athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, 3 or ). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 99 3 2, $2,9, SITE $32, Campus Total 2, $3,2,30 Building: Main Category: Building Exterior Entrance Entrance Control - Audio EA $3,9 Entrance Control - Audio EA $,9 Exterior Doors - Exterior FRP Door EA $2,2 Exterior Doors - Exterior Steel Door EA $,9 Exterior Doors - Side lite EA $,23 Exterior Doors - Store Front 3 EA $,099 Exterior Doors - Transom Lite EA $3, Foundation Lighting Roof System Foundation - Concrete,0 LF Superstructure - Metal Deck/ Concrete Topping 2, SF Exterior Lighting - Wall Mounted 2 EA $ Exterior Lighting - Wall Mounted 3 EA $3, Chimney - Metal Flue 3 LF $,3 Coping - Stone,20 LF $,0 Downspouts - Interior Downspouts,20 LF $,2 Parapet - " - 30" Height 0 LF $,90 GREEE Page of Assessment Date: /2/20
Category: Building Exterior Roof System athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Parapet - Parapet > 30",200 LF $,0 Roof - Modified Bitumen 33, SF $3,2 Roof Structure - Steel / Metal Deck/ Concrete Topping 33, SF Walls Windows Canopy - Metal 20 SF $3,3 Exterior Walls - Brick 20 SF $3,293 Exterior Walls - Brick 3,90 SF $29,33 Exterior Walls - Stone-Cast 0 SF $ Exterior Walls - Stone-Cast,3 SF $3,2 Clerestory - Glass Double-Pane 20 SF $2,3 Guard - Guards perforated 2,90 SF $3,92 Lintels - Steel, LF $33,093 Windows - Louver 20 SF $, Windows - Sash Aluminum Double-pane,00 SF $0,03 Building Exterior Subtotal: $9, Building: Main Category: Electrical System Emergency System Automatic Transfer Switch EA $ Emergency A/C Power - Corridors and Stairs,39 SF $,23 Emergency A/C Power - Gym,0 SF $,3 Emergency A/C Power - Lunchrooms 3,920 SF $, Emergency A/C Power - Students Toilets 2,90 SF $ Emergency Battery Packs - Corridors and Stairs 30 EA $,0 Emergency Battery Packs - Gym EA $,03 Emergency Battery Packs - Lunchrooms EA $, Emergency Battery Packs - Students Toilets 0 EA $2,02 Exit Signs - Corridors and Stairs EA 2 $2,20 Exit Signs - Gym 3 EA 2 $,3 Exit Signs - Lunchroom 2 EA 2 $,09 Security System - CCTV 2, SF $2, Security System - Intrusion Detection 2, SF $2, GREEE Page 2 of Assessment Date: /2/20
Category: Electrical System Emergency System athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Main Service Power Distribution Independent Electrical Service for emergency power EA $2,92 Main Electrical Service - 2000 A 2/0/3PH 2 EA PA System 2, SF $2,9 Lighting and Power Panels - 00 A EA $299 Lighting and Power Panels - Above 00 A 2 EA Main Distribution Panels - 0-00 amp 3 EA Transformers - 2/0-20/20 EA Electrical System Subtotal: $20,3 Building: Main Category: Safty System Fire Alarm Fire Alarm Panel EA Fire Alarm Strobe Lights 2, SF Fire Alarm_System 2, SF Fire Pump Controller EA $,23 Pump Room Assembly Sprinkler System Fire Pump - 2-0 hp EA $, Jockey Pump EA $ Sprinkler Heads 2, SF Sprinkler Piping 2, SF Wet Sprinkler System 2, SF Safty System Subtotal: $,39 Building: Main Category: Mechanical System GREEE Page 3 of Assessment Date: /2/20
Category: Mechanical System Air Conditioning Air Handling Systems Boiler Systems Heating Devices Mechanical Plumbing athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Chiller-Air Cooled- Recipricating-Roof Mounted - 0-00 tons EA $3,9 Condensing Unit- Ground Mounted - Less than tons EA $3,33 Glycol Feed EA $90 Pipes - Chilled Water Pipe- Copper 00 LF Pipes - Chilled Water Pipe- Steel 0 LF Air Handling Unit- Package Multi Zone- Indoor- Hot Water and Chilled Water Coils - 000- EA $3,30 0000 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - 200- EA $3,30 20000 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - 00- EA $3,30 2000 cfm Air Handling Unit-Package Single Zone- Indoor- Hot Water and Chilled Water Coils - Greater EA $3,30 than 30,000 cfm Air Intake 3 EA Fan Power Box - Fan Power Box with Hot Water Coil EA $,23 Indoor Return Fans- Centrifugal Inline - 000-20000 CFM EA $, Indoor Return Fans- Centrifugal Inline - 000-0000 CFM EA $, Indoor Return Fans- Centrifugal Inline - Greater than 20000 CFM EA $2,33 Make Up Air Unit- Roof Mounted- Gas Heating - 000-0,000 cfm EA $,302 VAV Box 2 EA $,2 Zone Dampers EA $, Boiler Auxiliary- on Condensing Hot Water - 00-2000 MBH EA $3, Combustion Dampers 2 EA $ Glycol Feed System EA $39 on Condensing- Water Tube- Flexible Tube- Force Draft- Hot Water Boiler - 00-2000 EA $,9 MBH Piping - Dual Temperature Pipes- Copper 0 LF $, Piping - Dual Temperature Pipes- Steel 20 LF $2 Cabinet Heaters - With Hot Water Coil EA $, Radiator Panels - Hot Water 0 EA $2, Unit Heater - Hot Water EA $,39 Chilled Water Pump - 0-20 HP 2 EA $2, Daul Temperature Pump - 0-20 HP 2 EA $2, GREEE Page of Assessment Date: /2/20
Category: Mechanical System Mechanical Plumbing athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Hot Water Pump - 0-20 HP 2 EA $2, Temperature Control Ventilation DDC System 2, SF $3,9 Thermostats - DDC EA Exhaust Fans- Indoor - 00-00 CFM EA $92 Exhaust Fans- Roof Mounted - 0-000 CFM EA $2,30 Type I Exhaust Hood- Kitchen 3 EA Type II Exhaust Hood- Warming Kitchen EA Mechanical System Subtotal: $9,9 Building: Main Category: Plumbing System Hot Water Electric Heater - 20-0 KW EA $2 Gas Heater - 0000-300000 BTU/HR 2 EA $20 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures 2, SF Domestic Piping-Cold Water Horizontal Lines 2, SF Domestic Piping-Cold Water Risers 2, SF Domestic Piping-Hot Water from Risers to Fixtures 2, SF Domestic Piping-Hot Water Horizontal Lines 2, SF Domestic Piping-Hot Water Return Lines 2, SF Domestic Piping-Hot Water Return Risers 2, SF Sanitary Piping 2, SF Storm Piping 2, SF Vent Piping 2, SF Pumps - Domestic Booster Pump-Duplex EA $,9 Pumps - Sump-Simplex EA $ Plumbing System Subtotal: $,02 GREEE Page of Assessment Date: /2/20
Category: Classrooms Art Room ( room) athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Casework LF $,3 Ceiling - Lay-in,0 SF $3,2 Chalk Board 2 LF $2,203 Doors - Side-lite SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet,0 SF $,09 Lighting - Lay-in EA Storage/ Closet 90 SF $3 Walls - Concrete Block 00 SF $2,3 Walls - Plaster/Drywall SF $,3 Work Sink EA $39 Computer Lab ( room) Faculty Lounge ( room) Casework 0 LF $2,2 Ceiling - Lay-in,00 SF $3,3 Chalk Board 2 LF $3 Doors - Side-lite SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet,00 SF $,0 Lighting - Lay-in 2 EA Storage/ Closet SF $3 Walls - Concrete Block 20 SF $2 Walls - Plaster/Drywall 3 SF $2,32 Work Sink EA $39 Casework 3 LF $909 Ceiling - Lay-in 0 SF $2,3 Chalk Board 2 LF $2,203 Doors - Side-lite SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet 0 SF $ Lighting - Lay-in 2 EA Storage/ Closet SF $3 Walls - Concrete Block 2 SF $2,292 Walls - Plaster/Drywall 2 SF $20 Work Sink EA $39 GREEE Page of Assessment Date: /2/20
Category: Classrooms ( rooms) athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Casework 232 LF $,9 Ceiling - Lay-in,23 SF $2, Chalk Board LF $,09 Doors - Side-lite SF $02 Doors - Transom Window SF $3 Doors - Wood Doors inclu hw EA $2,0 Floor - Tile/Sheet,23 SF $,20 Lighting - Lay-in 0 EA $2,9 Storage/ Closet 0 SF $3,23 Walls - Concrete Block,3 SF $,9 Walls - Plaster/Drywall 2,90 SF $,023 Work Sink 9 EA $,20 Music Room ( room) Casework LF $0 Ceiling - Lay-in,00 SF $3,3 Chalk Board 2 LF $2,203 Doors - Side-lite SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet,00 SF $,0 Lighting - Lay-in 2 EA Storage/ Closet SF $3 Walls - Concrete Block 20 SF $2 Walls - Plaster/Drywall 3 SF $2,32 (20 rooms) Casework 39 LF $,3 Ceiling - Lay-in SF $ Ceiling - Lay-in,2 SF $9,9 Chalk Board 3 LF $3,2 Chalk Board 2 LF $3 Doors - Side-lite 0 SF $2, Doors - Wood Doors inclu hw 20 EA $,020 Floor - Carpet 90 SF $2,0 Floor - Tile/Sheet,2 SF $, Lighting - Lay-in 2 EA $2, Lighting - Lay-in 20 EA Marker Board 2 LF GREEE Page of Assessment Date: /2/20
Category: Classrooms (20 rooms) Science Classroom ( room) Special Education ( room) athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Storage/ Closet 2 SF $,3 Walls - Concrete Block 2, SF $3, Walls - Metal Panel 0 SF $,0 Walls - Plaster/Drywall,2 SF $20, Work Sink EA $,3 Casework 0 LF $, Ceiling - Lay-in,2 SF $3,3 Chalk Board 2 LF $2,203 Doors - Side-lite SF $2 Doors - Wood Doors inclu hw 2 EA 2 Floor - Tile/Sheet,93 SF $,9 Lighting - Lay-in EA Storage/ Closet SF $3 Walls - Concrete Block 29 SF $ Walls - Plaster/Drywall SF $2,3 Work Sink 3 EA $,3 Casework 2 LF $2 Ceiling - Lay-in SF $, Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet SF $ Lighting - Lay-in EA $ Marker Board 2 LF $2 Walls - Concrete Block 2 SF $,23 Walls - Plaster/Drywall 39 SF $,093 Classrooms Subtotal: $3,2 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Ceiling - Lay-in,39 SF $3,090 Doors - Side-lite SF $3 Doors - Steel Doors incl hw 3 EA $903 GREEE Page of Assessment Date: /2/20
Category: Rooms (Other Than Classrooms) Administrative Suites/Offices athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Doors - Wood Doors inclu hw 0 EA $3,00 Floor - Carpet 2, SF $,2 Floor - Terrazzo 3 SF $9 Floor - Tile/Sheet,0 SF $,023 Lighting - Lay-in 3 EA $,9 Lighting - Lay-in EA Power Distribution 2 EA Storage/ Closet 0 SF $ Walls - Concrete Block, SF $3, Walls - Plaster/Drywall,03 SF $3,9 Work SInk 2 EA $,0 Gymnasia Kitchen Library Bleacher Seating EA $2, Ceiling - Exposed, SF $,3 Doors - Steel Doors incl hw 2 EA 2 Floor - Wood, SF $29,2 Lighting - Metal Halide/Sodium Vapor EA $2, Lighting - Pendent/Surface 2 EA $, Sound System EA $, Storage/ Closet 0 SF $,0 Walls - Concrete Block, SF $2,90 Ceiling - Lay-in,9 SF $,22 Doors - Steel Doors incl hw 2 EA 2 Floor - Concrete Epoxy/ Painted,9 SF $92 Lighting - Lay-in EA $2, Serving Line 3 LF $2,02 Storage/ Closet SF $,0 Walls - Concrete Block 2,9 SF $,3 Casework LF $,39 Ceiling - Lay-in 2, SF $,20 Doors - Side-lite SF $2 Doors - Wood Doors inclu hw 2 EA 2 Floor - Carpet 2, SF $, Lighting - Lay-in 3 EA GREEE Page 9 of Assessment Date: /2/20
Category: Rooms (Other Than Classrooms) Library athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Walls - Concrete Block,200 SF $3, Walls - Plaster/Drywall 20 SF $2,23 Locker/Shower Room Accessories SF $9 Ceiling - Lay-In SF $3 Doors - Steel Doors incl hw 2 EA 2 Floor - Concrete SF $9 Floor Drain 2 EA $2, Lavatory 2 EA $39 Lighting - Lay-in 2 EA $23 Partitions 2 EA $9 Student Lockers - One Tier 0 EA $92 Walls - Concrete Block 32 SF $9 Walls - Tile Ceramic/ Porcelain 32 SF $3 Water Closet 2 EA $2 Lunch & Multipurpose Room Ceiling - Exposed 3,30 SF $,9 Ceiling - Lay-in SF $, Doors - Wood Doors inclu hw 3 EA $903 Floor - Tile/Sheet 3,92 SF $3,92 Lighting - Pendent/Surface 20 EA $2, Walls - Concrete Block,3 SF $2,3 MDF_IDF AC Unit EA $9 Doors - Wood Doors inclu hw EA $30 Finishes 3 SF $,092 Ventilation and Cooling EA $, Mechanical/ Service Rooms Boiler Room 2,0 SF $,0 Janitor's Closet 3 SF $, Loading Docks 9 SF $23 Mechanical/ Service Rooms,9 SF $, Storage Room 2 SF $,9 Restroom Accessories 2,0 SF $23,2 GREEE Page 0 of Assessment Date: /2/20
Category: Rooms (Other Than Classrooms) Restroom athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Ceiling - Lay-in 3 SF $20 Ceiling - Lay-in,09 SF $3,20 Ceiling - Plaster/Drywall, SF $,039 Doors - Wood Doors inclu hw 0 EA $3,00 Floor - Terrazzo 2,0 SF $,0 Floor Drain 30 EA $3, Lavatory EA $,02 Lighting - Lay-in 2 EA $3,33 Lighting - Lay-in 2 EA Partitions 32 EA $9,02 Urinals EA $,3 Urinals EA $3,9 Walls - Structural Glazed Tile,9 SF $23, Walls - Tile Ceramic/ Porcelain, SF $3,2 Water Closet 2 EA $, Rooms (Other Than Classrooms) Subtotal: $,23 Building: Main Category: Building Interior Corridor Ceiling - Exposed 20 SF $2 Ceiling - Lay-in 3,29 SF $39,93 Doors - Steel Doors incl hw 2 EA $3,2 Doors - Transom Window 2 EA $, Drinking Fountains - Double Water Cooler EA $3 Drinking Fountains - Single Fountain EA $,930 Floor - Terrazzo 3, SF $,0 Lighting - Lay-in 3 EA $,93 Lighting - Lay-in EA Lighting - Pendent/Surface 2 EA $3,9 Walls - Concrete Block,00 SF $23, Walls - Structural Glazed Tile 3,0 SF $, Safety Camera Viewing Station 2 EA $,3 GREEE Page of Assessment Date: /2/20
Category: Building Interior Safety athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Security Cameras EA $ Stairs Vertical Conveyance Ceiling - Lay-in SF $2,23 Floor - Terrazzo, SF $,0 Handrails 32 LF $2,0 Lighting - Lay-in EA $2,2 Stairs - Terrazzo LF $, Walls - Concrete Block,0 SF $2,9 Walls - Structural Glazed Tile 2,0 SF $,9 Elevator - Hydraulic Elevator EA $9,23 Building Interior Subtotal: $33, Total Building Cost $2,9, SITE Category: Site Civil/Drainage Fencing Landscape Civil/ Drainage - Catch Basin EA $,9 Civil/ Drainage - Site Manhole EA $,9 Fencing - ew Standard Ornamental 0 LF $,2 Fencing - ew Standard Ornamental, LF $,9 Benches EA $,20 Landscape - Grass 0,2 SF $,99 Landscape - Hardscape- Concrete,30 SF $, Lighting - Pole Mounted 2 EA $,0 Lighting - Pole Mounted 3 EA $3,2 Parkway trees 20 EA $3,20 Planting Beds/ Area 0, SF $,20 Trash Receptacles EA $32 GREEE Page 2 of Assessment Date: /2/20
athanael Greene Elementary School 32 S Honore St Chicago, IL 009 SITE Category: Site Parking Lot Sidewalks Signage Concrete Curbs 90 LF $0, Lighting - Pole Mounted EA $,2 Lighting - Pole Mounted 2 EA $2,90 Surface - Asphalt,20 SF $3,2 Surface - Concrete 90 SF $2, Trash Enclosure - Wood 0 SF $30,92 Sidewalks - Internal Walks,020 LF $2,22 Sidewalks - Perimeter Sidewalks 9,0 SF $9,9 Flag Pole - Flag Pole EA $, Monument - Sign EA Site Subtotal: $32, Total Site Cost $32, Campus Total ² ³ $3,2,30 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). GREEE Page 3 of Assessment Date: /2/20
athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. GREEE Page of Assessment Date: /2/20
athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Art Room Computer Lab Faculty Lounge Music Room Science Classroom Special Education Art Room Office st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor st Floor 30 20 0 0 0 09 0 2 20 03 0 20 203 20 2 23 2 30 303 30 30 30 30 309 30 3 32 33 3 20 0 30 20 0 0 0 09 0 2 20 03 0 20 203 20 2 23 2 30 303 30 30 30 30 309 30 3 32 33 3 20 0,0,00 0,092,092,092,092,092,092 2,00 0 0 0 90 0 0 93 03,93 2 2 2 0 2 2 2 2 2 2 0 2 2 0 20 3 20 20 20 20 20 20 0 0 0 0 0 0 0 0 0 0 0 0 03 0 0 0 0 0 0 0 0 0 0 9 9 9 9 9 33 9 9 9 9 9 0 3 GREEE Page of Assessment Date: /2/20