A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

Similar documents
NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

Integrate the Window and WRB (1/2)

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Building Wrap and Flashing

Shapes Siding. Perfection Shingles. Chalk Line

Building Wrap and Flashing

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

CFDTT-01. Control Joint Study (General)

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Guide - Evolution Series Wood Siding

DW VERTICAL INSTALLATION

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

The better way to build TM. Installation Manual ROOF SIPs

eco-shake INSTALLATION INSTRUCTION

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

SLATE & SHINGLE INSTALLATION

Curtain Wall Installation Guide

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Integrity Polygon and Round Top Installation and Finishing Instructions

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Eagle clad double-hung window installation instructions

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

8x8 Shed Plans and Building Guide

KS42 MF SERIES - HORIZONTAL INSTALLATION

PRIMED STRAND REVERSIBLE SHAKE

Installation Instructions

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

Dura-Lock Roof System

12x12 Shed Plans and Building Guide

10x10 Shed Plans and Building Guide

Flashing Materials. Rough Opening Preparation

How To Install Windows: Nail-Fin Application

Installation Guide Classic Series Wood Siding

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

WindowSeal. Installation Instructions. Prep & General Conditions

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

WINDOW INSTALLATION GUIDE

KS SERIES - VERTICAL INSTALLATION

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Vinyl Siding Labor Division 190. General Requirements

Tools required by installer: Materials required by installer:

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

Show them you're an InstallationMaster, and watch your business grow. InstallationMasters Training Manual Addendum Level RLC-1

DW HORIZONTAL INSTALLATION

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Chapter 9. Windows and Exterior Doors

Installation Instructions for Custom Wood and Fiberglass Door Systems (JII100)

Installation Instructions

Butyl Flash. Installation Instructions. Prep & General Conditions

In the 30-plus years that I ve been a remodeling contractor, I ve

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

900 SERIES WALL PANELS

Installation Instructions

CERACLAD.

Harvest (8094) Mystic (8078) Niagara (8095) Shenandoah (8057) 2 DURATA MORTARLESS STONE DURATA FLAT KIT PROFILE #:

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

6x6 Shed Plans and Building Guide

Sun Windows General Information New Construction Hinged Door Installation Instructions

Installation Guide for Andersen Architectural Clad Awning Windows

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

INSTALLATION INSTRUCTIONS for Pre-Hung Exterior Entry Doors (JII106) IMPORTANT INFORMATION AND GLOSSARY. Estimated Install Time for New Construction

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Before installation, check your local and state requirements for this type of install.

SmartVent Eave Edge Installation Instructions

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

Providing 3 Layers of Protection

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

All Window Installation Instruction

Installation Recommendations for Finless Frame Doors

Chapter 9. Windows and Exterior Doors

INSTALLATION PROCEDURE

COMPOSITE SIDING INSTALLATION GUIDE

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Boxed Shed. QUAKER or A-FRAME SIZES: 6 x 8 6 x 10 T1-11Siding

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

Vinyl Windows and Doors Manufactured by Pella Corporation

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

Installation Manual SOLID CORE SIDING

Pocket Door Installation Instructions

Installation Guide for Andersen Architectural Clad Hinged Windows

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

400 SERIES VERTICAL INSTALLATION

HUB REV 9/18 ROOF INSTALLATION MANUAL ZIPSYSTEM.COM

3M Air and Vapour Barrier 3015 Technical guide

8 x 10 Timber-frame Garden Shed

BARRELL VAULT BATTENLESS

TABLE OF CONTENTS A-1

UNIT 5: EXTERIOR DOORS AND WINDOWS

Transcription:

WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS Per: 2006 B.C.B.C. Part 9

DISCLAIMER THE INFORMATION CONTAINED IN THIS DOCUMENT REPRESENTS CURRENT WOOD FRAME BUILDING PRACTICES IN THE BRITISH COLUMBIA COASTAL REGION AND HAS BEEN REVIEWED BY A SPECTRUM OF INDUSTRY PARTICIPANTS. THE READER IS ADVISED TO EVALUATE THE INFORMATION, MATERIALS AND TECHNIQUES CAUTIOUSLY AND TO CONSULT APPLICABLE BUILDING CODES AND GUIDELINES TO DETERMINE WHETHER THE INFORMATION, MATERIALS AND TECHNIQUES ARE SUITABLE IN EACH INSTANCE. THE DRAWINGS AND TEXT ARE INTENDED AS A GENERAL REFERENCE GUIDE ONLY. PROJECT AND SITE SPECIFIC FACTORS INCLUDING CLIMATE, EXPOSURE, COMPLEXITY, AESTHETICS, ETC. MUST ALWAYS BE TAKEN INTO CONSIDERATION. LIMITATIONS THESE DETAILS ARE INTENDED AS A PRACTICAL REFERENCE GUIDE FOR ASSEMBLING THE BUILDING ENVELOPE IN WOOD FRAME CONSTRUCTION. IT IS NOT INTENDED TO REPLACE PROFESSIONAL ADVICE. ENSURE THAT ALL PROPOSED PRODUCTS AND SYSTEMS ARE ACCEPTABLE TO THE BUILDING AUTHORITY HAVING JURISDICTION PRIOR TO INSTALLATION. THE INFORMATION PRESENTED HEREIN IS NOT EXCLUSIVE, MANY PRODUCTS AND METHODS MAY BE USED AS ALTERNATIVES TO SATISFY REGIONAL REQUIREMENTS, COST CONSIDERATIONS, AVAILABILITY AND SPECIFIC DESIGN REQUIREMENTS. ENSURE THAT MATERIALS USED IN CONJUNCTION WITH ONE AND ANOTHER ARE COMPATIBLE.

CUT SHEATHING FLUSH WITH FRAME ON ALL SIDES P&S TO LAP SILL AND JAMB BY 3" Min. Min. 3/8" GAP IN SHEATHING INSTALL PEEL & STICK (P&S) GUSSETS WITH PRIMER AS PER MANUFACTURERS INSTRUCTIONS 12" 12" 12" STRIP OF 60 MIN. FLASHING PAPER STAPLE TOP EDGE ONLY SO BUILDING PAPER (B.P.) CAN BE INSTALLED UNDERNEATH LATER 2" Dia. Min. HOLE FOR VENTILATION Sill Flashing Paper & Gussets Warranty Provider Accepted NTS 1.0

OVERLAP ALL FLASHING PAPER SHINGLE STYLE (AS SHOWN) 12" 12" 60 MIN. FLASHING PAPER Place plastic horseshoe shims on sill spaced as per window manufacturers specifications. Ensure that the shims do not extend past the inside of the window frame. Place one behind each fastener when fastening the sill flange 12" APPLY P&S WITH PRIMER AS PER MANUFACTURERS REQUIREMENTS FROM INSIDE OF SILL EXTEND DOWN THE PAPER AND UP THE JAMBS BY 3" Min. Peel & Stick & Flashing Paper Warranty Provider Accepted NTS 1.1

APPLY A GENEROUS BEAD OF POLYURETHANE CAULK (or approved alternate) TO THE PAPER 3/4" OUT FROM THE OPENING TO JAMB AND HEAD ONLY DO NOT CAULK THE SILL TO ALLOW FOR DRAINAGE FASTEN WINDOW AS PER MANUFACTURER'S INSTRUCTIONS INSERT HORESHOE SHIM UNDER EACH NAIL IN THE SILL FLANGE ONLY Window Installation Warranty Provider Accepted 1.2 NTS

ALL VERTICAL LAPS TO BE 12" Min. AND STAGGERED THE INSIDE OF THE FRAME IS TO BE SEALED TO THE AIR/VAPOUR BARRIER (A.B & V.B.) ON ALL FOUR SIDES WITH POLYURETHANE CAULK AT THE SILL AND ROD & CAULK AT THE JAMBS & HEAD SEAL FIELD PAPER TO FLANGE WITH MASTIC OR POLYURETHANE CAULK (or approved alternate) HEAD FLASHING WITH END DAMS AS PER 9.27.3.8 40" 18" ENSURE FIELD PAPER LAPS UNDER FLASHING PAPER AT SILL INSTALL PAPER WITH FULL HALF LAPS + 2" START WITH HALF ROLL OF 30 MINUITE BUILDING PAPER Building paper installation Warranty Provider Accepted 1.3 NTS

SEAL BUILDING PAPER TO HEAD FLASHING AND TO FLANGE OF WINDOW AT JAMB WITH POLYURETHANE CAULK (or approved alternate) 8 7 HEAD FLASHING WITH END DAM 6 5 3/8" GAP BETWEEN STRAPPING AND WINDOW 5 4 CLADDING 1. HALF ROLL STARTER STRIP UNDER 3 SILL FLASHING WITH END DAM BEHIND STRAPPING BUG SCREEN SILL PEEL & STICK (P&S) 2 SILL FLASHING PAPER 10MM. Min. THICKNESS PRESSURE TREATED PLYWOOD STRAPPING AS PER 9.27.2.2 @ 16" O/C Max. ATTACHED TO STUDS WITH APPROVED FASENERS Building paper and strapping installation Warranty Provider Accepted NTS 1.4

DO NOT CUT HERE MINIMUM 75MM 110 NOTCH OUT FRONT FACE Step 1 MINIMUM BY CODE 10MM 25MM IS RECOMMENDED FOLDED SAFETY EDGE 50MM DO NOT CRIMP BACK FOLD TIGHT SO POSITIVE SLOPE IS MAINTAINED END DAM MUST EXTEND TO FACE OF CLADDING FOLD UP EDGE 25MM Step 2 FOLD OVER OUTER CORNER TO CREATE A SAFETY EDGE Step 3 Window Head Flashing with End Dam - Per: 9.27.3.8 Warranty Provider Accepted NTS 2.0

POLYURETHANE CAULK CAULK WINDOW FRAME TO P&S SILL FLASHING W/110 DEGREE SLOPE END DAMS AND 1/2" SAFTEY EDGE AS PER 9.27.3.8 (5) PEEL & STICK MEMBRANE BUG SCREEN 5MM GAP AS PER 9.27.3.8 (4e) TRIM BOARD 12" FLASHING PAPER P.T. STRAPPIMG AT 16" O/C Max. FLASHING ON TOP OF STRAPPING TWO LAYERS OF 30 MINUTE BUILDING PAPER EXTERIOR CLADDING SHEATHING 25MM 5MM GAP ALTERNATE 2 X 6 TRIM WITH 25MM. Min. NOTCH IN BOTTOM per 9.27.3.8 (2a) SILL FLASHING WITH END DAM (all dimensions similar to head flashing) Window Sill (flanged window with trim) Warranty Provider Accepted 3.0 NTS

60 MIN FLASHING PAPER 2 LAYERS 30 MIN BLDG PAPER BOTH LAYERS OF BLDG PAPER TO OVERLAP BACK LEG OF HEAD FLASHING P.T. STRAPPING AT 16" O/C Max. CLADDING TRIM FLASHING WITH DAM ENDS 1X6 WOOD TRIM INSECT SCREEN BACK CAULK WINDOW FLANGE MIN. 10MM AIR SPACE FOR VENTILATION SLOPED HEAD FLASHING WITH END DAMS ROD & CAULK Window Head (section) NTS Warranty Provider Accepted 3.1

B.P. TO EXTEND OVER WINDOW FLANGE SEAL TO FLANGE WITH APPROVED SEALANT 60 MIN FLASHING PAPER 3/4" WOOD TRIM CLADDING CAULKED TO WOOD TRIM 2 LAYERS 30 MIN BLDG PAPER POLYURETHANE CAULK ROD AND CAULK FRAME TO (A.B. & V.B.) POLY (A.B. & V.B.) BACK CAULK FLANGE AT HEAD AND JAMB ONLY WITH APPROVED SEALANT SEAL POLY HERE WINDOW JAMB WITH 3/4" TRIM 1 1/2" WOOD TRIM POLYURETHANE CAULK CLADDING CAULKED TO WOOD TRIM ROD AND CAULK FRAME TO (A.B. & V.B.) POLY (A.B. & V.B.) SEAL POLY HERE WINDOW JAMB WITH 1 1/2" TRIM Window Jamb (section) NTS Warranty Provider Accepted 3.2

CAULK PEEL & STICK AT SILL & 6" UP DOOR JAMB CAULK TRIM VERTICAL STRAPPING @ 16" O/C 150 MM SHEATHING 50 MM Min. Entry Door Sill NTS Warranty Provider Accepted 4.0

CLADDING 10 MM Min. GAP VINYL "J" TRIM STRAPPING FLASHING ON TOP OF STRAPPING ALTERNATE WITH "J" TRIM TWO LAYERS 30 MIN BUILDING PAPER SEALED POLY AIR / VAPOUR BARRIER BUG SCREEN PERFORATED SOFFIT VINYL "J" 10MM Min. SPACE FOR VENTING BUG SCREEN 10MM Min. STRAPPING CLADDING 2 LAYERS 30 MINUTE BUILDING PAPER Bottom & top of Walls at Cantilever NTS Warranty Provider Accepted 5.0

60 MIN FLASHING PAPER ON SHEATHING BEHIND ROOF FRAMING AND FLASHING 2LAYERS OF 30Min. BUILDING PAPER TO LAP FLASHING MIN 4" SEAL TO FLASHING 15LB ROOFING FELT METAL FLASHING P.T. STRAPPING CLADDING 1/2" LOWER THAN STRAPPING BUG SCREEN FLASHING TO HAVE 6" BACKLEG UP WALL CLADDING TO LAP FLASHING BY 4" MIN 2" CLEARANCE BETWEEN CLADDING AND ROOFING Roof to Wall Intersection NTS Warranty Provider Accepted 5.1

BRING DECKING MATERIAL OVER THRESHOLD AND UP SIDE OF JAMB 4" MIN MEMBRANE TO EXTEND UP WALL 8" MIN LAP WATERPROOFING OVER FLAP SO A PROPER LAPPING SEQUENCE CAN BE MADE WITH FIELD PAPER 1 1/2 x 1 1/2 x 6" WEDGE UNDER MEMBRANE DECK MATERIAL RETURNS OVER FLASHING EDGE DECK EDGE FLASHING 60 MIN FLASHING PAPER Deck to Wall Interface NTS Warranty Provider Accepted 5.2

VIINYL OUTSIDE CORNER TRIM CLADDING TWO LAYERS OF BUILDING PAPER DOUBLE LAPPED AT CORNERS FOR VINYL SIDING CLADDING TWO LAYERS OF BUILDING PAPER DOUBLE LAPPED AT CORNERS VINYL INSIDE CORNER TRIM (BACK TO BACK STOPS WILL NOT BE ACCEPTED LEAVE 10MM GAP IN CORNER STRIP OF 60 MINUITE BUILDING PAPER ON TOP OF STRAPPING CAULK CLADDING TO 2 X2 ALL LAYERS OF BUILDING PAPER TO LAP AROUND THE CORNER BY 6" min. FOR SIDING 1 X 4 1 X 4 CAULK STRIP OF 60 MINUITE BUILDING PAPER ON TOP OF STRAPPING LEAVE GAP IN STRAPPING AT CORNER Typical Corners NTS Warranty Provider Accepted 6.0

DRYWALL TWO LAYERS OF BUILDING PAPER PT STRAPPING TO HANG 3/4" BELOW CONCRETE VAPOUR BARRIER SILL GASKET CLADDING TO HANG 1/2" BELOW STRAPPING THERMAL BREAK SLAB ON GRADE 8" MIN Base of Wall NTS Warranty Provider Accepted 7.0

A - 2 LAYERS 30 MINUTE BUILDING PAPER B - PT PLYWOOD STRAPPING C - EXTERIOR CLADDING D - BUG SCREEN E - PRE-FINISHED FLASHING F - 60MIN FLASHING PAPER G - 2" X 10" TRIM H - DIVERTER FLASHING A A B C D 75MM 110 E D 25MM F G H C A Through Wall Flashing & Band Board Warranty Provider Accepted A NTS 8.1

SHEATHING 2 LAYER 30 MIN BUILDING PAPER 60 MIN FLASHING PAPER STRAPPING CLADDING HEAD FLASHING BUG SCREEN POLYURETHANE CAULKING WALL CAP COMBO VENT WITH DRIP FLANGE BUILT IN DRIP FLANGE BUG SCREEN 60MIN FLASHING PAPER 2 LAYERS 30MIN BUILDING PAPER UNDER FLASHING PAPER STRAPPING CLADDING Vent Cap Installation NTS Warranty Provider Accepted 9.1

Drill or punch (do NOT cut with a knife) a 1/4" hole in the middle of a 12" x 12" square of EPDM rubber roofing membrane and push the pipe thorough it. IT MUST MAKE A TIGHT FIT. Place the pipe in the wall and staple only the top of the membrane to the wall sheathing. Solder the pipe into the plumbing system at the inside of the wall. Take care not to heat the EPDM membrane. When applying the building paper, pull the bottom of the EPDM membrane outwards and them push it back along the pipe so it bulges OUT NOT IN at the pipe. Seal the membrane to the pipe with polyurethane caulk. Apply the lower paper under the membrane and the upper paper over the mambrane as shown. Be sure that the upper paper laps over the joint between the lower paper and the membrane by at least 4" as shown. Trim out the hose bib at the cladding line with an approved vinyl trim kit. LOWER PAPER UNDER THE EPDM MEMBRANE UPPER PAPER LAPPED OVER THE MEMBRANE AND THE LOWER PAPER BY 4" Min. UPPER PAPER EPDM MEMBRANE BULGE FACING OUT WITH POLYURETHANE CAULK UPPER PAPER LAPPING OVER MEMBRANE AND LOWER PAPER LOWER PAPER UNDER MEMBRANE AND UPPER PAPER Hose Bib Installation Warranty Provider Accepted NTS 9.2

ALL ELECTRICAL BOXES MUST HAVE GASKETS AND FLANGES Attach the flanged box on the wall with a piece of strapping behind the flange. Apply polyurethane caulk to the flange of the box. Cut a hole 1" smaller in both directions than the size of the opening in the box in the middle of a 12" x 12" square of EPDM rubber roofing membrane. Stretch the membrane over the opening of the box and seal it to the flange. IT MUST BE A TIGHT FIT, Staple only the top of the membrane to the wall. Apply the lower paper under the membrane and the upper paper over the mambrane as shown. Be sure that the upper paper laps over the joint between the lower paper and the membrane by at least 4" as shown. Trim out the electrical box at the cladding line with an approved vinyl trim kit. LOWER PAPER UNDER THE EPDM MEMBRANE UPPER PAPER LAPPED OVER THE MEMBRANE AND THE LOWER PAPER BY 4" Min. UPPER PAPER EPDM MEMBRANE WALL SHEATHING STRAPPING BULGE FACING OUT WITH POLYURETHANE CAULK UPPER PAPER LAPPING OVER MEMBRANE AND LOWER PAPER LOWER PAPER UNDER MEMBRANE AND UPPER PAPER Electrical Box Installation Warranty Provider Accepted NTS 9.3