Float Tank Plans Copyright 2006 All Rights Reserved

Similar documents
USER AND INSTALLATION MANUAL FOR THE BALNEA ENCLOSURE

Frameless Inline Door QCI5248

Frameless Fixed Panel Slider

Outdoor Cooler Cart. Outdoor Cooler Cart Construction Instructions

Overflow Kit Installation!

Frameless Inline Door With Return QCI5263

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

Frameless Inline Door QCI5254

Frameless Heavy Glass Door with Wall Mount Hinges

Frameless Door QCI5284

Keystone Garage Assembly Manual

Sauna & Steam. Traditional Sauna Installation Instruction Manual

Fodder-Pro Feed System

Double Frameless Swing Door QCI5247

Frameless Fixed Panel Slider QCI5279

Patrol Box Plans by David J. Yarusso Troop 609

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Frameless Inline Door QCI5288

Frameless Bypass Slider

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

Frameless Heavy Glass Door with Header

Free Doghouse Plans Page 1 of 2

Safety First! Review the Safety Checklist before performing tasks in this chapter.

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Sliding Glass Door Assembly and Installation Guide

15 Ft. x 39 Ft. Hoop House Construction

Building Instructions

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

MISCELLANEOUS CABINET REPAIRS

Best Barns USA Assembly Book

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

RV ENTRY DOOR REMOVAL AND SHIPPING BLOCK INSTALLATION AND ALIGNMENT

FrameSaver Jamb Bottom Replacement Instructions

INSTALLATION INSTRUCTIONS 935 RODA GLASS TO GLASS HINGES FRAMELESS DOOR / PANEL CELESTA DRESDEN GEOLUX TRESOR VONSE

Best Barns USA Assembly Book

PATIO INSTALLATION MANUAL


Frameless Bypass Slider

Frameless Inline Door QCI5250

Cowper From Steve Wolverton on the T&TTT forum, Feb 2005 For Reference Only Do not use to build a trailer. Check on Teardrop and Tiny Travel Trailers

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

INOVO 2-LITE SLIDING PATIO DOOR

Pacifica Pool House. Assembly Manual. Toll Free: Hours: 9-5 Monday-Friday EST. Package ships as shown. Suncast Corporation

HydroCycle 4" Pro NFT Lettuce Systems

Heavy Wall Applied Stop Tube Frame and Door Installation

935 RODA VINESSE NEED INSTALLATION HELP? DOUBLE ROLLERS FRAMELESS DOOR INSTALLATION INSTRUCTIONS QCI XX/XX/XXXX. Call BASCO ( )

12, 14 & 16 Wide Enclosure Assembly Guide

Safety First! Review the Safety Checklist before performing tasks in this chapter.

Garden Chalet 4X2 Assembly Manual

Cabinet is 90% assembled, all you need to do is to attach the legs, lay the glass top on the cabinet, connect the faucet, drains & ptrap.

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

InStallatIon InStruCtIonS for vinyl 2-lIte PatIo door assembled

4-lite Patio Door. Installation Instructions

Installation Guide. Model #400. Corporate Office: 349 Highland Road East Macedonia, Ohio

Revised April Unit/Standard Number. Proficiency Level Achieved: (X) Indicates Competency Achieved to Industry Proficiency Level

Installation Instructions for Vista Air Vertically Folding Walls

FIXED PANEL SLIDER QCI5241

A Generic Sauna Room Assembly Manual

8 x 10 Timber-frame Garden Shed

Sink BULL INSTRUCTION MANUAL. with Rapid Z -CUT & Rapid Z -DRUM

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

Supplies required to build a cardboard boat. (SAMPLE BOAT)

Sash Replacement Guide for Andersen Impact Resistant Casement Windows

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

Panel Installation Instructions

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

Assembly Instruction. 9,2 m² Grillkota

Plumbing Removal and Replacement Procedure

1/4 FRAMELESS DOOR WITH INLINE PANEL 1413A-1713A-1813A

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e H O W B U I L D S H E D.

8 Ft Wide Enclosure Assembly Guide

Garage Door Frame Retro-Fit Clad Installation Instructions

Best Barns USA Assembly Book

FRAMELESS FIXED PANEL SLIDER with 90 RETURN

Life* Installation Instructions & User Care Instructions. (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone)

Revision Date: April 01, Paramount Enclosure

Outdoor Storage Locker

Gambrel Barn Construction Manual 8x8 through 16x24 Units

Best Barns USA Assembly Book

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE

Installation Instructions for Siding

Model 6100 Illustrated Installation Instructions Contractors Wardrobe

The easy way to an affordable kitchen

Best Barns USA Assembly Book

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Grand Garden Chalet 6X3 Assembly Manual

KWIK-KIT KK-S INSTALLATION INSTRUCTION PACKAGE

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Contemporary 3 Panel Classic 5 Panel French Panel

tile redi redi DOOR Redi Swing SERIES: CONFIGURATION: MOUNTING PACKAGE:

A-935 RODA WALL MOUNT HINGES

Installation Guidelines

Grand Garden Chalet 6X3 Assembly Manual - Costco

General Array Layout Sketch

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Rainelle Sauna Installation & Owner s Manual

Grand Garden Chalet 6X3 Assembly Manual

Model 5400H / 7000H Illustrated Installation Instructions

Knock Down Patio Door Assembly Instructions Regular & Impact

The Bigger Best1 Dollhouse Wiring Set

Transcription:

Float Tank Plans Copyright 2006 All Rights Reserved Tank Material list: 5 4x8 sheets ½ Plywood 5 4x8 sheets ¼ Plywood 5 4x8 sheets 1 ½ Rigid Styrofoam 24 8 2 x 2 s (1 ½ x 1 ½ actual dimensions) 1 Door Handle 3 4 2 x 4 1 4 2 x 6 1 ½ wood screws 1 Piano Hinge for door 3 8 2 x ½ cedar strips for liner 1 30 mil vinyl liner 42 ½ by 90 ½ by 18 high (available at swimming pool supply stores) 1 Waterbed Heater (make sure heater has cord that plugs into Control box so it can be fed through hole in tank) 1 1/2 horse Jacuzzi Pump 1 Timer switch for pump 1 25 Square Foot Cartridge Filter 8 to 10 1 ½ PVC Pipe Various PVC fittings depending on your style of pump and filter 1 Ground Fault Interrupter (GFI) Breaker 1 Ground Fault Interrupter (GFI) Plug 1 Gallon High Grade Exterior Paint 1 Tube of Mould Resistant Silicone Caulking 2 2 round vent covers

Tank Construction Tank consists of 7 Panels. Panels are all 2 ¼ thick. All Interior pieces will be ¼ plywood (blue pieces). All Exterior pieces will be ½ plywood. Make sure 2 x 2 s are 1 ½ by 1 ½. Bottom Panel, Left Side Panel, Right Side Panel, Back Panel, Top Panel, Lower Front Panel and Door Panel. This tank was finished with tongue and groove Cedar. I floated with my head to the back opposite the door.

Bottom Panel (floor) ½ plywood 47 95 Cut sheet of ½ plywood to 95 by 47 42 ½ ¼ plywood Styrofoam Styrofoam 2 x2 s 94 Cut sheet of ¼ plywood to 94 by 42 ½. Screw 2 by 2 s to outside edges and through center of ¼ plywood. Cut Styrofoam to fit. Screw to ½ plywood leaving ½ lip top and bottom and 2 ¼ lip on both sides.

Left Side and Right Side Panels 66 ¼ ½ plywood 48 21 95 Cut 2 sheets of ½ plywood to 95 by 48 Measure 66 ¼ at top and 21 from bottom on left side and cut. 65 ¾ 2 x 2 s ¼ plywood 48 21 ½ 19 to center 94 Cut 2 sheets of 1/4 plywood to 94 by 48 Measure 65 ¾ at top and 21 ½ from bottom on left side and cut. Screw 2 by 2 s to outside edges of both sheets of ¼ plywood making sure ¼ sheet will be on the inside of tank(these 2 panels will be exact opposite). Measure 19 from bottom. This will be center of middle 2 x 2. Locate it here so there will be backing for liner. Cut Styrofoam to fit. Screw to ½ plywood making it flush top and bottom and ½ lip on both sides. It will be flush on angle. *MAKE SURE THESE 2 PANELS ARE EXACT OPPOSITE.

Back Panel ½ plywood 48 46 Cut sheet of ½ plywood to 48 by 46. 2 by 2 s ¼ plywood Syrofoam 46 ¼ 17 ¼ to center 42 ½ Cut sheet of ¼ plywood to 46 ¼ by 42 ½. Screw 2 by 2 s to outside edges. Measure 17 ¼ from bottom. This will be center of middle 2 x 2. Locate it here so there will be backing for liner. Cut Styrofoam to fit. Screw to ½ plywood making it flush on top and 1 ¾ lip on both sides and bottom. Save leftover plywood from this panel for door piece.

Top Panel 70 angle This piece has a 70 angle on the front side so we will make it bigger, assemble panel and then cut the excess off. ½ plywood 47 67 ½ rough cut Cut sheet of ½ plywood 67 ½ by 47. 2 x 2 s 2 x 4 ¼ plywood Styrofoam 42 ½ Styrofoam 65 ¼ rough cut

Cut sheet of ¼ plywood 65 1/8 by 42 ½.Screw 2 x 4 to left outside edge making sure ends are flush with top and bottom. Screw 2 x 2 s to top, bottom and right side outside edges and through center. Cut Styrofoam to fit. Screw to ½ plywood leaving a 2 ¼ lip on top, bottom and right side. Left side should be flush or close. With ½ side facing up, Measure 66 ½ from side with 2 ¼ overhang (cut side that is flush) and snap a line with chalkline or draw one with straight edge. Set your Circular Saw blade at 20 and cut along line making sure the ½ plywood is the longer. ½ 2 by 4 ¼ When finished there should be a 2 ¼ overhang on the other side and on the top and bottom. Save leftover plywood from this panel for bottom front piece. Lower Front Panel This piece has a 50 angle on the top so we will make it bigger, assemble panel and then cut the excess off. ½ plywood 23 5/8 rough cut 46

Cut sheet of ½ plywood 46 by 23 5/8. 2 x 6 2 x 2 ¼ plywood Styrofoam 22 rough cut 42 ½ Cut sheet of ¼ plywood 42 ½ by 22. Screw 2 x 6 to top outside edge making sure ends are flush with both sides. Screw 2 x 2 s to bottom edge and both sides. Cut Styrofoam to fit. Screw to ½ plywood leaving a 1 ¾ lip on bottom and both sides. Top should be flush. With ¼ side facing up measure up 21 from bottom and draw a line with a straight edge. Set your Circular Saw blade at 40 and cut along line making sure the ¼ plywood is the longer. If blade does not cut right through you may have to flip panel and make another cut on ½ plywood. The measurement will be 21 up from bottom of ½ plywood. ¼ 2 x 6 ½

Door Panel Side View 2 70 angle 8 ½ 8 ½ 36 39 1/8 ½ plywood Top Front 50 angle 47 ½ Cut ½ plywood 47 wide. Set Circular saw at 20 and cut 70 angle at top.cut will have long side up. Measure down 39 1/8 and draw line. Set saw at 40 and cut on line. Cut will have short side up. Measure door opening and cut out. This will be easier if you use a jigsaw in the corners. The piece you cut out will be used to make the door. Cut 2 x 4 42 ½ long. Measure in 1 7/8. Set saw to 20 and cut 70 angle on 2 x 4. Screw this piece flush onto back top of ½ plywood leaving a 2 ¼ lip on both sides. 1 7/8 1 7/8 2 x 4 Side View 70

42 ½ Cut 2 2 x 2 s 33 ¾ long. Screw them (going up and down) to the ½ plywood leaving a 2 ¼ lip. The bottom 2 x 4 will have a 50 angle. Side View 1 ¾ 50 42 ½ 1 ¾ Cut 2 x 4 42 ½ long. Measure in 1 ¾. Set saw at 40 and cut 50 angle. Screw to ½ plywood with the angle cut facing towards bottom of plywood. Top of 2 x 4 should be flush with door opening. Cut 2 more 2 x 2 s to fit flush with door opening. Cut Styrofoam to fit.

2 ¾ 7 ¾ 7 ¾ 36 ¾ 3 42 ½ Cut ¼ plywood 42 ½ by 36 ¾. Cut out door opening. Screw to ½ plywood. Don t worry about cutting any angles just make sure to center. This will leave a 1 ½ lip on door opening. Glue 1 ½ x 1 ½ Styrofoam on lip all around door opening. This acts as a door stop. ½ plywood door 33 7/8 29 7/8 Cut ½ plywood 33 7/8 by 29 7/8. This will be the door. Install in opening with piano hinge and fasten door handle. Paint panels with a good grade exterior paint.

Tank Assembly If you are putting this tank on a cement floor it would be a good idea to put a sheet of Styrofoam insulation under it for extra insulation. Screw 2 side pieces and back piece to floor and to each other. Screw top on. Set Waterbed Heater up towards back. Drill small hole in left side panel at back and push heater cord out to Heater Control. From the outside push copper heat sensor in and tape to floor about 6 out from side keeping it away from heating pad. Make sure sensor is taped at any points that could pierce liner. Mount control on outside of tank where it will be accessible. Caulk edges and all screws. Drill 2 2 vent holes in tank and cap with vent caps. These can be in the back panel or wherever they work best for your setup. Leave door panel off until liner is installed.

Plumbing Plumbing Instructions will be completely dependant on the pump and filter you use. I used a ½ horse pump and a 25 Square Foot Cartridge Filter. Drill a hole in side of tank towards back end and one in front panel making sure you are below water level (water will be 9 deep). The size of the hole will be dependant on your fitting. The one I used required a larger hole in exterior and Styrofoam and a smaller hole in interior plywood. Small ring with a gasket went inside and screwed to larger fitting with gasket making a waterproof seal. If using same setup drill holes for screws before installing liner. Make sure and install a valve on both sides of pump and filter set up so you can do maintenance on filter and pump. Wire Timer switch to Panel box using a Ground Fault Interrupter(GFI) Breaker. Wire pump to timer. Install GFI plug in room for Waterbed Heater. Install Liner and screw cedar strips to wall keeping liner in place. Caulk strips and screws. Screw the two interior rings and gaskets to exterior plumbing fixtures. Extra caulking can be used. Once rings are in place carefully cut vinyl that is inside ring. Cedar Strips Timer Switch

Door Panel Screw door panel to tank. Install door if not already done. All pictures in this instruction book are from a tank that has been disassembled for quite a while so it is showing some wear. The exterior was finished in Cedar boards. Also you might want to build an access box to cover Pump and the rest of plumbing. The more visually inviting the tank is the better the experience.

Extras The Book Of Floating by Michael Hutchison (excellent book on the subject) Battery Operated Intercom System Battery Operated Light Hook for towel Audio Speakers (Transducers) To install Transducers (Underwater Speakers) cut an access hole in floor of tank where your head will be positioned. Cut Styrofoam to fit Transducers in and reinstall access panel and Caulk. Feed wiring out same hole as waterbed cord. The Transducers I used looked like rubber hockey pucks.you can get some here: http://www.richtechenterprises.com/ Filling Tank 1. Using garden hose put 3 of very hot water in tank. 2. Add 800 lbs Epsom Salt (Magnesium Sulfate). 3. Fill with more hot water to 9 deep.(run pump until water is clean) 4. Heat water to 93.8 94 Degrees 5. Keep buoyancy at a gravity of 1.275 to 1.30 Use a hydrometer to check gravity and top up salt as needed. Use thermometer to fine tune water temperature(waterbed control might show higher or lower temperature). I run pump and filter for 15 minutes a day plus 15 minutes directly after floating. Check ph on a regular basis with inexpensive ph kit that can be purchased at spa store. Spa store will be able to provide you with information and chemical to maintain proper ph. and sanitation. Clean filter on regular basis.

Good luck and Happy Floating