TITGEMEYER Tf1663GB(0514)1. GETO Megaport II flush rear doors Assembly Instructions

Similar documents
TITGEMEYER Tf1673GB(0517)1. GETO City Body Kit with a self-supporting base and without a base Assembly Instructions

Operating Manual Riveting Tool R1. For installing blind rivet nuts

WELD MOUNT fastening system

Clamping devices 521

APPLICATION NOTE. Mounting instructions for EasyPIM / EasyPACK modules with screw clamps. 1. General information

TITGEMEYER Tb1671GB(0917)1. n TIOS hand tools

Sport-Thieme. Handball Goal. Assembly instruction. 3x2 m, Free-standing with Fixed Net Brackets

Deauville Installation Guide

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Portofino Installation Guide

3.2.3 Rear Door Window and Quarter Window Carrier Assembly

Constable Oak Extension Dining Table

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

Curium 19H Installation Instructions & Parts List

VISAGE SCREEN SYSTEM - FOUR SIDED (FLAT PACK) OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET

Deauville Installation Guide

INFINITE RANGE - CENTRE FOLDING DOOR

BSM, GSM & GSS. Joint Kit Instruction. (Modified for IMPACT) (NSF Certified) Curved Glass Fresh Meat Delicatessen and Seafood Merchandisers

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

ASS 70 FD folding / sliding door. Installation Guide

ALDoor DOUBLE DOOR INSTALLATION

Installation and Operating Instructions

Sectional Door Installation Instructions

Aluminum Frame Type Instruction Manual

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

2300 BI-FOLD INSTALLATION GUIDE

ASS 70 FD folding/sliding door installation guide

LOCKN LOAD FIRST TIME INSTALLATION

Frameless Inline Door With Return QCI5263

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

DOOR BiFOLD DOOR SET (3 + 1)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Gallium 03 Installation Instructions & Parts List

SPIETH Locknuts. Series MSW. Works Standard SN 04.03

Sport-Thieme Handball Goal, 3x2 m, Free-Standing or socketed

MODUS 770 AND MODUS 1280 (FLAT PACK) OPERATIONAL, ASSEMBLY & FIXING INSTRUCTION LEAFLET

INFINITE RANGE - HINGE DOOR

Wooden Frame Type Instruction Manual

Frameless Door QCI5284

Aluminium hinges DORMA LM. October 1999

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

Installation Instructions

CV1B Sliding Table Installation and Setup Guide

Double Frameless Swing Door QCI5247

Xenon 05 Installation Instructions & Parts List

Portofino Case2 Installation Guide

Note: This assembly instruction will cover all configurations of Alloy adjustable height double bases.

Installation Instruction

INSTALLATION INSTRUCTION RRU DOUBLE LIGHT POLE MOUNT

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Installation Instructions Kit, Base Rail Bracket Part # 31413

Sliding Door Kit

ROBOT KR 350. Installation, Connection, Exchange. Ro/Me/03/ en. 1of 26

SECTION side windows round corners

Frameless Heavy Glass Door with Wall Mount Hinges

B A T H R O O M G L A S S

Gardman Lean-to Greenhouse Assembly Instructions

Installation Instructions for Vista Air Vertically Folding Walls

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Curium 19.4H Installation Instructions & Parts List

Greenhouse Assembly Instructions

Durapipe ABS Jointing Guide

CIRRUS AIRPLANE MAINTENANCE MANUAL

Tool 3-1 A2 Bushing 6 Check if the bushing supports (angle iron) are properly welded with the upper part of the structure pipes. welded bushing suppor

Assembly Instructions

INSTALLATION INSTRUCTIONS TRI-ROOF. energy for a better world

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

ALL SEASON PATIO COVER

ABM International, Inc.

Frameless Inline Door QCI5248

INSTALLATION INSTRUCTIONS

Rorty No.2 Tube Bender.

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Privacy Wall & Glass Selections Pivot-Hinged Door (For products manufactured after September 14, 2009)

Frameless Inline Door QCI5254

Hinge Door + Side Panel

Dubnium 11 Installation Instructions & Parts List

Tools Required Page 1. KIT CONTENTS: Smoking Shelter Page 1-2 Smoking Shelter Optional Extras Page 3

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

BBF Series Blower Base Frame Assembly Instructions Rev.: BFA-9105

Potting Store Assembly Instructions

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

Frameless Inline Door QCI5250

Wall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun

Repair manual. Fifth-wheel coupling JSK 38/50

Dura-Lock Roof System

9/16" (14mm) 1/2" (12mm)

ALU 4200-K/ZV Clampable tilt-sash fitting for aluminium windows

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

Tree protection systems 2.0

Technical features. Positive Taper Lock System for manual tool clamping. Technical features:

Required Tools: Suggested Additional Tools: 1 Cordless Drill with Robertson Bits 1 Ratchet Wrench 1 7/16 or 11mm socket 1 7/16 or 11mm Gear Wrench

Zero Point Clamping System. ZERO lock BALL lock

INSTALLATION INSTRUCTIONS

EZ-Lock Assembly Manual

MANUAL PLASTIC STRAPPING TOOL MODEL P404

3D PRINTER. Pack 11. Anything you can imagine, you can make! 3D technology is now available for you at home! BUILD YOUR OWN

LOCKN LOAD FIRST TIME INSTALLATION

Transcription:

TITGEMEYER GETO Megaport II flush rear doors

All rights reserved. The technical data quoted in this catalogue, performance descrip - tions, recommendations and instructions e.g. for the installation of the components available from us, are without liability. These are based on our experience. Claims against us as a consequence are expressly excluded as much of the application of our goods remains outside our direct influence. It is a fundamental obligation of the user to ascertain and to decide whether the goods provided by us are appropriate for a particular application. This catalogue is our intellectual property! Disclosure to third parties is prohibited. Reproduction even in part as well as use of our illustrations and TITGEMEYER part-numbering systems is only permitted with our express permission in writing. Subject to change. Supply of goods is in conformity with our delivery and payment conditions. Gebr. TITGEMEYER GmbH & Co. KG Osnabrück

Contents Assembly instructions for GETO Megaport II flush rear doors Pre-assembly work.......................................................... 4 List of supplied parts........................................................ 5 Assembly instructions....................................................... 6 Important information.......................................................12 L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com 3

Pre-assembly work Please read the following installation instructions before installing the GETO Megaport II flush rear doors. TITGEMEYER cannot be held responsible for incorrect installation work. It is assumed that only suitably qualified employees will be used for the installation work and that, at all times, the relevant technical standards and applicable regulations will be observed. The products constantly undergo improvement and technical review. These installation instructions apply to the 2-door and 4-door versions of the GETO Megaport II flush rear doors. The following fitting materials are supplied Bottom door gear keepers Top door gear keepers Double pivoting hinges (unassembled) for the doors comprising: Aluminium hinges with bushes, unmilled 4 aluminium hinges with bushes, milled 4 torsion springs 1 hinge bracket per hinge 2 cheese head screws with M 8 safety nut per hinge Tools required for the installation work C clamps, clamps Set square Drill and drill bits Installation tool for 6.5 mm blind rivets Ring and open-ended spanners: 13, 17 mm Allen key, 6 mm Ratchet and adaptors 13, 17 mm Tightening torque for bolted joints M 10 thread - screw grade 8.8 - torque 49 Nm Assembly sequence Adjust, align and fasten the door leafs on the rear frame Adjust, align and fasten the hinge brackets on the rear frame Rivet or weld on the hinge brackets Fit the double pivoting hinge plates Fit the top and bottom door gear keepers Fit the leg springs (tension springs) in the hinges Preparatory steps The rear frame on which the flush rear doors are to be fitted must be assembled on a flat surface without any misalignments. The diagonal deviation should be < 3 mm! 4 L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com

List of supplied parts List of supplied parts for GETO Megaport II Item Item name Part No. 1 2 3 4 5 6 7 8 9 10 11 Door leaf right/left Top door gear keepers Bottom door gear keepers Hinge bracket: rivet-on/screw-on version Cheese head screw M 8 x 130 8.8 DIN 912 Safety nut M 8 galvanised DIN 982 Torsion spring made of 1.4301 Bush M 8 Hinge, milled Hinge, milled extra-large spacing Hinge, unmilled Hinge, unmilled extra-large spacing Bolt-on bracket, casting Bolt-on bracket, casting extra-large spacing Cheese head screw M 8 x 16 8.8 DIN 912 (not shown) 240 526 000 240 207 000 240 515 000 240 523 000 661 822 000 240 521 000 240 518 000 240 308 000 240 308 001 240 309 000 240 309 001 240 516 000 240 307 000 240 520 000 The quantities of items 4 to 11 that are supplied depends on the number and type of hinge systems. 2 4 7 8 9 10, 11 1 5,6 5,6 3 8 L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com 5

Assembly preparation Ensure that the flush rear door bearing sur - faces are properly aligned and flat. The diagonal deviation on the rear frame should be < 3 mm! When constructing the frame, its external width should tally with the specifications provided with the order for the door kit. First, position the left, then the right-hand leaf on the frame at the desired point of installation. Align the door leafs as per the specifications and lock in place using the C-clamps and clamps. At least 20 mm of the horizontal seal inside the top and bottom of the door leaf should be showing. Use larger overlaps for even better results! The rear portal frame should be at least 30 mm wide. The door frames must not touch in the middle! Installation gap approx. 5 6 mm! Interior sealing 20 100 (min. 55) 20 130 (min. 85) 35 (min. 30) Interior sealing Portal frame header: To ensure effective sealing, the seal must overlap the header by at least 20 mm. A further 55 mm is required to fit the top door gear keepers. Rear bottom member: To ensure effective sealing, the seal must overlap the header by at least 20 mm. A further 85 mm is required to fit the bottom door gear keepers. Corner posts: To ensure effective sealing, the seal must overlap the posts by at least 30 mm. 6 L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com

Fitting the hinge brackets The outer radius of the door hinges must be flush to the outer edges of the rear frame! Tolerance: max. 1 mm inwards, max. 2 mm outwards. This tolerance must be observed at all times to ensure that the doors open and fold completely! Adjusting and attaching the hinge brackets The hinge bracket and door hinge must be installed at the same height. The hinge bracket must be properly aligned to the hinge and rest flush to the outer edge of the rear frame. max. 1 mm 35 (min. 30) max. 2 mm L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com 7

The hinge brackets can be riveted, screwed or welded on. Hinge bracket versions Two different hinge brackets are available for installing the door. The standard option used is the rivet-on version, which can also be welded on. When installing on a GETO Van, only the weld-on option is available! Interior Weld-on version for GETO Van Rivet, screw and weld-on version M-Lock blind rivet 6.4 x 14.2 mm A2 / A2 Grip range = 2.0-9.5 mm Part no.: 415 920 000 Double pivoting hinge Both hinge versions are installed in exactly the same way! 5 mm It is also possible to retrofit double pivoting hinges by replacing the hinge plates and screw-in brackets in the door leafs. Hinge protrusion approx. 5 mm Standard Extended version 8 L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com

Installing the double pivoting hinges Hinge with plastic bushes, unmilled = for middle hinge position (without spring) Hinge with plastic bushes, milled in the middle = for top and bottom door hinge respectively (with spring) The curvature on the hinge plate must face the rear frame. Insert the hinge bolts from above and fasten using hexagon nuts. Do not overtighten the hinge bolts. One or two threads should still be showing on the hexagon nut! Do not install the tension springs at this point! Hinge with milled edge installed top and bottom Milled hinge Unmilled hinge with plastic bush Do not install the tension springs at this point! L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com 9

Installing the door gear keepers Position the top and bottom door gear keepers for the door locks where they are to be installed, then align them and secure in place. Align the door gear keepers so they are parallel to each other and rest firmly against the cam lock. Top door gear keeper with cam The height of the door leafs must not be off-centre when closed! Ensure that the door frame profiles do not touch! If necessary, check the diagonals on the rear frame max. deviation +/- 3 mm Drill holes (10.5 mm) in the middle of the slotted holes in the door gear keepers. Bolt the door gear keepers onto the rear frame. Affix the top and bottom door gear keepers using: Hexagon bolts M 10 x 30-8.8 DIN 933 galvanised; Washer 10.5, DIN 125, galvanised Lock nuts M 10 DIN 985 galvanised Bottom door gear keeper with locking handle 10 L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com

Inserting the tension springs into the double pivoting hinges Note: The tension spring is untensioned when the door is open. The spring will only tension when the door is closed and will move the hinge plate to the required position. Open door; tension spring not under tension Open the door as far as it will go Remove the top and bottom hinge bolts from the rear frame one after another, insert the tension spring into the centre of the notch and re-attach and tighten the hinge bolts The double pivoting hinges should still move freely after the bolts have been tightened! Open door; tension spring not under tension Check that the door and the door locks are working correctly and re-adjust the door gear keepers if necessary. Door closed, spring under tension L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com 11

Important information Notes on sealing the external transition from extrusion to panel on GETO Megaport II flush rear doors Pre-treating / cleaning the area around the hollow weld (panel edge profile) Moisten a lint-free, non-bleaching disposable paper towel with GETO PUR Cleaner 2 (making sure it is not dripping wet) and wipe the welded seam in one go, turn the towel over and then wipe again in the same direction. Leave the pre-treated sealant application surfaces to air for at least 5 minutes. If you suspect that some of the solvent might have been transferred from the towel into the area in or around the joints, allow an additional amount of time for the solvent to evaporate completely. To check whether this has occurred, insert a dark sheet of paper into the gap between the profile and the panel. The paper should not show any traces of moisture! Applying GETO PUR 21s sealant or Sikaflex 221 Cut the applicator nozzle so that it will produce the required bead thickness, then apply a bead of sealant to the area of transition between the panel and the edge profile. When applying the sealant, make sure that it runs across the surface correctly. This can be achieved either by placing an excess of sealant ahead of the direction in which the sealant is to be applied through the nozzle or by forming and smoothening the sealant using a suitable spatula after the sealant has been applied. Cleaning residual sealant off dirty surfaces Unhardened sealant can be wiped off using lint-free, non-bleaching disposable paper towel soaked in GETO PUR Cleaner 2 until dripping wet. Hardened residual sealant can only be removed mechanically. Painting / varnishing GETO Megaport II flush rear doors With regard to painting / varnishing GETO Megaport II flush rear doors, including any pre-treatment of the surfaces in question, we advise you to observe the recommendations of the paint/varnish manufacturers concerned. The door seals must always be kept free from paint or varnish so as not to impair their sealing properties. 12 L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com

NOTES L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com 13

NOTES 14 L Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com

The technical specifications contained in this brochure are approximate and no guarantee is given as to their accuracy! Designs are subject to change. Our design proposals are non-binding! TITGEMEYER, GETO and Megaport are trademarks, registered trademarks or product names belonging to the respective title holder. Gebr. TITGEMEYER GmbH & Co. KG Hannoversche Straße 97 (Navigation: Hettlicher Masch 2) 49084 Osnabrück, Germany P.O. Box 43 20 49033 Osnabrück, Germany Phone: +49 (0)5 41/58 22-0 Fax: +49 (0)5 41/58 22-494 email: truckandtrailer@titgemeyer.com www.titgemeyer.com