Campus Circulation Improvements. Thursday, March 17, 2016 Pre-Proposal Conference

Similar documents
Cone HVAC Modernization. Thursday, September 1, 2016 Pre Proposal Conference

PAR AG presentation. May ROCKVILLE PIKE ELEMENTARY & PRESCHOOL BUILDING

CTA Blue Line Forest Park Branch Feasibility/Vision Study

RFQ No. 19-C668 for On-Call Consulting Services for the Capital Projects Program Addendum No. 04

GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

Rail System Wireless Interconnect Between Traffic Signal and Train Control Cabinets

EL MONTE STATION Call to Artists: Four Artist Opportunities

Aesthetic Steering Committee Meeting No. 8

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

754 Sir Francis Drake Boulevard

FREMONT COUNTY. APPLICATION FOR ZONE CHANGE #2 USE DESIGNATION PLAN (Requires Subsequent Approval of ZC #2 Final Designation Plan) 1.

King Mill Lambert DRI# 2035 Henry County, Georgia

CONCEPT REVIEW GUIDELINES

Moorhead / Dilworth Fixed Route Expansion Study

City of Hamilton INFORMATION FOR CONDITIONAL USE PERMIT

MassDOT Turnpike Air Rights Parcels Citizens Advisory Committee Meeting #7 February 15, 2012

This Call for Qualifications does not require the preparation of a design proposal.

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007

Checklist for Minor Plan Modification

Compliance with this acceptable construction practice satisfies Performance Requirement P2.5.2 for balustrades or other barriers.

Checklist for Tentative Subdivision Map

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT PHASE 2 EXPLORING THE OPTIONS CONSULTATION SUMMARY REPORT AUGUST 2013

This page is intentionally left blank

BUILDING SIGN PROGRAM JULY 2012

Chapter 1 General Design Information

CONFEDERATION LINE PRESENTATION TO RPIC CONFERENCE

CALL FOR ARTISTS REQUEST FOR QUALIFICATIONS

State Road A1A North Bridge over ICWW Bridge

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Operating Standards Attachment to Development Application

Levitt AMP [Your City] Grant Awards Application and Instructions

BOARD OF DIRECTORS MEETING MINUTES

I. REQUEST: The undersigned petition the Village of Matteson, Illinois to approve the application(s) submitted.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

DOWNTOWN DEVELOPMENT REVIEW BOARD APPLICATION

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

Application for Site Plan Review

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT COLLEGE CAMPUS MASTER SIGN PROGRAM, PHASE 2 BID NO

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Pledge of Allegiance Staff Introduction Bid Package Submittal Sign-In Sheet and Project Scope Q&A Process Anticipated Date Sequence General Project

CITY OF MERCER ISLAND DEVELOPMENT SERVICES GROUP 9611 SE 36 th Street, Mercer Island, WA (206)

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

CITY OF SCHENECTADY NEW YORK CITY PLANNING COMMISSION

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

AMES INDUSTRIAL PARK AND OFFICE PLAZA

UNION SQUARE & WASHINGTON STREET

Clear Creek County Site Development

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Appointments are available the first two weeks of June 2001 (06/04/01 06/15/01) from 9:00 a.m. to 4:00 p.m.

Applying for a Site Development Review

SECTION SUBMITTAL PROCEDURES

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

Update: July 20, 2012

Architectural Design Process

City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Automated Machine Guidance

MnDOT Contract Exhibit A - Scope of Services

Attachment #2 PPW133-07

DESIGN REVIEW PROCESS AND APPLICATION

KEY MAP PLAN AREA MAP. St. Albans Sub-Area Plan. Area Boundary

Call for Clallam County Professional Artists Port Angeles Waterfront Design Team Artist Opportunity

100,000± SF OFFICE FOR LEASE AT FORMER MACY S SITE

McKenzie County Healthcare Systems

Design Documents for Wayfinding

MnDOT Contract Exhibit A- Scope of Services. Project Information -

Procedure for Obtaining Design Review Committee Approval

TAB B-9 RECORD DRAWINGS

INCOMPLETE APPLICATION WILL NOT BE ACCEPTED COMPLETE ALL INFORMATION BELOW. Construction Value: $

State College Area School District

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

Index. 1 Introduction. 2 Executive Summary. 3 Long-Range Facility Master Plan

Dallas Area Rapid Transit (DART) Traffic Signal Priority (TSP) Project

STATE UNIVERSITY CONSTRUCTION FUND

PLANNED SIGN PROGRAM SUBMITTAL REQUIREMENTS

TECHNICAL BRIEFING WORK ON THE RÉSEAU EXPRESS MÉTROPOLITAIN JUNE 4, 2018

Appendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge

RETAIL FOR LEASE. brewpub TRACY CORNELL AARON BENNETT

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

CHAPTER 18 Lighting Regulations

The Forestville/ Goodwood Tram Overpass Murals Project (Good Forest Murals) 1 PROJECT AIMS AND OBJECTIVES

ARB Submittal Package Checklist

Working Drawing Procedure

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

Hillside & Foothills Development Application

Palm Beach Community College

Agenda Sustainability Task Force A Committee of the Chico City Council

CLINTON CLOSURE DETOURS

PUBLIC ART MURAL COMMITTEE STAFF REPORT PUBLIC HEARING

SUBURBAN MOBILITY AUTHORITY FOR REGIONAL TRANSPORTATION BOARD OF DIRECTORS MEETING

ADDENDUM #2 September 12, 2018

INTERIOR SIGNAGE MANUAL

GOVERNMENT NOTICE DEPARTMENT OF HIGHER EDUCATION AND TRAINING TRADE TEST REGULATIONS, 2013 SKILLS DEVELOPMENT ACT, 1998

Call t o Artis ts. City of Coeur d Alene, I daho Coeur d Alene Arts Commission

Transcription:

Campus Circulation Improvements Thursday, March 17, 2016 Pre-Proposal Conference

Meeting Agenda Part I: General, Part II: Submittal, Part III: Project I. General Welcome Introductions Questions: efrere@uncc.edu Updates: facilities.uncc.edu/advertisements Last date to submit questions is March 22 nd at noon Final Addendum posted no later than March 24 th HUB & Small Business Enterprise are not considerations for designer selection

II. Submittal Schedule Format Organization Selection Criteria Meeting Agenda III. Project Overview Project Budget & Intent General Information & Program Key Challenges Site Designer Questions Optional Site Visit

Submittal Schedule Proposal Due Date March 31 st at 2:00 PM Shortlisting to be complete by early-april, interviews with selected firms will be on the morning of April 14, 2016 Projected Notice to Proceed Date April 21, 2016 Complete of Advance Planning by mid-june 2016 Completion of all Design approvals and contract documents by November 15, 2016 Construction Schedule: December 2016 July 2017 Note: This is an Advance Planning Submittal with option to retain firm for full design services

Submittal Format No larger than 12 ½ in height x 9 ½ in width Provide five (5) printed copies & one (1) digital copy 40 page limit (20 double sided) Page limit incudes all printed pages, but not covers, tabs, clear covers, blank pages, cardstock backs, etc. Page count will be derived from digital copy, so omit all blank pages from the digital version

Submittal Organization Provide Information in the following Order: A. Required Submittal Cover Sheet B. Designer s Supplemental Information Form (or Designer s Staffing Information Form) C. Cover letter (optional) D. SF330 Part I & II (Make sure to fully complete and submit both parts!) NOTE: PLEASE USE BOLD FONT FOR ALL SQUARE FOOTAGE COSTS! E. Supplemental Information organized into ten categories with subheadings matching the ten Designer Selection Criteria

Submittal Selection Criteria Submittals must clearly provide information for each category below utilizing the numbering system and categories for the submittal subtitles. (1) Specialized or appropriate expertise in this type of project. (2) Past performance on similar projects. (3) Adequate staff and proposed design or consultant team for the project. (4) Current workload and State projects awarded. (5) Proposed design approach for the project including design team and consultants. (6) Recent experience with project costs and schedules. (7) Construction administration capabilities. (8) Proximity to and familiarity with the area where project is located. (9) Record of successfully completed projects without major legal or technical problems. (10) Other factors that may be appropriate for the project.

LESS IS MORE

Project Overview Budget Total Budget: $1M including soft costs (this includes the AP & Design) Construction Cost: $865,000 Intent Improve multimodal access and connections required for Charlotte Area Transit System s (CATS) LYNX Blue Line Extension (BLE) stations that provide direct access to UNC Charlotte Wayfinding for preferred routes

Project Overview General Information: CATS LYNX Blue Line Extension 9.3 mile light rail extension, 11 stations, will provide continuous travel from I-485/South Blvd through Center City to UNC Charlotte Currently under construction, scheduled to be operational in 2017

Project Overview General Information: LYNX BLE Stations UNC Charlotte Main Station ( Main ) JW Clay Station ( Clay )

Project Overview Program: Main Station Total Ridership Anticipation: 4,000 daily riders Stairs and ramp system to Lot 25 Bus pull-off serving both CATS and UNC Charlotte bus lines Multiple existing paths with various widths, ranging between 5 and 7 with 24 width at crossing to Wallis

Project Overview Program: Clay Station Total Ridership Anticipation: 2,000 daily riders Pedestrian bridge access over N. Tryon St Routes are fixed between JW Clay Deck, the Clay platform, and the Campus Tower Clay platform has access to N. Tryon St to cross at grade at JW Clay signalized intersection

Project Overview Key Challenges Construction completion to coincide with CATS LYNX Blue Line Extension anticipated completion, in the summer of 2017 Wayfinding system that guides pedestrian traffic from the Main station to University preferred routes, especially sensitive to deter through traffic in the adjacent residence hall quad spaces Site improvements to area in front of Wallis Hall and the Main station to delineate transition between public space, semi-public space, and semi-private spaces Pathway upgrades and integration into existing campus circulation, including ADA compliance

QUESTIONS?

Campus Map CONE DECK 1 CONE UNIVERSITY CENTER University Rd CONE DECK 2 Field 14