The CMS ECAL Laser Monitoring System

Similar documents
The CMS ECAL Laser Monitoring System

PERFORMANCE OF THE CMS ECAL LASER MONITORING SOURCE IN THE TEST BEAM

Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics

The CMS electromagnetic calorimeter barrel upgrade for High-Luminosity LHC

CMS Conference Report

A Diode-Pumped DP2-447 Blue Laser for Monitoring CMS Lead Tungstate Crystal Calorimeter at the LHC

A Diode-Pumped Solid State Blue Laser for Monitoring CMS Lead Tungstate Crystal Calorimeter at the LHC

Monitoring LSO/LYSO Based Crystal Calorimeters

PWO Crystal ECAL. Ren-yuan Zhu California Institute of Technology May 19 th US CMS Collaboration Meeting, May 19, 2001 Ren-yuan Zhu, Caltech

Monitoring Light Source for CMS Lead Tungstate Crystal Calorimeter at LHC

The Run-2 ATLAS. ATLAS Trigger System: Design, Performance and Plans

PWO Crystal ECAL Status

Operation and performance of the CMS Resistive Plate Chambers during LHC run II

The design and performance of the ATLAS jet trigger

Data acquisition and Trigger (with emphasis on LHC)

Red Laser for Monitoring Light Source

Performance and Operation of the CsI(Tl) Crystal Calorimeter of the BaBar Detector

Data acquisition and Trigger (with emphasis on LHC)

The trigger system of the muon spectrometer of the ALICE experiment at the LHC

CALICE AHCAL overview

The CMS ECAL Barrel HV system

Data Quality Monitoring of the CMS Pixel Detector

arxiv:physics/ v2 [physics.ins-det] 29 Sep 2005

Construction and first beam-tests of silicon-tungsten prototype modules for the CMS High Granularity Calorimeter for HL-LHC

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Calorimeter Monitoring at DØ

LHC Experiments - Trigger, Data-taking and Computing

CMS electron and _ photon performance at s = 13 TeV. Francesco Micheli on behalf of CMS Collaboration

LUCX - THZ PROGRAM: OVERVIEW AND PROSPECTS

Beam Condition Monitors and a Luminometer Based on Diamond Sensors

The ATLAS Trigger in Run 2: Design, Menu, and Performance

ITk silicon strips detector test beam at DESY

Front-End Electronics and Feature-Extraction Algorithm for the PANDA Electromagnetic Calorimeter

Attilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties

DAQ & Electronics for the CW Beam at Jefferson Lab

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration

Status of the LHCb Experiment

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II

CALICE Software. Data handling, prototype reconstruction, and physics analysis. Niels Meyer, DESY DESY DV Seminar June 29, 2009

The CMS Outer HCAL SiPM Upgrade.

LED monitoring system for the BTeV lead tungstate crystal calorimeter prototype

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring

Upgrade of the ATLAS Thin Gap Chamber Electronics for HL-LHC. Yasuyuki Horii, Nagoya University, on Behalf of the ATLAS Muon Collaboration

Performance of the Prototype NLC RF Phase and Timing Distribution System *

PoS(EPS-HEP2017)476. The CMS Tracker upgrade for HL-LHC. Sudha Ahuja on behalf of the CMS Collaboration

Phase 1 upgrade of the CMS pixel detector

Signal Reconstruction of the ATLAS Hadronic Tile Calorimeter: implementation and performance

Monitoring Light Source for CMS Lead Tungstate Crystal Calorimeter at LHC

The CMS Muon Trigger

Mitigating high energy anomalous signals in the CMS barrel Electromagnetic Calorimeter

Recent Development and Study of Silicon Solid State Photomultiplier (MRS Avalanche Photodetector)

Test (Irradiate) Delivered Parts

Forward Endcap Analog Electronics

5kW DIODE-PUMPED TEST AMPLIFIER

Aging studies for the CMS RPC system

Monika Wielers Rutherford Appleton Laboratory

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. CMS detector performance.

Operation and Performance of the ATLAS Level-1 Calorimeter and Level-1 Topological Triggers in Run 2 at the LHC

The detector read-out in ALICE during Run 3 and 4

Performance of 8-stage Multianode Photomultipliers

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The LHCb trigger system

What do the experiments want?

Photon Detector with PbWO 4 Crystals and APD Readout

Micromegas calorimetry R&D

Hardware Trigger Processor for the MDT System

A New Laser Source for SEE Testing

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Status of ATLAS. Xin Wu, University of Geneva On behalf of the ATLAS collaboration. X. Wu, HCP2009, Evian, 17/11/09 ATL-GEN-SLIDE

Trigger and DAQ at the LHC. (Part II)

The Commissioning of the ATLAS Pixel Detector

Construction and Performance of the stgc and Micromegas chambers for ATLAS NSW Upgrade

ATLAS LAr Electronics Optimization and Studies of High-Granularity Forward Calorimetry

Commissioning Status and Results of ATLAS Level1 Endcap Muon Trigger System. Yasuyuki Okumura. Nagoya TWEPP 2008

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

CMS Silicon Strip Tracker: Operation and Performance

ATLAS Phase-II trigger upgrade

Detection of Radio Pulses from Air Showers with LOPES

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

arxiv: v2 [physics.ins-det] 20 Oct 2008

Hardware Trigger Processor for the MDT System

A tracking detector to study O(1 GeV) ν μ CC interactions

Chemistry Instrumental Analysis Lecture 10. Chem 4631

Results of FE65-P2 Pixel Readout Test Chip for High Luminosity LHC Upgrades

Spectrometer cavern background


Designing for Femtosecond Pulses

Diamond sensors as beam conditions monitors in CMS and LHC

Construction and Performance of the stgc and MicroMegas chambers for ATLAS NSW Upgrade

Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4. Final design and pre-production.

Totem Experiment Status Report

Track Triggers for ATLAS

Overview of the ATLAS Trigger/DAQ System

Features. Applications. Optional Features

The CMS HGCAL detector for HL-LHC upgrade

High Power and Energy Femtosecond Lasers

ELECTRON BEAM DIAGNOSTICS AND FEEDBACK FOR THE LCLS-II*

Level-1 Calorimeter Trigger Calibration

Opera&on of the Upgraded ATLAS Level- 1 Central Trigger System

Status of the PRad Experiment (E )

Transcription:

The CMS ECAL Laser Monitoring System IPRD 2008 11th Topical Seminar On Innovative Particle and Radiation Detectors Adi Bornheim California Institute of Technology On behalf of the CMS ECAL Collaboration Siena,

90 Tons of Lead-Tungstate 2

Introduction CMS is building a high resolution Crystal Calorimeter (ECAL) to be operated at LHC in a very harsh radiation environment. Barrel resolution design goal : Current effective resolution goal : 2.5% / E 0.55% 0.2 / E <0.5% for energies above 100 GeV Calibrating and maintaining the calibration of this device will be very challenging. Hadronic environment makes physics calibration more challenging PWO4 Crystals change transparency under radiation. The damage is significant (few % - up to ~5 % for CMS ECAL barrel radiation levels) compared to the desired constant term (0.5 %). The dynamics of the transparency change is fast (few hours) compared to the time scale needed for a calibration with physics events (days - weeks - month). Compensate by monitoring the change with a laser monitoring system. 3

Radiation Effects on PWO4 Transparency Radiation Reduces transmittance in the blue and green, peak of PWO4 emission spectrum Effect is dose rate dependent. Monitoring relative loss of PWO4 transmittance with pulsed laser light. For the expected dose rate at CMS barrel (15 rad/hour), typical transmittance loss is at a level of up to ~5%. Almost no effect in the red wavelength range. Monitor with red light to separate out possible variations in the light distribution system and the readout chain. Approx. PWO emission spectrum 4

PWO4 Transparency Change Characteristics Crystal light yield changes under irradiation. Change is dose rate dependent. Crystal light yield change under irradiation is linearly correlated with longitudinal transmittance (transparency). Magnitude of the transparency change is crystal dependent. Transparency change recovers at room temperature. Recovery time is crystal dependent with two time constants, one of few 10 hours and one >1000 hours. 5

Damage and Recovery in a LHC Cycle Simulation Test Beam Data Depends on : Radiation level (η, Luminosity) Crystal characteristics Damage Recovery Damage Recovery Damage-recovery cycle in sync with the ~12 hour LHC fill cycle 6

In-Situ Monitoring & LHC Bunch Train Abort Gap Abort gaps occur at ~10 khz - Laser pulses at ~100 Hz Use ~1% of gaps. Measure transparency of all crystals from one half-module at a time. 600 laser shots for one transparency measurement. Laser pulse latency ~4 µs Scan entire ECAL every 20 minutes 7

On-Detector Monitoring System APD PN APD Very stable PN-diodes used as reference system Each Level-1 Fan-out is seen by 2 PN diodes, each PN diode sees 2 Level-1 Fan-out, 10 PN diodes per SM SM are illuminated one half at a time, 88 LM for full ECAL Barrel crystals front illuminated, endcap rear illuminated Precision charge pulsing system for electronics calibration 4 VPT 8

Ti:Sapphire Laser with Two Wavelengths Nd:YLF Pump Tunable Ti:S 10 kw 440 nm 500 nm 700 nm 800 nm 100 mw 9

Long Term Laser Performance Changes in the pulse shape of the laser are the larges systematic effect. Precise control of laser performance is of utmost importance. 10

Light Distribution System 1.015 1.01 1.005 1.0 0.995 0.99 0.985 11

Endcap LED Pulser System ECAL EE equipped with additional LED pulser system. Provides additional wavelength (~600 nm) and allows high rate pulsing. Complementary to laser system. 12

Monitoring System Performance - Stability Stability : RMS of the measured APD/PN values over a period of 4 weeks. Mean before and after correction for laser pulse shape changes : 0.180 % Peak before and after correction for laser pulse shape changes : ~0.170 % 0.088 % ~0.05 % Typically ~0.1 % long term stability in real environment. This includes the stability of the entire readout chain - temperature, HV, etc. We can measure the crystal transparency with better than 0.1 %. 13

Laser Light Loss Electron Signal Loss # Crystals Dispersion of α for 35 BTCP crystals signal from Beam (e-) slopea: α = 1.55 a 2002 2003 mean = 1.538 2004 (fall) σ/mean 6% 2004 (spring) 2006 (center) 2006 (neighbor) signal from Laser α About 100 α-parameter extractions with final hardware on 35 barrel and 41 endcap crystals have been performed. At startup use same parameters for all crystals from one producer. An in-situ determination of α is under consideration. 14

Correcting Transparency Change Single irradiation cycle effects : Transparency change can be corrected to better than 0.1 % Energy resolution is fully restored to pre-irradiation level 15

Laser Monitoring Online Data Flow ECAL DAQ LaserSystem EMTC Other Subdetectors ECAL TTCci Calibration Events CMS Global Trigger Storage Offline Managers LaserFarm Disk Buffer Readout Units Online PCs HLT Filter Filter Farm Laser data acquisition fully integrated in the CMS DAQ and data flow. 16

Running experience in CMS Quasi Online Analysis Plots CMS Online DQM Plots Raw data rate for laser monitoring is 4 Mb/s. Data is sampled by DQM and analysed in ECAL Laser Farm detail in a quasi-online fashion. Aim to have transparency corrections available on the level of 0.1% at the end of a LHC fill. So far mostly used for commissioning, debugging and timing studies of ECAL. Stability studies are under way. Regular data taking has commenced, aiming to monitor at design precision. 17

Summary CMS ECAL Laser Monitoring System has been installed and commissioned in the final detector. All performance criterions have so far been achieved. Next step is to validate the stability of ECAL response to the level of 0.1 % over several weeks without irradiation. Then, operating the system and follow the crystal transparency on the level of 0.1% over 10 years. 18