Multi-Stage ASSEMBLY INSTRUCTIONS ST-8100 SERIES. 125 TAYLOR PARKWAY ARCHBOLD, OH PHONE: (419) FAX: (419)

Similar documents
ASSEMBLY INSTRUCTIONS

Installation Instructions for the AlphaDeck Staging System

ASSEMBLY INSTRUCTIONS TF Tent Flooring System. 125 Taylor Parkway Archbold, Ohio Phone: (419) Fax: (419)

Your order will be shipped with the supports and rail components packaged inside the ramp package. Each accessory package is labeled.

Vertical Offset Base and Safety Rail System Installation Instructions

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Sunrise Deck Assembly Instructions for Kingston Left

General Guidelines:

BLEACHER ASSEMBLY INSTRUCTIONS

Supplement. Assembly and Maintenance Guide Titan Series Commercial Step System. Manufactured in the USA

ATLANTIS RAIL Contact Information

Installation Instructions - Model V4JSD 1

VARIABLE TERRAIN STAGE AND RISER SYSTEM

ASSEMBLY OF THE KNOCKED-DOWN LADDERS: 8 to 12 STEPS STANDARD TOP AND SAFELOCK REQUIRED TOOLS

BSM, GSM & GSS. Joint Kit Instruction. (Modified for IMPACT) (NSF Certified) Curved Glass Fresh Meat Delicatessen and Seafood Merchandisers

PATHWAY HD Code Compliant Modular Access System Assembly Manual

Modular XP Ramp Assembly Manual

Modular XP Ramp Assembly Manual

FLOE quick attach & standard sectional dock and leg kits

INSTALLATION INSTRUCTIONS

Downtown Rack. Custom logo option available

F-150 Structural Holding System

SS1062, SS10621 & SS10621E Free Standing PWC & Fishing Boat Hoist SS1062 SS10621 SS10621E

55000/55010 Installation Instructions

OWNERS MANUAL MODEL F660 HIP SLED

Austin Standing Seam Awning with Overhead Braces Assembly and Installation Instructions. Assembly Instructions

MAG-CONV Basic, 48, 48R & Midline Front Mount

40993 Parts List. Front Bow Assy.(1) Rear Bow Assy.(1)

The following instructions will guide you through the installation of your new vinyl railing.

π H-4408 ALUMINUM BLEACHERS 5-ROW x 15' PARTS uline.com TOOLS NEEDED

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Assembly Instructions 10 X 10 Aluminum Roof Support

XHD Bull Bar w/ Dual Row LED Light Bar (10-17 Jeep JK)

The Queen Quilter Professional Quilters Kit Frame

The following instructions will guide you through the installation of your new vinyl railing stair kit.

2-PIECE STAIRWAY ASSEMBLY

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

Installation Instructions for Vista Air Vertically Folding Walls

Continuous Handrail Kit Installation Instructions

Instruction Guide 4A90L

Swerve Rack CUSTOM RACKS AVAILABLE

O-Sullivan King 4 Poster Bed O-Sullivan Queen 4 Poster Bed Parts and Hardware List

Installation Manual. Fortress OSHA Stair System Adjustable Temporary Stair Rated Load: 100 psf, 300 lbs. concentrated. 3-Tread at 25.

For additional assistance call

Leveling Foot RB210. Leg Extender RLT66

7141 & NATIONAL POLE VAULT STANDARDS SPECIFICATIONS

Lab Style Table Frame Part No Assembly Guide Automation Technology

COMPOSITE RAILING INSTALLATION

4099T Parts List. Front Bow Assy. (1) Rear Bow Assy. (1) Long Mounting Rail (2) Short Mounting Rail (2)

Spiral Slide

Support Stands & Conveyor Mountings. Parts, Assembly & Maintenance Manual. Steel Support Stand. Aluminum Support Stand Rev.

Cable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue

INSTRUCTION BOOKLET #C20

ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV 89030

ASSEMBLY INSTRUCTIONS Last Updated

MK52 Series ULTRA-LOW FREQUENCY VIBRATION ISOLATION WORKSTATION ASSEMBLY AND OPERATION INSTRUCTIONS

Face Mount to Through-the-Post Mount

Pathway Stair System For use with the Pathway Modular Ramp System, as freestanding stair, or with other structures.

CNC Router Parts PRO Machine Kit Cable Track Installation Instructions

INSTRUCTION BOOKLET #34. For Wallbed models: KING SIZE SIERRA WITH STORAGE HEADBOARD

Transmission Line Support Systems

Installation, Maintenance & Parts Manual

ASSEMBLY INSTRUCTIONS FOR HAULER II UNIVERSAL CAMPER SERIES RACKS

M2 Assembly. M2 Sub-Assemblies mm Belt Sub-Assembly mm Belt Sub-Assembly Spider Sub-Assembly... 4

Side Winder R o u t e r L i f t.

Assembly Aid. One of the packages contains the required bolts, washers and nuts for final assembly

TechBench Installation Manual

INSTALLATION INSTRUCTIONS DODGE RAM 2 & 4WD 1500 PART # P5058

CTTR Tire Rack Required tools

Roll In W/L Dock PAGE 1

Queen Wingback Bed King Wingback Bed

Assembly Instructions. Table of Contents

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

Stainless Steel Bench Stand

Trak-Slider Instructions

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

NOTE: Top section pole (Q) is packed INSIDE bottom section pole (S)

Aluminum Railing Installation. Glass Railing Spindle Railings Intimacy Railings and Panels

FENCING ASSEMBLY INSTRUCTIONS

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Installation Instructions for. Handrail Component System

Installation Manual. Solid Plastic Toilet Partitions. IN CANADA & AREAS OTHER THAN U.S.A.: IN THE U.S.A.:

Instruction sheet -- VTI Flat panel TV cart

Ford Pick Up Rear leaf Spring Kit Installation Instructions

model tsa-sa48 Sliding Crosscut Table installation guide

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

Interactive Monitor Arm

Sliding Crosscut Table installation guide

Installation Guide. Mounting Kit for Mounting Philips Avalon CTS Cordless Fetal Transducer System on Wall, 2'' Post, Rail, or Slide-on Mounting Plate

======================================================================================== ( DR / DR) JK WRANGLER MOD RACK

BLT ERGO-E.EAZY

floe dock steps for roll-in and sectional docks

IDR assembly instructions:

Xceed ASSEMBLY MANUAL

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

PLEASE CHECK ALL BOXES FOR HARDWARE BEFORE DISCARDING

INSTALLATION INSTRUCTIONS

Assembly Instructions

Q-Zone Hoop-Frame. Assembly Instructions. Copyright July 11, 2018 Grace Company (Reproduction Prohibited) Version 1.8

Transcription:

125 TAYLOR PARKWAY ARCHBOLD, OH 43502 PHONE: (419) 445-8915 FAX: (419) 445-0367 www.biljax.com Multi-Stage ST-8100 SERIES ASSEMBLY INSTRUCTIONS ALL DRAWINGS ARE FOR ILLUSTRATION ONLY. PRINTED IN U.S.A. Print Date 9-2006 LL-204-50 of 8

Assembly Instructions Include: Step 1... Site Preparation Step 2... Leg Assembly Step 3... Setting the Stage (Non-Telescoping Legs) Steps 4-6... Setting the Stage Step 7... Guard Rail Installation Step 8... Diagonal Bracing Step 9... Stairs Special Configurations Sections STEP 1 Site Preparation A. Determine the exact location of the stage. B. For outdoor stages, mudsills are recommended to distribute the weight (150 PSF) on the legs. This will help prevent the legs from sinking and ease in leveling the stage. STEP 2 Leg Assembly Attach adjustable rubber base pad to galvanized legs in 3rd hole with 2" snap pins. Insert leg completely into stage socket and pin. Insert leg completely into stage socket and pin. Multi-Stage Leg 2" Snap Pin 1-3/4" Sq. Tube (Telescoping Sleeve) 1-1/2" Sq. Tube x 4" Telescope to desired length. 6" min. overlap Multi-Stage Leg Multi-Stage Leg with Telescoping Sleeve STEP 3 Setting the Stage (Non-Telescoping Legs) A. Insert legs completely into all four corner sockets in first stage section using 2" snap pins. Note: The head of the snap pin should face the outside of deck. B. Set first section in back left-hand corner of stage area. (any corner may be used as starting point*) C. Align the stage section so that the studs are to the inside and the slotted sides are to the outside of the stage area. * Any corner may be used when using the 4' x 4' decks exclusively. 2 of 8

STEP 4 (Only two galvanized legs are needed on each stage section in this row.) A. Set back row of stage sections first. B. Insert the two legs into stage sections as shown and attach it to previous section by means of the slot and pin connections. C. Insert 5/16" T-handle hex wrench through the top of the deck and lock stages together by rotating the cam lock clockwise. D. Insert a plastic plug into the stage deck to cover the cam lock hole as shown. STEP 5 Note: Step C & D can be done as you are setting up the stage or when assembly is completed. Upon completion of the back row, begin the second row with one section and two legs as shown in Step 4- B, C & D. STEP 6 A B A. To continue the second row, insert one leg in corner socket as shown and pin. Attach section to adjacent sections A & B as shown. B. Additional stage sections in each row are assembled in a like manner. C. Decks should be locked together with cam lock (see Step 4, C & D). 3 of 8

STEP 7 Guard Rail Installation Panel Guard Installation A. Use 1" long bolt to bolt the guard rail to the side of the stage and use 2-1/2" long bolt to bolt the guard rail to the leg of the stage. 1" 2½" Post and Rail Installation A. Select appropriate legs and attach each guard rail post with (2)-3/8" x 2-1/2" hex bolts and nuts directly below the deck sockets as shown in installation options #1 - #4 below. B. Posts will be spaced at 4' or 8' intervals depending on rail lengths. Attach mid-rails with 1/2" wing nuts and top rails with 1/2" black rail knobs. (Pre-set all posts and rails before tightening.) Option #1 Option #2 Option #3 Option #4 STEP 8 Diagonal Bracing A. Diagonal bracing is required on stages with heights over 30". Brace each corner and every third bay along each side. Use 3/8 x 2-1/2" hex bolts and wing nuts. Internal braces should be placed in the same row as perimeter bracing. B. Double diagonal bracing should be used on heights over 48". At least one of the braces should span the connection between the 1-1/2" leg and the 1-3/4" telescoping sleeve. C. The bolt space of the diagonal braces will be: 12" with legs at 48" center line. 18" with legs at 46" center line. Position braces on leg height to maintain equal brace spacing. 4 of 8 Guard Rail Post Installation NOTE: Installing guard railing often requires pre-planning. The options shown are the positions that the guard rail post can be bolted to the stage leg. Bolt Space

STEP 8 D. When bracing the Multi-Stage, a common leg should be braced in both directions as shown. E. Multi-Stage should be braced every 2-3 decks as shown when bracing is required. (Note the common leg bracing method is shown below.) STEP 9 Common Leg Stairs A Bolt each bracket in place with the following hardware: A. (1) 3/8" x 1" long hex bolt (1) 3/8" lock washer (1) 3/8" hex nut B. (1) 3/8" x 2-1/2" long hex bolt (1) 3/8" lock washer B Assemble foot bracket to each leg using the following: (1) 3/8" x 2-1/2" long hex bolt (1) 3/8" lock washer (1) 3/8" hex nut Extend stringer to required length and bolt temporarily until steps are assembled. 5 of 8

STEP 9 Assemble step as shown with edge to accept optional striping toward the front. (Striping not included.) Parts required to assemble one step are as follows: (1) End plank bracket - right (1) End plank bracket - left (1) 44" Aluminum step plank (4) 1/4" x 3/4" long hex bolt (4) 1/4" hex nut (4) 1/4" lock washer Assemble the step to the stringer as shown using the following hardware: (4) 3/8" x 2-1/2" long hex bolt (4) 3/8" hex nut (4) 3/8" lock washer Assemble handrail stiffener (3-4 ft. package and 4-6 ft. models only) centrally locating it between the handrail support posts on the 3' - 4' stair unit. Place them (2 pcs.) as near as possible to the handrail support posts on the 4' - 6' stair units. 1. 3/8" x 2-1/2" long hex bolt 2. 3/8" hex nut 3. 3/8" lock washer 4. Handrail stiffener (2 pcs. on 4-6 ft. pkg. only) 5. Handrail (will vary depending on pkg.) Handrail Styles 2' - 3' Models 3' - 4' & 4' - 6" Models Pin support leg (2) to stringer support socket (1) and leveling pad (3). Assemble stringer support socket to the stringer as shown: 6 of 8 1. Stringer support socket (2) 2. Support leg (2) 3. Adjustable rubber base pad (2) 4. 2" snap pin (4) 5. 3/8" x 2-1/2" long hex bolt (4) 6. 3/8" hex nut (4) 7. 3/8" lockwasher (4) Note: The stringer support is included with the 4' - 6' stair unit and is recommended for use on stages over 4' in height.

STEP 9A Ultra-Stair A. Assemble handrail units as shown using bolt (1). B. Insert handrail assembly into sockets on stair unit. Fasten with bolts (4) as shown. C. Place stair unit onto stage as shown. Secure stair to stage through legs with bolts (6) and under stage with bolts (5). D. Adjust height of lowest stair to match rise of other stairs using the adjustable foot pads (7). 1. Bolt - 3/8-16 x 3-1/2" (8) 2. Flat Washer - 3/8" (20) 3. Lock Nut - 3/8-16 (16) 4. Bolt - 3/8-16 x 2" (6) 5. Bolt - 3/8-16 x 1" (2) 6. Bolt - 3/8-16 x 2-3/4" (2) 7. Rubber Foot Pad (2) 45 Stage SPECIAL CONFIGURATIONS When a 45 stage is mated to the notched side of a deck, bolting is required using: (2) 3/8" x 1" hex bolts (2) 3/8" hex nuts Bolt through at these 2 locations. Riser Assembly with Guard Rail 1. Riser socket 2. 3/8" x 1" long hex bolt 3. 3/8" hex nut Using a riser application, chair rails w/clamp would be required. Contact factory for details. 2 3 2 3 1 2 3 7 of 8

ADA Access Ramp Assembly with Guard Rail 7 ADA 5-Degree Top Deck Guard Rail Panel w/ Handrail Part No. 0106-348-1 Left Part No. 0106-348-2 Right 6 5-Degree Angle Deck Guard Rail Panel Part No. 0106-234-1 Left Part No. 0106-234-2 Right 9 ADA 4' Handrail for Transitional and 5-Degree Guard Rail Panels Part No. 0106-357-04 5 Transitional Deck Guard Rail Panel Part No. 0106-239-1 Left Part No. 0106-239-2 Right 4 ADA Starter Deck Guard Rail Panel w/ Handrail Part No. 0106-351-1 Left Part No. 0106-351-2 Right 4' x 4' Standard Stage Deck Part No. 0106-039-6 4' x 4' 5-Degree Deck Part No. 0106-064-5 ADA Handrail Clamp Part No. 0106-354 4' x 4' Transitional Deck Part No. 0106-236-5 4' X 22" ADA Starter Deck Part No. 0106-286-5 1 8 2 3 A. Ramp should be assembled at 5 o slope. (1 inch of rise to 12 inches of run) B. Ramp should be assembled from platform height to the ground. C. Intermediate platform is required when ramp exceeds 30 feet. 1) 4' x 4' 5-Degree Angle Deck... 0106-064-5 2) 4' x 4' Transitional Deck... 0106-236-5 3) 4' x 22" ADA Starter Deck... 0106-286-5 4) ADA Starter Deck Guard Rail Panel... 0106-351-1 (Left) with Handrail... 0106-351-2 (Right) 5) Transitional Deck Guard Rail Panel... 0106-239-1 (Left)... 0106-239-2 (Right) 6) Ramp Deck Guard Rail Panel... 0106-234-1 (Left)... 0106-234-2 (Right) 7) Top Deck Guard Rail Panel with Hand Rail... 0106-348-1 (Left)... 0106-348-2 (Right) 8) ADA Handrail Clamp (to attach Item 9 to Item 5 & 6)... 0106-354 9) ADA Handrail (for Item 5 & 6)... 0106-357-04 8 of 8 Bil-Jax, Inc. 2006