY DEMOLITION OR ROAD Renewable Water Resources ADIV-3 B&V Project No. 192263

CONTRACTOR SHALL RELOCATE OR ESTABLISH EROSION CONTROL FOR THIS WORK AT THAT TIME. 3. Drawing Y06 Restoration Plan, Drop Shaft and Upstream Connections. Add new Note 9: 9. CONTRACTOR SHALL RESTRICT ACTIVITIES ON SALVATION SHOWN ON Y04 EXCEPT FOR ROADWAY MILLING AND REPAVING ACTIVITIES. NO ROADWAY DEMOLITION OR ROAD CONTRACTOR SHALL RELOCATE OR ESTABLISH EROSION CONTROL FOR THIS WORK AT THAT TIME. 4. Drawing C11 Plan and Profile, Drop Shaft and Upstream Connections. Add new Note 3: 3. CONTRACTOR SHALL RESTRICT ACTIVITIES ON SALVATION SHOWN ON THIS DRAWING EXCEPT FOR ROADWAY MILLING AND REPAVING ACTIVITIES. NO ROADWAY DEMOLITION OR ROAD CONTRACTOR SHALL RELOCATE OR ESTABLISH EROSION CONTROL FOR THIS WORK. 5. Drawing S06 MH 590A - Junction Box, Plans and Sections. Section 1. Delete 60 RCP and replace with 60 DIP. Renewable Water Resources ADIV-4 B&V Project No. 192263

RENEWABLE WATER RESOURCES REEDY RIVER BASIN SEWER TUNNEL FIGURE 1: TEMPORARY EASEMENT BOUNDARY REVISION PROJECT NO. 192263 SHEETS: Y04 Y06 C11 Renewable Water Resources ADIV-5 B&V Project No. 192263