INSTALLATION OF SERRATED METAL CORE WITHOUT FULL DISASSEMBLY OF A HEAT EXCHANGER

Similar documents
Practical Bolting and Gasketing for the Non Standard-Flanged Joint

INSTRUCTIONS FOR AIRFLEX 36WCBEP/36WCSEP WEAR PLATE REPLACEMENT USING GASKET SEALING TAPE

Fluid Sealing Association

3M Impact Protection Profile Installation System Instructions

Dubnium 11 Installation Instructions & Parts List

Curium 19.4H Installation Instructions & Parts List

OTECO INC. MODEL ,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL

Radon 07 Installation Instructions & Parts List

Curium 19H Installation Instructions & Parts List

Mobile Weapons Storage System Specifications

R2C Performance Products 7550 Industrial Drive Forest Park, IL Ph: (708)

Repair Instructions. Durametallic PSS III. Experience In Motion. Split Seal

HANDHOLE SEAT GRINDER

IX. FLARED JOINTS IX. FLARED JOINTS

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

Pocket Door Installation Instructions

Gallium 03 Installation Instructions & Parts List

Important Notices. Manway Lockout Point

Installation and Specification Manual December 2012

Reliance SG800 Series Steel Water Gage Valves

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

Contents. pages 20-24: Installing Edge sinks into. custom laminate countertops page 8: Installing Edge sinks into postform laminate countertops

Quick Set Dovetail Jig

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual. Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B

Water Line and Water Line Assembly Gasket

Steel Sound Enclosure

Hinge Door + Inline Panel + Return Panel

VERSAtoolTM SAE J533 & SAE J1453. Safety and Operating Manual

Specifications for EA31002 U Tube Bundle for CDU 3

assembly instructions

ARMADILLO STAINLESS VAULT CLOSURE REPLACEMENT KIT

Tech Sheet. T4 Interior conversion kit how to - fitting instructions. 1. Rear seat belts. 2.

Location. Established in 2015 Office location: Klepp Næringspark, Norway.

TURBULENT ORB by Ned Kahn MAINTENANCE INSTRUCTIONS

Body Repair. Collision Repair. Specification. Fastener Specifications Fastener Specifications. Blind Rivet. Flow Drill Screw (FDS) Torque FDS

Spring Loaded All Season Roll-Up Doors

Riser Extension INSTALLATION GUIDE 40100AX35 / 40100AX18. Manual 40100X35-8

EKX Full-Range Loudspeaker Accessories

FLANGE INTEGRITY MANAGEMENT

Wall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

DASH KIT INSTALLATION

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

ETX Powered Loudspeaker Accessories

Installation Instructions

Xenon 05 Installation Instructions & Parts List

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

How To Install Windows: Nail-Fin Application

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

QB78 CO 2 Pellet Rifle

INS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...

'Mutiny' Ozone Reactor Kit

Hospital Grade Welded Ceiling System

Installation Instructions for Vista Air Vertically Folding Walls

Tyler Alignment & Calibration System For the Leksell Stereotactic Frame

Manufacturing Instructions

Joint Preparation prior to Tensioning: General:

hargreaves cast iron installation guide

Side and rear window, assembly overview

AFB (AIR FAN BEARING) INSTALLATION GUIDE

DODGE Grease Lubricated SPLIT-SPHER Roller Bearings and Pillow Blocks

Hinge Door + Side Panel

Gared Pro-S Portable Backstop

APPLICATION RANGE FEED STROKE FREE SPEED TORQUE mm 25 mm 100 Rpm 140 Nm. 300,0 mm. Body height: 13, mm 25 mm 100 Rpm 2,0 4,0 1,0

IOM 004 Effective 3/29/04 Rev A. MULTI-VENT Laminar Flow Panels Installation Operation and Maintenance

HURST COMP STICK KIT DODGE CHARGER, MAGNUM, AND CHRYSLER 300 (with AUTO-STICK) Catalog # & by Hurst Performance

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS

4.4 PUMP MAINTENANCE MODELS: DB, DC, DF, DG, DJ, DL

General Four-Way Operation, Maintenance & Service Manual

CV Control Valves Installation and Operation Manual

The use of retaining pins is not required when using Armaflex 520 Adhesive.

Installation, Operation, Inspection and Maintenance Manual

INFUSIONS and METALWORKS Wings Accent and Acoustical Clouds

TOYOTA TUNDRA 2015 BLACK TEXTURED FENDER FLARE

Volume Control PJ AN

Elcometer Muller Laboratory Grinder

SLIDING DOOR for CORNER installation ONLY - this door closes to side panel -

Argon 02 Installation Instructions & Parts List

Optima 450 LED Edge-Lit Single-Sided Light Box. Installation Instructions INSTALLATION INSTRUCTIONS. Figure 1. Tools you ll need

Welding & Fabrication Tools FT-Flat Electrode Welding

Table of Contents. B. Base Tool Changer...2 MC-6 Manual Tool Changer...2

A-PDF Split DEMO : Purchase from to remove the watermark SHAFT DRIVE

LOW PROFILE LIFEGUARD STANDS

SERRATING / GROOVING TOOL - ST SERIES. Features : 1/8 x3/8 x1/8

Table of Contents. B. Base Tool Changer...2 MC-36 Manual Tool Changer...2

MANUAL PLASTIC STRAPPING TOOL MODEL P404

Detection of Internal OR External Pits from Inside OR Outside a tube with New Technology (EMIT)

ORDER ONLINE!! Pricing is not guaranteed, and can be subject to change at the discretion of our suppliers.

This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.

Installation Instructions for Harrison Design Ejectors BEFORE YOU GET STARTED REMOVE OLD EJECTOR

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

4" (DN 100) 5RET Tank Car Fire-Tite Bottom Unloading Valves. Installation, Maintenance and Operating Instructions

Operating, Servicing, and Safety Manual Model # & 72 Ultimate Box & Pan Brake

**************************************************************************************************

Installation Instructions

Product Guide Specification

Fuel - Defuel Valve. Model Maintenance & Repair Manual. SM61499 Issued: February 1996 Applicable additional manuals: NONE

Replacement of Pitch Link Retainer and Service Improvement of the Pitch Control System. Effectivity: Helicopters manufactured prior to January, 1981

Transcription:

PVP2010 25685 INSTALLATION OF SERRATED METAL CORE WITHOUT FULL DISASSEMBLY OF A HEAT EXCHANGER Abstract Problem Russ Currie R Davis Flexitallic Limited Scandinavia Mill Cleckheaton West Yorkshire UK Rcurrie@flexitallic.eu The problem faced was to provide a sealing solution on a heat exchanger where certain restrictions were in place. Several years had passed since the bundle was last pulled, the concern over the service was that corrosion may be present on the flanges inspection had not been determined. The sit e had become congested since it was first installed which reduced the available movement of the bundle. Shutdown would be extended if floors had to be cut out, the exchanger dropped and rerouted to the edge of the platform. There were several unknowns; documentation on what had been done last time was sketchy, along with its location in the North Sea with climatic issues. The platform itself had replaced a facility which is remembered in history for major loss of life. Investigation The initial review of the documentary evidence, along with site visit provided invaluable fact finding. The geometry of the exchanger, the operating conditions, and the availability of skills, men and equipment were taken into the initial review. Following initial discussions a proposal was prepared and presented to the key decision makers. At the initial review several unknowns were still present so a contingency plan was required to anticipate the possible issues. The development of the procedure for the, pulling, inspection review and the subsequent installation of a Sigma faced Kammprofile gasket on the Shell /Tube sheet position without pulling the tube bundle full out of shell was carried out in conjunction with Ross Offshore, Wood Group, Talisman and Flexitallic. This was refined on land by the use of life size models, using out of service equipment to refine procedures, proving the system of operation, site testing and then subsequent off site testing of welds, and destructive testing of the sealing elements In previous situations the geometry of bundles would allow metallic components to be manipulated in the cold state to pull over the

bundle. Through the bundle stud bolting in this case didn t allow this to be used. Planning The procedure commences with the manufacture of the core in 1 piece at the Flexitallic facility. Facing material to match the core sizes were cut and cleaned. The relevant dimensions were made in accordance with the Flexitallic drawing specifications. The dimensions of the gasket were based on the operating conditions, the available bolting and gasket style. The current gasket used in the system utilized a solid metal core which utilized a stress raise nubbin on the shell side to generate sufficient stress to deform the metallic core. The use of solid metal gasket s on many heat exchangers has been replaced using serrated metal core on land. This was the option taken here to replace 1 solid metal gasket with 2 Kammprofile gaskets. The gasket core is cut by guillotine action in a perpendicular cut. This action does not remove metal and provides edge prep for the welding. The tube sheet needs to be pulled to a significant distance to allow ease of access. The decision to remove or utilize the previous gasket is made following inspection and the necessary materials are cleaned and removed. The sealing faces are cleaned free from debris and surface condition noted. The replacement by two gaskets could be an issue of the gasket already has a low maintenance factor and low minimum seating stress. Photo of trial exchanger The Kammprofile gasket offers a low stress sealing solution over the solid metal product, utilizes a soft material deformation and not relying on deformation of metal, this feature of soft deformation of material is well established with significant growth worldwide on this product. Distance apart required for operations

Once the channel section was removed the bundle was pulled sufficiently to allow inspection and determination of the sealing faces. The pre split core is fed onto the back of the tube sheet and cleaned before any welding is considered. The tubes are cleaned and suitable protection of them is carried out to prevent damage or product contamination. (Not Shown) clamps to the exchanger baffles, they are utilized to hold the metal in alignment before welding and also used to hold the sealing face material onto the metallic core in climatic conditions. Trial run on sample pieces set out to set up welding machine and account for local conditions carried out in horizontal mode. This is accordance with the weld procedure. A practice of using dressing tool also to give feel for conditions is recommended. This is to allow the operator a feel for the job in the Site inspection of previously used shell to tubesheet gasket The core is positioned to allow ease of access for the weld to be carried out. environment. A purpose designed compressed tool was developed. The serration depth, spacing is key to a successful seal. Groove alignment is achieved from clamping the rings prior to welding. Groove depth and spacing is determined by the tool, using a cam machined in the bush depth is controlled, spacing determined using a micrometer. The core is aligned using wide jaw clamps and supporting sacrificial backing rings, these are stainless rings which are sized as the sealing element. This backing ring provides support for

cutter head into the groove and tensioning the cutter against the bottom of the groove. This locates the cutting tool in line with the groove. This position is used to zero the gauge associated with the linear index control of the milling tool. The linear indexing screw is then locked in place. Once adjusted, the motor is initiated using the paddle trigger. The ring is then indexed, passing the welded section and cutting the groove in alignment with the balance of the groove. After the initial groove is re machined, the cutting tool is raised to a level sufficient to clear the surface of the ring. The cutting tool is then indexed inward based upon the factory machining specifications of the ring. Alternately, the same procedure used to set the initial groove location may be used. Each ring is machined and a final cleanup is performed on the weld area if necessary to remove any small burrs or improve final flatness. It is essential to have good lighting in the area as each of the individual kammprofile grooves will be dressed. The initial weld is removed using an orbital sander with a coarse wheel; the milling tool is used to dress the weld. Once the re machining is completed, the portable equipment is removed and the process for facing the ring quadrant is initiated. The individual serrations are re cut using a custom manufactured portable milling tool. The prepared ring is located and fixed in place using four guides. The guides are adjustable to accommodate rings of varying width and thickness. The cutting tool is initially positioned and set for depth by indexing the ring to a clean adjacent to the weld area. Depth is set by lowering the

The cleaning and bonding process is a three stage operation Stage 1 use a citric based degreaser can label Stage 2 uses either clean distilled water or an alcohol wipe to remove any residue of degreaser Stage 3 contact adhesive applied to metallic and sigma sparingly Example: Citrus Based Cleaner Example: Adhesive The cleaner is to be removed with a damp lint free cloth wetted with either clean water or white solvent material so as to remove all traces of the degreaser. The adhesive is applied to both sealing surfaces to be bonded. The minimal amount of contact adhesive is to be used to ensure bonding. Both bonding surfaces the serrated metal and the gasket facing are treated with the adhesive. The example shown is one option for facing inplace. The facing is provided in pre cut arcs to suite the width and diameter of the ring. As shown in the example photograph, these segments are installed and then fixed in place using standard welding clamps. Larger diameters will necessitate more frequent clamping along with backing rings may be employed. For high temperature facing materials such as Thermiculite, the facing may be bonded in advance of cutting, installation and welding, with only a small segment of the facing removed for the procedure. Mating arcs of Thermiculite are provided to re face the bare segment. These facing sections are placed over the bare metal and extend beyond the coated face. The existing facing and segment facing are then match cut on a 45 degree angle using a razor knife at each end. The bonded facing, extending beyond the cut is then removed and the exposed surface is cleaned per the previous direction. The existing facing is protected against overspray while the bonding agent is applied to the bare metal and new facing segment. In all cases, the joint should be clamped for a period of time which will insure setting of the bonding agent. After removal of the clamps or backing, the entire gasket surface is then inspected and cleaned as necessary. The equipment may now be reassembled. Bolting up may begin.

Customer Approval On certain exchangers where the flange bolts are separate the pulling over of the kammprofile from the channel side onto the tubeside can be carried out by manipulation of the solid 1 piece gasket into position by forming an ellipse and guidance. As with this case with the tubesheet with the intergral bolt holes this technique is not possible. To offer confidence to the customer several steps were taken 1. Trial using a full scale wooden mock up of the tubesheet to show and demonstrate the principle 2. A demonstration showing the technique on a smaller exchanger onshore to show the step by step method used 3. A weld carried out in situation on the smaller exchanger, dressed and manufactured. This was done on several occasions to allow the gaskets to be subsequently examined using NDE techniques and then subjected to compression loading, gas sealing test 3.1.1 Test 1, this involves a simple compression recovery test to determine the mechanical properties of the gasket. This test involves the placement of a refaced, welded used gasket between plates and loading and unloading at a predetermined rate of 100kN/min. Rig set to maximum 3MN which equates to gasket surface stress of 290MPa.. 3.2 Test 2, this involves a series of compression, recovery unloading tests on the gasket in a cyclic manner, up to a surface stress of 290MPa in 50 MPa steps. 3.3 Test 3, this involves loading the gasket to 290MPa, then pressurising the system to 180Bar with gas. The load is then unloaded in a series of steps with pauses every 500KN. The steps halt when 1 bubble of Nitrogen gas is collected in the gas jar. A visual record of sealing pressure is made when 1 bubble leaks. Load (kn) 3500 3000 2500 2000 1500 1000 500 0 3.4 visual examination of sealing faces Test Scope Test Gasket dimensions = 325.2mm OD x 304.8mm ID Area = 10093.9 mm2 Test Results 3.1 Test 1 Compression test on gasket, load unload characteristic Cyclic Load Gasket Stress MPa Rate 1 504.5 50 100kN/min 2 100.9 100 100kN/min 3 1514 150 100kN/min 4 2018 200 100kN/min 5 2523 250 100kN/min 6 2926 290 100kN/min value Flexitallic Ltd Test Ref: 2.4 2.8 3.2 3.6 4 4.4 Displacement (mm) FJ force Disp 3.2 Test 2 Loading limits and stress

load kn Sigma 500 Kamm repeated loading 3500 3000 2500 2000 1500 1000 500 0 3-500 3.2 3.4 3.6 3.8 4 thickness comp ( kn) 2. the facing of the gaskets were not penetrated by the kammprofile core under a loading of 290MPa, therefore isolation of the core from the flange is intact 3. The gasket sealing width sealed 180 Bar without leakage 3.2 Test 2 cyclic compression test characteristics Pressure (Bar) 200 150 100 50 Pressure (Bar) Full scale wooden model of the heat exchanger showing gasket position 0 2933 2685 2436 2187 1939 1691 1441 1192 939 681 428 173 8.84 Logistics 3.3 Test 3, Gas sealing test Pressure v Load at 180Bar, unload until 1 Nitrogen gas bubble leak, at Gasket stress Once the procedure was finalized the unknown had to be anticipated in the plan. Duplication of cores, sealing faces and cleaning bonding materials were prepared Climatic conditions could affect the soft face bonding to the metallic core so an effective mechanism for holding the material in situ using clamps and sacrificial support strips was used. Oversized facing material to allow on site trimming on the cores 3.4 Test 4 The underside surface of the gasket was removed and examined for damage after each compression test, the core was refaced before the sealing test. 1. Gasket welds were intact after 1 site test, 1 compression test, 6 cyclic loads and 1 sealing pressure test All of the materials were packaged, organized and shipped to site prior to shutdown commencement. Conclusion The bundle was pulled early in the shutdown, surface condition was such that a 2 part sealing

element was used which was faced each side with single piece sealing face following the joining and the weld dressing. The shutdown was not delayed due to this critical component and returned into service following pressure testing. Further work using this procedure is expected allowing troublesome exchangers with limited access to have the kammprofile gasket fitted. end