275 Lexington Parkway North Project Summary: Central is the oldest high school in the state of Minnesota, beginning its 150th year. Its rich traditions, including academic excellence, are widely celebrated. Families prize the high value we place on academics; the varied extracurricular opportunities; our culture of constant innovation; and our focus on relationships as the center for learning. It was originally constructed in 1912 at 188,000 square feet. A later addition was completed in 1925 and a major renovation was completed in 1977. It is now 340,641 square feet. Issues Identified By School Community In 2015 1. Safety and security 2. Indoor air quality unhealthy 3. Update of camera system 4. Furniture - fixtures and equipment 5. Improve all learning spaces 6. Bathroom improvements 7. True study hall space with desks and good lighting 8. Community and shared - open social space 9. Welcoming entrance and identity Grade Levels: 9-12 SY 2014/15 Enrollment: 1858 Design Enrollment: 2160 General Notes: Existing utilization shown is for School Year 2014-2015 The Conceptual Utilization Plans are exploratory rather than actual construction plans and represent the design at one moment in time, which will change as the design and funding process progress. The Conceptual Plans are included as a way to organize scopes of work into logical, efficient and meaningful projects. There is no prioritization implied in a work scope title (e.g. Work Scope A is not necessarily the most critical work to be done). The plans in this document are not comprehensive of the entire building s needs as maintenance and replacement of existing building systems such as roofs and mechanical systems are omitted to maintain graphic clarity of the overall vision generated during the Facilities Master Plan Process. Formal zoning reviews have not been undertaken for the proposed work shown in these plans. A review with zoning and building code authorities will occur once the funding is secured. 1
Legend: S1. New main entry, lobby, commons, and Instructional Space additions Site Concept (9,230 SF) S2. Incorporate Plaza retrofit (by others) into new landscape construction at Main Entry (12,000 SF) S3. Relocate outdoor Instructional Space (1,600 SF) MATCH-LINE Property Line Main Entry Secondary Entry Service Entry Alterations New Landscape Construction New Building Construction 2
Existing Utilization BASEMENT FLOOR 3.1
Existing Utilization FIRST FLOOR 3.2
Existing Utilization SECOND FLOOR 3.3
Existing Utilization THIRD FLOOR 3.4
Existing Utilization FOURTH FLOOR 3.5
Conceptual Utilization Plan Legend: C1. New Instructional Space (1,194 SF) C2. Refurbish Instructional Space - furniture, lighting, equipment, aesthetics (5,330 SF) C3. Restroom upgrades (270 SF) BASEMENT 4.1
Conceptual Utilization Plan Legend: C2. Refurbish Instructional Space - furniture, lighting, equipment, aesthetics (16,974 SF) C3. Restroom upgrades (2,286 SF) FIRST FLOOR Property Line Main Entry Secondary Entry Service Entry 4.2A
Conceptual Utilization Plan Legend: C1. New Instructional Space (6,110 SF) C2. Refurbish Instructional Space - furniture, lighting, equipment, aesthetics (3,000 SF) C3. Restroom upgrades (903 SF) C4. New Corridor (2,445 SF) C5. New Elevator (200 SF) See 4.2A C6. New 2-story Entry Lobby and grand stair (3,270 SF) EXISTING FIRST FLOOR ADDITION Property Line Main Entry Secondary Entry Service Entry 4.2B
Conceptual Utilization Plan Legend: C2. Refurbish Instructional Space - furniture, lighting, equipment, aesthetics (7,404 SF) See 4.3B See 4.3B SECOND FLOOR 4.3A
Conceptual Utilization Plan Legend: C2. Refurbish Instructional Space - furniture, lighting, equipment, aesthetics (13,932 SF) C3. Restroom upgrades (997 SF) C6. New 2-story Entry Lobby and grand stair (See 4.2B) C7. New Student Commons (7,654 SF) C8. Upgrade Cafeteria (7,786 SF) C9. Cafeteria expansion (4,930 SF) EXISTING ADDITION SECOND FLOOR 4.3B
Conceptual Utilization Plan Legend: C2. Refurbish Instructional Space - furniture, lighting, equipment, aesthetics (16,268 SF) C3. Restroom upgrades (1,124 SF) C10. New shared centralized learning area (3,081 SF) THIRD FLOOR 4.4
Conceptual Utilization Plan Legend: C2. Refurbish Instructional Space - furniture, lighting, equipment, aesthetics (17,509 SF) C3. Restroom upgrades (912 SF) C4. New Corridor (450 SF) C10. New shared centralized learning area (4,798 SF) C11. upgrades (8,496 SF) FOURTH FLOOR 4.5
Conceptual Construction Plan Scope Package Light Remodel Finishes Only A B 270 SF 1,194 SF 5,328 SF C TOTAL 270 SF 1,194 SF 5,328 SF Line Items Unit Lump Sum Air Quality Security System BASEMENT Light Remodel Finishes Only No Work 5.1
Conceptual Construction Plan Scope Package Light Remodel Finishes Only A 1,452 SF B 2,285 SF 15,522 SF C TOTAL 2,285 SF 16,974 SF Line Items Unit Lump Sum Air Quality Security System FIRST FLOOR Light Remodel Finishes Only No Work 5.2A
Conceptual Construction Plan Scope Package Light Remodel Finishes Only A 9,327 SF 4,081 SF 4,573 SF B 903 SF SEE 5.2A C TOTAL 9,327 SF 4,984 SF 4,573 SF Line Items Unit Lump Sum Air Quality Security System EXISTING FIRST FLOOR ADDITION New Main Entry, grand stair and elevator Light Remodel Finishes Only No Work 5.2B
Conceptual Construction Plan Scope Package Light Remodel Finishes Only A B 9, 075 SF SEE 5.3B C TOTAL 9, 075 SF Line Items Unit Lump Sum Air Quality Security System SECOND FLOOR Light Remodel Finishes Only No Work 5.3A
Conceptual Construction Plan Scope Package Light Remodel Finishes Only A 10,058 SF 3,087 SF 9, 496 SF B 997 SF 14,377 SF C TOTAL 10,058 SF 4,084 SF 9, 496 SF 14,377 SF SEE 5.3A Line Items Unit Lump Sum Air Quality Security System Remove stair EXISTING ADDITION SECOND FLOOR New Main Entry, grand stair and elevator Light Remodel Finishes Only No Work 5.3B
Conceptual Construction Plan Scope Package Light Remodel Finishes Only A B 14,388 SF C 625 SF 5,385 SF TOTAL 625 SF 5,385 SF 14,388 SF Line Items Unit Lump Sum Air Quality Security System Typical at 3 areas: Expand Instructional Space footprint, remove existing exterior wall and add new glazing Remove walls and add sliding glass partitions to provide flexible learning areas THIRD FLOOR Light Remodel Finishes Only No Work 5.4
Conceptual Construction Plan Scope Package Light Remodel Finishes Only A B 17,347 SF C 625 SF 13,922 SF TOTAL 625 SF 13,922 SF 17,347 SF Line Items Unit Lump Sum Air Quality Security System Typical at 3 areas: Expand Instructional Space footprint, remove existing exterior wall and add new glazing Remove walls and add sliding glass partitions to provide flexible learning areas FOURTH FLOOR Light Remodel Finishes Only No Work 5.5