Controlling Changes Lessons Learned from Waste Management Facilities 8

Similar documents
Integration of MGDS Design into the Licensing Process' This paper presents an overview of how the Mined Geologic Disposal System (MGDS) design

Argonne National Laboratory P.O. Box 2528 Idaho Falls, ID

J.C. Courtney Nuclear Science Center Louisiana State University Baton Rouge, LA

U.S. DEPARTMENT OF ENERGY. YlAMT-485 Y-I 2. Project Accomplishment Summary for Project Number 92-Y12P-013-B2 HYDROFORMING DESIGN AND PROCESS ADVISOR

DISCLAIMER. Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

D&D Knowledge Management through Contributions in Wikipedia

The ACT External HEPA Push-Through Filter Assembly. A. A. Frigo, S. G. Wiedmeyer, D. E. Preuss, E. F. Bielick, and R. F. Malecha

STP-NU ROADMAP TO DEVELOP ASME CODE RULES FOR THE CONSTRUCTION OF HIGH TEMPERATURE GAS COOLED REACTORS (HTGRS)

Engineering Drawing System

Y f OAK RIDGE Y4 2 PLANT. Lionel Levinson General Electric Company. November 24, Approved for Public Release; distribution is unlimited.

Lewis-Clark State College No Date 2/87 Rev. Policy and Procedures Manual Page 1 of 7

IMPACT TESTING EXEMPTION CURVES

IMU integration into Sensor suite for Inspection of H-Canyon

Engineering Drawing System

1. Redistributions of documents, or parts of documents, must retain the SWGIT cover page containing the disclaimer.

Assisting DOE EM 4.12, Office of Groundwater and Subsurface Closure

The Technology Development Office

The Development of an Enhanced Strain Measurement Device to Support Testing of Radioactive Material Packages*

STP-PT-032 BUCKLING OF CYLINDRICAL, THIN WALL, TRAILER TRUCK TANKS AND ASME SECTION XII

INTERMEDIATE HEAT EXCHANGER (IHX) STP-NU-038

Recent advances in ALAMO

Distribution Restriction Statement Approved for public release; distribution is unlimited.

v-~ -8 m w Abstract Framework for Sandia Technolow Transfer Process Introduction

U.S.Department of Energy

MAPPING INDUCED POLARIZATION WITH NATURAL ELECTROMAGNETIC FIELDS FOR EXPLORATION AND RESOURCES CHARACTERIZATION BY THE MINING INDUSTRY

California State University, Northridge Policy Statement on Inventions and Patents

LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT

GA A23741 DATA MANAGEMENT, CODE DEPLOYMENT, AND SCIENTIFIC VISUALIZATION TO ENHANCE SCIENTIFIC DISCOVERY THROUGH ADVANCED COMPUTING

STP-PT-054 CONCENTRATED SOLAR POWER (CSP) CODES AND STANDARDS GAP ANALYSIS

DEPLOYING INNOVATIVE TECHNOLOGIES TO IMPROVE DOE D&D PROJECT BASELINES

Risk-Based Cost Methods

Safety Assessment of a Robotic System Handling Nuclear Material

Armlication For United States Patent For HOT CELL SHIELD PLUG EXTRACTION APPARATUS. Philip A. Knapp Moore, ID. and. Larry K. Manhart Pingree, ID

ASME NQA-1 Quality Assurance Requirements for Nuclear Facility Applications. Prague, CR July 7 8, 2014

THE EM LEAD LABORATORY: PROVIDING THE RESOURCES AND FRAMEWORK FOR COMPLEXWIDE ENVIRONMENTAL CLEANUP-STEWARDSHIP ACTIVITIES

Utilizing OSIsoft Visualizing PI Data System for Tank Level Data

High Explosive Radio Telemetry System. Federal Manufacturing & Technologies. R. Johnson, FM&T; B. Mclaughlin, FM&T;

THE NATIONAL SHIPBUILDING RESEARCH PROGRAM

GSFC CONFIGURATION MANAGEMENT MANUAL

Violent Intent Modeling System

Nanosecond, pulsed, frequency-modulated optical parametric oscillator

TI Designs: Biometric Steering Wheel. Amy Ball TIDA-00292

. Technical and Operating Conference, Chicago, IL, November )

GA A23281 EXTENDING DIII D NEUTRAL BEAM MODULATED OPERATIONS WITH A CAMAC BASED TOTAL ON TIME INTERLOCK

Evaluation of Roof Bolting Requirements Based on In-Mine Roof Bolter Drilling

Nuclear Science and Security Consortium: Advancing Nonproliferation Policy Education

MAPPING INDUCED POLARIZATION WITH NATURAL ELECTROMAGNETIC FIELDS FOR EXPLORATION AND RESOURCES CHARACTERIZATION BY THE MINING INDUSTRY

This version has been archived. Find the current version at on the Current Documents page. Scientific Working Groups on.

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

&ofif-qb /GdW -- APPLICATIONS OF VIRTUAL REALITY TO NUCLEAR SAFEGUARDS AND NON-PROLIFERATIO

Los A LA-UR Los Alamos National Laboratory Los Alamos, New Mexico 87545

UCRL-ID Broad-Band Characterization of the Complex Permittivity and Permeability of Materials. Carlos A. Avalle

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

National Accelerator Laboratory

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

Five-beam Fabry-Perot velocimeter

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design

S-84,835 ) AN ARC FAULT-DETECTION. Inventor:

INFCIRC/57. 72/Rev.6. under. Safetyy. read in. Convention. involve. National Reports. on Nuclear 2015.

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

AIGaAs/InGaAIP Tunnel Junctions for Multifunction Solar Cells. Sharps, N. Y. Li, J. S. Hills, and H. Hou EMCORE Photovoltaics

Turning the wheels of your success

High-]FrequencyElectric Field Measurement Using a Toroidal Antenna


American Nuclear Society

Department of Energy Technology Readiness Assessments Process Guide and Training Plan

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

PRIMATECH WHITE PAPER COMPARISON OF FIRST AND SECOND EDITIONS OF HAZOP APPLICATION GUIDE, IEC 61882: A PROCESS SAFETY PERSPECTIVE

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

NOTICE CONCERNING COPYRIGHT RESTRICTIONS

&wf-9+/ob/--21*~~ II. Ron Harper and Robert A. Hike

Prepared by the Working Group on the Use of Nuclear Power Sources in Outer Space

(1) Patents/Patentable means:

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

A. Section includes administrative and procedural requirements for project record documents, including the following:

GA A23983 AN ADVANCED COLLABORATIVE ENVIRONMENT TO ENHANCE MAGNETIC FUSION RESEARCH

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

FD: l-a3-97 f /WE#Tt5- u$-af79f733

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

D. F. Spencer R. Aryaeinejad E. L. Reber. October 2001

ADJUSTABLE CUTTING TOOL HOLDER INVENTORS WILLIAM LEE STEINHOUR Goneaway Lane Glenarm, Illinois DREW WEST

ELECTRONICALLY CONFIGURED BATTERY PACK

Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines and Equipment API RECOMMENDED PRACTICE 17U FIRST EDITION, FEBRUARY 2015

Hardware-in-the-Loop Testing of Wireless Systems in Realistic Environments

Image Enhancement by Edge-Preserving Filtering

PEP-I11Magnet Power Conversion Systems:.

Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents

Test, Validation and Regulatory Requirements for Medical Electronics

Appendix-1. Project Design Matrix (PDM)

Safety recommendations for nuclear power source applications in outer space

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

Revisiting the USPTO Concordance Between the U.S. Patent Classification and the Standard Industrial Classification Systems

Fault Management Architectures and the Challenges of Providing Software Assurance

CPC s Primary Objectives

F98-3 Intellectual/Creative Property

Transcription:

Controlling Changes Lessons Learned from Waste Management Facilities 8 B. M. Johnson, A. S. Koplow, F. E. Stoll, and W. D. Waetje Idaho National Engineering Laboratory EG&G Idaho, Inc. Introduction This paper discusses lessons learned about change control at the Waste Reduction Operations Complex (WROC) and Waste Experimental Reduction Facility (WERF) of the Idaho National Engineering Laboratory (INEL). WROC and WERF have developed and implemented change control and an as-built drawing process and have identified structures, systems, and components (SSCs) for configuration management. The operations have also formed an Independent Review Committee to minimize costs and resources associated with changing documents. WROC and WERF perform waste management activities at the INEL. WROC activities include storage, treatment, and disposal of hazardous and mixed waste. WERF provides volume reduction of solid low-level waste through compaction, incineration, and sizing operations. WROC and WERF's efforts aim to improve change control processes that have worked inefficiently in the past. Configuration Management Change Control Implementation Configuration management is an integrated management process to help ensure that physical, functional, and operational characteristics of a facility conform to its design. Configuration management establishes and maintains consistency among design requirements, physical configuration, and facility documentation over the life of the facility. The Configuration Management Plan (CMP) identifies what is included in the configuration management program, associated implementing documents, and organizational interfaces. CMPs for WROC and WERF implement U.S. Department of Energy (DOE) requirements as specified in DOE Order 4700.1 and DOE-STD-1073-93. The CMPs guide establishment of a comprehensive configuration management process to control approved baselines, associated documentation, and information throughout all phases of the project, from development, through startup of SSCs, to operation and final decommissioning of the facilities. a. Work supported by the U.S. Department of Energy (DOE), Office of Environmental Restoration and Waste Management, under DOE Idaho Operations Office Contract DE-AC07-76ID01570. DISTRIBUTION QF THIS DOCUMENT IS UNLIMITED

DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

WROC and WERF apply configuration management elements using a graded approach, while managing facility SSCs. Identify SSCs under Configuration Management SSCs important to the safety and operation of WROC and WERF facilities are required to be under configuration management. They are selected based upon certain criteria relating to safety significance of the SSC, hazard classification, importance of the SSC to the facility mission, remaining facility lifetime, and other factors. Both facilities follow recommendations of DOE-STD-1073-93 and categorize SSCs as follows: Nuclear Safety A safety limit is established in the Safety Analysis Report (SAR) or the Technical Safety Requirements (TSR) document. The SSC is classified as safety significant in the SAR. Environmental, Safety, and Health Operations must meet regulatory requirements such as DOE orders, and EPA and OSHA regulations. Mission-Critical The SSC has been identified as important to prevent or mitigate substantial interruptions in WROC or WERF operations or to satisfy other DOE mission considerations. Designer Option The SSC has been identified as necessary for safeguards or security. The SSC is considered important by management for operational considerations, such as maintenance, plant protection, productivity, etc. These four categories are in descending order of importance. This allows an initial graded approach to prioritization of SSCs for management control and resource allocations in surveillance, maintenance, and configuration management. Whenever a particular SSC falls under more than one of the stated criteria, its grading is determined by the highest applicable category. Identify Master Facility Drawings. Master Facility Drawings (MFDs) help control SSC configuration. These drawings are maintained to depict the current as-built design of SSCs. The system engineer determines which drawings are categorized as MFDs. Drawings generated as a result of construction activities or facility modifications shall be reviewed and evaluated by the system engineer to determine whether the drawings should be categorized as a MFD or the information incorporated into an existing MFD. 2

MFDs are designated on a Master Facility Drawing List (MFDL), which is controlled and updated as necessary to include the latest revisions and any additions or deletions. Identify MFD Key Drawings. MFDs required for operation and maintenance of SSCs are designated as Key Drawings and are required to be "as-built" at all times. An example of a Key Drawing might be the electrical schematic of a facility evacuation system. Key Drawings shall be so noted on the MFDL. The requirement that Key Drawings be "as-built" at all times is accomplished through use of Interim Drawings. Use of interim Drawings. Interim Drawings are used for design, installation, and inspection of modifications to SSCs, where it is required that drawings used to operate and maintain the facility depict true configuration during the modification effort. Specific requirements for Interim Drawings include the following: Prepare, check, review, approve, and release in accordance with company drawing procedures. Identify as an Interim Drawing and cross reference to the related Key Drawing. Show the necessary details to complete the modification and to incorporate the information onto the affected Key Drawing at the completion of the modification. Areas of change may be circled, with notations "RIPOUT" or "INSTALL" as applicable. Interim Drawings shall contain a general statement such as: "This drawing is for use with (work order number). See drawing (Key Drawing number) for status." The affected Key Drawing shall contain a general statement such as: This drawing affected by Work Order Number Ripout Drawing Number Install Drawing Number Develop a Configuration Management Equipment List. The baseline for controlling changes stems from the ability of management to have a concise and valid method to specify the configuration. This baseline for WROC and WERF is defined as the design basis and is primarily shown by the architectural and engineering drawings of facility SSCs. Since drawings are not user friendly for efficient retrieval of data, it was important to develop a better way to make the WROC and WERF configuration information available to operations, maintenance, and support personnel. A list of the SSCs was developed by WROC and WERF system engineers from design basis documents. This was a difficult task, but the engineers set up a successful top down identification process which helped greatly. Detailed review of as-built drawings and listing all the subsets of equipment met this criteria. This information is referred to as an "equipment list." If facilities are large or there are limited resources, it may be necessary to list major structures and systems and add components to the list as time and resources allow. It is important to identify each piece of equipment in the equipment list with a unique identifier, for example, labels required by the Conduct 3

of Operations. Also, several more fields of information should be specified, such as manufacturer, model number, serial number, drawing number, location, size, capacity, and rating. Personal computer tools were used to prepare an equipment list for WERF and WROC. Changes can now be controlled, since the equipment list sets a baseline from which change can be effectively administered. Once established, the equipment list should be rigidly maintained and updated under a routine document control process similar to drawing or procedure change controls. Membership Independent Review Committee The WROC Independent Review Committee (WIRC) comprises personnel with expertise in various disciplines not directly involved in the requested change. Chairperson. Chosen by facility management, the WIRC chairperson's primary responsibility is to assign the minimum number of reviewers necessary for each document change requested. Coordinator. The WIRC coordinator is an administrator who receives change requests, arranges review meetings, disseminates comments and resolutions, and provides document control and distribution services. Representatives from Disciplines. These representatives are experts in certain disciplines and can be referred to as cognizant professionals. They include such individuals as quality engineers, industrial safety engineers, industrial hygienists, radiological engineers, fire protection engineers, criticality safety engineers, and system engineers. Review Process. The review process (see Figure 1) starts when a change request is submitted to the WIRC coordinator, who communicates with the chairperson. The chairperson assigns appropriate disciplines to review the proposed change, thus limiting the number of needed reviewers. This method is considered fast track and is more efficient and cost effective. Copies of the change, with tracking and comment methods, and due date or meeting notification, are sent to designated WIRC members and the document owner. The coordinator gathers comments and submits them to the document owner for resolution. The owner sends revisions to the coordinator for incorporation. Each WIRC member involved must approve the revisions. The coordinator then submits the WIRC signed change request for management approval and subsequently releases and distributes the changed document. 4

IRC chairperson Document owner Change request IRC Coordinator Management approval Release Figure 1. The independent review process. What WERF Did As-Built Drawings Lessons Learned The as-built drawing project at WERF was initiated to bring facility drawings into compliance with configuration of physical hardware. Respective system engineers reviewed existing drawings and selected Master Facility Drawings and Key Drawings. However, system engineers followed no specific criteria in making these selections. Following numerous planning meetings, the as-built team enthusiastically began the project. Because of undocumented requirements, however, me project floundered. After 3 weeks, facility management hired a team of "experts" that had just completed an as-building task elsewhere within the company. Management appointed a new project manager, assigned new walk-down team members, and restarted the project. While this new team had experience in as-building, it was unrelated to WERF and added little value. The new team eventually completed the project, but with cost and schedule overruns and an inconsistent result. Criteria used by specific walkdown teams were subjective and undocumented. Some drawings included several systems on the same drawing, which led to more than one team redlining the same drawings at separate times. 5

What WERF should have done In retrospect, WERF should have: 1. Identified the scope of the project, determined exactly which drawings needed work, negotiated the time to complete the task, and documented specific "deliverable" requirements. 2. Developed selection criteria for MFDs and Key Drawings. 3. Selected a project manager with facility familiarity, engineering background, and pertinent project management experience. 4. Familiarized walkdown team members with facility nomenclature, including facility definitions and tiering of drawings. 5. Identified owners of systems/drawings. 6. With concurrence of operations personnel, identified, named, and trained walkdown team leaders. 7. Defined the requirements for walkdown validations. 8. Considered training requirements, including walkdown training, facility-specific training, radiological training, and emergency training. 9. Coordinated activities with operations and maintenance personnel. 10. Arranged for necessary work space, equipment, and drafting services. 11. Required walkdown teams to attend Plan of the Day meetings to report and coordinate activities. Summary Through evaluating ineffective change control in the past, WROC and WERF have learned valuable lessons that will lead to improved waste management activities. The facilities are currently emphasizing configuration management to improve change control, with a goal of efficient and easy-to-use processes. Effective change control documentation identifies what is to be accomplished, defines details of the proposed change, ensures appropriate reviews have been conducted, and records as-built information. DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.