STOLITE CONSTRUCTION SYSTEM EXT.CORNER - MANUF.STONE/STOLITE

Similar documents
STOPOREN FACADE SYSTEM TIMBER WINDOW JOINERY - HEAD DETAIL

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

STOPOREN FACADE SYSTEM DRAWING REGISTER

The WANZ Guide to Window Installation

BBS Rusticated & Splaycut Cavity System

4256HM JAMES HARDIE MONOLITHIC CLADDING

System for 2+ Level Buildings

E2 REDWAY FLASHINGS. Product. Scope. Appraisal No. 977 [2017] Appraisal No. 977 (2017) BRANZ Appraisals


JAMES HARDIE RIGID AIR BARRIERS

ADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS

The WANZ Guide to Window Installation. as described in E2/AS1 Amendment 7

INTERNAL LININGS INSTALLATION GUIDE

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

UPVC Door Measuring Guide

9.0 PS Pacbld Sidings

Timber Cavity Batten Technical Specifiction

ALPINE TRAY. To get the best from this product please follow these recommendations.

STEEL FRAMING WEATHERBOARD SYSTEM

Acceptable Standards of Domestic Construction

NULINE PLUS WEATHERBOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 641 [2015]

Pipe penetration refer CT15. Viking CertainTeed Shingles General Roof details

DurasheetTM Fibre Cement

How-To-build guide Garden shed

TEKTON WEATHERIZATION SYSTEM SPECIFICATION

General Installation Guidelines

Column and Beam Fire Protection SYSTEMS 335 INSTALLATION 337 GENERAL REQUIREMENTS 337 FRAMING 337

DURABARRIER RIGID SHEATHING / AIR BARRIER

Brick, blockwork and concrete walls are also suitable providing the surfaces are flush without excessively wide mortar joints.

A-lign Technical Manual

Installation guide for 20/20

Installation instructions: Elements Vulcan+ Newport Hector Cladding

CERACLAD.

A-lign Technical Manual

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008)

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

Flashing Materials. Rough Opening Preparation

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Picture Frame Method Revised 10/24/2016

Bevel back. Technical & installation manual. Component details & drawings installation guide maintenance & care warranty

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

WO OD LOCK W E AT H ERBOARDS & FASCIA Installa tion info r m at ion and t echnic al draw ings

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

Horizontal Shaft Wall

UCO Vistabord Fixing Manual

rondo exangle drywall finishing sections

Shingle Installation Guide

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

SHADOWCLAD SPECIFICATION & INSTALLATION GUIDE

rondo extreme pvc beads

12x12 Shed Plans and Building Guide

THIS DRAWING IS INDICATIVE ONLY AND BY NO MEANS COMPREHENSIVE

HeatBoard Joisted Floor System

DURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

Plasterboard Ceiling Systems

Technical Specification MARCH 2017 I NEW ZEALAND

NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING

HILAND TRAY FORM AND FUNCTION MATERIAL SPECIFICATIONS DESIGN GUIDE ROOFING I WALLING

NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS

TYPICAL BARGE DETAIL - CROSS SECTION

NZQA Expiring unit standard version 2 Page 1 of 5. Describe roof shingle preparation and installation procedures

Gyproc Proflex Access Panels - Installation Guidance Notes

8x8 Shed Plans and Building Guide

6x6 Shed Plans and Building Guide

Dimension Form. windows24.com: Number 1 for windows and doors online

TRADE SILL FLASHING TAPE. Product. Scope. Appraisal No. 712 [2012] Appraisal No. 712 (2012) Amended 19 July BRANZ Appraisals

In the 30-plus years that I ve been a remodeling contractor, I ve

Interior Wall and Floor Applications. / Mechanical Application / Fuga Fitted System. System Components:

ForceField Air & Water Barrier System. installation instructions

10x10 Shed Plans and Building Guide

novista doorsets hidden door system

Quantum Sliding Door. Features & Benefits. Trend Windows & Doors Design Manual Q-Mk-1 May 2014

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

DBP Technical Data Series Rev. 0 Jan. 1, Pre Assembled Door Canopies

INSTALLATION INSTRUCTIONS

GENERAL INSTALLATION GUIDELINES

PROTECTO SILL WINDOW SEALING SYSTEM. Product. Scope. Appraisal No. 444 [2017]

MASADA D5 BUILDING BOARDS DRAINED CAVITY CLADDING SYSTEM MANUAL

NULINE PLUS WEATHERBOARD DIRECT FIXED CLADDING SYSTEM. Product. Scope. Appraisal No. 640 [2015]

DESIGN AND INSTALLATION GUIDE

Technical Note No. 026

HOLLOW METAL DOOR/WINDOW SYSTEM FOR THERMALSAFE CF WALLS WINDOW ASEMBLY GUIDE PIONEERING INSULATED METAL PANEL TECHNOLOGY

Note. Returns are blocks / mouldings that have finished sides suitable for doors and windows as shown below. Surround return.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

DURACRYL WALL INDEX INTRODUCTION TOOLS AND MATERIALS REQUIRED FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

Method of Build 1. Fire. Sound

ES2. fully integrated screening system for bifold doors. load balancing technology. tough PVC-coated polyester mesh.

Technical Specification MARCH 2015 I NEW ZEALAND

FireCase. Frameless structural steel encasement system. FireCase.

Series Sloped glazed Curtain wall. Installation Instructions

INSTALLATION GUIDE. Biowood Outdoor Wall Panel BWWPO20018 Shiplap 8x6 Deep. Green Resources Material Australia Pty Ltd

Installation Manual for Thermo Panel

Pitched roofs rafter level

Installation Instructions. This leaflet must be read thoroughly before commencing installation. 1 P a g e. Version 2.

TYPAR WEATHER PROTECTION SYSTEM TABLE OF CONTENTS. SPECIAL INSTALLATION CONSIDERATIONS Stucco** Brick** Stone Veneer** Wood Siding**

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

Installation Instructions

MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA

Transcription:

RENDER TIMBER FRAMING WALL UNDERLAY CONTINUOUS AROUND CORNERS, POLYPROPYLENE TAPE APPLIED TO PROTECT WALL UNDERLAY 75mm MIN.WIDE CLIP ON MS SEALANT ON PEF ROD SEALANT TO JUNCTION PROPRIETARY MANUF.STONE CLADDING FIXED ACCORDINGLY TO NOTE: FINISH CLADDING BEFORE INSTALLING STONE CLADDING CONSTRUCTION EXT.CORNER - MANUF.STONE/ SL 840

TIMBER FRAMING WALL UNDERLAY CONTINUOUS AROUND CORNERS E2/AS1 COMPLIANT BACK PROPRIETARY STONE VENEER CLADDING FIXED ACCORDING TO PLASTER WITH STO upvc CLIPON STO PREMESHED PVC CNR.ANGLES ON ALL EXT.CNRS CONSTRUCTION BOXED EXTERNAL CORNER - STONE VENEER/ SL 841

WALL UNDERLAY CONTINUOUS AROUND CORNERS RENDER CLIP ON MS SEALANT ON PEF ROD PROPRIETARY MANUF.STONE CLADDING FIXED ACCORDING TO 8 E2/AS1 COMPLIANT 50x50mm CORNER 8mm BETWEEN SHEETS, MS SEALANT JOINT TIMBER FRAMING DOUBLE STUD REQUIRED NOTE: INSTALL FC SHEET AND FINISH CLADDING BEFORE INSTALLING STONE CONSTRUCTION INTERNAL CORNER - MANUF.STONE/ SL 842

50mm MIN. COVER 50mm MIN. COVER E2/AS1 COMPLIANT BACK RENDER STO upvc CLIP ON PROPRIETARY MANUF.STONE CLADDING OVER FIXED ACCORDING TO MS SEALANT ON PEF ROD CONSTRUCTION VERTICAL JUNCTION - MANUF.STONE/ SL 843

TIMBER FRAMING 20mm DRAINED CAVITY 6mm FIBRE CEMENT SHEET RENDER WALL UNDERLAY CONTINUOUS AROUND CONERS,POLY PROPYLENE TAPE APPLIED TO PROTECT WALL UNDERLAY 75mm MIN.WIDE INSTALL FC SHEET AND FINISH CLADDING BEFORE INSTALLING SCHIST OR STONE CLIP ON MS SEALANT ON PEF ROD SCHIST OR STONE VENEER CLADDING FIXED ACCORDING TO CONSTRUCTION EXT.CORNER - SCHIST or STONE VENEER/ SL 844

RENDER WALL UNDERLAY CONTINUOUS AROUND CORNERS MS SEALANT ON PEF ROD SCHIST OR STONE VENEER CLADDING AN FIXED ACCORDING TO 50mm MIN. 8mm BETWEEN SHEETS, MS SEALANT 8 E2/AS1 COMPLIANT BACK WITH 50mm MIN. COVER TO CLADDING TIMBER FRAMING NOTE: INSTALL FC SHEET AND FINISH CLADDING BEFORE INSTALLING STONE DOUBLE STUD REQUIRED CONSTRUCTION INT.CORNER - SCHIST or STONE VENEER/ SL 845

50mm COVER 50mm COVER MS SEALANT ON PEF ROD E2/AS1 COMPLIANT BACK WITH 50mm MIN.CLADDING COVER CAVITY BATTENS RENDER STO upvc CLIP ON SCHIST OR STONE VENEER CLADDING FIXED ACCORDING TO CONSTRUCTION VERTICAL JUNCTION - SCHIST or STONE VENEER/ SL 846 The information contained in this detail is based on our experience and testing and represents the latest information available at the date of issue. This detail is intended for use by the design professional and users of Sto products to assist in developing specific project details to be used in conjunction with a Sto Specification. We reserve the right to alter or update information at any time without prior notice & it is the responsibility of the specifier and/or the project manager to insure that they have the current Sto details and specifications.

RENDER 35mm COVER TAPE ONTO BUILDING UNDERLAY AND OVER COMPLIANT METAL VERMIN TRAY BY OTHERS upvc CLIP ON 10mm GAP NOTE: SCHIST OR STONE VENEER CLADDING FIXED ACCORDING TO TOP PIECE OF SCHIST OR STONE MUST EITHER BE PLACED OR CUT SO A 15 SLOPE IS FORMED ON THE SILL CONSTRUCTION HORIZ.JUNCTION - SCHIST or STONE VENEER/ SL 847