bridges Installation Manual

Similar documents
Bridges II Installation Guide. Effective June 2017 DESIGN GUIDE

compile system INSTALLATION GUIDE Updated January 2019

Assembly Instructions

OXYGEN INSTALLATION. Revision date

Interra Installation Manual

Compile Installation Manual

installation guide ICON classic benching

Revised

Assembly Instructions & General Overview

Topo Freestanding Applications - Private Office

ZAPF PANEL SYSTEM ASSEMBLY INSTRUCTIONS. It is recommended that the components be installed in the sequence of this assembly manual.

a.k.a. casegoods instructions

Note: This assembly instruction will cover all configurations of Alloy adjustable height double bases.

Product must be installed as shown using the screws and brackets provided. Use of incorrect hardware could result in damage to the product.

Linear Hook- on Worksurfaces

Footprint Worksurface Assembly Instructions

INSTALLATION MANUAL DASH. friant.com/dash

Footer & Base Plate Assembly. installation guide. ILINE power/data beam

Mirage Installation Manual

INSTALLATION MANUAL VERITY. friant.com/verity

Workbench Instructions for Assembly

Sentinel Series Cigar Humidor End Tables

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Workbench Instructions for Assembly

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

ASSEMBLY AND CARE INSTRUCTIONS JUST FOR KIDS 355

Sales & Service. JFK - Just For Kids. sasportonline.com. 135 Forestview Road 7879 Will Rogers Blvd.

FitWork Walkstation Series 7 AdjusTables

MPA-9000 Universal Ceiling Projector Mount Kit

Figure A. Figure B. Figure C. Figure D

Privacy Wall Glass Selections - Polished Edge Slider Door

Installation Instructions

STAKS. Crossover Casegoods ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS RIGHT & LEFT HAND "J" TABLE

ROS-APT Caucus Plinth Table with Trough Note: Details apply, however the actual configuration of your table may vary from what is depicted here.

MobileTrak5 Installation Instructions

WAREHOUSE HANGER INSTALLATION INSTRUCTIONS R H INS T A L L A TIO N INS T R U C TIO N S

Series 7 - Adjustable Height Tables

Sentinel Series Cigar Humidor End Tables

INSTALLATION AND CARE INSTRUCTIONS

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

REC Series Rack Installation Guide

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

Series 7 AdjusTable Height Tables

Footprint Mobile Assembly Instructions

Kai Installation Instructions

Single Sided Height Adjustable Benching

Series Adjustable Height Tables

Angled Side Flush with Panel Face

13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

Assembly Instructions Nevins Phone Booth

MantelMount. TM1A Installation Instructions IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Hover. Installation Instructions. Raised Panel. Version

Assembly Instructions

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR

EPPA2-KIT DUAL MONITOR ARM CONVERSION

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S ROD IRON SCROLL HANGER R H

S6 User s Manual USER S MANUAL ver. 1.0

NOTE: Top section pole (Q) is packed INSIDE bottom section pole (S)

Range height adjustable assembly

mila-wall (Series100) General Operating Instructions page 1 of 15

PROFILE Flat Panel Console System Installation Manual

7878 K940. Checkpoint Antenna. Kit Instructions. Issue B

Preference Collection 5580 Treatment Console INSTALLATION GUIDE

Assembly Instructions

OPERATOR'S MANUAL RULES FOR SAFE OPERATION

Closet System Installation Manual

Oxford Stalls Installation Instructions

Depending on the size you ordered you will have either 5 Foot sections which will build the 10 Foot frame or 6 Foot sections which will build the 12

Perks Assembly Instructions

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

Installation Instructions

ABM International, Inc.

Height Adjustable Benching End Panel and Utility Pole

Stainless Steel Bench Stand

Assembly Instructions 10 X 10 Aluminum Roof Support

WEIGHT ADJUSTABLE ESPREE. Model 2ESP-WA-C48- Model 2ESP-WA-C60- 2ESP-WA Rev B 8/17 ASSEMBLY AND OPERATION

BY ALIEN TECHNOLOGIES CORP

Medium HoneyBadger Chase Rack Installation Instructions

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

BARN DOOR HARDWARE KIT

Installation And Care Instructions. Vertical Honeycomb Shades

Hardware and Components:

Industrial Hanger ASSEMBLY INSTRUCTIONS

model tsa-sa48 Sliding Crosscut Table installation guide

Mount to the Wall INSTALLATION MANUAL

Assembly Instructions Nevins Phone Booth

Jenny Legs Assembly Instructions

Installation Instructions. Oakmont Folding Doors

TITAN2-EDGE Public Access Computer Station Dual Track

INSTALLATION AND CARE INSTRUCTIONS

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

Gared Pro-S Portable Backstop

P a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s

Xceed ASSEMBLY MANUAL

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

Transcription:

bridges Installation Manual 0 OHSAS 800:007 CGSB #0HS-009 ISO 900:008 CGSB #96- ISO 00:00 CGSB #EMS-00 Global Contract Inc. 6 Petrolia Road North York, Ontario, MJ X8 Visit us on the Internet at globalcontract.com (6) 79-000

Bridges Required Tools Safety Glasses Wrench Flathead Screwdriver Phillips Screwdriver Spring 0 Allen Key Viceversa Bridges Installation Sequence STEP : LAYOUT ORIENTATION Orient the layout plan within the installation area, determine the location of table assemblies, power source and main storage components; establish the highest point on the floor. STEP : SUPPORTING STRUCTURE - legs, supporting beams Identify type and size of required components and position them in accordance with layout plans. Proceed with connecting legs and structural beams (see the following pages for detailed instructions). Make sure that all rails are leveled and securely connected before proceeding with installation of work. STEP : WORKSURFACES STEP : ACCESSORIES - task and paper organizers Determine type and location of accessories fitting into either top or bottom of the rail as specified in floor plans. Proceed with installation of accessories. STEP : STORAGE STEP 6: ELECTRICS and DATA / COMMUNICATION - cable routing; cable management Connect power feed harness to building power supply; check circuit assignments and functionality of power delivery at each duplex receptacle. STEP 7: WALK THROUGH / INSTALLATION INSPECTION Supporting Structure Height Adjustment Set the legs to desired height. The inner leg has two threaded holes. STEP : The top threaded hole is typically used to secure legs with levelers. STEP : The lower threaded hole is used for securing legs with casters. STEP : If the desired top surface height is 9 from the floor, for instance, and the table structure is to be on levelers, align top threaded hole in the inner leg () with the fourth hole in the table leg () as illustrated. When installing legs on casters, align the lower () threaded hole in the inner leg with the same fourth hole () in the table leg and secure with provided screws. STEP : The height adjustment screws must be only used with the provided, translucent cup/washer. Please contact your Global Contract Service Representative at 6-79-000 for any questions or concerns. Page globalcontract.com NOTE: Any alterations to listed components will void the manufacturer s warranty. The manufacturer will not be responsible for any damage or bodily harm caused by alterations in accordance with national or local electrical codes and manufacturer s specifications. In accordance with the manufacturer s policy of continual product improvement, the product presented in this document is subject to change without notice or obligation.

Supporting Structure Height Adjustment Legs are connected with supporting beams. There is one beam for a single line of tables while two beams connect back-to-back table structures. There are three types of beams whose application principles are common to building support for single-line and back-to-back table assemblies: Standard Beam, Interconnect Beam and Telescopic Beam STANDARD BEAM Designed to bridge two or three legs to form support for a single table, or for two adjacent table assemblies. To connect a beam to a leg, identify the correct type (Standard or Interconnect) first - in accordance with your desired table configuration. STEP : Position beam s end bracket over leg s horizontal, rectangular tube. STEP : Space cord bumpers along beam. A 7 beam should have STEP : Secure top and bottom bracket ends with two supplied screws. Level the whole assembly. Spring 0 STEP : Install worksurfaces and secure with supplied screws by proceeding from the central, shared leg to the outside of the assembly in both directions. INTERCONNECT BEAM Designed to bridge space between two table assemblies. Because the interconnect beam is longer than the standard beam, it spreads supporting legs apart so that they can be shared by adjacent worksurfaces. A typical, multiple surface table run begins with a standard beam, continues with required number of interconnect beams and ends with a standard beam at the opposite end of the run. STANDARD BEAM INTERCONNECT BEAM TELESCOPIC BEAM Legs and Beams TELESCOPIC BEAM Designed to provide support for worksurfaces perpendicularly connected to a primary table run. The telescopic beam is connected to the leg s horizontal, rectangular tube on one side, while the opposite side is secured off module to the perpendicular, central beam and can be adjusted to accommodate and 0 deep primary worksurfaces. STEP : Position beam s end bracket over leg s horizontal, rectangular tube. STEP : Secure top and bottom bracket ends with two supplied screws. STEP : Adjust the length of the telescopic beam in accordance with the depth of primary worksurface. STEP : Position end bracket of the telescopic beam over the primary, perpendicular beam. Level the whole assembly. STEP : Install primary worksurface. STEP 6: Secure the secondary worksurface to legs first. STEP 7: Adjust the secondary worksurface/telescopic beam position. STEP 8: Secure the worksurfaces with flat brackets. 8 7 6 globalcontract.com Page

GENERAL INFORMATION January 00 0º Beam Support Designed to connect A frame legs with 0º corner leg to form support for a single table, or for adjacent table assemblies. The integrated 0ª beam bracket allows for the beam to be mounted in two positions: A) end of run leg placement B) shared leg placement A Identify the desired leg position (A or B) STEP : Align two mounting holes in beam with two holes in the integrated 0º beam bracket. Position beam s end bracket over leg s horizontal, rectangular tube. STEP : Secure both beams to the integrated 0º beam bracket with four supplied screws. B STEP : Position beam s end bracket over leg s horizontal rectangular tube. STEP : Secure top and bottom bracket ends with two supplied screws. STEP : Level the whole assembly. STEP 6: Install work surfaces and secure with supplied screws by proceeding from the central, 0º leg to the outside of the assembly in both directions. NOTE: deep worksurfaces are mounted centrally on top of the table structure. 0 deep worksurfaces are mounted off center, with a longer overhang facing the user. 6 Page globalcontract.com

January 00 GENERAL INFORMATION Sliding Return Ensure that back-to-back table installation is complete, level and structurally sound. Installation of Sliding Rail requires a special degree of accuracy of work surface alignment. Failure to do so may result in binding of the sliding mechanism on the Sliding Rail. Establish range of the Sliding Return. STEP : Mark a line in from (and parallel with) the front edge of work surface. STEP : Position the Sliding Rail and secure it with supplied screws. Always proceed from the second hole, leaving the first hole for installation of the Rail stop. NOTE: the pair of screws provided to secure the rubber rail stops at either end of the rail are longer than the screws for securing the rail to the work surface. Do not use these longer screws to secure the rail as the screws may penetrate through the top of the work surface. STEP : Secure leg support bracket to a leg frame with supplied machine screws (wide flat allen head). STEP : Place the Sliding Return work surface upside down on a clean surface. Secure the leg assembly to the work surface with supplied wood screws. Ensure that the legs are set to the same height as the legs supporting the rest of the table installation. STEP : Place eight supplied rubber spacers over pre-drilled holes. If you are converting an existing Return work surface to a Sliding Return, mark a line in from (and parallel with) the edge of the Return work surface. STEP 6: Align supporting brackets with rubber spacers / pre-drilled holes (or the marked line) and secure both brackets with supplied wood screws. NOTE: In order to ensure a smooth sliding action, both brackets must be perfectly perpendicular to the edge of the return work surface. STEP 7: Slide the two glide blocks with bushings carefully onto the Rail as illustrated. STEP 8: This step requires two people: While the leg supported side of the Return rests on the floor have an assistant position supporting brackets under sliding glide blocks, align the holes and gently drive in two machine screws (metric M6 as provided). Do not tighten. In the same manner secure the second bracket to the second glide block and test smoothness of the slide. Carefully tighten all four metric screws while repeatedly testing smoothness of the slide. If the return binds on the Sliding Rail, then your support bracket(s) are not perpendicular to the rail - causing the glide blocks to jam. 6 STEP 9: Secure rail stops to both ends of the rail with supplied (longer) srews to prevent disengagement. 7 9 8 globalcontract.com Page

Table Supports ROUND TABLE SUPPORT Round table structure consists of one main leg and two individual legs. Spring 0 STEP : Position each individual leg s end bracket over the main leg s horizontal, rectangular tube. STEP : Secure top and bottom bracket ends with the supplied screws. Level the whole assembly. STEP : Install round worksurface. PIVOTING TABLE SUPPORT Round and oval pivoting table structure consists of one main leg, leg bracket and a pivoting clamp. Place oval worksurface upside down on a clean surface. STEP : Align clamp over pre-drilled holes. STEP : Rotate pivoting clamp over disc to reveal screw holes and drive in supplied screws (the clamp must be rotated 90 degrees to reveal the next screw hole). STEP : Secure leg support bracket to leg with two screws. STEP : Secure leg support bracket/leg assembly to worksurface with five supplied screws. STEP : Increase leg height by (two increments) to compensate for the height of the pivoting clamp. Invert the table assembly. STEP 6: Position table with pivoting bracket over the edge of the primary table as illustrated. STEP 7: Tighten the set screws of the pivoting clamp, securing it to the primary table. ROUND / OVAL TABLE 7 6 PRIMARY TABLE Page globalcontract.com

Cantilevers for Glass Tops Cantilever/Glass Tops Designed to provide support to either single or multiple glass work surfaces. Size of the cantilever corresponds with the depth of glass worksurface ( and 0 ). Begin by assembling table leg/beam structure as described previously and level the complete support assembly. Spring 0 STEP : Position the glass top cantilever over table leg so that threaded pins which are welded to the bottom of each cantilever fit through the four mounting holes in the leg. STEP :Secure each glass top cantilever with four supplied acorn nuts. STEP :Position the glass top on the structure while ensuring that all clear contact pads are in place. STEP :When installing multiple glass tops on a shared leg/cantilever support assemblies, ensure that each adjacent glass top edge is placed in the centre of each shared cantilever, resting on two clear contact pads. STEP :Position the first glass top. Apply transparent, adhesive bumper on the edge facing the adjacent glass top. The transparent bumper protects the two glass tops from rubbing and chipping. Complete the installation by placing the second glass top on the supporting structure. Cable Management and Electrics At the basic level, table and floor based office equipment is serviced by a wall or floor power supply. As the operation grows, there might be a need to organize excessive cable clutter. Cable tray () fits over the Standard or Interconnect Beams and cables are simply coiled into it. As many as Cable Tray will fit on a 60 beam. Cable Snake() installed in proximity of floor monument and worksurface grommet manages vertical cable clutter. Table clamped, single circuit power and date Mini-Adapt modules () deliver services to desk height, while tapping into wall or floor power supply. Again, the excessive cables can be managed with Cable Trays. Viceversa Power Tower () and Power Pole () deliver up to four circuits either from the floor or ceiling power sources. When combined with Mini- Adapt modules, this power could be distributed further horizontally, at desk level. Doc-it rail (6) can be installed between back-to-back tables for extended desk height power/data distribution. 6 globalcontract.com Page 6

Power Trough NOTE: Install dividers, storage and table top accessories prior to proceeding with the installation of power trough. Spring 0 A) SUPPORTING STRUCTURE Identify length and location of required Power Troughs and position them in accordance with lay-out plans. Install brackets on Power Troughs. Make sure that all Power Troughs are securely connected before proceeding with installation of electrical components. B) ELECTRIC COMPONENTS Identify type and location of required electrical components and position them in accordance with lay-out plans. Secure Power Feed to the Power Trough brackets (ensure that the liquid tight whip is long enough to reach the power source / floor monument. Proceed with connecting Power Distribution Assemblies and Jumper Harnesses on the ground, just below their future location. Install Duplex Receptacles as specified. Secure interconnected electrical components to Power Trough. C) DATA/COMMUNICATION Arrange cables below their future location into bundles under the tables. Install cable terminals and snap Terminal Plates into the openings in the middle of Power Trough. Proceed from one side of the table assembly, lift cable bundles and secure them to the Power Trough with extruded Data Cable Manager. D) CONNECT TO THE BUILDING POWER SUPPLY It is recommended that the connection to the building power supply be made under the supervision of a licensed electrician and according to applicable codes and regulations. Connection to the building power supply must be done by a licensed electrician. Do not connect or disconnect components while the system is under load. Disconnect the main power before servicing or reconfiguration. E) WALK THROUGH / INSTALLATION INSPECTION Page 7 globalcontract.com

Power Trough Supporting Structure STEP : Install four brackets (two pairs of left and right brackets are required). Ensure that tab A fits over the rectangular VVDL leg horizontal cross member. Use tab B to locate the bracket against the VVDL leg worksurface bracket as illustrated. Secure each bracket by driving supplied screws through tab C into the bottom of the worksurface. Spring 0 STEP : Install Power Troughs. Power troughs are provided with pairs of mounting holes to accommodate various VVDL leg positions. Use pair of mounting holes B - B to secure Power Trough to a single assembly of two back-to-back tables or to a back-to-back table assembly at the beginning of a multiple table run. (Single table assemblies and tables at the beginning of a table run employ standard-length support beams). Use the pair of mounting holes A - A to secure Power Trough to back-to-back tables in the middle of a multiple table run. (Tables in the middle of a multiple table run employ extended-length support beams. The legs are wide apart, shared between adjacent back-to-back table assemblies.) STEP : Slide Power Trough loosely over the brackets (first on one end, then on the opposite end of the Power Trough). STEP : Position the Power Trough over the brackets. Ensure that threaded studs protrude through the holes in the Power Trough. 0º Power Trough C A B 0º Power Troughs are secured to tables with two types of brackets: the standard trough-mounting brackets on one side )the same, above described rules apply: A position for shared application; B position for end of a run application) and narrow Z brackets securing the opposite side of the Power Troughs in the proximity of the 0º corner leg. STEP : Preassemble Z brackets and power Troughs: Thread the threaded stud through the Power Trough as illustrated. (Notch in the front edge of the Power Trough prevents the Z bracket from rotating). Follow steps and to install the opposite side of the 0º Power Trough. A B A B globalcontract.com Page 8

Power Trough Electric Components Identify type and location of required electric components and position them in accordance with lay-out plans. STEP : Secure Power Feed to the Power Trough brackets (ensure that the liquid tight whip is long enough to reach the power source / floor monument). STEP 6: Lift the Power Trough on one side and rest the Power Feed mounting bracket on top of the Power Trough brackets. STEP 7: Lower the Power Trough so that the Power Feed bracket is sandwiched between the Power Trough and Power Trough supporting brackets; ensure that threaded studs protrude hrough the holes in the Power Trough. Spring 0 STEP 8: Secure all Power Troughs with supplied knurled thumb nuts. STEP 9: Connect Power Distribution Housings and Jumper Harnesses on the ground, just below their future location. NOTE : There is an arrow and a letter N on each Power Distribution Housing and on every Jumper Harness referring to the correct position in relation to each other. STEP 0: Install Duplex Receptacles as illustrated, with circuit numbers in accordance with the electrical plans. 8 7 6 Page 9 globalcontract.com

Power Trough Electric Components : Continued STEP : Secure interconnected Electrical Components to Power Troughs: Proceed from the Power Feed by connecting its harness to the Power Distribution Housing. NOTE: There is an arrow and a letter N on each Power Distribution Housing and every Power Feed referring to the correct position in relation to each other. Spring 0 STEP : Repeat steps and under the opposite Duplex Receptacle. Proceed to the opposite end of Power Distribution Housing. Ensure that all electrical components are interconnected and secured to Power Troughs. Connect Power Feed to the building power supply. STEP : Insert assembled Electrical Components into the Power Trough from the bottom. Ensure that all four Duplex Receptacles are located in their designated openings. STEP : Insert Power Distribution Housing Lock into the gap between Power Trough and the bottom of the Duplex Receptacle. NOTE: There must be only one power feed entry into each cluster of harnesses. WARNING! It is recommended that installation of the wiring system be made under the supervision of a licensed electrician in accordance with applicable codes and regulations. Connection to the building power supply must be done by a licensed electrician. Do not connect or disconnect components while the system is under load. Disconnect the main power before servicing or reconfiguration. STEP : Slide back to engage the opposite end as illustrated. Organize data/communication cables on the ground just below their future location. STEP 6: Thread cable through data/communication opening (located in the middle of each Power Trough). Connect terminals and snap terminal plate into data/communication opening. 6 STEP 7: Capture cable bundles in the extruded Data Cable Manager trough STEP 8: Snap Data Cable Manager Trough into the bottom of Power Trough. Ensure that Data/communication Troughs are securely engaged with all tabs at the bottom of Power Troughs. (Refer to actual part) 8 7 globalcontract.com Page 0

Glazed Table Divider 6, and 8 wide dividers have brackets, all others have. STEP : Install mounting brackets along the bottom edge of the divider (two upper screws provide clamping power while the central set screw adjusts clamping angle). STEP : Ensure that the brackets are perfectly perpendicular to the divider. Spring 0 STEP : Bring the divider/bracket assembly from the bottom, up through the gap between the tables. Have two people holding it in desired location, while a third person secures the brackets to the bottom of the worksurfaces. STEP : Use the two rectangular openings in the brackets to centre the bracket exactly in between back-to-back worksurfaces. STEP : Bolt the brackets to the underside of worksurfaces. Once installed, ensure that the divider is perfectly vertical. Check and adjust mutual alignment if there are more dividers installed. Fabric Table Divider Install mounting brackets into the bottom of Fabric Table Divider. 6, and 8 wide dividers require brackets, and 60 wide dividers require. STEP : Slide bracket rods into the holes in the bottom of fabric dividers. STEP : Ensure that the brackets are perfectly perpendicular to the divider and secure each bracket with supplied, self drilling screws. STEP : Bring the divider/brackets assembly from the bottom, up through the gap between the tables. Have two people holding it in desired location while a third person secures the brackets to the bottom of the worksurface. STEP : Use the two rectangular openings in the brackets to centre the bracket exactly in between back-to-back worksurfaces. STEP : Bolt the brackets to the underside of the worksurface. Once installed, ensure that the divider is perfectly vertical. Check and adjust mutual alignment if there are more dividers installed. Page globalcontract.com

Dividers Table Hung This divider secures to the rear edge of a table and serves as a privacy/modesty panel. Spring 0 GENERAL INFORMATION STEP : Engage key holes in the mounting bracket with the screws and tighten. Pre-assemble the divider and mounting brackets: STEP : Lay the divider on a clear surface. STEP : Slide two rectangular anchor nuts through the bottom of the groove in the divider s vertical frame member. Align the nuts with two holes in the bottom of the groove (this determines constant height of all brackets) and partially drive in two screws. NOTE: The screws are actually longer than the depth of the groove. The rectangular anchor nuts must be positioned exactly above the holes in divider s vertical, to allow the longer screws to locate in the hole. STEP : Have two people hold the divider bracket against bottom of the table worksurface while a third person secures the brackets with screws. NOTE: Measure to leave 0.60 (/8 ) gap between divider s vertical frame and the back of the worksurface. Once installed, ensure that the divider is perfectly vertical. Check and adjust alignment if there are more dividers installed. Table Dividers PERPENDICULAR TABLE DIVIDER This divider secures to the rear table edge (between two back-to-back tables) and serves to establish side-to-side territory. Front of the divider is equipped with a translucent suction cup to protect the worksurface it rests on. Position the divider in desired location. STEP : Let the front foot with the suction cup rest on worksurface, while the rear bracket fits right under the rear edge of the worksurface. STEP : Secure the rear bracket with supplied screws. Once installed, ensure the divider is perfectly vertical. PERSONAL BAY / PERSONAL BAY WITH INTEGRATED MODESTY PANEL Place the Bay in desired location and press it against the rear table edge. STEP : Slide both brackets up against the bottom of the worksurface. STEP : Tighten acorn nuts. STEP : Ensure that the side panels are perpendicular to the rear worksurface edge and secure the Bay by driving supplied screws through the brackets into the worksurface. globalcontract.com Page

Modesty Panel This modesty panel secures to the bottom of table worksurface. Spring 0 Place table upside down on a clean surface. STEP : Place the Modesty Panel on the reverse surface, with short lip pointing towards the centre of the table. STEP : Align the first and the last hole in the Modesty Panel lip with two holes predrilled in the worksurface. STEP : Secure the Modesty Panel by driving supplied screws into the first and the last hole. STEP : Complete the installation by securing the remainder of the Modesty Panel with supplied wood screws. Bridges Box Ensure that back-to-back table installation is complete, level and structurally sound. STEP : Place the Bridges Box upside down on a clean surface, align supporting brackets with pre-drilled holes and secure both with supplied wood screws. STEP : Position the Box in the desired location, over the gap between two back-to-back tables. STEP : Align holes in the bottom plate with holes in the upright brackets and secure with supplied machine screws. Page globalcontract.com