Cutless Bearing Removal and Replacement for a Watkins 27 By John Everson

Similar documents
OPERATIONAL MANUAL V1.0. Removing/Replacing Blades

What is a fastener? A device to locate or hold parts

Instruction Manual 3 BLADE CLASSIC. Scan the QR code with a mobile device to view the installation video.

What is a fastener? A device to locate or hold parts

Block Foundation. From the 1950s through the 80s. Hydraulically driven. piers provide bearing. for a settling foundation

Replacing Original Starwind 19 Ports with Plexiglass:

Instruction Manual 2 BLADE CLASSIC. Scan the QR code with a mobile device to view the installation video.

Instruction Manual. EASY / WHISPER 2, 3, 4 & 5 Blades. Scan the QR code with a mobile device to view the installation video.

Document Revision No.: 0 Revised: 05/11/2015 RIT KGCOE MSD Program DUAL PURPOSE WHEELCHAIR-PLATFORM SWING ASSEMBLY MANUAL

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

Introduction To Automotive Technology

Repacking the Spindle Bearings on a 1990 Enco RF-30 Mill/Drill, Version 1.1

BEAST THE. Tube and Pipe Notcher Operating Instructions. Notches In Bends Straight Notches. Angled Notches. Offset Notches

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at:

1984 to ZX (Z31) Rear Camber Modification Gary Molitor, March 1, 2009

Bearing Overhaul Instructions for: Nickel (0.1) and Butcher (0.1) a) Using a 6mm Allen wrench, remove the two bolts attaching the shock.

Bearing Overhaul Instructions for: Tallboy (.1) 2009

DYNATRAC BALL JOINT REBUILD INSTRUCTIONS V4.0

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

J D SQUARED INC. NOTCH MASTER Tube and Pipe Notcher Operating Instructions

PROSTEER BALL JOINT REBUILD INSTRUCTIONS V1.0

Parts list Instruction guide Warnings Please read carefully before assembling and using product.

RTI TECHNOLOGIES, INC.

It s a good idea to identify the Front and Rear cylinder heads. before starting the teardown process.

DYNATRAC BALL JOINT REBUILD INSTRUCTIONS V5.0

Inventory (Figure 2)

Installation Instructions

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

MODEL H " BYRD SHELIX CUTTERHEAD INSTRUCTIONS

Thank you for considering "cutting edge technology."

Inventory (Figure 2)

TABLE OF CONTENTS REQUIRED TOOLS

Furnace build report

Travis Bishop. Submitted to: Dr. John Davis. Date: 3 December Course: ETME 310 Section: 004. Lab Topic: Milling Project (Vise)

MODEL T " SPIRAL CUTTERHEAD INSTALLATION INSTRUCTIONS

Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide

Concealed Headlights Restoring Concealed Corvette Headlights

Deck Mount Installation with Bench

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket.

Z14 MANUAL TÉCNICO TECHNICAL MANUAL

Chapter 26 CHISELS HOW TO CHOOSE AND USE THEM TM 9-243

- INSTALLATION INSTRUCTIONS -

MODEL T " HELICAL CUTTERHEAD INSTALLATION INSTRUCTIONS

For dressing an emery wheel.

How to Make a Wedding Band 52 to 66 K, XL & XLH By the OSKRG vs.2

More Storage Space Under Yacht Bed

Replacing the Crosstube Seals

Model 209 Fireback Replacement

Agricultural Mechanics and Technology Power Tool Safety Rules

HOME WORKSHOP HANDBOOK Rugged BENCH GRINDER. By JOEL B. LONG

3" LATHE THREAD CUTTING ATTACHMENT

Inventory (Figure 2)

Installation of Balustrade Systems

Obtained from Omarshauntedtrail.com

Special Z-Axis Ballscrew Replacement

ASSEMBLY INSTRUCTIONS JK270

Required Tools: Procedure:

SPARE PARTS LIST MODEL NO. LB1200F PAGE 1 ITEM PART NO. DESCRIPTION QTY NOTE

OPERATOR'S MANUAL 46" SNOW BLADE. Model Numbers OEM IMPORTANT: READ SAFETY RULES AND INSTRUCTIONS CAREFULLY

PAK Drum Roll Top Assembly Instructions. Note: 2 people will be required to assemble roll top

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Students have little or no previous knowledge or skill in the material being covered.

Various Bolt Removal Process

Dillon XL 650 Spent Primer Catch Upgrade Instructions. (Please read through all of the steps before beginning.)

Clocking a TD-04 Turbo Compressor Housing. Appendix A : AWIC Silicone and Tubing Fitting

MAG-CONV Basic, 48, 48R & Midline Front Mount

1503 Follow Spot Yoke, Source Four LED

Installing CNC Stepper Motor Mounts On A Sherline Mill

MODEL T27697 & T " & 8" HELICAL CUTTERHEADS INSTALLATION INSTRUCTIONS

Wind Turbine Experimenter s Kit User Guide

INSTALLATION OF WELLS SUPER QUICK CHUCK LEFT HAND ON BALDOR LATHE

BY ALIEN TECHNOLOGIES CORP

Owners Manual / Operating Instructions

General Features. Low Profile. The SMART BOXX stands only 1.5 off of the bed of your truck so cargo space is maximized

Downtown Rack. Custom logo option available

Wheeler Rex Ashtabula, Ohio Tel: Fax:

Pump Replacement Manual. Bill Wallace by Wallace Marine Services, Inc.

MODEL D DIESEL PILE HAMMER

INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT

Type 316SS Backed Conveyor Strip Brush Nylon Bristles, 6" O'all HT, 2' Lg, 3/16" Backing

Mechanical Issues. January 4 th, Aaron Sokoloski

Ford Pick Up Rear leaf Spring Kit Installation Instructions

Swerve Rack CUSTOM RACKS AVAILABLE

Operating, Servicing, and Safety Manual Model # & 72 Ultimate Box & Pan Brake

Exploded View Saw Base - Model 7060 Semi-Automatic Cut-Off Band Saw

Plans & Materials List for Handwashing Station

SR-1.0 Manual, a.doc 11/14/2006 Page 1 of 17

M14 MODULAR CHASSIS SYSTEM (MOD 1) INSTRUCTION MANUAL. West Springfield, MA Phone: (866) FAX: (413)

White Industries Front Hub Instructions

The new motor and motor mount. The remote control and 3 axis DRO mounted

Replacing the Spindle Bearings Detailed Instructions

M14 MODULAR CHASSIS SYSTEM (MOD 1) INSTRUCTION MANUAL. West Springfield, MA Phone: (866) FAX: (413)

Various Bolt Removal Process

PARTS LIST MS 2892-D

H HD Adult Wheelchair Swing Frame & Hangers(perm) IMPORTANT

TRAILMATE METEOR ASSEMBLY MANUAL

F l a t S c r e e n A R M S I n s t a l l a t i o n

Fastener Basics. Common Fastener Types. Fastener Materials. Grade / Class and Fastener Strength

SADDLE BUDDY EASY ASSEMBLY. The Saddle Buddy is easy to install Galvanized Surface In-Ground. Rail.

Transcription:

Cutless Bearing Removal and Replacement for a Watkins 27 By John Everson This is a fairly difficult job, but if you are mechanically inclined and want to save a significant amount of cash, you might want to ponder what I did. Plan on this taking up most of you day. The bearing I replace was a Bonito or Bale model; 1 ½ X 1 X 4 bought online for about $36. Your large chain marine store will hit you up for $80 for the same thing. **DISCLAIMER** This is not a how to guide. This is how I replaced my bearing. This is also the fifth or sixth cutless bearing I have replaced so I have it down pretty well. I can t be held responsible if your boat falls on you, you get stuck in the bilge, you hurt yourself, you ruin a bearing or shaft, your wife laughs at you, etc. The first step was to remove the zinc and the prop. I removed the cotter pin, backed off the two nuts holding the prop on noting that the larger nut is against the prop. Taking lots of pictures along the way helps putting things back together. Next I took my gear puller and extended it with a few galvanized brackets and used it to remove the prop.

I made sure the jaws were centered, the threaded rod was centered on the shaft, and then using a socket wrench tightened the threaded rod on the shaft. After a few turns and a few taps with a plastic mallet, the prop came off. I usually take my props off every year just because that makes it that much easier the next time. There is nothing worse than trying to get a prop off that has been on a few years. At this point I climbed into the bilge and removed the two stainless hose clamps from around the shaft log. I also brought several box end wrenches and determined that a 9/16 th was needed for the removal of the shaft log. I climbed out of the bilge and sent my son in and had him hold the wrench on the top nut. I went below and removed the top bolt using a socket. The bolt on the bottom was a lag bolt, so my son had the rest of the morning off. With a little patience and a little twisting and prying, the shaft log loosened from the hose and slid out. Once I knew it was coming out, I cleaned and polished the prop shaft and then removed the shaft log. The hull was then sanded and cleaned in preparation for putting the shaft log back. I made sure I had plenty of polysulfide sealant to re bed the shaft.

After the shaft log was out, I took a reciprocating saw and using a fine metal blade, and made two cuts along the inside of the cutless bearing on each side of the set screw. This step took about fifteen or twenty minutes as much care was taken not to cut too far through the old bearing and score the shaft log.

After cutting was completed, I tried to tighten the set screw all the way all the way through opening up the cutless bearing where it was cut. But that trick never works, so I removed the set screw, inserted a punch into the hole and beat it with a hammer.

Once the bearing was split, the pressure was released from the wall of the shaft log. Now I could move to the next step and push the bearing out. I used a piece of 1 inch I.D. black gas pipe which is just the right size to fit in the shaft log and still catch the bearing on the inside. I then smacked the pipe a few times and the bearing came out. *NOTE* Some of my friends take the new bearing and shaft log at this step to a machine shop and have them press the bearing in. They charge around $30-$50 to do this, and it s probably a good deal because you are still saving a wad of cash up to this point and the job is done right. But, since I m a frugal New Englander and I don t really like to giving some one else money for something I could do, I did it my self without a press. How? Easy. First, I took the new bearing (Bonito or Bale model; 1 ½ X 1 X 4) bought online for about $36 smoothed and polished the outside and then put it in my freezer. Next I spent about and hour cleaning, sanding and then polishing the inside of the shaft log. I came back a couple of hours later, set the shaft log up on end and heated it with a torch just until it was starting to get hot. Then I ran and grabbed the now slightly smaller frozen bearing and put it into the now slightly larger shaft log and pounded it home with a plastic mallet and then with a hammer using a piece of 2 x 4 as a buffer. It took about 10 or 12 whacks to get the bearing seated all the way. Time out for a few cold ones. Putting it all back together is pretty much the reverse order of what I did so far.