Appendix D Answers To Chapter Review Questions

Similar documents
DIVISION PAVEMENT MARKINGS AND MARKERS

STATE OF OHIO DEPARTMENT OF TRANSPORTATION. SUPPLEMENTAL SPECIFICATION 817 SPRAY THERMOPLASTIC PAVEMENT MARKING April 15, 2011

CHAPTER 5 PREFORMED THERMOPLASTIC

ITEM 644 THERMOPLASTIC PAVEMENT MARKING

SPECIAL PROVISION TO SPECIAL SPECIFICATION Reflectorized Pavement Markings with Retroreflective Requirements

Product Bulletin July 2011

SUPPLEMENTAL SPECIFICATION. PROFILE ROAD MARKING SYSTEM South Carolina Department of Transportation

C. For cold-applied tape, the pavement temperature shall be at least 70 F.

CHAPTER 4 LIQUID THERMOPLASTIC

Application Guidelines for Pavement Markings in Grooved Pavement Surfaces

SUPPLEMENTAL SPECIFICATION SINGLE COMPONENT HYBRIDIZED POLYMER PAVEMENT MARKINGS

3 All Weather Paint. Product Bulletin January Second Drop Glass Beads

Retroreflective Road Markings

SPECIAL SPECIFICATION 8582 All Weather Thermoplastic Pavement Markings

Pavement Marking Certification Study Guide 2016

INDEX TO CLAUSES PART 1 - GENERAL

Stamark Pavement Marking Tape and Liquid Pavement Markings Application Guidelines for Pavement Markings in Grooved Pavement Surfaces

Evaluation of Durable Lane Delineation Materials

DMS-8220, Hot Applied Thermoplastic

Section 7 Specification 7.2 Painted Roadway Lines TABLE OF CONTENTS

Liquid Pavement Marking Series 1200

PERMANENT CONCRETE PAVEMENT MARKINGS. David Darwin

Item P-620 Runway and Taxiway Marking

SPECIFICATION FOR WATERBORNE TRAFFIC LINE PAINT

Item P-620 Runway and Taxiway Marking

Opening date has been changes from October 29, 2014 to November 3, 2014.

THE ROADMARKING EXPERTS

CHAPTER 2 REFLECTIVE GLASS BEADS

SPECIAL SPECIFICATION 7368 High Build Paint

COMPLETE SOLUTION TO SAFE HIGH QUALITY ROAD & LINE MARKINGS. Road & Line Marking. Paint Equipment Additives & Accessories

PILOT VISIBILITY STUDY

Comparative Study of Glass Bead Usage in Pavement Marking Reflectorization

DMS-8290, Glass Traffic Beads

Date: October 17, To: All Prospective Bidders. Re: Addendum No 3. Questions and Answers and Construction Document Changes

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

Seal Coats and Surface Treatments Fred J. Benson, Dean of Engineering A. and M. College of Texas College Station, Texas The construction, as here

SPECIAL SPECIFICATION 7415 All Weather Paint

Pavement Markings Under Wet Night Road Conditions. A Comparison of 2 Beads in Grooved High Build Waterborne on I-215I

Section 914. JOINT AND WATERPROOFING MATERIALS

Waterborne Paint with Rohm and Haas Rhoplex HD-21 Binder. Interstates 1-89 and 1-91, Vermont. June2002 Reporting on Work Plan 2000-R-7 Final Report

Traffic Line Painting and Other Pavement Markings

MATERIALS DIVISION MEMORANDUM

Marine. Paint Specification: November ::Fiberglass Substrate:: PAINT that OUTLASTS & OUTPERFORMS

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

10P20-44MNF High Solids Epoxy Primer

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.

METRIC TT-B-1325C June 1, 1993 SUPERSEDING TT-B-1325B April 25, 1978 FEDERAL SPECIFICATION BEADS (GLASS SPHERES) RETRO-REFLECTIVE

IGGA Guide Specification: Dowel Bar Retrofit (DBR) Introduction

Maximising Durability and Performance of Marking Systems. NZRF Conference Rotorua Aug

All weather Beads can

Chapter 1 General Design Information

OKLAHOMA TURNPIKE AUTHORITY SPECIAL PROVISION FOR SECTION 711 TRAFFIC STRIPE MATERIAL FOR HOT-APPLIED THERMOPLASTIC COMPOUNDS

BUREAU OF INDIAN STANDARDS. Draft Indian Standard TWO COMPONENTS HIGH BUILD EPOXY MICACIOUS IRON OXIDE (MIO) PIGMENTED INTERMEDIATE COAT SPECIFICATION

ermseal is ColorPoint s main supplier and has been

FASTRACK 3427 Polymer Emulsion for Waterborne Traffic Marking Paints

Suggested Specification for Preparing Hot-Dip Galvanized Steel Surfaces for Painting Revised February 2002

High Performance Thermoplastic. Observations in the USA by Potters Asia Pacific

Road Marking Products

Reflective Solutions Engineered to Save Lives

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

Traffic paints based on acrylic emulsion resins in which the vehicle is water instead of solvents are readily available in the market place.

ROAD SAFETY EFFECTIVE AND ECONOMICAL

EXPLORE OUR WORLD OF GLASS BEADS THE KEY TO NIGHTTIME VISIBILITY OF ROAD MARKINGS

Aerodur 3001 Base Coat Special Effects

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

Enhancing Skid Resistance of Two-Component Road Marking Paint using Mineral and Recycled Materials

AIRFIELD MARKINGS INNOVATIVE PRODUCTS FOR SAFETY AND ORIENTATION ON AIRPORTS

loners SHERWIN-WILLIAMS COMPANY THIS AWARD IS FOR A ONE (1) YEAR PERIOD BEGINNING SEPTEMBER 9, 2015 THROUGH SEPTEMBER 8, 2016.

Introduction...2 Product Application Requirements...3 Adhesive Series of Stamark Tapes...3 Hot Inlay Application of Long Lines...

AquaCLAD Water-Reducible Rust Preventative Alkyd

AIR FORCE INSTITUTE OF TECHNOLOGY

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

September 10, 2009 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES

ENGINEERING DIRECTIVE

What is Paint?

DAP 33 Window Glazing

PUBLICATION 213. Think Safety First

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing

Jointed Precast Concrete Pavement

Special Provision No. 904S14 October OPSS 904, January 1995, Construction Specification for Concrete Structures, is amended as follows:

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

INSTALLATION INSTRUCTIONS FOR #101NS & #101QR FIXED BASE

H O O P RAC K. Simple Security

Low V.O.C. 2-Component Polyurethane Game Line Paint System

1.1 RELATED DOCUMENTS

REQUEST FOR PROPOSALS

1.9 round ADA compliant railing for Residential & Commercial applications

Particles On the Road. Who are we?

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEM(S) FOR STREETLIGHTS. 1 Definitions. 2 Scope of Work. 3 Extent of Work

Procedure for Testing Direct Tension Indicators (DTI) Assemblies

COMMERCIAL ITEM DESCRIPTION INK, MARKING, EPOXY BASE

Stamark Tapes Pavement Surface Preparation and Application Techniques

PLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Precast Concrete Panels for Rapid Pavement Repair

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

Commonwealth of Pennsylvania PA Test Method No. 517 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

DAP Latex Window Glazing

Transcription:

Appendix D Answers To Chapter Review Questions Chapter 1 Standard Practices 1. The purpose of pavement markings is to communicate information about the traveled roadway so motorists can safely reach their destination. 2. Standard markings shall only be used to convey the meaning prescribed for them in the Manual on Uniform Traffic Control Devices (MUTCD). 3. In Virginia, the normal specified width of a longitudinal line is: b) 4 6 inches 4. The standard for a broken line separating traffic in the same direction at the same speed limit is: c) 10 ft. segments with 30 ft. gaps. 5. Solid yellow lines are used to delineate the separation of traffic flows in: a) opposing directions. 6. The left edge of divided highways and one way roads is delineated by: d) a single solid yellow line. 7. White lines are used to delineate the separation of traffic flows in: b) the same direction. 8. The right edge of divided highways and one way roads is delineated by: c) a single solid white line. 2012 v1.0 D-1

9. Broken lines are restrictive in nature. 10. Solid lines are restrictive in nature. 11. A double line consists of two normal width lines separated by a 3 inch space. 12. A pavement marking plan or sketch may not be required before a road is marked, but is strongly encouraged. 13. A chalk line is the only approved way of pre-marking a road. 14. Traffic control is not required when pre-marking on low volume roads. 15. Which document takes precedence over all others: c) Special Provision Copied Notes 16. In the Road and Bridge Specifications Book, which section specifies that the publication, Quality Standards for Workzone Traffic Control Devices be used? c) Section 512 D-2 2012 v1.0

Chapter 2 Reflective Glass Beads 1. Reflective beads are used with pavement markings: c) to enhance nighttime visibility 2. The phenomenon where light is reflected directly back to the light source is called: b) retroreflectivity 3. For glass beads, the light bending phenomenon is known as: a) the refractive index 4. The optimum embedment depth for reflective beads is b) 50 to 60% 5. When inspecting pavement markings with regard to glass beads, which of the following criteria should be met? c) Both a & b 6. In order for glass beads to reflect light as intended, they must be: d) round 7. Proper bead distribution and depth are critical in ensuring a line. a) durable and retroreflective 8. Correct glass bead application and embedment will result in the line feeling like: c) sandpaper 2012 v1.0 D-3

Chapter 3 Traffic Paint 1. VDOT designated Type A traffic paint should dry track-free within: c) 60 seconds 2. Reflective beads are normally: b) spray applied to the wet paint immediately following application of the marking material. 3. The minimum surface temperature at which Virginia designated Type A traffic paint may be applied is: c) 50 F + 4. Before marking materials of any kind may be applied, the surface of the roadway must be: c) both a & b 5. The specified application thickness for Virginia designated Type A traffic paint is: c) 15 ±1 mil when wet 6. The minimum amount of glass beads applied to Type A paint is: a) 6 pounds per gallon D-4 2012 v1.0

Chapter 4 Liquid Thermoplastic 1. Liquid thermoplastic pavement marking material: a) is a blend of solid materials that becomes liquid when heated. 2. Markings constructed with liquid thermoplastic pavement marking materials are considered: a) durable markings. 3. Liquid thermoplastic comes from the manufacturer with reflective beads already intermixed. 4. Reflective beads have to be applied to liquid thermoplastic pavement markings. 5. Granular thermoplastic may be heated three (3) times. 6. Block thermoplastic may be heated three (3) times. 7. It is permissible to intermix alkyd and hydrocarbon thermoplastic materials in the same heating kettle. 8. Which of the following methods are acceptable for applying thermoplastic? d) all of the above 2012 v1.0 D-5

9. Virginia Road & Bridge Specifications requires the thickness of thermoplastic markings to be: b) 90 ± 5 mils when set 10. Virginia specifies that glass beads be applied to liquid thermoplastic immediately and uniformly across the entire line at the rate of: a) 7 lb/100 ft 2 D-6 2012 v1.0

Chapter 5 Preformed Thermoplastic 1. There is no need to add glass beads to newly applied preformed thermoplastic since they are intermixed with the material at the factory. c) False 2. When stored inside at a temperature between 35ºF and 95ºF, preformed thermoplastic has a shelf life of. c) 1 year 3. Preformed thermoplastic is considered to be a: a) durable pavement marking 4. When preformed thermoplastic has been positioned on the pavement, it is necessary to heat only the edges of the material to achieve a good bond with the pavement. 5. When a small portion of freshly applied preformed thermoplastic has been chiseled up to inspect for bonding with the pavement, it should on the underside. b) have some asphalt stuck to it 2012 v1.0 D-7

Chapter 6 Epoxy Resins 1. Epoxy pavement marking material: a) is a two component system. 2. Epoxy pavement marking material does not contain solvent. 3. For epoxy pavement markings, the ratio of resin to hardener is: d) all of the above 4. The Virginia specified thickness for epoxy pavement markings is: c) 20 ± 1 mil when wet 5. The equipment used to apply epoxy resin pavement markings cannot be used to apply any other liquid binder material. 6. The minimum surface temperature for applying epoxy markings in Virginia is: c) 50 F + 7. Glass beads should be applied to the surface of epoxy resin at the rate of: b) 25 pounds per gallon D-8 2012 v1.0

Chapter 7 Polyester Resin 1. What is one advantage for using polyester pavement marking materials? b) It is a relatively inexpensive material. 2. The Virginia specified thickness for polyester pavement markings is c) 15 ± 1 mils when wet 3. Polyester resin will not cure properly if the appropriate amount of catalyst is not added. 4. Polyester pavement marking material may be applied over any existing type of marking. 5. The minimum road and air temperature required to apply polyester pavement marking is: c) 50 F+ 6. Polyester resin is dependent upon heat to make it set up. 2012 v1.0 D-9

Chapter 8 Preformed Tape 1. Preformed tapes do not contain pigments. 2. Preformed pavement marking tapes can be used for: c) both a & b 3. When patterned tape is inlaid, no primer is used. 4. Glass beads are applied to pavement marking tapes: c) by the manufacturer 5. The minimum surface temperature at which pavement marking tapes may be applied is: d) as recommended by the manufacturer 6. Virginia specifications allow pavement marking tapes to be tamped with vehicle tires. 7. Virginia Road & Bridge specifications state that the contractor is responsible for supplying a copy of the manufacturer s installation recommendations to the project inspector. 8. Virginia designated Type E tape is: c) black D-10 2012 v1.0

Chapter 9 Pavement Markers 1. Pavement markers may be used in lieu of pavement markings. 2. The most common types of pavement markers are: d) all of the above 3. Raised temporary pavement markers are glued to the roadway with a bitumen or epoxy adhesive. 4. Raised temporary pavement markers are normally used with: b) construction zone markings. 5. Raised snow plowable marker castings are installed using bitumen adhesive. 2012 v1.0 D-11

Chapter 10 Installation & Quality Control 1. VDOT requires that by the end of each workday, form C-85, Contractor s Daily Log and Quality Control Report, shall be signed by the Contractor and delivered to the: c) Engineer or VDOT Inspector 2. VDOT specs. state that before proceeding with work, surface temperature and weather conditions must be checked for compliance with the specifications by the: b) contractor s certified Q.C. technician 3. Layouts for pavement markings must be in conformance with: b) The Manual on Uniform Traffic Control Devices(MUTCD). 4. VDOT requires that quality control tests be conducted in accordance with: d) VTM-94. 5. What topics should be discussed at the pre-construction conference held prior to beginning pavement marking operations? d) all of the above 6. A copy of the manufacturer s recommended installation instructions for pavement marking tapes does not have to be supplied by the contractor. 7. A Material Safety Data Sheet (MSDS) must be obtained by the contractor for each material required for a particular type of pavement marking. 8. In Virginia, traffic control must be constantly monitored to minimize disruption and to ensure compliance with: e) a and c D-12 2012 v1.0

9. The contractor is required to measure the application thickness and bead application rate: b) at the beginning of each workday and every three hours thereafter. 10. Both the contractor and the inspector should constantly monitor the installation and quality of the material being placed. 11. In addition to application rates and glass bead distribution, markings should be inspected with regard to: d) all of the above 12. VDOT requires in order that corrective action be taken, the inspector should immediately report unacceptable work to: c) the contractor. 13. When should pay quantities be compared and confirmed by the contractor and inspector? b) at the end of each operation or the end of each workday 14. Before beginning work, the Source of Materials Document is required to insure that: d) all of the above 15. VDOT specifications require the Materials Inventory Tracking system to be maintained by the: a) contractor 16. The contractor s inventory is monitored by the: a) Central Office Materials Quality Assurance Section 17. Copies of materials certifications are to be retained by the contractor as part of the Materials Inventory Tracking documentation. 2012 v1.0 D-13

18. When materials are delivered directly from the manufacturer to a VDOT project, the project inspector will contact: b) Central Office Materials Quality Assurance Section 19. When materials are delivered directly from the manufacturer to a VDOT project, the contractor will be required to maintain an Inventory Tracking Program. 20. Contractor s Daily Log and Quality Control Report is required on Federal Projects only. D-14 2012 v1.0

Chapter 11 Equipment 1. A long-line paint truck manufactured by one company should look exactly the same as that of a different manufacturer. 2. Which item mentioned below is a component for a long-line truck? d) all of the above 3. The inspector should be knowledgeable with the pavement marking equipment to help identify problems. 4. Clear communication and cooperation between the inspector and contractor helps ensure quality. 5. One must inspect pavement marking close up to ensure quality. 2012 v1.0 D-15

Chapter 12 Eradication 1. Failure to remove existing markings when there are shifts in the traffic pattern can: d) all of the above 2. Which of the following methods is not acceptable for long term eradication? e) both b and c 3. All residue created when eradicating pavement markings must be: b) contained. 4. Eradication methods, other than those specified, must be submitted to the project engineer for approval prior to beginning work. 5. Eradicated lines should be inspected for: c) both a & b 6. Virginia designated Type E black tape may only be used on hydraulic cement concrete roadways. 7. One of the criteria in Virginia for using Type E black tape in lieu of eradication is that the traffic pattern will shift back to the original pattern within: c) 120 days. D-16 2012 v1.0