3 W th St Chicago, IL 09 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 9 9,08 $,8,980 SITE $3,89 Campus Total 9,08 $,9,9 Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video EA $0 Exterior Doors - Exterior AMP Door EA $9,3 Exterior Doors - Exterior FRP Door EA $3,9 Exterior Doors - Exterior Steel Door EA $, Exterior Doors - Exterior Steel Door EA $,3 Exterior Doors - Exterior Steel Door EA $, Exterior Doors - Exterior Wood Door EA $9,3 Exterior Doors - Exterior Wood Door EA $8 Exterior Doors - Overhead Rolling/ Garage Door EA $, Exterior Doors - Side lite 3 EA $9 Exterior Doors - Store Front EA $,0 Exterior Doors - Transom Lite 3 EA $,0 Exterior Stairs - Concrete 3 LF $3,83 Exterior Stairs - Concrete LF $3,98 Exterior Stairs - Steel or Aluminum 30 LF $ Exterior Stairs - Stone 9 LF $,0 Power Door Operator and Controls EA Stair Handrail - Steel_Stair Handrail 0 LF $,0 Stair Handrail - Steel_Stair Handrail 0 LF $,300 HACOCK HS Page of 9 Assessment Date: 8//0
Category: Building Exterior Foundation 3 W th St Chicago, IL 09 Foundation - Concrete 30 LF $,8 Foundation - Concrete,93 LF Superstructure - Concrete 9,08 SF Lighting Roof System Walls Windows Exterior Lighting - Parapet or Roof Mounted 8 EA $,9 Exterior Lighting - Wall Mounted EA $,3 Chimney - Brick Chimney- Concrete/ Mortar Liner 3 LF, Coping - Metal LF $3,983 Coping - Stone, LF $8,309 Downspouts - Exterior Downspouts,39 LF $, Parapet - " - 30" Height,98 LF $9,39 Parapet - Parapet > 30" LF $,003 Roof - Asphalt Shingle 3 SF $,3 Roof - Modified Bitumen,3 SF,98 Roof - Modified Bitumen,838 SF $38, Roof Structure - Concrete,09 SF Roof Structure - Heavy Timber 90 SF Canopy - Metal 8 SF $38 Cheek-Wall - Stone 80 SF $80 Cornice - Masonry Projecting Limestone 30 LF $,8 Exterior Walls - Brick,39 SF $, Exterior Walls - Stone-Cast 0 SF $ Exterior Walls - Stone-Cast 8,3 SF $, Exterior Walls - Wood Siding SF $,83 Curtain wall - Glazed Double Pane,33 SF $,0 Curtain wall - Louver 8 SF $, Guard - Guards perforated 3,898 SF $9, Lintels - Steel,3 LF $8,03 Lintels - Stone 90 LF Windows - Casement Aluminum Double-pane 300 SF $,39 Windows - Decorative SF $90 Windows - Sash Aluminum SF $,8 HACOCK HS Page of 9 Assessment Date: 8//0
Category: Building Exterior Windows 3 W th St Chicago, IL 09 Windows - Sash Aluminum Double-pane,0 SF $8,9 Windows - Sash Aluminum Double-pane 0,33 SF $, Building Exterior Subtotal: $,,3 Building: Main Category: Electrical System Emergency System Automatic Transfer Switch 3 EA $, Emergency A/C Power - Corridors and Stairs 3,838 SF $, Emergency A/C Power - Gym,9 SF $, Emergency A/C Power - Lunchrooms,0 SF $, Emergency A/C Power - Multipurpose Room,8 SF $88 Emergency A/C Power - Students Toilets,38 SF $ Emergency Battery Packs - Auditoium and Aisle Lighting EA $ Emergency Battery Packs - Gym EA $ Emergency Generator- Outdoor- Diesel - 0-0 KW EA Exit Signs - Corridors and Stairs EA $,09 Exit Signs - Corridors and Stairs 0 EA $,8 Exit Signs - Lunchroom EA $9 Exit Signs - Multipurpose Room 0 EA $,99 Security System - CCTV 9,08 SF $0, Security System - Intrusion Detection 9,08 SF $3,3 Main Service Power Distribution Independent Electrical Service for emergency power EA Main Electrical Service - 00 A /80/3PH EA $,9 Main Electrical Service- Live Front - 00 A 0//3PH EA $,30 PA System 9,08 SF $, Lighting and Power Panels - 00 A EA $,89 Lighting and Power Panels - 00 A 8 EA $,38 Lighting and Power Panels - Above 00 A 30 EA $,9 Main Distribution Panels - 0-00 amp 3 EA $,83 Main Distribution Panels - Greater than 00 amp EA $, Transformers - /80-0/08 EA $,30 HACOCK HS Page 3 of 9 Assessment Date: 8//0
Category: Electrical System Power Distribution 3 W th St Chicago, IL 09 Transformers - /80-0/ EA $,09 Electrical System Subtotal: $,89 Building: Main Category: Safty System Fire Alarm Fire Alarm Panel EA $, Fire Alarm Strobe Lights 9,08 SF,8 Fire Alarm_System 9,08 SF $8,0 Sprinkler System Sprinkler Heads,0 SF Sprinkler Piping,0 SF $83 Wet Sprinkler System,0 SF $, Safty System Subtotal: $,0 Building: Main Category: Mechanical System Air Conditioning Chemical Pot Feeder EA $,3 Chiller-Air Cooled-Screw Type-Ground Mounted - 0-00 tons EA $8,8 Glycol Feed EA $980 Pipes - Chilled Water Pipe- Galvanized 0 LF $, Pressure Fill System EA $, Air Handling Systems Boiler Systems Air Handling Unit- Package Single Zone- Indoor- Daul Temperature Coils- - 000-000 cfm 3 EA,00 Air Handling Unit- Package Single Zone- Indoor- Daul Temperature Coils- - 00-0000 cfm EA $3,30 Air Intake EA $3,09 Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - - 00 HP EA $,09 Chemical Feed System EA $,08 Combustion Dampers EA $88 HACOCK HS Page of 9 Assessment Date: 8//0
Category: Mechanical System Boiler Systems 3 W th St Chicago, IL 09 Feed Water Pumps and Tank EA $, on Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - - 00 HP EA $3,033 Piping - Condensate Pipe- Steel 0 LF $, Steam Traps 0 EA $,98 Gas Booster Heat Exchangers Heating Devices Mechanical Plumbing Temperature Control Unit Ventilation Ventilation Gas Booster EA $998 Heat Exchanger - Steam to Hot Water Shell Type EA Cabinet Heaters - With Hot Water Coil 0 EA $,8 Cabinet Heaters - With Hot Water Coil 3 EA $8,9 Cabinet Heaters - With Steam Coil EA $3, Cabinet Heaters - With Steam Coil 0 EA $3, Fin Tube - Hot Water 0 LF $,0 Fin Tube - Hot Water 00 LF $,9 Radiators - Hot Water EA $, Radiators - Steam EA $3,3 Radiators - Steam 0 EA $,8 Unit Heater - Electric 3 EA $3,03 Unit Heater - Electric 3 EA $833 Unit Heater - Hot Water 9 EA $, Daul Temperature Pump - - 0 HP EA $,88 Daul Temperature Pump - Less than 0 EA $, DDC System 9,08 SF $9, Thermostats - DDC EA $,9 Thermostats - DDC 00 EA Unit Ventilators- Floor Mounted- Hot Water & Chilled Water Coils EA $,39 Unit Ventilators- Floor Mounted- Hot Water & Chilled Water Coils 0 EA $,38 Exhaust Fans- Indoor - 0-8000 CFM EA $,9 Exhaust Fans- Indoor - Less than 00 CFM EA $, HACOCK HS Page of 9 Assessment Date: 8//0
Category: Mechanical System Ventilation 3 W th St Chicago, IL 09 Exhaust Fans- Roof Mounted - Less than 00 CFM EA $,8 Lab Exhaust Hood EA $,99 Roof Mounted Duct Work 0 LF $, Type I Exhaust Hood- Culinary Arts EA $,8 Type I Exhaust Hood- Kitchen EA $,8 Type II Exhaust Hood- Warming Kitchen EA $90 Mechanical System Subtotal: $90,3 Building: Main Category: Plumbing System Hot Water Gas Heater - 0000-300000 BTU/HR EA $,9 Hot Water Storage Tank_Gas - 0-00 Gallons EA $,9 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures 9,08 SF $33,8 Domestic Piping-Cold Water Horizontal Lines 9,08 SF $,0 Domestic Piping-Cold Water Risers 9,08 SF $3,33 Domestic Piping-Hot Water from Risers to Fixtures 9,08 SF $,9 Domestic Piping-Hot Water Horizontal Lines 9,08 SF $3,33 Domestic Piping-Hot Water Return Lines 9,08 SF $,9 Domestic Piping-Hot Water Return Risers 9,08 SF $,9 Sanitary Piping 9,08 SF $,8 Storm Piping 9,08 SF $,9 Vent Piping 9,08 SF $3,3 Pumps - Domestic Booster Pump-Duplex EA $,9 Pumps - Ejector-Duplex EA $,38 Pumps - Ejector-Simplex EA $ Pumps - Sump-Duplex EA $, Pumps - Sump-Simplex EA $,90 Plumbing System Subtotal: $,33 Building: Main HACOCK HS Page of 9 Assessment Date: 8//0
Category: Classrooms Art Room ( rooms) 3 W th St Chicago, IL 09 Casework 0 LF $3,88 Ceiling - Lay-in,8 SF $,8 Chalk Board LF $ Doors - Transom Window 0 SF $,0 Doors - Wood Doors inclu hw 8 EA $,8 Floor - Tile,8 SF $,9 Kiln EA $,3 Lighting - Lay-in 9 EA Marker Board LF $8 Walls - Plaster/Drywall 3,88 SF $8,99 Work Sink 3 EA $,3 Computer Lab (3 rooms) Music Room ( room) Office ( room) Ceiling - Plaster/Drywall,98 SF $,8 Charging Station EA $99 Doors - Transom Window 8 SF $83 Doors - Wood Doors inclu hw EA $,0 Floor - Tile,98 SF $,3 Lighting - Pendent/Surface 8 EA Marker Board 8 LF $, Walls - Plaster/Drywall 3,0 SF $8, Wireless System EA $3 Wireless System EA Casework 0 LF $0 Ceiling - Plaster/Drywall 93 SF $3,98 Doors - Wood Doors inclu hw EA Floor - Tile 93 SF $,08 Lighting - Pendent/Surface 30 EA $,9 Storage/ Closet SF $ Walls - Plaster/Drywall,09 SF $3,0 Ceiling - Plaster/Drywall 900 SF $8,0 Doors - Transom Window SF $ Doors - Wood Doors inclu hw EA Floor - Tile 900 SF $,99 Lighting - Pendent/Surface 8 EA Walls - Plaster/Drywall, SF $3,9 HACOCK HS Page of 9 Assessment Date: 8//0
Category: Classrooms ( rooms) Science Classroom ( room) Science Lab Level ( room) 3 W th St Chicago, IL 09 Casework LF $3,839 Ceiling - Lay-in 00 SF $,0 Ceiling - Plaster/Drywall 3,8 SF $3,93 Ceiling - Plaster/Drywall,8 SF $,83 Chalk Board LF $, Chalk Board LF $89 Doors - Transom Window 3 SF $, Doors - Wood Doors inclu hw EA $,039 Floor - Terrazzo 8 SF $8 Floor - Tile 8 SF $,39 Floor - Tile 8 SF $ Floor - Tile 8,9 SF $,8 Lighting - Lay-in EA Lighting - Pendent/Surface 3 EA Marker Board 9 LF $,0 Storage/ Closet 0 SF $3 Walls - Plaster/Drywall 3,98 SF $30,9 Walls - Plaster/Drywall,9 SF $9,93 Work Sink EA $,89 Ceiling - Lay-in 8 SF $, Doors - Transom Window 8 SF $30 Doors - Wood Doors inclu hw EA Floor - Tile 8 SF $,80 Lighting - Lay-in EA Marker Board 8 LF $ Science Lab Elements 8 SF $,9 Walls - Plaster/Drywall,00 SF $,9 Work Sink EA $8 Casework 0 LF $, Ceiling - Lay-in,090 SF $3,3 Doors - Wood Doors inclu hw EA Eye Wash Station EA $33 Floor - Tile,090 SF $,38 Fume Hood EA $8 HACOCK HS Page 8 of 9 Assessment Date: 8//0
Category: Classrooms Science Lab Level ( room) Science Lab Level 3 ( rooms) 3 W th St Chicago, IL 09 Gas Line 8 EA $,03 Lighting - Lay-in EA Marker Board 0 LF $ Science Lab Elements,090 SF $,388 Science Lab Shower EA $39 Walls - Plaster/Drywall,3 SF $3,8 Work Sink EA $,3 Casework 0 LF $, Ceiling - Lay-in,03 SF $3, Ceiling - Plaster/Drywall,0 SF $3,980 Doors - Side-lite 3 SF Doors - Transom Window SF $ Doors - Wood Doors inclu hw EA $,0 Eye Wash Station EA $33 Floor - Tile,3 SF $,8 Gas Line EA $09 Lighting - Lay-in EA Marker Board 0 LF $8 Science Lab Elements,3 SF $,08 Walls - Plaster/Drywall, SF $,80 Work Sink EA $8 Special Program ( room) Ceiling - Plaster/Drywall, SF $8,3 Doors - Transom Window 8 SF $30 Doors - Wood Doors inclu hw EA Floor - Carpet,0 SF $, Floor - Tile,0 SF $, Lighting - Lay-in EA $,90 Lighting - Pendent/Surface EA Marker Board LF $9 Storage/ Closet SF $33 Walls - Plaster/Drywall, SF $9,09 Classrooms Subtotal: $0,9 HACOCK HS Page 9 of 9 Assessment Date: 8//0
Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 3 W th St Chicago, IL 09 AC Unit EA $9 Ceiling - Lay-in SF $33 Ceiling - Plaster/Drywall SF $,93 Ceiling - Plaster/Drywall,8 SF $, Ceiling - Splined,030 SF $8 Doors - Side-lite 0 SF $ Doors - Store Front 8 EA $,8 Doors - Transom Window 3 SF $,0 Doors - Wood Doors inclu hw EA $,38 Doors - Wood Doors inclu hw 3 EA $9,33 Floor - Carpet,3 SF $3, Floor - Concrete 8 SF $89 Floor - Terrazzo SF $,3 Floor - Tile,3 SF $, Lighting - Lay-in 3 EA Lighting - Pendent/Surface EA $,08 Lighting - Pendent/Surface EA $ Lighting - Pendent/Surface EA Power Distribution 8 EA $38,8 Storage/ Closet 9 SF $83 Walls - Masonry 93 SF Walls - Plaster/Drywall SF $3,89 Walls - Plaster/Drywall 0,39 SF $8,90 Walls - Structural Glazed Tile,09 SF $,8 Work SInk EA $08 Auditorium & Theater Balcony Seating 30 EA $3,0 Ceiling - Plaster/Drywall,3 SF, Doors - Steel Doors incl hw EA $,80 Doors - Store Front EA $,9 Doors - Transom Window 3 SF Floor - Tile 0,08 SF $,9 Floor - Wood,0 SF $, Lighting - Lay-in EA Lighting - Pendent/Surface EA Main Floor Seating 0 EA $,0 Sound System EA, HACOCK HS Page 0 of 9 Assessment Date: 8//0
Category: Rooms (Other Than Classrooms) Auditorium & Theater 3 W th St Chicago, IL 09 Stage,0 SF $,83 Stage Curtain EA Stage Lift EA $,0 Stage Lighting System EA $8,0 Stage-Stairs - Wood LF $ Stairs - Terrazzo 90 LF $89 Storage/ Closet SF $, Walls - Plaster/Drywall,8 SF $9,938 Gymnasia Kitchen Library Bleacher Seating 0 EA $,3 Ceiling - Plaster/Drywall,9 SF $3,90 Doors - Steel Doors incl hw EA $, Floor - Wood,9 SF $,0 Lighting - Metal Halide/ High Pressure Sodium 0 EA $,33 Scoreboards EA $, Sound System EA $, Stage 80 SF $,0 Stage Curtain EA Stage Lift EA $,0 Stage Lighting System EA $,39 Stage-Stairs - Wood LF $ Storage/ Closet 0 SF $,0 Walls - Plaster/Drywall,8 SF $,0 Walls - Structural Glazed Tile,8 SF $,8 Ceiling - Plaster/Drywall,093 SF $3,8 Doors - Steel Doors incl hw EA $,80 Floor - Tile,093 SF $,39 Lighting - Pendent/Surface 8 EA Storage/ Closet,0 SF $,3 Walls - Structural Glazed Tile, SF $,89 Casework LF $,0 Ceiling - Lay-in,09 SF $,9 Doors - Wood Doors inclu hw EA Floor - Tile,09 SF $8,9 HACOCK HS Page of 9 Assessment Date: 8//0
Category: Rooms (Other Than Classrooms) Library 3 W th St Chicago, IL 09 Lighting - Lay-in 3 EA Storage/ Closet,80 SF $,80 Walls - Plaster/Drywall,3 SF $,8 Locker/Shower Room Accessories 80 SF $,3 Ceiling - Plaster/ Drywall 80 SF $,00 Doors - Wood Doors inclu hw EA $, Floor - Terrazzo 80 SF $,9 Floor Drain EA $,8 Lavatory EA $39 Lighting - Pendent/Surface 9 EA Partitions EA $,8 Showers 3 EA $93 Student Lockers - Two Tier EA $3,0 Walls - Plaster/Drywall 0 SF Walls - Structural Glazed Tile 90 SF $3,00 Water Closet EA $ Lunch & Multipurpose Room Ceiling - Plaster/Drywall,98 SF $3,9 Doors - Steel Doors incl hw EA $30 Doors - Wood Doors inclu hw EA $,0 Floor - Tile,0 SF $9,80 Floor - Tile/Sheet,8 SF $,30 Lighting - Lay-in 8 EA $9 Lighting - Pendent/Surface 0 EA $,8 Lighting - Pendent/Surface 0 EA Market Board LF $ Serving Line 0 LF $,9 Storage/ Closet 9 SF $03 Walls - Plaster/Drywall 3,30 SF,08 Walls - Structural Glazed Tile,08 SF $3,30 MDF_IDF AC Unit EA $,08 Doors - Wood Doors inclu hw EA $30 Finishes 9 SF $,38 HACOCK HS Page of 9 Assessment Date: 8//0
Category: Rooms (Other Than Classrooms) Mechanical/ Service Rooms 3 W th St Chicago, IL 09 Air Tunnel,8 SF $8,8 Boiler Room, SF,080 Janitor's Closet 3 SF $, Loading Docks 0 SF $38 Mechanical/ Service Rooms,08 SF $,3 Storage Room,90 SF $9, Prep Room Restroom Casework 90 LF $,3 Ceiling - Lay-in SF $,3 Doors - Wood Doors inclu hw 3 EA $903 Floor - Tile SF $, Lighting - Lay-in EA Walls - Plaster/Drywall 8 SF $, Work Sink 3 EA $,3 Accessories,33 SF $, Ceiling - Lay-in SF $ Ceiling - Plaster/Drywall SF $08 Ceiling - Plaster/Drywall,03 SF $,03 Doors - Wood Doors inclu hw 0 EA $,00 Floor - Terrazzo,9 SF $3,08 Floor - Tile SF $38 Floor - Tile SF $ Floor - Tile SF $ Floor - Tile Ceramic/ Porcelain 3 SF $, Floor Drain EA $8,00 Hand Dryer 3 EA $90 Lavatory 30 EA $9,88 Lighting - Lay-in 8 EA Lighting - Pendent/Surface EA $ Lighting - Pendent/Surface EA $8 Lighting - Pendent/Surface EA Lighting - Wall Mounted EA $ Partitions 38 EA $,83 Showers EA $3 Student Lockers - One Tier 3 EA $9 HACOCK HS Page 3 of 9 Assessment Date: 8//0
Category: Rooms (Other Than Classrooms) Restroom 3 W th St Chicago, IL 09 Urinals 3 EA $,38 Walls - Plaster/Drywall 9 SF $98 Walls - Plaster/Drywall,8 SF $,8 Walls - Structural Glazed Tile,3 SF $,3 Walls - Tile Ceramic/ Porcelain,3 SF $3,098 Water Closet EA $,9 Rooms (Other Than Classrooms) Subtotal: $,90,3 Building: Main Category: Building Interior Corridor Ceiling - Lay-in 3,90 SF $9,880 Ceiling - Plaster/Drywall, SF $39,90 Ceiling - Splined SF $,98 Doors - Wood Doors include hw EA $, Drinking Fountains - Double Water Cooler EA $,08 Drinking Fountains - Single Water Cooler 8 EA $,3 Floor - Terrazzo 3,8 SF $30,0 Floor - Tile Quarry, SF $,8 Floor - Tile/Sheet,3 SF $,3 Lighting - Lay-in 3 EA $,30 Lighting - Pendent/Surface EA $3, Lighting - Pendent/Surface EA $,3 Lighting - Pendent/Surface 0 EA Stairs - Terrazzo LF $ Student Lockers - One Tier 80 EA $3,8 Student Lockers - Three Tiers EA $,980 Student Lockers - Two Tiers 90 EA $,8 Walls - Plaster/Drywall 8,3 SF $3,8 Walls - Structural Glazed Tile 8,9 SF $,09 Safety Camera Viewing Station EA $,3 Metal Dedector EA $, Security Cameras EA $,9 HACOCK HS Page of 9 Assessment Date: 8//0
Category: Building Interior Stairs 3 W th St Chicago, IL 09 Ceiling - Plaster/Drywall,9 SF $30, Floor - Terrazzo, SF $8,8 Floor - Tile,0 SF $3 Handrails,8 LF $8,8 Lighting - Pendent/Surface 80 EA $9,9 Stairs - Terrazzo 8 LF $,0 Stairs - Tile 80 LF $, Walls - Plaster/Drywall 9,0 SF $80, Walls - Structural Glazed Tile,9 SF $,0 Vertical Conveyance Elevator - Elevator- Roped Holeless Hydraulic EA $9,38 Elevator - Freight Elevator EA $9,38 Building Interior Subtotal: $89, Total Building Cost $,8,980 SITE Category: Site Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin 8 EA $8, Civil/ Drainage - Site Drain EA $,8 Civil/ Drainage - Site Manhole EA $,0 Fencing - Chain Link LF $3,89 Fencing - ew Standard Ornamental LF $8,39 Benches EA $, Benches 8 EA $, Landscape - Grass, SF $,09 Landscape - Hardscape- Asphalt 3,33 SF $8,0 Landscape - Hardscape- Concrete,9 SF $,3 Landscape - Hardscape- Concrete 3 SF $, Parkway trees EA $30,3 HACOCK HS Page of 9 Assessment Date: 8//0
3 W th St Chicago, IL 09 SITE Category: Site Landscape Parking Lot Service Garage Sidewalks Signage Planting Beds/ Area,08 SF $8,9 Retaining Wall - Concrete 00 SF $,88 Trash Receptacles 3 EA $93 Concrete Curbs LF $3,3 Surface - Asphalt 3,3 SF $3,90 Surface - Concrete 300 SF $ Trash Compactor EA Trash Enclosure - Masonry 30 SF $0,90 Vehicular Screening LF $,9 Service Garage - Built-in 3 SF $8 Service Garage - Free-Standing SF $ Sidewalks - Internal Walks 30 LF $,33 Sidewalks - Internal Walks 9 LF $,3 Sidewalks - Perimeter Sidewalks 00 SF $3,8 Sidewalks - Perimeter Sidewalks 8 SF $, Sidewalks - Perimeter Sidewalks 3,8 SF $, Flag Pole - Building Mounted Flag Pole EA $88 Monument - Sign EA Site Subtotal: $3,89 Total Site Cost $3,89 Campus Total ² ³ $,9,9 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. HACOCK HS Page of 9 Assessment Date: 8//0
3 W th St Chicago, IL 09 ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. HACOCK HS Page of 9 Assessment Date: 8//0
3 W th St Chicago, IL 09 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Art Room Computer Lab Computer Lab Computer Lab Music Room Office Science Classroom Science Lab Level Science Lab Level 3 Science Science Music Room Science Classroom Science Lab Level Science Lab Level Science Lab Level 3 nd Floor nd Floor st Floor nd Floor th Floor Basement nd Floor st Floor st Floor st Floor st Floor nd Floor nd Floor nd Floor nd Floor nd Floor th Floor th Floor th Floor th Floor th Floor th Floor th Floor th Floor th Floor th Floor th Floor th Floor 0 09 0 0 0 0 0 03 0 03 0 08 0 30 303 30 30 3 3 0 3 9 3 9 308 30 33 A A A03 A A A A C0 C0 C0 C0 A A A A A A A A A A A A A A A A A A A A A A A A A A,0,3 98 93 900 8 8 8 8 00 90 900 9 0 93 8 900 9,009 9 8,090,03 0 3 30 80 0 8 0 0 8 8 8 8 8 8 8 30 30 8 0 0 8 9 0 3 0 8 0 0 3 3 8 0 89 0 9 3 8 9 33 33 33 33 8 9 3 9 3 9 33 39 33 33 8 8 3 3 8 0 3 HACOCK HS Page 8 of 9 Assessment Date: 8//0
3 W th St Chicago, IL 09 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Science Lab Level 3 Special Program Science Lab Level 3 Other Instructional Use 3 30 A A,0, 0 0 9 0 8 HACOCK HS Page 9 of 9 Assessment Date: 8//0