Information on the Evaluation of VHF and UHF Terrestrial Cross-Border Frequency Coordination Requests

Similar documents
Propagation Modelling White Paper

Supporting Network Planning Tools II

Introduction. TV Coverage and Interference, February 06, 2004.

Technical Requirements for Fixed Line-of-Sight Radio Systems Operating in the Band MHz

Point-to-Multipoint Coexistence with C-band FSS. March 27th, 2018

Technical Requirements for Fixed Radio Systems Operating in the Bands GHz and GHz

Technical Requirements for Fixed Line-of-Sight Radio Systems Operating in the Band MHz

Technical Requirements for Fixed Radio Systems Operating in the Bands GHz and GHz

COMPATIBILITY BETWEEN NARROWBAND DIGITAL PMR/PAMR AND TACTICAL RADIO RELAY IN THE 900 MHz BAND. Cavtat, May 2003

Technical Requirements for Fixed Line-of-Sight Radio Systems Operating in the Band GHz

ECC Report 276. Thresholds for the coordination of CDMA and LTE broadband systems in the 400 MHz band

Earth Station Coordination

SRSP-101 Issue 1 May Spectrum Management. Standard Radio System Plan

Technical Requirements for Fixed Wireless Access Systems Operating in the Band MHz

RECOMMENDATION ITU-R F.1819

Part 9: Application Procedures and Rules for Terrestrial S-DARS Undertakings (Satellite Digital Audio Radio Service)

ADJACENT BAND COMPATIBILITY BETWEEN GSM AND TETRA MOBILE SERVICES AT 915 MHz

Technical Requirements for Fixed Line-of-Sight Radio Systems Operating in the Band MHz

Technical Requirements for Land Mobile and Fixed Radio Services Operating in the Bands MHz and MHz

PART 1 RECOMMENDATION ITU-R P.1144 GUIDE TO THE APPLICATION OF THE PROPAGATION METHODS OF RADIOCOMMUNICATION STUDY GROUP 3

Spectrum Management and Telecommunications

Sharing Considerations Between Small Cells and Geostationary Satellite Networks in the Fixed-Satellite Service in the GHz Frequency Band

RECOMMENDATION ITU-R F.1402*, **

Mobile Radio Wave propagation channel- Path loss Models

Technical Requirements for Fixed Radio Systems Operating in the Bands MHz and MHz

Radio Propagation Fundamentals

Technical Requirements for Remote Rural Broadband Systems (RRBS) Operating in the Bands MHz and MHz (TV Channels 21 to 51)

RECOMMENDATION ITU-R P Guide to the application of the propagation methods of Radiocommunication Study Group 3

Adjacent Channel Studies in the FM Band

Technical Requirements for Cellular Radiotelephone Systems Operating in the Bands MHz and MHz

Contents. ITS323: Introduction to Data Communications CSS331: Fundamentals of Data Communications. Transmission Media and Spectrum.

ITS323: Introduction to Data Communications CSS331: Fundamentals of Data Communications

Notice of coordination procedure required under spectrum access licences for the 2.6 GHz band

Abstract. Propagation tests for land-mobile radio service

PROPAGATION MODELING 4C4

SRSP-518 Issue 2 October Spectrum Management and Telecommunications. Standard Radio System Plan

Notice of aeronautical radar coordination. Coordination procedure for air traffic control radar - notice issued to 3.

ADJACENT BAND COMPATIBILITY OF 400 MHZ TETRA AND ANALOGUE FM PMR AN ANALYSIS COMPLETED USING A MONTE CARLO BASED SIMULATION TOOL

RECOMMENDATION ITU-R P ATTENUATION IN VEGETATION. (Question ITU-R 202/3)

Chapter 1: Telecommunication Fundamentals

Antennas & Propagation. CSG 250 Fall 2007 Rajmohan Rajaraman

COMPATIBILITY AND SHARING ANALYSIS BETWEEN DVB T AND TALKBACK LINKS IN BANDS IV AND V

SRSP Issue 2 March 3, Spectrum Management. Standard Radio System Plan

Table 1: OoB e.i.r.p. limits for the MFCN SDL base station operating in the band MHz

Near-Earth Propagation Models

Channel models and antennas

The Measurement and Characterisation of Ultra Wide-Band (UWB) Intentionally Radiated Signals

ECC Recommendation (16)04

INTRODUCTION OF RADIO MICROPHONE APPLICATIONS IN THE FREQUENCY RANGE MHz

Point to point Radiocommunication

Technical Requirements for Fixed Line-of-Sight Radio Systems Operating in the Band MHz

Determination of Propagation Path Loss and Contour Map for Adaba FM Radio Station in Akure Nigeria

RECOMMENDATION ITU-R S.1341*

France. 1 Introduction. 2 Employed methodology. Radiocommunication Study Groups

Review of Path Loss models in different environments

SPECTRUM SHARING AND COMPATIBILITY BETWEEN THE INTERNATIONAL MOBILE TELECOMMUNICATION- ADVANCED AND DIGITAL BROADCASTING IN THE DIGITAL DIVIDEND BAND

RECOMMENDATION ITU-R SA Protection criteria for deep-space research

A Simple Field Strength Model for Broadcast Application in VHF Band in Minna City, Niger State, Nigeria

Antennas and Propagation

Technical and operational characteristics of land mobile MF/HF systems

Terrain Reflection and Diffraction, Part One

Cell Extender Antenna System Design Guide Lines

ECC Report 197. COMPATIBILITY STUDIES MSS TERMINALS TRANSMITTING TO A SATELLITE IN THE BAND MHz AND ADJACENT CHANNEL UMTS SERVICES

UNIT Derive the fundamental equation for free space propagation?

Technical Requirements for Wireless Broadband Services (WBS) in the Band MHz

Study of Factors which affect the Calculation of Co- Channel Interference in a Radio Link

Derivation of Power Flux Density Spectrum Usage Rights

RECOMMENDATION ITU-R F Characteristics of HF fixed radiocommunication systems

Chapter 15: Radio-Wave Propagation

Consultation on the Use of the Band GHz

ADJACENT BAND COMPATIBILITY OF TETRA AND TETRAPOL IN THE MHZ FREQUENCY RANGE, AN ANALYSIS COMPLETED USING A MONTE CARLO BASED SIMULATION TOOL

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

International Journal of Engineering and Technology Volume 3 No. 6, June, 2013

Mobile Hata Model and Walkfisch Ikegami

6 th INTERNATIONAL FORUM ON DIGITAL TV, LA HABANA November 5 to 7, 2018 DIGITAL DIVIDEND SPECTRUM SHARING ISSUES

AUSTRALIAN BROADCASTING PLANNING HANDBOOK FOR DIGITAL TERRESTRIAL TELEVISION BROADCASTING

Empirical Path Loss Models

Narrow- and wideband channels

Part 10: Application Procedures and Rules for Digital Television (DTV) Undertakings

Antennas and Propagation. Chapter 5

Radio compliance test

Prediction of clutter loss

Propagation curves for aeronautical mobile and radionavigation services using the VHF, UHF and SHF bands

Medical Devices Operating in the Band MHz

RECOMMENDATION ITU-R M.1652 *

Digital Transmission Systems (DTSs), Frequency Hopping Systems (FHSs) and Licence-Exempt Local Area Network (LE-LAN) Devices

Antennas and Propagation. Chapter 5

INTRODUCTION TO RF PROPAGATION

Technical Requirements for Fixed Radio Systems Operating in the Band GHz

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

Basic Understanding of FCC 700 MHz Rules

Revision of Lecture One

Revision of Lecture One

RECOMMENDATION ITU-R SF.1719

Technical characteristics and protection criteria for aeronautical mobile service systems in the frequency range GHz

Application Note No. 7 Radio Link Calculations (Link_Calc.xls)

Revised Technical Annex Telecommunication: Coordination and Use of Radio Frequencies Above 30 Megacycles per Second

Channel models and antennas

Antennas and Propagation


Transcription:

Issue 1 May 2013 Spectrum Management and Telecommunications Technical Bulletin Information on the Evaluation of VHF and UHF Terrestrial Cross-Border Frequency Coordination Requests Aussi disponible en français BT-7

Contents 1. Introduction... 1 2. Purpose... 1 3. Evaluation of Cross-Border Frequency Coordination Requests... 1 4. Initial EMC analysis... 2 5. In-Depth Analysis of Potential Conflicts... 6 6. Further Considerations... 8 i

1. Introduction In the mobile allocations in the bands UHF (406.1-430 MHz and 450-470 MHz) and VHF (138-144 MHz and 148-174 MHz), frequencies are coordinated on a first-come, first-served basis. Industry Canada receives a large number of coordination requests from the Federal Communications Commission and the National Telecommunications and Information Administration every year. Each request is assessed based on technical criteria and on the potential of interference to existing coordinated Canadian stations within the border area. 2. Purpose The purpose of this bulletin is to describe the Industry Canada evaluation process of VHF and UHF terrestrial cross-border frequency coordination requests. 3. Evaluation of Cross-Border Frequency Coordination Requests The evaluation of cross-border frequency coordination requests is a two-step process. The initial Land Mobile Electromagnetic Compatibility (LM EMC) analysis is performed using Industry Canada s LM EMC computer program, which determines whether there are potential conflicts based on the worst-case scenario (i.e. large culling distances, and use of the free space path loss model). Table 1 below shows the VHF and UHF frequency analysis default culling limits used by the LM EMC program to identify potential conflicts. Table 1 VHF and UHF frequency analysis culling limits Distance (km) Frequency Separation (khz) 240 ±35 This first step, the initial EMC analysis, provides a broad view of the Canadian radio environment that may be impacted by the proposed U.S. station. The large culling limit ensures inclusion of any circumstances where there may be conflicts beyond typical co-channel sharing distances. Such examples may include large areas of operations for either or both U.S. and Canadian stations (noting that the distance is taken between centres of operations) and mountain top line-of-sight conditions. Each EMC is manually reviewed. Many of the potential conflicts listed that have large separation distances can be quickly disregarded based on the technical and operational characteristics of the stations under study. If no potential conflicts remain once this first review has been completed, then the coordination request will be approved. No further analysis will be required since this initial analysis is based on large culling distances and on the free-space path loss model, which is a worst-case propagation scenario. However, if conflicts are found, the second step of the process will be undertaken. This step involves an in-depth analysis of each of these potential conflicts that uses more refined parameters to determine whether the attenuation of the signal reaching the victim receivers is greater than the one assumed in the initial analysis, and to determine whether this attenuation is enough for the two systems to co-exist. 1

Section 4 of this document describes the parameters used in the initial LM EMC analysis, while Section 5 provides details regarding the parameters used in the in-depth analysis of the various conflicts. 4. Initial EMC analysis The initial EMC analysis is performed based on calculating the received power of the interfering signal of the victim station receiver and comparing the received power to the minimum received signal power and the required desired-to-undesired signal ratio. The interfering signal strength is calculated using the following equation: P IN = ERP PL OCR + G R L R where: P IN = interfering signal strength at the receiver, in dbw ERP = effective radiated power of the transmitter, in dbw PL = free-space path loss, in db OCR = off-channel rejection, in db G R = receiver antenna gain, in dbd L R = receiver total losses, in db The ERP consists of: ERP = P T + G T L T where: P T = transmitted power, in dbw G T = transmitter antenna gain, in dbd L T = transmitter total losses, in db Path Loss (PL) Free-space path loss is normally used to determine the level of signal attenuation between transmitting and receiving antennas of sufficient height (above 20 metres) that are in close proximity (within 5 km) where one expects clear line-of-sight. However, free-space path loss is used in the initial LM EMC analysis for all distances since this represents the minimum path loss possible and it is thus considered to be a very conservative analysis. Consequently, if no conflicts are found using the free-space path loss propagation formula, then it is unlikely that a conflict will arise if a detailed analysis is performed which takes into consideration additional factors further attenuating the signal. Free-space path loss is based on the following equation: PL = 28.2 + 20 Log F + 20 log D where: F = frequency of the transmitter, in MHz D = distance between the transmitter and the receiver stations, in km 2

Off-Channel Rejection (OCR) While performing the initial LM EMC, the program takes into consideration the off-channel rejection (OCR) values. OCR value is an attenuation value used to compensate for the reduction of power at a frequency separation, f, between interfering transmitter and victim receiver frequencies, since not all of the power will fall into the receiver s filter. OCR is also sometimes referred to as adjacent channel coupled power (ACCP) or as frequency dependent rejection (FDR). For f # 35 khz, OCR is based on the following equation: OCR f 10log 10 db P( f ) df 2 P ( f ) H ( f f ) df where: P(f) = power spectral density (PSD) of the transmitter in Watts/Hz *H(f)* 2 = squared magnitude frequency response of the receiver )f = frequency spacing between the victim receiver and the interfering transmitter When a receiver (RX) and a transmitter (TX) are co-channel (i.e. Δf = 0), the majority of the power from the transmitter is received by the victim receiver, assuming both have the same bandwidths, as shown in Figure 1. In such instances, the OCR is zero. Figure 1: ACCP co-channel example 3

OCR is only taken into account when there is a frequency separation between the transmitter and the receiver. In such cases, not all of the power of the transmitter is received by the receiver due to the properties of transmitted emissions and the filter frequency response of the receiver, as shown in Figure 2. f RX TX Power being rejected by the victim receiver or OCR Power entering the victim receiver Figure 2: ACCP off-channel example ACCP becomes the main interference mechanism when the interfering carrier power spread by the modulation starts to enter the victim receiver s pass-band. The OCR values used by the LM EMC program are based on a set of curves and only reflect the dominant interference source present at specific frequency separations. Within frequency separations of 35 khz, the dominant interference can be attributed to the adjacent channel coupled power. There are different curves, depending on the nature of both the transmitted signal and the expected signal at the receiver, such as: 1. analog vs. digital signal; and 2. 30 khz, 25 khz, 15 khz, 12.5 khz, 7.5 khz and 6.25 khz channel bandwidths. The OCR curves were derived from actual physical measurements performed by Industry Canada and generally align with the values provided in the Telecommunications Systems Bulletin TSB-88-B, 1 Wireless Communications Systems Performance in Noise and Interference Limited Situations Recommended Methods for Technology Independent Modeling, Simulation, and Verification. The OCR curves are valid for signals with necessary bandwidths equal to or less than 16 khz. 2 1 2 TSB-88 is a TIA standard. For information on TIA standards, see: http://www.tiaonline.org/standards/buy-tia-standards. In Canada, an analog signal with a necessary bandwidth of 16 khz is used based on a 16F3E emission designation. This is equivalent to the 20 khz authorized bandwidth used in the U.S. for an analog signal with a 20F3E emission. This U.S. signal with a 20 khz authorized bandwidth would have a necessary bandwidth of about 16 khz. 4

Interference Threshold (P Thres. ) The interfering signal strength at the receiver (P IN ), which is calculated using the equation noted above, is then compared to the interference threshold (P Thres. ). The interference threshold is the maximum interference power that can reach the receiver without causing harmful interference. The interference threshold, which is a combination of the environmental noise and the desired-to-undesired (D/U) signal ratio from a single interfering source, can be expressed as follows: P Thres = P min D/U where: P Thres = interference threshold, in dbw P min = minimum desired signal, in dbw (based on environmental noise) D/U = desired to undesired signal ratio, in db Environmental Noise Depending on the location of the receiver and its noise environment, the minimum desired signal (P min ), or the receiver s working signal level, will be set to the level shown in Table 2. Table 2 Minimum desired signal level based on the location of the receiver Band (MHz) Rural Area (dbw) Suburban Area (dbw) Urban Area (dbw) 138-174 - 148-141 - 132 406-470 - 146-145 - 138 The minimum desired signal values shown in Table 2 are used in the initial EMC analysis when the path loss is calculated based on the free-space propagation model and when no other propagation losses are taken into account. Otherwise, when an in-depth analysis is performed, the assessment is based on the -146 dbw maximum interfering signal, as indicated in Section 5. Desired-to-Undesired Signal Ratio The LM EMC program also uses the Desired/Undesired (D/U) signal ratios, shown below in Table 3. Table 3 D/U ratios used by the EMC program for both VHF and UHF Signal Characteristics D/U Ratio (db) Analog Wideband 5 Analog Narrowband 7 Digital Narrowband 7 The D/U ratios for analog transmitters are based on the average D/U values recorded during OCR testing for various type of conflicts, while the D/U ratio for digital transmitters is based on the value found in TSB-88-B. 5

Conflict The initial LM EMC analysis will flag a potential conflict if the calculated interfering signal strength at the receiver (P IN ) is greater than the interference threshold (P Thres. ), i.e. if P IN > P Thres. In such cases, an in-depth analysis may be required. 5. In-Depth Analysis of Potential Conflicts Once the initial LM EMC analysis has identified one or several potential conflicts, an in-depth analysis of each potential conflict will be performed using more refined parameters. Industry Canada has developed a software tool in MapInfo 3 that enables the user to predict a more accurate path loss for VHF and UHF frequencies by taking into account additional factors. Its main component consists of a topographical database, which takes into account the terrain between two points. CRC-Predict Industry Canada uses the CRC-Predict propagation model to model path loss. 4 The basic path loss is established using the free-space propagation model. Then the loss incurred due to terrain variation is added in. In order to do so, CRC-Predict calculates both the diffraction loss and the tropospheric scatter loss between the two points. The greater of these two losses is then added to the free-space path loss. Then the K-factor (to take account of refraction), the time variability and the location variability are factored in. CRC-Predict v3.2.1 is the version used by spectrum management officers. Terrain Data The Canadian Digital Elevation Data (CDED) topographical database is used to determine the ground elevation variations between the transmitter and the receiver, using the mean sea level as a reference. The data is compatible with the US Digital Terrain Elevation Data (DTED). Coordinates are based on the North American Datum 1983 (NAD83) horizontal reference datum. Land cover, such as bare ground, forest, marsh, swamp, trees and water (as well as generalized urban clutter) is also included in the terrain profile, and is taken into account in the path loss calculations. In Canada and up to 400 km away from the border on U.S. territory, the Industry Canada software uses a 100-meter grid resolution for the terrain data. In addition, within Canada, terrain data with a 30-meter grid resolution is available for latitudes up to 56 degrees. However, technology is always improving; as revised versions of the databases with greater resolution become available, it is expected that they will be incorporated in future versions of CRC-Predict. 3 4 MapInfo is a commercial software with Microsoft Windows based mapping and geographic analysis applications. For details, see: http://www.pb.com/mapinfo/. For information on the CRC-Predict propagation model, see: http://www2.elo.utfsm.cl/~ipd465/papers%20y%20apuntes%20varios/sac%20april%202002/00995510.pdf. 6

Time and Location Variability and K-Factor Time variability accounts for variations in atmospheric refraction and perturbations. For transmitter/receiver separation distances greater than 50 km, the time variability becomes important. For interference analysis, the time variability is set at 10%. The K-factor, which is also dependent on the atmospheric conditions, is the ratio of the effective Earth radius to the actual Earth radius. The K-factor typically used in propagation is 4/3, and it is based on standard atmospheric refraction. The standard 4/3 K-factor is used in the CRC-Predict interference analysis. Location variability takes into account the path loss variances of a moving mobile. Since most coordination requests study the propagation profile between two base stations at fixed locations, the median value of 50% is used in analyses. Maximum Interfering Signal A maximum allowable interfering received signal level of -146 dbw is used when analyzing potential conflicts with CRC-Predict. However, when the analysis performed by the Industry Canada program still indicates that there is a potential interference conflict, others factors such as urban versus suburban area, public safety system versus paging system, etc. might be considered. Antenna and System Parameters The Industry Canada program allows the user to enter the transmitter and the receiver antenna heights, gains and polarizations, as well as the transmit power and system losses, so that these parameters are taken into consideration when performing an interference analysis. In the program, antenna gains are based on isotropic sources; therefore, a conversion to dbi units might be required. It should be noted that the antenna gains shown in both Industry Canada s and the FCC s databases are in dbd for frequencies below 960 MHz, and in dbi for frequencies equal to or greater than 960 MHz. However, the antenna gains shown in the NTIA database are in dbi for all frequencies. Antenna gains expressed in dbd units are based on a dipole antenna. To convert the antenna gain from dbd to dbi units, add 2.15 db to the dbd value. Point-to-Point vs. Point-to-Area The Industry Canada program enables the user to perform either a point-to-point or a point-to-area path loss analysis. When considering two fixed stations, the point-to-point analysis should be performed. However, for an analysis of the impact of a fixed station on a mobile one, the point-to-area analysis should be performed to evaluate the impact of the new fixed station on the whole area of operation of the mobile station. Propagation Models CRC-Predict is the reference propagation model used for interference analysis. However, spectrum management officers also have access to other models, such as Longley Rice and Okumura-Hata- Davidson. These propagation models are available through the Industry Canada program in MapInfo. 7

Industry Canada recognizes that the U.S. uses the Longley Rice propagation model, which is based on a rolling Earth. By contrast, CRC-Predict is based on a knife-edge diffraction propagation model. The difference between the two propagation models can explain the small variation between the results of interference analyses performed using Longley Rice versus using CRC-Predict. 6. Further Considerations Industry Canada considers a number of factors when performing interference analyses to evaluate cross-border frequency coordination requests for terrestrial systems in the UHF and VHF frequency ranges. In addition to the factors discussed in this paper, Industry Canada will also take into account any other relevant factors provided by either the NTIA or the FCC that might impact an interference analysis. For example, the pattern of a highly directive antenna could be factored in, if provided. Finally, Industry Canada is continually working to further enhance the tools used to perform interference analyses in order to improve the accuracy of these analyses. Marc Dupuis Director General, Engineering, Planning and Standards 8