CESRTA Low Emittance Tuning Instrumentation: x-ray Beam Size Monitor

Similar documents
x-ray Beam Size Monitor

Operation of a Single Pass, Bunch-by-bunch x-ray Beam Size Monitor for the CESR Test Accelerator Research Program. October 3, 2012

OPERATION OF A SINGLE PASS, BUNCH-BY-BUNCH X-RAY BEAM SIZE MONITOR FOR THE CESR TEST ACCELERATOR RESEARCH PROGRAM*

X-Ray Beam Size Monitor for CESRTA

Measurements of Small Vertical Beamsize using a Coded Aperture at Diamond Light Source. C. Bloomer G. Rehm J.W. Flanagan

Overview of performance and improvements to fixed exit double crystal monochromators at Diamond. Andrew Dent, Physical Science Coordinator, DLS

Supplementary Information

RANDY W. ALKIRE, GEROLD ROSENBAUM AND GWYNDAF EVANS

X-Ray Transport, Diagnostic, & Commissioning Plans. LCLS Diagnostics and Commissioning Workshop

Air Bearing Monochromator at APS 13-ID-E (GSECARS)

Beam Diagnostics, Low Level RF and Feedback for Room Temperature FELs. Josef Frisch Pohang, March 14, 2011

Silicon Photomultiplier Evaluation Kit. Quick Start Guide. Eval Kit SiPM. KETEK GmbH. Hofer Str Munich Germany.

LUSI Pulse Picker System

Pulse Shape Analysis for a New Pixel Readout Chip

Novel laser power sensor improves process control

Diamond X-ray Rocking Curve and Topograph Measurements at CHESS

LCLS project update. John Arthur. LCLS Photon Systems Manager

CSPADs: how to operate them, which performance to expect and what kind of features are available

A high resolution bunch arrival time monitor system for FLASH / XFEL

FIRST INDIRECT X-RAY IMAGING TESTS WITH AN 88-mm DIAMETER SINGLE CRYSTAL

Check the LCLS Project website to verify 2 of 7 that this is the correct version prior to use.

Water-Window Microscope Based on Nitrogen Plasma Capillary Discharge Source

Light gathering Power: Magnification with eyepiece:

DESIGN OF COMPACT PULSED 4 MIRROR LASER WIRE SYSTEM FOR QUICK MEASUREMENT OF ELECTRON BEAM PROFILE

Nano Beam Position Monitor

Nonintercepting Diagnostics for Transverse Beam Properties: from Rings to ERLs

System Integration of the TPS. J.R. Chen NSRRC, Hsinchu

Short-Pulse X-ray at the Advanced Photon Source Overview

Today s Outline - January 25, C. Segre (IIT) PHYS Spring 2018 January 25, / 26

Point Spread Function. Confocal Laser Scanning Microscopy. Confocal Aperture. Optical aberrations. Alternative Scanning Microscopy

CHAPTER 9 POSITION SENSITIVE PHOTOMULTIPLIER TUBES

Beam Size Monitors for KEKB, ILCDR. J.W. Flanagan ILC DR Workshop 19 Dec. 2007

Characteristics of point-focus Simultaneous Spatial and temporal Focusing (SSTF) as a two-photon excited fluorescence microscopy

Supplementary Figure 1

ABSTRACT. Supported by U.S. DoE grant No. DE-FG02-96ER54375

ELEC Dr Reji Mathew Electrical Engineering UNSW

Shenglan Xu. GM/CA CAT Argonne National Laboratory

Order Overlap. A single wavelength constructively interferes in several directions A given direction can receive multiple wavelengths.

Results from Diamond Detector tests at ELETTRA

ITk silicon strips detector test beam at DESY

Supplementary Figure 1. Effect of the spacer thickness on the resonance properties of the gold and silver metasurface layers.

Lithography. 3 rd. lecture: introduction. Prof. Yosi Shacham-Diamand. Fall 2004

MS260i 1/4 M IMAGING SPECTROGRAPHS

Detectors for microscopy - CCDs, APDs and PMTs. Antonia Göhler. Nov 2014

A Prototype Amplifier-Discriminator Chip for the GLAST Silicon-Strip Tracker

e+/e- Vertical Beam Dynamics during CESR-C Operation

FRAUNHOFER AND FRESNEL DIFFRACTION IN ONE DIMENSION

DESIGN NOTE: DIFFRACTION EFFECTS

Filter & Spectrometer Electron Optics

CALICE AHCAL overview

Criteria for Optical Systems: Optical Path Difference How do we determine the quality of a lens system? Several criteria used in optical design

NIST EUVL Metrology Programs

X-ray Detectors at DESY

Performance of the SASE3 monochromator equipped with a provisional short grating. Variable line spacing grating specifications

Upgrade of the ultra-small-angle scattering (USAXS) beamline BW4

MINIATURE X-RAY SOURCES AND THE EFFECTS OF SPOT SIZE ON SYSTEM PERFORMANCE

X-Ray Detection Using SOI Monolithic Sensors at a Compact High-Brightness X-Ray Source Based on Inverse Compton Scattering

BMC s heritage deformable mirror technology that uses hysteresis free electrostatic

Production of HPDs for the LHCb RICH Detectors

Interference [Hecht Ch. 9]

Why and How? Daniel Gitler Dept. of Physiology Ben-Gurion University of the Negev. Microscopy course, Michmoret Dec 2005

pcvd diamond beam position monitors for PETRA III

The Henryk Niewodniczański INSTITUTE OF NUCLEAR PHYSICS Polish Academy of Sciences ul. Radzikowskiego 152, Kraków, Poland.

Introduction to X-ray Detectors for Synchrotron Radiation Applications

cividec DIAMOND DETECTORS & SYSTEMS FOR X-RAYS Instrumentation CIVIDEC Instrumentation GmbH Vienna The Netherlands +31 (0)

Narrow line diode laser stacks for DPAL pumping

Light Source Diagnostics. Hywel Owen ASTEC Daresbury Laboratory

WFC3 TV2 Testing: UVIS Filtered Throughput

NIRCam optical calibration sources

Introduction... 3 Slits for AIR Operation... 4 Slits in Vacuum Vessels... 5 Slits for High Vacuum Operation... 6 Custom Slits... 7 Steel Slits...

Chromatic X-Ray imaging with a fine pitch CdTe sensor coupled to a large area photon counting pixel ASIC

Characterization of a High-Energy X-ray Compound Refractive Lens

Application Note (A11)

Ultra fast single photon counting chip

Low noise readout techniques for Charge Coupled Devices (CCD) Gustavo Cancelo, Juan Estrada, Guillermo Fernandez Moroni, Ken Treptow, Ted Zmuda

Large area position-sensitive CVD diamond detectors for X-ray beam monitoring with extreme position resolution

Performance Comparison of Spectrometers Featuring On-Axis and Off-Axis Grating Rotation

Scanning X-ray microscopy with a single photon counting 2D detector

Single bunch x-ray pulses on demand from a multi-bunch synchrotron radiation source. Resonant pulse picking and MHz Chopper

Totem Experiment Status Report

Comparison of FMCW-LiDAR system with optical- and electricaldomain swept light sources toward self-driving mobility application

Adaptive Optics for LIGO

Aurora II Integra OPO Integrated Nd:YAG Pumped Type II BBO OPO

Coherent Laser Measurement and Control Beam Diagnostics

UNIT VIII-SPECIAL PURPOSE ELECTRONIC DEVICES. 1. Explain tunnel Diode operation with the help of energy band diagrams.

Optimization of the LCLS Single Pulse Shutter

MEASUREMENT OF BEAM LOSSES USING OPTICAL FIBRES AT THE AUSTRALIAN SYNCHROTRON

Triplet polarimeter update

Optics and Lasers. Matt Young. Including Fibers and Optical Waveguides

Development of gating foils to inhibit ion feedback using FPC production techniques

Electron-Bombarded CMOS

RESULTS ON FIELD MEASUREMENTS IN A FLAT POLE MAGNET WITH THE CURRENT CARING SHEETS

ADALAM Sensor based adaptive laser micromachining using ultrashort pulse lasers for zero-failure manufacturing D2.2. Ger Folkersma (Demcon)

Influence of Distributed Ion Pump Voltage on the Anomalous Instability in CESR D.L. Hartill, T. Holmquist, J.T. Rogers, and D.C.

Spectroscopy in the UV and Visible: Instrumentation. Spectroscopy in the UV and Visible: Instrumentation

Citation X-Ray Spectrometry (2011), 40(4): 2. Right final form at

The CMS Outer HCAL SiPM Upgrade.

BEAM SIZE MEASUREMENTS USING SYNCHROTRON RADIATION INTERFEROMETRY AT ALBA

Optical Signal Processing

1/8 m GRATING MONOCHROMATOR

Transcription:

CESRTA Low Emittance Tuning Instrumentation: x-ray Beam Size Monitor xbsm group: (those who sit in the tunnel) J. Alexander, N. Eggert, J. Flanagan, W. Hopkins, B. Kreis, M. McDonald, D. Peterson, N. Rider plus infinite help from CESR and CHESS personnel xbsm status 20091002 Dan Peterson, Cornell page 1

x-ray Beam Size Monitor Overview: Measure beam size bunch-by-bunch for 4 ns bunch spacing (currently 14 ns) 2 products: LET tuning tool with rapid feedback of the beam size (height) measurements of beam size evolution as an indication of emittance growth Non destructive measurement (except that we require a horizontal bump) Both electron and positron sizes Flexible Operation DC or fast readout with/without monochromator variety of optics Previous Report: An update of this project was previously given November 2008, at ILC08, University of Illinois Chicago campus by Walter Hopkins. The November 2008 report included work with a preliminary diode array and a beam line with an incomplete vacuum. This report covers progress in running periods since November 2008. 2009-January-04 : 2009-February-01 2009-May-14 : 2009-June-12 2009-July-27 : 2009-August-26 xbsm status 20091002 Dan Peterson, Cornell page 2

x-ray Beam Size Monitor 2009-January : primary focus was hardware development at 2 GeV beam operation installation if the D-line e + optics and vacuum system including the diamond window alignment including the detector and the beam pipe detector controls shake-down detector development and understanding monochomator understanding some initial tests of image sensitivity to controlled changes in the beam height 2009-May : primary focus was development of software tools at 2 GeV beam operation revised detector mount Low Emittance Tuning real-time support 2009-July : primary focus was 5 GeV operation and pin-hole optics revised optics and optics mount 5 GeV beam operation/calibrations Adaptation of the LET tuning tool to use the pin-hole optics C-line e - optics and vacuum system software development of the emittance growth measurement (not discussed) xbsm status 20091002 Dan Peterson, Cornell page 3

Detector Box (200 mtorr Vac) Diamond Window x-ray Beam Size Monitor High Vacuum UHV Optics Box Outline: x-ray beam line and detector configuration detector details demonstration of the sensitivity detector improvements for May 2009 run calibrations hurdles LET tool e- commissioning 5 GeV operation further use of the LET tool future Source xbsm status 20091002 Dan Peterson, Cornell page 4

The x-ray optics assembly holds a chip with the optical elements. There are provisions for multiple optics chips with various elements in each chip: square hole Coded Aperture (CA) Fresnel Zone Plate (FZP) Each element has a gross size of about 1mm. There is also a vertical-limiting adjustable slit that can be used as an optical element. xbsm status 20091002 Dan Peterson, Cornell page 5

There have been two iterations of the optics assembly. The current assembly (July run) removes problems with the horizontal motion, has both low energy (2 GeV) optics (with FZP, CA, and hole) and high energy (5 GeV) optics (with CA). Optics assembly, January and May runs, 3 motions: 1) overall vertical motion selects position on chip 2) horizontal motion selects chip/hole selected 3) separate vertical motion selects vertical-limiting slit width Optics assembly, July run, 3 motions: 1) vertical motion selects chip/hole, and position on chip 2) vertical motion selects location of 3) separate vertical motion selects vertical-limiting slit width location in CESR xbsm status 20091002 Dan Peterson, Cornell page 6

The x-ray detector operates in a vacuum, but must be isolated from the CESR vacuum to avoid contamination of CESR and allow quick turn-around access to the detector. The detector vacuum (~0.5 Torr) is isolated from the x-ray line vacuum (~10-6 Torr ) by a diamond window (next slide). The pressure difference across the diamond window is controlled by the control system. CESR is protected against catastrophic failure of the window by a gate valve. xbsm status 20091002 Dan Peterson, Cornell page 7

The thin (4um) diamond window separates high quality CESR vacuum from the low quality vacuum of the detector enclosure. The window transmits 76% of the x-rays at 2.5keV, and is supported by a thick silicon frame; the 4um membrane region is 2mm (horizontal) x 6mm (vertical). The window was fabricated by Diamond Materials GmbH of Freiberg xbsm status 20091002 Dan Peterson, Cornell page 8

The detector box contains movable slits for calibration, and the diode array detector and preamplifiers. The monochomator is a silicon-tungsten multi-layer mirror. X-ray energies are selected as a function of angle with 1.5% FWHM bandwidth. This well matched the chromatic aberration of the 239 ring FZP. All devices are motor controlled. As this is in a vacuum, the amplifiers and monochromator are water-cooled. xbsm status 20091002 Dan Peterson, Cornell page 9

Detector: an array of ~ 64 diodes, InGaAs, manufactured by Fermionics Inc., 50µm pitch (1.6mm coverage over 32 diodes), 400µm pixel width. The InGaAs layer has thickness =3.5µm and absorbs 73% of photons at 2.5keV. We instrument 32 contiguous diodes for the fast readout, a FADC with 14ns repetition rate. There are also 8 diodes connected for the DC readout. xbsm status 20091002 Dan Peterson, Cornell page 10

10.186m 4.360m detector optics source magnification: image/source size = 2.34 xbsm status 20091002 Dan Peterson, Cornell page 11

Demonstration of the response to beam height The Fresnel Zone Plate is centered/fixed on the x-ray beam. We use the DC readout. There are 8 diodes that are connected to be available for the DC readout. One of the 8 instrumented diodes is read directly through a pico-ammeter. The ammeter output is collected, synchronized to the vertical motion of the detector stage. Thus, the single diode is swept through the x-ray image. We observe the diode current as a function of position. Integration is ~0.1 sec, the step size is typically less than a diode pitch. The plot shows the change in the FZP image for various applied tuning changes that are expected to change the beam height. This demonstration is the main result of the January run. this is a slow scan of 1 diode, TADETZ, 2mm motion, FZP, no-mono 20090201 xbsm status 20091002 Dan Peterson, Cornell page 12

January May There were many detector developments after the January run. Fast readout (measurements in a single CESR turn) requires pulse height measurements from 32 contiguous diode pixels. Development of the fast readout in the January run was limited by poor wire-bonding efficiency (~25%). The wire-bonding pattern was fixed for the May run providing 100% efficiency. xbsm status 20091002 Dan Peterson, Cornell page 13

Calibration of the Fast readout includes synchronization of the readout to the beam, mapping, channel-to-channel PH calibration, and signal shaping. Here, we are looking at the digitized signal of one diode. This is the storage oscilloscope mode. The diode response is sampled at 0.5 ns. (Individual measurements are separated by the turn time (2500ns) + 0.5 ns ) 14 ns 360 ns In the single pass mode the readout time is synchronized to the maximum diode response. Determine the physical order of the logical channels. Mapping was first mapping done by hand. (Use narrow focus FZP with monochromator.) Observe the relative signal strength of the logical (electronics) readout channels w.r.t. the illuminated position. Mapping and channel-to-channel PH calibration is now automated; four detector boards are mapped and certified. xbsm status 20091002 Dan Peterson, Cornell page 14

Emittance growth measurements, and measurements of bunches spaced as close at 4ns, require damping of the individual bunch signals to limit the distortion of subsequent measurements. Fermionics no shaping During the May run, we optimized the signal shaping as shown in the figures. Fermionics 39pF shaping as in January run Fermionics 150pF shaping May run xbsm status 20091002 Dan Peterson, Cornell page 15

So, after synchronization, mapping, signal shaping, and pulse height calibration, this is our fast readout. The fast readout uses 32 contiguous diodes, in a fixed position, instrumented with 14ns FADCs. this is turn average response 32 diodes, FZP, monochromator, 20090525-2368 The image is observed in the relative response of the 32 diodes compares with the earlier image observed in scanning a single diode through the x-rays. this is a slow scan of 1 diode, TADETZ, 2mm motion, FZP, no-mono 20090201 xbsm status 20091002 Dan Peterson, Cornell page 16

But, while use of the monochomator masks the chromatic aberration of the FZP (decreasing the image width, and improving the spatial resolution of the detector), the x-ray flux is too low to make single-turn measurements. (Plot shown is turn averaged.) We measured the number of photons reaching the detector by comparing the mean and variation of the PH in the peak channel. Using the FZP, monochromator, 1 bunch, 4.3ma beam. The observed rate is about 1 photon/(ma of beam) at the peak. (Multi-bunch measurements will require ~1-2 ma/bunch. a turn-averaged response 32 diodes FZP, monochromator We investigated the use of white-beam. The image will be a convolution of x-ray energies, with varying amount of defocus. 20090529: Using the DC readout, and a controlled increase in the beam size, we compared the sensitivity of white-beam measurements w.r.t. monochromatic beam, Using FZP, monochrometer, FWHM changes from.21 to.25mm FZP and white-beam, FWHM changes from.46 to.50mm. The relative photon count, at the peak, is 114. 20090601: We verified that the fast readout shape matches the DC readout. We can develop the measurement with white-beam. xbsm status 20091002 Dan Peterson, Cornell page 17

20090601: FZP, white-beam measurements Measured the beam position and image size for 10000 consecutive turns, single bunch beam structure. The measurement is based on fits to the image, as observed in a single turn, with the fast readout. (At this point, it is a simple gaussian fit.) The history of the image position over 10,000 measurements, 0.0256 seconds, shows a disturbance initiated at 60 Hz, with image size amplitude of 150 µm. The image position measurement accuracy is σ<35µm, as indicated by the narrowest part of the wave form. The history of the image size does not show a correlation with the variation of the position. While the image has size, σ=250 µm, the variation of the image size is σ σ ~ 35µm. (Based on the slow diode measurements 20090531, we expect σ (image shape) =230 µm.) xbsm status 20091002 Dan Peterson, Cornell page 18

This is the first time that we have observed this position variation. It creates a problem for averaging measurements from different turns, or comparing different turns, because the effect (150 µm, image) is ~larger than the effects we want to measure. As described on the previous page, the onset is 60 Hz. A Fourier analysis of the position disturbance reveals the betatron frequency ~142 khz and the synchrotron frequency ~20 khz. xbsm status 20091002 Dan Peterson, Cornell page 19

How do we go from here to a Low Emittance Tuning tool? The tuning tool is a chart recorder readout of the beam size and position that gives feedback to the CESR tuner. With white-beam, we have increased the x-ray flux to ~100 photons/(ma of beam) (which is still low), we have allowed an increase in the image width, and the beam position varies turn-by-turn with σ~150 µm. We require a faster and stable calculation method for the tuning tool display. Sum distributions from 100 turns. Fit the sum to a gaussian, then refit with 2nd iteration within ± 2σ. With this, we define a window, FW=4σ, for determining center and RMS for individual turns. (The window is the fixed for all turns.) Beam positions are averaged over the 100 turns. Beam sizes (the RMS), now de-convolved from the position, are averaged over the 100 turns. The stability of this procedure allows an update time of ~ 2 seconds. xbsm status 20091002 Dan Peterson, Cornell page 20

(The saved data is more coarse than during measurements. There is a brief period with relevant saved data.) 20090612, ~22:15 we varied image βsing1 position size (σ) µm µm 0 118 175 100 60 185 300-360 192-100 210 190-200 330 210 Current, ma Image Centroid, microns 5.000 4.500 4.000 3.500 3.000 2.500 2.000 1.500 1.000 0.500 0.000 800 700 600 500 400 300 200 100-100 0-200 -300-400 -500-600 -700-800 21.0 21.5 22.0 22.5 23.0 23.5 24.0 24.5 25.0 Time, relative to 20090612 00:00 position 20.0 20.5 21.0 21.5 22.0 22.5 23.0 23.5 24.0 24.5 25.0 Time, relative to 20090612 00:00 Beam position changes track earlier observations with the DC readout for the ßsing1 tuning knob. Scatter in the beam position and beam image size are both ~ ±10 µm. The scatter in the beam size is improved relative to the single turn measurements by averaging. Image Centroid, microns Image Centroid, microns 250 240 230 220 210 200 190 180 170 160 150 size 20.0 20.5 21.0 21.5 22.0 22.5 23.0 23.5 24.0 24.5 25.0 Time, relative to 20090612 00:00 1000 900 800 700 600 500 400 300 200 100 0 20.0 20.5 21.0 21.5 22.0 22.5 23.0 23.5 24.0 24.5 25.0 Time, relative to 20090612 00:00 xbsm status 20091002 Dan Peterson, Cornell page 21

Changes for the July Run Significant changes during the July run: commissioning of the electron line (Previous results are all with the e + line.) 5 GeV operation and associated hardware changes update of the LET tool xbsm status 20091002 Dan Peterson, Cornell page 22

All C-line vacuum work/controls and construction of the detector box were completed for the July run. Components were processed in beam. x-rays were brought through the optics and diamond window and observed on a fluorescent screen in the detector box. C-line, electrons D-line, positrons Further C-line development will wait until we have new 4ns electronics. xbsm status 20091002 Dan Peterson, Cornell page 23

July run: 5 GeV optics As shown on a previous slide, the optics carrier was updated. Provides smoother operation. Provides the 2 GeV optics, well studied in the May run, ( Fresnel Zone Plate, Coded Aperture, hole ). Provides a 5 GeV capable Coded Aperture Provides an precision adjustable slit usable at any energy. xbsm status 20091002 Dan Peterson, Cornell page 24

5 GeV running: Time was invested understanding the optics slit ( pinhole for 1-dimesional measurements) and 5 Gev Coded Aperture, calibrating the detector for 5 GeV beam. The pinhole size was optimized for the x-ray spectrum, finding the minimum resulting from the shadow and diffraction regimes. We provided a measurement of the 5 GeV beam height. σ beam = σ 2 image σ m 2 pinhole σ image = 2.678 * 50 µm = 133 µm σ pinhole = ~25 µm m=magnification= 2.34 σ beam = 57 µm Corresponding CA image. xbsm status 20091002 Dan Peterson, Cornell page 25

2 GeV running: Time was invested understanding the optics slit ( pinhole for 1-dimesional measurements). The pinhole provides the flux of the FZP, without the chromatic aberration. We made measurements of the 2 GeV beam height with the pinhole. σ beam = σ 2 image σ m 2 pinhole σ image = 1.083 * 50 µm = 54 µm σ pinhole = ~25 µm m=magnification= 2.34 σ beam = 21 µm Adapted the LET tool to use the pinhole (The LET tool was previously developed with the FZP). Corresponding CA image: 17 µm beam size, run 3385. xbsm status 20091002 Dan Peterson, Cornell page 26

2 GeV Low Emittance Tuning with Pinhole (Probably saw this plot in the previous talk.) Plot shows measured (green) and theoretical (red) beam size. The measured beam size is taken from the chart recorder LET tool, running with pinhole optics. Previous description of the LET tool showed the beam moves and there is limited range in the diode for this motion. These results utilize the beam chaser (feedback of the fit results to the diode vertical position motor). The rounded shape of the measured beam size is thought to be due to the finite size of the pin hole. The theoretical beam size has no input minimum. xbsm status 20091002 Dan Peterson, Cornell page 27

Low Emittance Tuning Status Chart recorder LET tool runs with at 2 GeV Fresnel Zone Plate optics (requires careful fitting) or pinhole optics (some limitations at small beam size.) At 5 GeV, the beam size is well matched to the pinhole. (There are problems with limiting the x-ray flux that will be addressed with a refined mask before the detector.) We have experience with the Coded Apertures at both 2 GeV and 5 Gev that will can be developed into a more precise measurement. xbsm status 20091002 Dan Peterson, Cornell page 28

Future Plans Upgrade electronics for 4 ns readout reduced noise variable gain to be able to read out 2, 4, 5 GeV with minimal physical flux reduction Commission C-Line optics Add fast read out to C-Line with 4 ns readout Calibrate detectors for 4 and 5 GeV Implement fitting of the Coded Aperture images xbsm status 20091002 Dan Peterson, Cornell page 29