APPENDIX 1 to LGIP INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY

Similar documents
INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY

NORTH CAROLINA INTERCONNECTION REQUEST. Utility: Designated Contact Person: Address: Telephone Number: Address:

GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

Issued: September 2, 2014 Effective: October 3, 2014 WN U-60 Attachment C to Schedule 152, Page 1 PUGET SOUND ENERGY

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 150 KW BUT LESS THAN OR EQUAL TO 550 KW

Generation Interconnection Study Data Sheet Synchronous Machines

SOUTH CENTRAL INDIANA REMC Application for Operation of Member-Owned Small Power Generation Systems

PART 1 OWNER/APPLICANT INFORMATION

Owner/Customer Name: Mailing Address: City: County: State: Zip Code: Phone Number: Representative: Address: Fax Number:

EASTERN ILLINI ELECTRIC COOPERATIVE Application for Operation of Member-Owned Generation

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System

APPLICATION FOR INTERCONNECTION & OPERATIONS OF MEMBER-OWNED GENERATION

GENERATOR INTERCONNECTION APPLICATION Category 3 For All Projects with Aggregate Generator Output of More Than 150 kw but Less Than or Equal to 550 kw

State of North Dakota Engineering data submittal Page 1 For interconnection of distributed generation to Otter Tail Power Company

APPENDIX B: Generation Interconnection Application Form

440 (12) 416 (12) 416 (12) 440 (12)

Facility Interconnection Requirements for Colorado Springs Utilities Version 03 TABLE OF CONTENTS

General Information. * Required

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

Spec Information. Reactances Per Unit Ohms

Time constants ( s ) Resistance. Other data - Class H /6600 V kva. Efficiencies ( % )(3 phase - Classe H V kva)

GENERATOR DATA JANUARY 30, 2015

S0L1-J1 - Technical Data Sheet

Form B. Connection Impact Assessment Application Form Distribution System

Initial Application Form for Connection of Distributed Generation (>10kW)

Impact Assessment Generator Form

S4L1S-D4 Wdg.17 - Technical Data Sheet

REQUIREMENTS FOR GENERATING FACILITY INTERCONNECTION TO THE LIPA TRANSMISSION SYSTEM

OPERATING, METERING, AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 2,000 KILOWATTS

Connection Impact Assessment Application Form

Connection Impact Assessment Application

Embedded Generation Connection Application Form

S4L1D-G41 Wdg Technical Data Sheet

Spec Information. Reactances Per Unit Ohms

Distributed Generation Application Form (Generation of Greater than 20 kw to 15 MW)

ALTERNATOR TECHNICAL DESCRIPTION 1. LSA 53.2 XL13 / 4p. Chargé d'affaire : Karthikeyan GN 1 Moteurs Leroy-Somer +33 (0) xx

PI734C - Technical Data Sheet

PI734A - Technical Data Sheet

Embedded Generation Connection Application Form

PM734B - Technical Data Sheet. Generator Solutions AS

PI734F - Winding 07. Technical Data Sheet APPROVED DOCUMENT

Remotes Case 2&3 Form REINDEER Cases 2&3 -Connection Impact Assessment (CIA) Application

PI734E - Winding 312. Technical Data Sheet APPROVED DOCUMENT

PI734C - Winding 312. Technical Data Sheet APPROVED DOCUMENT

PI734B - Winding 312. Technical Data Sheet APPROVED DOCUMENT

WDG 71 - Technical Data Sheet

PI734F - Winding 28. Technical Data Sheet APPROVED DOCUMENT

PM734D - Winding 312. Technical Data Sheet APPROVED DOCUMENT. Generator Solutions AS

PM734F - Winding 312. Technical Data Sheet APPROVED DOCUMENT

Embedded Generation Connection Application Form

QUESTIONNAIRE for Wind Farm Power Stations only

WDG 12 - Technical Data Sheet

Sizing Generators for Leading Power Factor

AGN 034 Alternator Reactance

WDG 12 - Technical Data Sheet

WDG 61 - Technical Data Sheet

WDG 13 - Technical Data Sheet

WDG 07 - Technical Data Sheet

WDG 51 - Technical Data Sheet

TABLE OF CONTENT

WDG 12 - Technical Data Sheet

WDG 12 - Technical Data Sheet

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation

WDG 83 - Technical Data Sheet

SYNCHRONOUS MACHINES

Type KLF Generator Field Protection-Loss of Field Relay

Generator Advanced Concepts

PARTNER ALTERNATORS LSA 40-4 Pole

LONG ISLAND POWER AUTHORITY INTERCONNECTION GUIDE FOR INDEPENDENT POWER PRODUCERS

Electrical Theory. Power Principles and Phase Angle. PJM State & Member Training Dept. PJM /22/2018

TAL 044 Low Voltage Alternator - 4 pole

Low Voltage alternators - 4 pole LSA 46.2

Low Voltage alternators - 4 pole LSA 47.2

BE Semester- VI (Electrical Engineering) Question Bank (E 605 ELECTRICAL POWER SYSTEM - II) Y - Y transformer : 300 MVA, 33Y / 220Y kv, X = 15 %

Imperial Irrigation District System Planning ATTACHMENT A

TAL 049 Low Voltage Alternator - 4 pole

LSA Pole. R 726 Mains paralleling

TAL 047 Low Voltage Alternator - 4 pole

Kestrel Power Engineering

PARTNER ALTERNATORS LSA Pole

Conventional Paper-II-2013

Code No: R Set No. 1

Power Systems Modelling and Fault Analysis

LSA R & LSA H 49.1 Low Voltage Alternators - 4 pole

Appendix C-1. Protection Requirements & Guidelines Non-Utility Generator Connection to Okanogan PUD

Cork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours)

Experiment 45. Three-Phase Circuits. G 1. a. Using your Power Supply and AC Voltmeter connect the circuit shown OBJECTIVE

Apprentice Electrical Technician Test (ETT) Preparation Guide

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control

TRANSFORMER OPERATION

Design, Implementation, and Dynamic Behavior of a Power Plant Model

IJSER. Fig-1: Interconnection diagram in the vicinity of the RajWest power plant

NERC Protection Coordination Webinar Series June 16, Phil Tatro Jon Gardell

Short-circuit behavior - Xd ; s-s, transient, subtransient. Chapter 4 - Series Resistance of Transmission Lines

R10. III B.Tech. II Semester Supplementary Examinations, January POWER SYSTEM ANALYSIS (Electrical and Electronics Engineering) Time: 3 Hours

STEADY STATE REACTANCE

Power Plant and Transmission System Protection Coordination of-field (40) and Out-of. of-step Protection (78)

Transcription:

APPENDIX 1 to LGIP INTERCONNECTION REQUEST FOR A LARGE GENERATING FACILITY 1. The undersigned Interconnection Customer submits this request to interconnect its Large Generating Facility with Transmission Provider's Transmission System pursuant to a Tariff. 2. This Interconnection Request is for (check one): A proposed new Large Generating Facility. An increase in the generating capacity or a Material Modification of an existing Generating Facility.. 3. The type of interconnection service requested (check one): Energy Resource Interconnection Service Network Resource Interconnection Service 4. Check here only if Interconnection Customer requesting Network Resource Interconnection Service also seeks to have its Generating Facility studied for Energy Resource Interconnection Service 5. Interconnection Customer provides the following information: a. Address or location or the proposed new Large Generating Facility site (to the extent known) or, in the case of an existing Generating Facility, the name and specific location of the existing Generating Facility; b. Maximum summer at degrees C and winter at degrees C megawatt electrical output of the proposed new Large Generating Facility or the amount of megawatt increase in the generating capacity of an existing Generating Facility; c. General description of the equipment configuration; d. Commercial Operation Date (Day, Month, and Year); e. Name, address, telephone number, and e-mail address of Interconnection Customer's contact person;

f. Approximate location of the proposed Point of Interconnection (optional); g. Interconnection Customer Data (set forth in Attachment A); and h. Primary frequency response operating range for electric storage resources. 6. Applicable deposit amount as specified in the LGIP. 7. Evidence of Site Control as specified in the LGIP (check one) Is attached to this Interconnection Request Will be provided at a later date in accordance with this LGIP 8. This Interconnection Request shall be submitted to the representative indicated below: [To be completed by Transmission Provider] 9. Representative of Interconnection Customer to contact: [To be completed by Interconnection Customer] 10. This Interconnection Request is submitted by: Name of Interconnection Customer: By (signature): Name (type or print): Title: Date:

LARGE GENERATING FACILITY DATA UNIT RATINGS kva F Voltage Power Factor Speed (RPM) Connection (e.g. Wye) Short Circuit Ratio Frequency, Hertz Stator Amperes at Rated kva Field Volts Max Turbine MW F Attachment A to Appendix 1 Interconnection Request Primary frequency response operating range for electric storage resources: Minimum State of Charge: Maximum State of Charge: COMBINED TURBINE-GENERATOR-EXCITER INERTIA DATA Inertia Constant, H = kw sec/kva Moment-of-Inertia, WR 2 = lb. ft. 2 REACTANCE DATA (PER UNIT-RATED KVA) DIRECT AXIS QUADRATURE AXIS Synchronous saturated Xdv Xqv Synchronous unsaturated Xdi Xqi Transient saturated X'dv X'qv Transient unsaturated X'di X'qi Subtransient saturated X"dv X"qv Subtransient unsaturated X"di X"qi Negative Sequence saturated X2v Negative Sequence unsaturated X2i Zero Sequence saturated X0v Zero Sequence unsaturated X0i Leakage Reactance Xlm FIELD TIME CONSTANT DATA (SEC) Open Circuit T'do T'qo

Three-Phase Short Circuit Transient T'd3 T'q Line to Line Short Circuit Transient T'd2 Line to Neutral Short Circuit Transient T'd1 Short Circuit Subtransient T"d T"q Open Circuit Subtransient T"do T"qo ARMATURE TIME CONSTANT DATA (SEC) Three Phase Short Circuit Line to Line Short Circuit Line to Neutral Short Circuit Ta3 Ta2 Ta1 NOTE: If requested information is not applicable, indicate by marking "N/A." MW CAPABILITY AND PLANT CONFIGURATION LARGE GENERATING FACILITY DATA ARMATURE WINDING RESISTANCE DATA (PER UNIT) Positive Negative Zero R1 R2 R0 Rotor Short Time Thermal Capacity I2 2 t = Field Current at Rated kva, Armature Voltage and PF = amps Field Current at Rated kva and Armature Voltage, 0 PF = amps Three Phase Armature Winding Capacitance = microfarad Field Winding Resistance = ohms C Armature Winding Resistance (Per Phase) = ohms C CURVES Provide Saturation, Vee, Reactive Capability, Capacity Temperature Correction curves. Designate normal and emergency Hydrogen Pressure operating range for multiple curves. GENERATOR STEP-UP TRANSFORMER DATA RATINGS Capacity Self-cooled/ Maximum Nameplate / kva

Voltage Ratio(Generator Side/System side/tertiary) / / kv Winding Connections (Low V/High V/Tertiary V (Delta or Wye)) / / Fixed Taps Available Present Tap Setting IMPEDANCE Positive Z1 (on self-cooled kva rating) % X/R Zero Z0 (on self-cooled kva rating) % X/R EXCITATION SYSTEM DATA Identify appropriate IEEE model block diagram of excitation system and power system stabilizer (PSS) for computer representation in power system stability simulations and the corresponding excitation system and PSS constants for use in the model. GOVERNOR SYSTEM DATA Identify appropriate IEEE model block diagram of governor system for computer representation in power system stability simulations and the corresponding governor system constants for use in the model. WIND GENERATORS Number of generators to be interconnected pursuant to this Interconnection Request: Elevation: Single Phase Three Phase Inverter manufacturer, model name, number, and version:

List of adjustable set-points for the protective equipment or software: Note: A completed General Electric Company Power Systems Load Flow (PSLF) data sheet or other compatible formats, such as IEEE and PTI power flow models, must be supplied with the Interconnection Request. If other data sheets are more appropriate to the proposed device, then they shall be provided and discussed at Scoping Meeting. INDUCTION GENERATORS (*) Field Volts: (*) Field Amperes: (*) Motoring Power (kw): (*) Neutral Grounding Resistor (If Applicable): (*) I2 2 t or K (Heating Time Constant): (*) Rotor Resistance: (*) Stator Resistance: (*) Stator Reactance: (*) Rotor Reactance: (*) Magnetizing Reactance: (*) Short Circuit Reactance: (*) Exciting Current: (*) Temperature Rise: (*) Frame Size: (*) Design Letter: (*) Reactive Power Required In Vars (No Load): (*) Reactive Power Required In Vars (Full Load): (*) Total Rotating Inertia, H: Per Unit on KVA Base Note: Please consult Transmission Provider prior to submitting the Interconnection Request to determine if the information designated by (*) is required