SUBMITTAL REVIEW Steel Reinforcement - Slab and Masonry Shop Drawings GCAN. Notes: 1. See comments on submittal.

Similar documents
Spec Section: Concrete Mix Design psi - Review Form Concrete Mix Design psi Data Sheets GCAN

SUBMITTAL REVIEW B Passenger Elevators Shop Drawings GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

SUBMITTAL REVIEW Food Service Equipment Data Sheets GCAN. Notes: 1. See D-C Design comments. Submittal: No. 035.

SUBMITTAL REVIEW Underground Natural Gas Piping Data Sheets GCAN. Notes: 1. See engineer s comments. Submittal: No. 016.

City Plaza Energy Upgrades Timeline of Events Pella Window Cancellation

LETTER OF TRANSMITTAL

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY

SUBMITTAL REVIEW COVERSHEET

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Section Meetings Section Material and Equipment. None Required

SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project

LETTER OF TRANSMITTAL

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Working Drawing Procedure

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

Working Drawing Manual

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED RESUBMITTED 2 TIME(S) SUBMITTAL NUMBER: SUBMITTAL DETAILS: CONTRACTOR/CM:

Submittal Packages Detailed with Items and Reviewers

PROCEDURE FOR PROCESSING WORKING DRAWINGS

SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTAL PROCEDURES

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

Submittal Review SW Macadam Ave Suite 200 ATTENTION: Riley Tobin. Portland, OR RE: BSD Sunset High School

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

What Are Submittals?

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

East Central College

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

LETTER OF TRANSMITTAL

REMARKS: The A.F.F. dimension noted on the drawings to the bottom of the grid is 15 0, this dimension should be 16 0.

Letter of Transmittal

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

SUBMITTAL TRANSMITTAL OCPS CLAY SPRINGS ES REVIEWED HVAC WATER TREATMENT CHILLED WATER PIPING TR SUBMITTAL NUMBER: SUBMITTAL DETAILS:

SECTION SUBMITTAL PROCEDURES

Submittal Review Form

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

January, 2014 Page 1 of 5

Submittal Transmittal

CHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel

Jacksonville District Master

Windmill Village Homeowners Association

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

submittals 1s e c t i o n

Submittal Transmittal

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

BERKELEY COUNTY ENGINEERING AND

BUILDING PLANS. BUILDING INSPECTIONS DEPARTMENT

COVER SHEET A0.1 A0.1 COVER SHEET A1.1 FLOOR PLANS - FOUNDATION & MAIN LEVEL A1.2 FLOOR PLANS - UPPER LEVEL & ROOF A3.1 SECTIONS & INTERIOR ELEVATIONS

Submittal Packages Detailed with Items and Reviewers

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

SCOPE: This procedure is applicable to construction projects and is an alternate method of submitting documentation for plan review and permitting.

Section XV - PER, Design, and Construction Submittal Requirements

Answer: Qualification statement should be provided with the bid.

SECTION PROJECT MANAGEMENT AND COORDINATION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1

00-General Drawings. Doc. no.: NA-00-STS002

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

INDIGO LAKES HOA ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

PEAK VIEW RANCH HOMEOWNERS ASSOCIATION Architectural & Design Review Request Form

ARCHITECT S SUPPLEMENTAL INSTRUCTIONSS

TAB B-9 RECORD DRAWINGS

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

COMMERCIAL / INDUSTRIAL APPLICATION FOR PLAN EXAMINATION AND BUILDING PERMIT

White Lake Township Building Dept Highland Rd. (248) White Lake, MI Fax (248)

CITY OF RICHMOND SUBDIVISION PLAT AND PUBLIC INFRASTRUCTURE SUBMITTAL, REVIEW AND APPROVAL PROCEDURES

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

Museum of the Bible Submittal Pkg. No.: Submittal Review Form Submittal Items 1 thru 1

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

PROJECT LOCATION BOZEMAN HIGH SCHOOL. ELECTRICAL ENGINEER: Van Dykken Engineering 37 Spanish Peak Drive Bozeman, MT Phone:

Technical Note. Placing Drawings The Detail Drawings for Reinforcing Bars in Site-Cast Reinforced Concrete Construction ENGINEERING.

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

MTJ Outdoor Baggage Claim

Below is a list of items that are required to accompany the application prior to review by the Architectural Review Committee.

Chapter 1 General Design Information

FAST TRACK WORKSHOP OBJECTIVES

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

Operating Standards Attachment to Development Application

SECTION SUBMITTAL PROCEDURES

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

1 copy of all plans in pdf format and I copy of this form must be submitted, or it will be returned because it is an incomplete submittal.

Stantec Architecture Inc South Flores Street Suite 201 San Antonio TX Tel: (210) Fax: (210)

Transcription:

SUBMITTAL REVIEW Submittal: No. 010.00 Spec Section: 03 3000 2.3 Steel Reinforcement Shop Drawings - Slab and Masonry Reviewed By: Laura Landon, Comma-Q Architecture Date: June 13, 2012 Project: BPS Belgrade Elementary School Location: Belgrade, MT Job Number: 11-03 Copy to: File, Owner This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the CONTRACTOR from compliance with the requirements of the plans and specifications. An opinion of equivalence of a specific item shall not be interpreted as an opinion of equivalence of an assembly of which the item is a component. Submittal review comments have been made within this format and not on the submittal sheets according to the following: NEN No Exceptions Noted GCAN Generally Conforms as Noted RAN Rejected for Reason as Noted IAS Incomplete as Submitted 1. 10.00-03 3000 2.3 Steel Reinforcement - Slab and Masonry Shop Drawings GCAN Notes: 1. See comments on submittal. END OF REVIEW

EMAIL TRANSMITTAL PROJECT: TO: ADDRESS: New Belgrade Elementary School Comma-Q Architecture 109 N. Rouse Ave., #1 Bozeman, MT. 59715 DATE: JOB# SUBMITTAL# 6/11/2012 11011 NM06112012-1 ATTENTION: PHONE: FAX: Laura Landon (406) 585-1112 (406) 585-5518 TRANSMITTED: Proposal Shop Drawings Field Report Other Prints RFI Response Specifications Letter Calculations Sketches These are Transmitted as Checked Below: No Exceptions Taken Make Corrections Noted Revise As Noted And Resubmit Rejected/Resubmit As Specified Reviewed For Load To Structure Only Submitted Previously For Your File For Your Use As Requested ITEM DATE COPIES 1 1 DESCRIPTION PDF -Submittal #10 Steel Reinf. Slab on Metal Deck & Masonry TRANSMIT Via: Email No. Page: 1 REMARKS: COPY TO: TRANSMITTED BY: Matt Miller 108 West Babcock Street, Bozeman, MT. 59715 Phone: (406) 582-9901 FAX: (406) 582-9992

TRANSMITTAL May 21, 2012 To: Nishkian Monks Attention: Matt Miller From: Laura Landon Project: BPS Belgrade Elementary School Location: Bozeman, MT Job Number: 11-03 Copy to: File we are sending you : Attached Under separate cover the following: Shop drawings: Copy of letter: Specification: Prints: Samples: Drawings: Other: these are transmitted as checked below: Approved: Approved as corrected: Revise and resubmit: Rejected: For your signature: For return : For review & comment: date qty description 5/21/2012 1 (elec) Submittal 10.00-03 3000 2.3 Steel Reinforcement Shop Drawings - Slab and Masonry Remarks: Matt, please review the attached submittal, please return an electronic version to our office with your comments. Thanks

MARTEL CONSTRUCTION, INC. 1203 South Church Avenue Bozeman, MT 59715-5801 LETTER OF TRANSMITTAL Telephone: (406) 586-8585 Facsimile: (406) 586-8646 DATE 05/21/12 JOB NO. 12-001 TRANSMITTAL/SUBMITTAL NO. 10.00 TO: Comma Q Architects RE: Rebar Shop Drawings - Slabs and Masonry 109 North Rouse Ave #1 Bozeman, MT 59715 ATTENTION: Laura Landon BELGRADE ELEMENTARY SCHOOL We are hand delivering We are sending via Email ATTACHED UNDER SEPARATE COVER TheThe following items: X Shop drawings Prints Plans Samples Specifications Copy of letter Change order Product Data COPIES DATE DWG NO. DESCRIPTION 1 Section 03 3000 2.3 Steel Reinforcement Shop Drawings - Slab on Metal Deck and Masonry Rebar THESE ARE TRANSMITTED as checked below: X For approval Approved as Submitted Resubmit Copies for Approval For your use Approved as Noted Submit Copies for Distribution As requested Returned for Corrections Return Corrected Prints For review and comment REMARKS: FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US 1 Copy delivered to Nishkian for review COPY TO File Nishkian SIGNED: Mike Wilkinson - Project Engineer If enclosures are not as noted, kindly notify us at once.