Bowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange

Similar documents
Jackie Robinson Elementary School

Marcus Moziah Garvey Elementary School

Everett McKinley Dirksen Elementary School

EPIC Academy High School

John Milton Gregory Elementary School

Daniel S Wentworth Elementary School

Alexander Graham Bell Elementary School

Wendell Smith Elementary School

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

Amos Alonzo Stagg Elementary School

Rufus M Hitch Elementary School

Philip Rogers Elementary School

John Spry Elementary Community School

Richard J Oglesby Elementary School

Charles N Holden Elementary School

University of Chicago Charter - Carter G Woodson

Robert Fulton Elementary School

John Harvard Elementary School of Excellence

Morton School of Excellence

Disney II Magnet School

University of Chicago Charter - NKO

Langston Hughes Elementary School

Disney II Magnet High School

Architecture, Construction, and Engineering Technical Charter

William Penn Elementary School

Andrew Carnegie Elementary School

George Washington Elementary School

George W Tilton Elementary School

Jonathan Burr Elementary School

Academy for Global Citizenship Elementary School

North Lawndale College Prep Charter - Collins

John F Kennedy High School

Cyrus H McCormick Elementary School

Brian Piccolo Elementary Specialty School

Arthur E Canty Elementary School

Phoenix Military Academy High School

George Washington High School

Arthur A Libby Elementary School

Norman A Bridge Elementary School

Joseph E Gary Elementary School

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

Amandla Charter High School

Multicultural Academy of Scholarship

John Hancock College Preparatory High School

Richard T Crane Medical Preparatory HS

Theodore Roosevelt High School

Legacy Charter Elementary School

Urban Prep Academy for Young Men - West

John L Marsh Elementary School

Walt Disney Magnet Elementary School

Betty Shabazz Intl Charter - DuSable Leadership

Henry H Nash Elementary School

William Howard Taft High School

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

James Shields Middle School 2611 W 48th St Chicago, IL 60632

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

Joseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641

James Otis Elementary School 525 N Armour St Chicago, IL 60642

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Manley Career Academy High School 2935 W Polk St Chicago, IL 60612

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

Wendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647

William J Onahan Elementary School 6634 W Raven St Chicago, IL 60631

SITE $1,539,659. Item - Type Quantity Unit Rank Cost. Entrance Control - Audio and Video 2 EA Exterior Doors - Exterior Wood Door 2 EA

Charles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639

Francis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER

William Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631

OCPS Submittal Register for Product Data and Shop Drawing Reviews

U of I Facilities Standards Updates for 2017

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

BUILDING DEPARTMENT CURRENT

BUILDING PLAN REVIEW REQUIREMENTS

BUILDING STANDARDS BUILDING AND DEVELOPMENT PERMIT APPLICATION DRAWING REQUIREMENTS

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CHIMNEY Brick Chimney - Concrete/ Mortar Liner Metal Flue 1 7 45 GRE 7 53 145 LF 53 LF CORNICE Cornice - Terra Cotta 1 7,003 418 1,421 LF $30,766 $30,766 Assessment Date: 11/28/2012 Page 1 of 20

DOORS Exterior Steel Door Exterior Wood Door Overhead Rolling / Garage Door Transom Lite 1 7 GRE 6 31 10 GRE 6 25 6 GRE 6 21 21 27 4 $10,240 3 $8,022 $1,027 69 EA $65,405 $84,695 ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio Power Door Operator and Controls Ramp Handrails 1 GRE 6 90 267 GRE 6 5 20 7 GRE 7 2 BLU 5 40 20 357 LF $57,593 25 LF $5,089 2 EA 60 LF $396 $63,079 FIRE ESCAPE Fire Escapes 1 7 GRE 6 50 427 477 LF $5,097 $5,097 FOUNDATION Concrete Foundation Masonry Foundation 1 7,710,185 1,710 LF 1,185 SF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 1 0 GRE 6 3 83 7 10 EA $5,005 86 EA $19,305 Assessment Date: 11/28/2012 Page 2 of 20

$24,310 LINTELS Lintels - Brick Lintels - Steel Lintels - Terra Cotta 1 7 GRE 7 60 33 9 GRE 6 2,060 60 LF 142 LF $5,021 2,060 LF $5,021 PARAPET Coping - Metal Coping - Stone Coping - Terra Cotta Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height 1 7 8 1,302 GRE 6 304 30,058 BLU 5 70 57 82 983 1,320 LF $505 334 LF 1,058 LF 70 LF $16,847 157 LF 1,165 LF $37,790 $55,141 ROOF SYSTEM Asphalt Gravel Ballast Roof Asphalt Shingle Roof Exterior Downspouts Interior Downspouts Metal Roof Modified Bitumen Roof Roof Structure: Steel with Clay Tile Arch Roof Structure: Steel/Metal Deck/Concrete Topping 1 GRE 6 200 97,353 BLU 5 21,364 7 GRE 6 645 70 GRE 6 723 GRE 6 75 3,200 6,485 GRE 6 325 GRE 7 82,542 GRE 7 50,837 97,553 SF $623,446 21,364 SF $141,143 715 LF $11,991 723 LF 9,760 SF $25,502 325 SF $2,301 82,542 SF 50,837 SF $804,383 Assessment Date: 11/28/2012 Page 3 of 20

SUPERSTRUCTURE Slab on Grade Steel Steel with Clay Tile Arch 1 7 GRE 7 4,238 GRE 7 92,966 99,237 4,238 SF 92,966 SF 199,237 SF WALLS Brick Prefabricated Metal Panel Wall Stone - Cast 1 7 GRE 6 29,209 95,223 GRE 6 432 GRE 6 5,099 124,432 SF $192,972 432 SF $3,669 5,099 SF $72,916 $269,557 WINDOWS Curtain wall - Glazed Single Pane Curtain wall - Insulated panel Curtain wall - Louver Skylite - Glass Single-Pane Skylite - Lexan Window - Guards perforated Windows - Casement Aluminum Windows - Decorative Windows - Sash Aluminum Windows - Sash Aluminum Double-pane EXTERIOR 1 YEL 4 5,632 BLU 5 2,920 7 GRE 7 996 BLU 5 1,316 YEL 4 4,649 GRE 7 6,342 GRE 7 702 GRE 7 400,480 6,840 5,632 SF $956,787 2,920 SF $110,236 996 SF 1,316 SF $79,491 4,649 SF $991,626 6,342 SF 702 SF 400 SF 1,480 SF 16,840 SF $2,138,139 $3,480,187 Assessment Date: 11/28/2012 Page 4 of 20

ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency generator 100 to 150 KW diesel - Outdoor Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - CCTV Security System - Intrusion detection 1 7 GRE 7 2 GRE 7 5,938 17,088 GRE 7 24,609 GRE 7 2,779 7 GRE 7 2 2 GRE 7 84 9 GRE 7 2 YEL 4 296,441 82,150 GRE 7 296,441 GRE 7 82,150 2 EA 5,938 SF 117,088 SF 24,609 SF 2,779 SF 17 EA 2 EA 12 EA 84 EA 19 EA 2 EA 378,591 SF $1,100,638 296,441 SF 82,150 SF $1,100,638 MAIN SERVICE Main Electrical service - Live Front - 2000 A 120/208/3PH Main Electrical service 2000 A 120/208/3PH Main Electrical service 2000 to 3000 A 120/208/3PH 1 7 POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp 1 7 3 14 GRE 7 2 27 EA $70,642 2 EA Assessment Date: 11/28/2012 Page 5 of 20

Main distribution panels less than 400 amp ELECTRICAL 1 2 EA $6,578 $77,220 $1,177,858 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION 1 7 GRE 7 296,441 22,842 296,441 SF 122,842 SF MECHANICAL AIR CONDITIONING Chillers - Air Cooled - Rotary/Screw type - Ground Mounted 100 to 200 tons Condensing - Ground Mounted less than 5 tons Condensing - Roof Mounted 5 to 10 tons Window A/C AIR HANDLING SYSTEMS Air Handling Package - Multi Zone - Hot Water 15,001-20,000 cfm Air Handling Package - Single Zone - Electric 12,001 to 20,000 cfm Air Intake - Built Up Air Handling Air intake for all Air Handling s except built up AHU Make Up Air - Roof Mounted - Gas-Heating less than 6,000 cfm Multi Zone Built Up Air Handling - Steam above 35,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam above 35,000 cfm Reheat Boxes With Steam Coils 1 GRE 6 4 GRE 6 7 1 GRE 6 2 YEL 4 2 YEL 4 2 1 GRE 6 4 YEL 4 3 YEL 4 3 GRE 6 2 7 7 $25,597 $715 4 EA $9,152 7 EA $1,502 $36,966 2 EA $18,590 2 EA $148,720 3 EA $68,354 4 EA $5,720 $2,860 3 EA $493,350 3 EA $132,990 2 EA $2,088 Assessment Date: 11/28/2012 Page 6 of 20

Return Duct Work - Indoor - Vertical Shaft and Ducts Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft Return Fans - Indoor 10,001 to 20,000 CFM GRE 7 400 YEL 4 300 GRE 6 4 400 LF 300 LF $793,650 4 EA $9,724 $1,676,046 BOILER SYSTEMS Boiler Assembly - Non-Condensing Scotch Marine Hot Water Boiler greater than 4,000 MBH Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler greater than 200 HP Boiler Auxiliary - Steam Boiler greater than 200 HP Boiler Auxiliary Non-Condensing Hot Water Boiler greater than 4,000MBH Chemical Feed System (Steam Boilers) Chemical Pot Feeder - Hot Water Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Glycol Feed System 1 BLU 5 1 BLU 5 2 GRE 6 2 BLU 5 1 7 1 GRE 6 2 3 BLU 5 1 $155,155 2 EA $200,200 2 EA $6,578 $32,890 $2,145 2 EA $1,502 5 EA $572 $19,305 $1,087 $419,433 HEATING DEVICES Fin Tube Hot Water Radiators - Hot Water Radiators - Steam Heater - Hot Water MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Hydronic Supply and Return - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Chilled Water less than 10 HP 1 GRE 6 200 GRE 6 5 GRE 6 35 GRE 6 8 1 YEL 4 2 ORA 3 700 BLU 5 500 BLU 5 700 GRE 6 2 7 7 200 LF $3,432 5 EA $629 35 EA $4,905 8 EA $11,440 $20,406 2 EA $57,200 700 LF $68,569 500 LF $24,739 700 LF $34,635 2 EA $4,004 Assessment Date: 11/28/2012 Page 7 of 20

Pumps - Hot Water 5 to 10 HP GRE 6 2 2 EA $4,004 $193,150 TEMPERATURE CONTROL Pneumatic System Thermostats - Pneumatic Zone Dampers UNIT VENTILATION Ventilators - Hot Water and Chilled Water VENTILATION 1 BLU 5 214,291 82,150 BLU 5 10 90 18 YEL 4 106 8 1 GRE 6 31 7 7 296,441 SF $1,561,549 118 EA $59,345 114 EA $90,576 $1,711,470 3 $53,196 $53,196 Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM Lab Exhaust Hood Type I Exhaust Hood - Kitchen or Culinary Arts MECHANICAL 1 7 2 BLU 5 1 1 2 1 GRE 6 2 GRE 6 6 ORA 2 1 3 EA $4,290 5 EA $5,034 2 EA $315 6 EA $19,734 $26,884 $56,256 $4,166,923 PLUMBING HOT WATER Hot Water Heater - Gas 150,000-300,000 BTU/HR Hot Water Heater - Gas more than 300,000 BTU/HR Storage Tank less than 500 gallons 1 GRE 6 2 GRE 6 2 7 2 EA $8,294 2 EA $13,442 $21,736 Assessment Date: 11/28/2012 Page 8 of 20

PIPING Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping 1 7 GRE 6 82,150 199,237 YEL 4 199,237 82,150 GRE 6 82,150 199,237 YEL 4 199,237 82,150 YEL 4 199,237 82,150 GRE 6 4,238 10,816 82,150 199,237 GRE 6 4,238 10,816 82,150 199,237 BLU 5 169,361 82,150 40,692 99,237 82,150 99,237 82,150 99,237 82,150 281,387 SF $14,097 281,387 SF $155,228 281,387 SF $93,980 281,387 SF $108,792 281,387 SF $129,411 296,441 SF $108,785 296,441 SF $73,173 292,203 SF $238,389 281,387 SF $122,511 281,387 SF $94,020 281,387 SF $71,227 $1,209,613 POOL SYSTEMS 1 7 Pool Drain Piping YEL 4 150 150 LF $25,740 Pool Filtration System YEL 4 1 $217,360 Pool Hot Water Heater - Steam Heat Exchanger YEL 4 1 $13,013 Pool Supply and Return Piping YEL 4 150 150 LF $23,595 $279,708 PUMPS Domestic Booster Pump duplex Ejector Pump Sump Pump PLUMBING 1 BLU 5 1 YEL 4 1 1 YEL 4 1 7 $15,730 2 EA $33,033 $11,869 $60,632 $1,571,689 Assessment Date: 11/28/2012 Page 9 of 20

INTERIOR ADMINISTRATIVE SUITES Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Concrete Flooring - Terrazzo Flooring - Tile/Sheet Flooring - Wood Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile 1 7 GRE 6 9,167 3,008,143,688 GRE 6 83 GRE 7 385 GRE 6 8,329 2,488 GRE 6 345 BLU 5 111 49 BLU 5 9 3 GRE 6 5,195 1,988 GRE 6 960 6,056 7,303 GRE 6 648 12,175 SF $19,663 1,143 SF $3,236 1,688 SF $2,414 83 SF $392 385 SF 10,817 SF $11,910 345 SF $2,605 160 SF $516 12 SF $59 7,183 SF $14,858 14,319 SF $18,819 648 SF $4,633 $79,106 AUDITORIUM - DEDICATED Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System 1 GRE 6 60 GRE 6 568 7 0 60 EA $2,208 568 EA $20,907 10 EA $23,116 CHORAL ROOM Risers 1 7 GRE 6 80 187 267 LF $515 $515 Assessment Date: 11/28/2012 Page 10 of 20

CLASSROOMS Work Sink 1 BLU 5 1 7 $1,931 $1,931 CORRIDOR Student Lockers DOORS 1 GRE 6 20 7 20 EA $2,860 $2,860 Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Transom Window 1 7 GRE 6 38 21 4 196 94 GRE 6 90 26 41 36 59 EA $10,759 304 EA $62,102 116 SF $1,673 177 SF $2,621 $77,156 DRINKING FOUNTAINS Single Fountain 1 7 GRE 6 4 18 22 EA $1,544 $1,544 GYMNASIUM / AUDITORIUM Bleacher Seating Ceiling - Exposed Ceiling - Plaster/Drywall Flooring - Wood Lighting - Metal Halide/Sodium Vapor Scoreboards Sound System 1 GRE 6 440 GRE 6 8,021 GRE 6 3,007 5,661 7 GRE 6 5,661 11,028 GRE 7 79 GRE 7 2 GRE 7 2 440 EA $10,633 8,021 SF $61,021 8,668 SF $78,510 16,689 SF $42,743 79 EA 2 EA 2 EA Assessment Date: 11/28/2012 Page 11 of 20

Walls - Concrete Block Walls - Structural Glazed Tile GRE 7 8,487 BLU 5 6,785 4,805 8,487 SF 11,590 SF $354,540 $547,446 KITCHEN Ceiling - Plaster/Drywall Flooring - Concrete Lighting - Pendant/Surface Wall - Plaster/Drywall 1 GRE 6 850 7 GRE 7 850 GRE 7 20,222 850 SF $3,209 850 SF 20 SF 1,222 SF $3,209 LIBRARY Casework Flooring Tile/ Sheet Lighting - Lay-In LOCKER/SHOWER ROOM 1 GRE 6 360 GRE 6 2,370 YEL 4 60 7 360 LF $11,042 2,370 SF $3,389 60 SF $279 $14,710 Benches Lockers Showers 1 50 7 GRE 6 218 400 3 26 150 LF $858 618 EA $10,699 39 EA $3,160 $14,717 LUNCHROOM Ceiling - Lay-In Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Serving Line 1 7 GRE 6 7,086 834 GRE 6 834 7,086 YEL 4 72 2 68 7,920 SF $15,199 7,920 SF $1,193 72 SF $335 12 SF 168 LF Assessment Date: 11/28/2012 Page 12 of 20

Wall - Plaster/Drywall Wall - Structural Glazed Tile GRE 6 5,236 GRE 7 4,304 5,236 SF $12,354 4,304 SF $29,081 MDF/IDF Finishes Ventilation and Cooling 1 BLU 5 275 7 275 SF $3,083 $3,083 MECHANICAL/SERVICE ROOMS Air Handling/ Mechanical Room Air Intake Plenums Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room Vaults 1 GRE 6 800 BLU 5 900 7,985 GRE 6 2 4 GRE 6 3,429 5,195 GRE 6 2,071 7,905 1,372 GRE 6 97 70 800 SF $3,775 900 SF $10,193 1,985 SF 6 SF $9 8,624 SF $16,181 11,348 SF $60,759 167 SF $458 $91,376 PHYSICAL EDUCATION ROOMS Weight/ Fitness Room Floor Matting STAFF RESTROOM 1,400 2,265 7 3,665 SF $28,589 $28,589 Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete 1 7 GRE 6 9,206 2,523 10 GRE 6 3,029 5,143 GRE 7 39 GRE 6 6,657 11,729 SF $71,089 110 SF $236 8,172 SF $8,576 39 EA 6,657 SF $31,414 Assessment Date: 11/28/2012 Page 13 of 20

Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Wall - Tile Ceramic/ Porcelain Water Closet,473 3,598 GRE 6 62 GRE 7 22 GRE 6 3 49 YEL 4 18 GRE 6 35 1 123 49 54 GRE 6 2 37 80 2,858 6,422 GRE 6 362 1,004 1,538 GRE 6 2,351 5,425 BLU 5 180 68 5,071 SF $3,749 62 SF $89 22 EA 52 EA $5,577 18 SF $64 159 SF $151 104 EA $9,359 39 EA $3,718 9,460 SF $9,533 2,904 SF $4,077 7,776 SF $16,810 180 SF $2,831 69 EA $1,859 $169,133 SWIMMING POOL Accessories Bleacher Seating/Plank seating Lighting - Pendant/ Surface Pool Basin Pool Deck Pool deck drains Splined Ceiling including access Structural Glazed Tile 1 GRE 6 4 7 GRE 7 48 GRE 6 72 BLU 5 1,538,800 0 GRE 6 3,094 GRE 6 4,256 4 SF $31 48 EA 72 SF $77 1,538 SF $145,156 1,800 SF 10 EA 3,094 SF $33,183 4,256 SF $30,430 $208,878 THEATER Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Concrete Lighting - Pendant/ Surface 1 7 GRE 7 5,938 GRE 6 2,969 GRE 7 2,969 GRE 7 8 5,938 SF 2,969 SF $4,246 2,969 SF 8 SF Assessment Date: 11/28/2012 Page 14 of 20

Stage Stage Platform Wall - Plaster/Drywall Wall - Structural Glazed Tile,207 GRE 6 288 GRE 7 5,968 GRE 7 5,968 1,207 SF 288 SF $1,223 5,968 SF 5,968 SF $5,469 VERTICAL CONVEYANCE Elevator - Roped Holeless Hydraulic Stage Lift 1 7 VOCATIONAL SHOP Work Sink INTERIOR 1 7 GRE 6 2 1 32 35 EA $4,247 $4,247 $1,306,165 ROOM CASEWORK Casework 1 7 GRE 6 210 879 682 1,771 LF $68,962 $68,962 CEILING Ceiling Exposed Ceiling Lay-In/Drop Plaster/Drywall Splined Ceiling 1 GRE 6 895 GRE 6 385 7 GRE 6 892 69,169 3,350 GRE 6 7,045 6,676 895 BLU 5 1,565 895 SF $2,534 385 SF $727 73,411 SF $153,419 14,616 SF $58,797 1,565 SF $8,862 $224,339 Assessment Date: 11/28/2012 Page 15 of 20

CHALK BOARD Chalk Board CLASSROOM 1 YEL 4 1,381 Bowen High School 7 1,381 LF $167,861 $167,861 Eye Wash Station Laptop Charging Station Science Lab Elements Science Lab Shower 1 7 GRE 7 2 GRE 7 6 GRE 6 857 1,009 GRE 7 2 2 EA 6 EA 1,866 SF $40,442 2 EA $40,442 CORRIDORS Concrete Block Drop/Lay-In Lay-In Pendant/Surface Plaster/Drywall Single Water Cooler Stair Handrails Student Lockers Terrazzo Tile/Sheet Flooring 1 7 GRE 7 24,306 GRE 6 51,620 YEL 4 208 YEL 4 2,512 GRE 6 58,222 GRE 6 4,144,575 GRE 7 2,901 GRE 6 48,881 24,306 SF 51,620 SF $110,725 208 EA $1,264 2,512 EA $24,427 58,222 SF $137,375 4 EA $2,460 1,144 LF 1,575 EA $225,225 2,901 SF 48,881 SF $69,900 $571,375 FLOOR Concrete Tile/Sheet Wood 1 BLU 5 2,545 7,695 49,647 5,223 GRE 6 32,047 2,545 SF $12,010 56,565 SF $80,594 32,047 SF $241,968 Assessment Date: 11/28/2012 Page 16 of 20

$334,571 LIBRARY_CEILING Drop/Lay-In LIBRARY_WALL Concrete Block Mansory LIGHTING 1 GRE 6 2,370 1,350 GRE 6 830 7 7 2,370 SF $5,084 $5,084 1,350 SF $3,861 830 SF $10,682 $14,543 Lay-In Pendant/Surface 1 7 YEL 4 1,154 33 YEL 4 279 1,187 EA $429,057 279 EA $109,717 $538,774 MARKER BOARD Marker Board 1 7,928 1,928 LF RESTROOM_CEILING Restroom Ceiling 1 7 GRE 7 3,508 3,508 SF STAIRS Terrazzo 1 7 GRE 7 591 591 SF Assessment Date: 11/28/2012 Page 17 of 20

WALL Concrete Block Masonry Metal/Folding Panel Plaster/Drywall ROOM 1 7 GRE 6 28,125 5,610 BLU 5 7,495 1,500 440 GRE 6 670 0,538 51,333 6,532 33,735 SF $80,438 9,435 SF $302,256 670 SF $1,581 68,403 SF $170,849 $555,124 $2,521,073 SITE CIVIL/DRAINAGE Catch Basin Site Manhole 1 7 4 GRE 7 24 14 EA 24 EA FENCING Chain Link Ornamental Iron 1 GRE 6 224 7 5 200 1,248 224 LF $3,213 1,463 LF $4,710 $7,922 LANDSCAPE Benches Grass Parkway trees Planting Beds/ Areas Retaining Wall - Concrete Retaining Wall - Masonry Trash Receptacles 1 7 GRE 7 46 GRE 6 600 87,001 GRE 7 55 GRE 6 23,501 GRE 6 48 50 GRE 7 5 46 EA 87,601 SF $781 55 EA 23,501 SF 48 SF $1,133 150 SF $2,124 5 EA Assessment Date: 11/28/2012 Page 18 of 20

$4,037 PARKING LOT Asphalt Concrete Curbs Lights, Pole Mounted Parking lot interior plantings Trash Compactor Vehicular Screening 1 GRE 6 97,613,254 BLU 5 6 GRE 6 340 7 GRE 7 35 97,613 SF $83,752 1,254 LF $7,567 6 EA $24,024 340 LF $3,575 35 LF $118,918 PLAYGROUND Playground Equipment - Pre-K 3-5 Playground Surfacing - Poured Surface Playground Surfacing - Wood Chips 1 3 7 GRE 7 404 YEL 4 1,115 4 EA 404 SF 1,115 SF $7,175 $7,175 SIDEWALKS Internal Walks Perimeter Sidewalks 1 7 GRE 6 988 214 GRE 6 8,281 22,442 1,202 LF $9,325 30,723 SF $15,631 $24,956 SIGNAGE Flag Pole Marquee - Free Standing Back Lighted w/ LED SITE 1 BLU 5 1 7 $16,517 $16,517 $179,525 Assessment Date: 11/28/2012 Page 19 of 20

Campus Need ² ³ $14,403,420 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 11/28/2012 Page 20 of 20