John F Kennedy High School

Similar documents
Jackie Robinson Elementary School

Marcus Moziah Garvey Elementary School

Amos Alonzo Stagg Elementary School

Everett McKinley Dirksen Elementary School

Wendell Smith Elementary School

EPIC Academy High School

John Milton Gregory Elementary School

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

University of Chicago Charter - Carter G Woodson

Philip Rogers Elementary School

Architecture, Construction, and Engineering Technical Charter

Morton School of Excellence

Charles N Holden Elementary School

North Lawndale College Prep Charter - Collins

Langston Hughes Elementary School

Andrew Carnegie Elementary School

John Spry Elementary Community School

Alexander Graham Bell Elementary School

Daniel S Wentworth Elementary School

George Washington High School

Robert Fulton Elementary School

Richard J Oglesby Elementary School

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

John Harvard Elementary School of Excellence

George Washington Elementary School

Disney II Magnet High School

Jonathan Burr Elementary School

Rufus M Hitch Elementary School

Disney II Magnet School

George W Tilton Elementary School

Cyrus H McCormick Elementary School

Brian Piccolo Elementary Specialty School

Academy for Global Citizenship Elementary School

Theodore Roosevelt High School

Arthur E Canty Elementary School

University of Chicago Charter - NKO

William Penn Elementary School

Urban Prep Academy for Young Men - West

John Hancock College Preparatory High School

Walt Disney Magnet Elementary School

Norman A Bridge Elementary School

Multicultural Academy of Scholarship

Phoenix Military Academy High School

Legacy Charter Elementary School

Joseph E Gary Elementary School

Arthur A Libby Elementary School

Richard T Crane Medical Preparatory HS

Amandla Charter High School

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Betty Shabazz Intl Charter - DuSable Leadership

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Bowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange

Henry H Nash Elementary School

John L Marsh Elementary School

William Howard Taft High School

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

James Shields Middle School 2611 W 48th St Chicago, IL 60632

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

Joseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641

James Otis Elementary School 525 N Armour St Chicago, IL 60642

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

Manley Career Academy High School 2935 W Polk St Chicago, IL 60612

Wendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653

SITE $1,539,659. Item - Type Quantity Unit Rank Cost. Entrance Control - Audio and Video 2 EA Exterior Doors - Exterior Wood Door 2 EA

Charles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647

William J Onahan Elementary School 6634 W Raven St Chicago, IL 60631

Francis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER

William Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631

OCPS Submittal Register for Product Data and Shop Drawing Reviews

U of I Facilities Standards Updates for 2017

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

BUILDING DEPARTMENT CURRENT

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

BUILDING PLAN REVIEW REQUIREMENTS

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions : The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Concrete/ Stucco Canopy Metal Canopy 1 2 4 GRE 6 250 400 GRE 7 1,092 650 SF $7,079 1,092 SF $7,079 CHIMNEY Brick Chimney - Stainless Steel Liner Metal Flue 1 2 4 GRE 6 20 30 GRE 7 5 50 LF $10,010 5 LF $10,010 Assessment Date: 9/26/2012 Page 1 of 19

DOORS Exterior FRP Door Exterior Steel Door Overhead Rolling / Garage Door Side Lite Store Front Door Transom Lite 1 2 4 GRE 7 10 GRE 6 3 20 GRE 7 1 GRE 7 47 GRE 6 4 21 GRE 7 24 10 EA 23 EA $991 1 EA 47 EA 25 EA $2,076 24 EA $3,067 ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio and Video Power Door Operator and Controls Ramp Handrails Stair Handrails 1 2 4 GRE 6 72 522 420 GRE 6 40 250 GRE 7 4 GRE 7 6 GRE 6 200 380 95 380 1,014 LF $79,151 290 LF $5,577 4 EA 6 EA 580 LF 575 LF $84,728 FOUNDATION Concrete Foundation 1 2 4 GRE 6 50 2,913 2,963 LF $7,786 $7,786 LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 1 2 4 GRE 6 37 GRE 6 3 40 37 EA $18,519 43 EA $13,299 $31,818 Assessment Date: 9/26/2012 Page 2 of 19

LINTELS Lintels - Steel 1 2 4 GRE 7 140 140 LF PARAPET Coping - Metal Coping - Stone Parapet < 16" Height 1 2 4 BLU 5 2,440 GRE 7 3,775 2 LF $56 1,440 LF 3,775 LF $56 ROOF SYSTEM Asphalt Gravel Ballast Roof Exterior Downspouts Interior Downspouts Modified Bitumen Roof Roof Structure: Concrete 1 2 4 29,043 GRE 7 3 GRE 7 1,572 GRE 7 330 GRE 7 129,376 129,043 SF $823,010 3 LF 1,572 LF 330 SF 129,376 SF $823,010 SUPERSTRUCTURE Concrete 1 2 4 GRE 7 358,364 358,364 SF WALLS Brick Concrete Block Precast Panel Wall Prefabricated Metal Panel Wall 1 2 4 GRE 6 305 1,800 67,706 GRE 7 640,677 GRE 7 1,786 69,811 SF $18,800 640 SF 1,677 SF $11,079 1,786 SF Assessment Date: 9/26/2012 Page 3 of 19

Stone - Cast Stone - Cut GRE 6 3,150 GRE 7 255 3,150 SF $45,045 255 SF $74,925 WINDOWS Curtain wall - Insulated panel Window - Guards perforated Window - Guards wire guard Windows - Decorative Windows - Sash Aluminum Double-pane EXTERIOR 1 2 4 GRE 6 8,420 GRE 7 588 GRE 7 2,613 80 873 GRE 7 25,412 8,420 SF $79,468 588 SF 2,613 SF 1,053 SF $54,363 25,412 SF $133,831 $1,176,309 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency generator 100 to 150 KW diesel - Outdoor Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Public Announcement System Security System - Intrusion detection 1 2 4 GRE 6 4 GRE 6 6,284 BLU 5 10,281 28,941 BLU 5 19,754 19,754 GRE 6 3,127 GRE 6 4 GRE 6 8 BLU 5 32 32 BLU 5 12 16 GRE 6 358,364 GRE 6 358,364 4 EA $5,720 6,284 SF $8,537 39,222 SF $44,025 39,508 SF $45,762 3,127 SF $1,341 4 EA $429 1 EA $11,440 8 EA $1,865 64 EA $37,203 28 EA $14,883 358,364 SF $215,233 358,364 SF $333,099 $719,538 Assessment Date: 9/26/2012 Page 4 of 19

MAIN SERVICE Main Electrical service 1600 A 120/208/3PH Main Electrical service 1600 A 277/480/3PH Main Electrical service 2000 to 3000 A 277/480/3PH Main Electrical service above 3000 A 120/208/3PH 1 2 4 YEL 4 1 1 EA $130,416 1 EA $11,619 1 EA $30,388 1 EA $35,750 $208,172 POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 277/480-120/208 ELECTRICAL FIRE PROTECTION FIRE ALARM 1 2 4 BLU 5 24 21 YEL 4 4 1 BLU 5 2 1 BLU 5 2 1 GRE 6 3 45 EA $145,431 5 EA $50,050 3 EA $39,325 3 EA $14,372 3 EA $3,432 $252,610 $1,180,320 Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION 1 2 4 GRE 7 358,364 06,838 251,526 358,364 SF 358,364 SF $129,862 $129,862 $129,862 MECHANICAL AIR CONDITIONING Chillers - Air Cooled - Rotary/Screw type - Roof Mounted 201 to 300 tons 1 2 4 GRE 6 4 4 EA $240,240 Assessment Date: 9/26/2012 Page 5 of 19

Condensing - Ground Mounted less than 5 tons Window A/C GRE 6 3 GRE 6 2 3 EA $2,145 2 EA $429 $242,814 AIR HANDLING SYSTEMS Air Handling Package - Multi Zone - Steam 10,001 to 15,000 cfm Air Handling Package - Multi Zone - Steam above 30,000 cfm Air Handling Package - Single Zone - Steam 4,000 to 8,000 cfm Air Handling Package - Single Zone - Steam 8,001 to 12,000 cfm Air Handling Package - Single Zone - Steam above 30,000 cfm Air Handling Package - Single Zone - Steam less than 4,000 cfm Air intake for all Air Handling s except built up AHU Fan Coil - Hot Water and Chilled Water Make Up Air - Indoor Mounted - Steam 6,000 to 10,000 cfm Reheat Boxes With Steam Coils Return Fans - Indoor 10,001 to 20,000 CFM Return Fans - Indoor greater than 20,000 CFM BOILER SYSTEMS Boiler Assembly - Steam - Flexible Tube Boiler greater than 200 HP Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler greater than 200 HP Boiler Auxiliary - Steam Boiler greater than 200 HP Chemical Feed System (Steam Boilers) Chemical Pot Feeder - Hot Water Combustion Dampers Feed Water Pumps and Tank - Steam Boilers 1 2 4 BLU 5 1 BLU 5 3 BLU 5 1 BLU 5 1 BLU 5 1 1 GRE 6 9 GRE 6 50 BLU 5 1 GRE 6 23 GRE 6 2 1 2 4 GRE 6 2 YEL 4 3 BLU 5 3 2 BLU 5 2 GRE 6 5 YEL 4 1 1 1 EA $31,460 3 EA $300,300 1 EA $15,730 1 EA $21,450 1 EA $85,800 2 EA $13,585 9 EA $12,870 50 EA $71,500 1 EA $15,730 23 EA $24,010 2 EA $4,862 1 EA $3,289 $600,586 2 EA $61,776 3 EA $896,610 5 EA $105,248 1 EA $2,145 2 EA $3,003 5 EA $1,430 2 EA $50,765 $1,120,977 Assessment Date: 9/26/2012 Page 6 of 19

HEAT EXCHANGERS Heat Exchanger - Steam to Hot Water Shell Type 1 2 4 GRE 7 3 3 EA HEATING DEVICES Radiators - Steam Heater - Electric Heater - Gas Wall Heater - Electric MECHANICAL PLUMBING 1 2 4 YEL 4 20 GRE 6 5 20 EA $28,028 1 EA $1,430 1 EA $2,145 5 EA $515 $32,118 Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Chilled Water 10 to 20 HP Pumps - Chilled Water 21-50 HP Pumps - Chilled Water less than 10 HP Pumps - Hot Water 5 to 10 HP 1 2 4 GRE 6 3 1 BLU 5 4,000 1,800 BLU 5 4,000 1,800 GRE 6 3 GRE 6 2 2 GRE 6 2 GRE 6 2 4 EA $28,314 5,800 LF $404,175 5,800 LF $495,009 3 EA $7,722 4 EA $11,440 2 EA $4,004 2 EA $4,004 $954,668 TEMPERATURE CONTROL Direct Digital Control (DDC) System Pneumatic System Thermostats - Direct Digital Control (DDC) Thermostats - Pneumatic Zone Dampers 1 2 4 GRE 6 251,526 YEL 4 106,838 GRE 6 65 YEL 4 65 GRE 6 86 251,526 SF $251,778 106,838 SF $763,892 65 EA $9,295 65 EA $42,757 86 EA $12,298 $1,080,019 Assessment Date: 9/26/2012 Page 7 of 19

UNIT VENTILATION Ventilators - Hot Water and Chilled Water 1 2 4 GRE 6 67 67 EA $114,972 $114,972 VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM Lab Exhaust Hood Type I Exhaust Hood - Kitchen or Culinary Arts MECHANICAL 1 2 4 GRE 6 6 GRE 6 4 11 3 GRE 6 7 9 GRE 6 2 5 GRE 6 4 YEL 4 1 1 6 EA $3,003 18 EA $21,879 16 EA $1,602 7 EA $3,146 4 EA $13,156 2 EA $26,884 $69,670 $4,215,823 PLUMBING HOT WATER Hot Water Heater - Gas 150,000-300,000 BTU/HR Hot Water Heater - Steam Heat Exchanger Storage Tank less than 500 gallons 1 2 4 GRE 6 2 GRE 7 2 2 EA $8,294 1 EA $2,288 2 EA $10,582 PIPING 1 2 4 Domestic Piping - Cold Water from Risers to Fixtures YEL 4 358,364 358,364 SF $117,866 Domestic Piping - Cold Water Risers YEL 4 358,364 358,364 SF $230,607 Domestic Piping - Hot Water from Riser to fixtures YEL 4 358,364 358,364 SF $76,869 Domestic Piping - Hot Water Return Risers YEL 4 358,364 358,364 SF $163,987 Domestic Piping - Hot Water Risers YEL 4 358,364 358,364 SF $194,735 Assessment Date: 9/26/2012 Page 8 of 19

Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping BLU 5 251,526 106,838 BLU 5 251,526 106,838 BLU 5 358,364 106,838 06,838 251,526 06,838 251,526 06,838 251,526 358,364 SF $600,669 358,364 SF $496,361 465,202 SF $409,968 358,364 SF $65,695 358,364 SF $50,417 358,364 SF $38,195 $2,445,370 POOL SYSTEMS Pool Drain Piping Pool Filtration System Pool Hot Water Heater - Gas Fired Pool Supply and Return Piping 1 2 4 GRE 7 500 GRE 7 1 ORA 3 1 GRE 7 1,000 500 LF 1 EA 1 EA $37,180 1,000 LF $37,180 PUMPS Ejector Pump Sump Pump PLUMBING INTERIOR ADMINISTRATIVE SUITES 1 2 4 GRE 6 2 GRE 6 4 2 EA $6,006 4 EA $5,434 $11,440 $2,504,572 Ceiling - Lay-In Ceiling - Plaster/Drywall Ceiling - Splined Flooring - Carpet Flooring - Concrete Flooring - Tile Ceramic/Porcelain 1 2 4 GRE 6 208 GRE 6 8,153 2,857 GRE 6 644 GRE 6 360 1,869 31 GRE 7 122 208 SF $446 11,010 SF $23,084 644 SF $1,381 2,229 SF $515 131 SF $618 122 SF Assessment Date: 9/26/2012 Page 9 of 19

Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile GRE 6 7,278 1,454 BLU 5 20 12 YEL 4 151 2 23 GRE 6 8,792 3,945 GRE 6 7,358 1,060 GRE 7 605 8,732 SF $10,408 32 SF $93 176 SF $995 12,737 SF $25,145 8,418 SF $17,361 605 SF $80,046 AUDITORIUM - DEDICATED Main Floor Seating Sound System Stage Curtains Stage Lighting System 1 2 4 GRE 7 783 GRE 7 1 GRE 7 10 GRE 7 3 783 EA 1 EA 10 EA 3 EA CLASSROOMS Work Sink 1 2 4 GRE 7 1 1 EA CORRIDOR Ceiling - Plaster/Drywall Ceiling - Splined Flooring Terrazzo Flooring Tile/ Sheet Lighting - Pendant/ Surface Stair Handrails Stairs - Terrazzo Student Lockers Walls - Concrete Block Walls - Plaster/Drywall 1 2 4 GRE 7 28,941 0,281 GRE 7 9,246 GRE 7 29,976 BLU 5 366 144 GRE 7 1,051 GRE 7 513 GRE 7 1,537 GRE 7 16,641 1,245 28,941 SF 10,281 SF $22,053 9,246 SF 29,976 SF 510 SF $3,662 1,051 LF 513 LF 1,537 EA 16,641 SF 11,245 SF $26,533 Assessment Date: 9/26/2012 Page 10 of 19

Walls - Structural Glazed Tile GRE 7 61,170 61,170 SF $52,247 DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Store Front Door Transom Window 1 2 4 GRE 7 58 GRE 6 65 25 230 GRE 7 29 GRE 7 19 GRE 7 5 58 EA 320 EA $37,752 29 SF 19 EA 5 SF $37,752 DRINKING FOUNTAINS Double Fountain Single Fountain 1 2 4 GRE 7 9 GRE 7 9 9 EA 9 EA GYMNASIUM / AUDITORIUM Bleacher Seating Ceiling - Exposed Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Wood Lighting - Lay-In Lighting - Metal Halide/Sodium Vapor Scoreboards Walls - Concrete Block Walls - Structural Glazed Tile 1 2 4 GRE 7 140 GRE 7 6,536 GRE 6 5,575 GRE 6 5,893 GRE 7 18,004 YEL 4 36 GRE 7 24 GRE 7 1 GRE 6 6,138 5,457 GRE 6 6,138 5,457 140 EA 6,536 SF 5,575 SF $43,847 5,893 SF $50,393 18,004 SF 36 SF $167 24 EA 1 EA 11,595 SF $52,664 11,595 SF $43,887 $190,959 Assessment Date: 9/26/2012 Page 11 of 19

KITCHEN Ceiling - Plaster/Drywall Ceiling - Splined Flooring - Tile Quarry Flooring - Tile/Sheet Lighting - Pendant/Surface Wall - Concrete Block Wall - Structural Glazed Tile 1 2 4 GRE 7 1,684 GRE 6 523 GRE 7 1,479 GRE 6 523 205 BLU 5 41 10 GRE 7 528 GRE 7 3,187 1,684 SF 523 SF $1,496 1,479 SF 728 SF $748 51 SF $270 528 SF 3,187 SF $2,513 LIBRARY Ceiling - Splined Flooring Carpet Flooring Tile/ Sheet Lighting - Pendant/ Surface 1 2 4 GRE 7 5,674 GRE 7 1,050 GRE 7 4,624 BLU 5 98 30 5,674 SF 1,050 SF 4,624 SF 128 SF $645 $645 LOCKER/SHOWER ROOM Benches Lockers Showers 1 2 4 GRE 7 164 GRE 6 3 299 GRE 6 3 56 164 LF 302 EA $147 59 EA $729 $877 LUNCHROOM Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Lay-In 1 2 4 GRE 6 3,397 GRE 7 8,286 GRE 6 3,397 8,286 YEL 4 12 3,397 SF $7,287 8,286 SF 11,683 SF $4,858 12 SF $56 Assessment Date: 9/26/2012 Page 12 of 19

Lighting - Pendant/Surface Serving Line Wall - Concrete Block Wall - Structural Glazed Tile BLU 5 70 15 GRE 7 106 GRE 6 2,109 GRE 6 2,109 10,295 85 SF $460 106 LF 2,109 SF $6,032 12,404 SF $15,079 $33,772 MDF/IDF Finishes Ventilation and Cooling 1 2 4 GRE 7 399 310 399 SF 311 EA $7,007 $7,007 MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room Vaults 1 2 4 GRE 7 9,227 2 1 GRE 6 2,400 492 3,208 GRE 6 264 9,655 GRE 7 275 9,227 SF 13 SF $57 6,100 SF $29,503 9,919 SF $1,246 275 SF $30,806 PHYSICAL EDUCATION ROOMS Flooring Tile/ Sheet Lighting - Pendant/ Surface Paint Splined Ceiling 1 2 4 GRE 7 2,640 BLU 5 72 60 GRE 7 3,404,584 2,640 SF 132 SF $427 3,404 SF 1,584 SF $3,398 $3,825 STAFF RESTROOM Accessories Ceiling - Exposed 1 2 4 GRE 6 445 12,526 GRE 7 32 12,971 SF $3,436 32 SF Assessment Date: 9/26/2012 Page 13 of 19

Ceiling - Lay-In Ceiling - Plaster/Drywall Ceiling - Splined Floor Drain Flooring - Concrete Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Wall - Tile Ceramic/ Porcelain Water Closet GRE 6 90 GRE 6 2,315 8,058,668 58 GRE 7 4,524 GRE 6 606 6,824 GRE 6 208 586 223 60 GRE 6 2 119 YEL 4 49 BLU 5 100 7 34 GRE 6 2 GRE 6 6 130 GRE 7 48 GRE 6 2,443 6,270 95 GRE 7 26,564 GRE 7 365 GRE 6 5 167 90 SF $193 10,373 SF $6,555 1,668 SF $3,578 59 EA $300 4,524 SF 7,430 SF $1,543 1,017 SF $2,016 61 EA $716 121 EA $744 49 SF $175 141 SF $434 2 EA $57 136 EA $1,076 48 EA 8,713 SF $6,987 195 SF $460 26,564 SF 365 SF 172 EA $1,859 $30,129 SWIMMING POOL Accessories Bleacher Seating/Plank seating Lighting - Pendant/ Surface Pool Basin Pool Deck Pool deck drains Splined Ceiling including access Structural Glazed Tile 1 2 4 GRE 7 6,994 GRE 7 230 YEL 4 80 GRE 7 3,396 GRE 7 3,048 GRE 7 25 GRE 7 6,994 GRE 7 13,784 6,994 SF 230 EA 80 SF $458 3,396 SF 3,048 SF 25 EA 6,994 SF 13,784 SF $458 Assessment Date: 9/26/2012 Page 14 of 19

THEATER Ceiling - Plaster/Drywall Flooring - Carpet Lighting - Lay-In Stage Platform Wall - Concrete Block 1 2 4 GRE 7 6,284 GRE 7 6,284 YEL 4 66 GRE 7 1,293 GRE 7 7,589 6,284 SF 6,284 SF 66 SF $425 1,293 SF 7,589 SF $425 VERTICAL CONVEYANCE Elevator - Roped Holeless Hydraulic 1 2 4 GRE 7 1 1 EA VOCATIONAL SHOP Work Sink INTERIOR 1 2 4 GRE 7 52 52 EA $471,459 ROOM ADMIN_CEILING Administrative Office Ceiling 1 2 4 GRE 7 122 122 SF ADMIN_FLOOR Administrative Office Floor 1 2 4 GRE 6 770 770 SF $1,101 $1,101 Assessment Date: 9/26/2012 Page 15 of 19

ADMIN_LIGHT Administrative Office Lighting 1 2 4 GRE 7 6 6 EA CASEWORK Casework 1 2 4 72 2,166 2,338 LF $6,149 $6,149 CEILING Lay-In/Drop Plaster/Drywall Splined Ceiling 1 2 4 GRE 6 22,836 2,920 GRE 6 2,772 14,610 GRE 6 33,947 3,484 25,756 SF $48,983 17,382 SF $7,849 37,431 SF $72,816 $129,648 CHALK BOARD 1 2 4 Chalk Board YEL 4 688 688 LF $83,626 $83,626 CLASSROOM Eye Wash Station Laptop Charging Station Science Lab Elements Science Lab Shower 1 2 4 GRE 7 5 GRE 7 9 GRE 6 3,396 1,402 GRE 7 1 5 EA 9 EA 4,798 SF $77,700 1 EA $77,700 Assessment Date: 9/26/2012 Page 16 of 19

FLOOR Carpet Concrete Tile/Sheet 1 2 4 GRE 6 4,745 16,212 15,419,897 GRE 6 36,179 5,017 36,376 SF $40,147 1,897 SF $8,952 41,196 SF $51,736 $100,834 LIBRARY_WALL Concrete Block 1 2 4 GRE 7 7,115 7,115 SF LIGHTING Lay-In Pendant/Surface 1 2 4 GRE 6 99 303 BLU 5 826 462 402 EA $36,808 1,288 EA $324,825 $361,633 MARKER BOARD Marker Board 1 2 4 0 1,482 1,492 LF $286 $286 RESTROOM_CEILING Restroom Ceiling 1 2 4 GRE 6 90 718 808 SF $255 $255 RESTROOM_WALL Restroom Walls 1 2 4 GRE 7 216 216 SF Assessment Date: 9/26/2012 Page 17 of 19

WALL Concrete Block Plaster/Drywall Structural Glazed Tile ROOM 1 2 4,656 47,576 45,669 GRE 6 5,632 2,028 GRE 7 577 94,901 SF $148,571 7,660 SF $13,289 577 SF $161,860 $923,093 SITE CIVIL/DRAINAGE Catch Basin Site Drain Site Manhole 1 2 4 GRE 7 12 GRE 6 4 3 GRE 7 10 12 EA 7 EA $4,004 10 EA $4,004 FENCING Chain Link Ornamental Iron 1 2 4 GRE 7 781 GRE 7 685 781 LF 685 LF LANDSCAPE Grass Hardscape - Concrete Parkway trees Planting Beds/ Areas Retaining Wall - Concrete Trash Receptacles 1 2 4 GRE 7 23,672 BLU 5 2,048 1,361 GRE 7 23 GRE 7 16,007 GRE 7 1,160 GRE 7 6 23,672 SF 3,409 SF $38,658 23 EA 16,007 SF 1,160 SF 6 EA $38,658 Assessment Date: 9/26/2012 Page 18 of 19

PARKING LOT Asphalt Concrete Trash Compactor Trash Enclosure Vehicular Screening 1 2 4 GRE 6 200 46,517 7,729 GRE 6 2,462 GRE 6 590 GRE 6 262 54,446 SF $40,478 2,462 SF 1 EA $3,575 590 SF $6,328 262 LF $50,381 SIDEWALKS Internal Walks Perimeter Sidewalks 1 2 4 0 1,045 GRE 6 200 16,878 1,055 LF $10,174 17,078 SF $378 $10,552 SIGNAGE Flag Pole Marquee - Free Standing Back Lighted Marquee - Free Standing Back Lighted w/ LED SITE Campus Need ² ³ 1 2 4 1 2 EA 1 EA 1 EA $103,594 $10,705,032 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 9/26/2012 Page 19 of 19