ChemCurb System. The ChemCurb penetration pieces consist of the following sizes:

Similar documents
eco-shake INSTALLATION INSTRUCTION

A. Provide a comprehensive guide to the products that are used when flashing, what they are used for, and the proper way to use them.

Technical Note No. 028

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

ARDEX Butynol. Installation Instructions. For installation of ARDEX Butynol and Butyseal

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

Slate Shingle Specifications

Ekoroof LiteTile Dimensions

Silicoflex Joint Sealing System

RPI ROYAL EDGE EPDM MATERIAL GLOSSARY & GUIDE

Installation Instructions

Instructions for Installation on a Flat Roof

#70 grit sand Putty knives, sized as needed #1 fine gray sand Corner tools Milestone acrylic liquid

3.4 Wall Flashing Wall Flashing General


Dura-Lock Roof System

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

A-935 RODA WALL MOUNT HINGES

How To Install Windows: Nail-Fin Application

W L. Standard Sizes: 2.125m underside of gutters m total height m roof m roof m roof.

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

PRODUCT DESCRIPTION. This evaluation report includes aluminum clad wood skylights based on the following tested configurations:

Aluminum Clad Wood Window Field Mulling and Stacking Instructions

TABLE OF CONTENTS A-1

INSTALLATION GUIDE StreamLine Linear Drain

Blue Barrier Flash N Wrap 2400

10, 12 &14 Oval Gazebo Floor

NON-PENETRATING ROOFTOP HANGERS AND SUPPORTS

4. Metal roof jacks at penetrations and attachments

SECTION SHEET METAL FLASHING AND TRIM

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

Linear Drain Installation Guide

AIA Specification. Section Slate Shingles PART 1 GENERAL

The City of Winnipeg SHINGLE ROOF REPLACEMENT Section Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 Bid Opp. No.

Frameless Inline Door With Return QCI5263

Side Light Frame Pack Assembly Instructions

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

EWI Install Guide. Thin Coat Render

Side Light Frame Pack Assembly Instructions

Technical Note No. 026

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

INSTALLATION GUIDE. StreamLine Linear Drain. Supply Drainage Support.

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS

Aluminum Siding System

Frameless Inline Door QCI5254

DECRA Shingle Installation Guidelines

Heavy Wall Applied Stop Tube Frame and Door Installation

Traditional Undermount: S Method (Undermount):

The Firestone QuickSeam Reinforced Perimeter Fastening Strip needs to be installed with appropriate fasteners at maximum centres of 300 mm.

SILVERBACK INSTALLATION MANUAL

Series 8 Mark II. Universal Vertical Band Saw

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

COMPOSITE SIDING INSTALLATION GUIDE

Kestrel Aluminium Systems Limited. Product Manual Section 11 Thermal Framing System - Fabrication. Manual Version

TECHNICAL GUIDE BEONSTONE PANELIZED STONE SIDING

B. Sequencing: Schedule installation to keep sheathing exposure to UV within the manufacturer s recommended limits.

Instructions for Installation on a Pitched Roof LIGHTWAY optical tube LW 260, LW 320, LW 520, LW 760

The Leka System Installation Guide

GV Standard Sliding Over Roof Installation Instruction Manual

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Best Barns. 10' x 12' the Cypress R. Assembly Book. revised September 29, 2016

Table of Contents. Important Notices 3. Residential Roofing Application 4. Trims & Accessories 5. Trim Glossary 6, 7, 8. Estimating Material 9

SPRINGLOK SPRINGLOK FLASHING SYSTEM PRODUCT BROCHURE ENGINEERED PRODUCT SYSTEMS

ROOF FLASHING FEATURES & BENEFITS PRODUCT DESCRIPTION

TRASH CAN & FIREWOOD STORAGE UNIT

SHEET METAL FLASHING AND TRIM Christ on the Mountain

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Balustrade Systems / Installation Instructions

ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) FAX: (450)

Installation Instructions

Installation and Maintenance Manual

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

Acrowall-CP Cement-Plaster Stucco

Best Barns. 10' x 12' the Elm R. Assembly Book. revised September 29, 2016

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

Metal Retrofit Roofing System

installation guide Villa

FlexLoc. Technical/Installation Information

ASPHALT T E C H N O L O G I E S

Engineering Services Program

GENERAL INSTALLATION GUIDE: WARRANTY: PRODUCT INFORMATION T F

PolyDock MAY RESULT IN PERSONAL INJURY OR DEATH AND WILL INVALIDATE THE

Solar Collector. (Evacuated Tube) Installation Guide, Operation & Maintenance Manual. Working towards a cleaner future

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

ClassicBond Installation Guide. Field Installation Guide

Guardian warm roof conversion system. Installation Guide

SECTION SHEET METAL FLASHING AND TRIM

ClassicBond Installation Guide. Field Installation Guide

Frameless Bypass Slider

NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)

Installation and Maintenance Manual IM 770-1

Best Barns. 10' x 16' the Elm R. Assembly Book. revised September 29, 2016

Double Frameless Swing Door QCI5247

1 SLABBING, RENDERING, FLOATING AND SKIMMING

Granite Ridge Shingle Guardian Shingle

Ash Brook Golf Course Scotch Plains, New Jersey

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

Transcription:

ChemCurb System The ChemCurb penetration pieces consist of the following sizes: ChemCurb Straights 6" & 12" straight sections used to lengthen the ChemCurb. Fit both curb sizes. F1304P (6" - Gray) -Contains 8 straights per carton only. F1303P (12" - Gray) -Contains 8 straights per carton only. ChemCurb Corners 2" corner pieces used with straight sections to make box shapes. F1305P (Gray) -Contains 8 Corners per carton only. ChemCurb Diameter Rounds 5" diameter ID round consisting of (2) 2.5" radius pcs. F1302P (Gray) -Contains 6 curbs per carton only. F1307P (1-Part Gray Kit) -Contains 3 curbs per carton with (1) 1/2 gallon pouch of 1-Part Pourable Sealant and (2) 10.1 oz. cartridges of M-1 Structural Sealant. 7.5" Diameter ID round consisting of (2) 3.75" radius pcs. F1301P (Gray) -Contains 4 curbs per carton only. F1306P (1-Part Gray Kit) -Contains 2 cubs per carton with (2) 1 2 gal. pouches of 1-Part Pourable Sealant and (2) 10.1 oz. cartridges of M-1 Structural Sealant. F1300P (ProPack Kit) -Contains 2 Curbs per carton with 1 gal. of PRO PACK black, two-part urethane sealer and (2) 10.1 oz. cartridges of M-1 Structural Sealant. Date: Sep 30, 2016 1 of 16 Drawn by: Christian Appold

HOW TO CALCULATE CHEMCURB VOLUMES Note: These figures represent volume of sealant needed for various sizes of curb combinations without displacement for penetrations. (To estimate exact volume needed, also figure volume of penetrations and subtract from volume of curbs.) To figure volume of a square curb: Multiply length x width x depth, (2") x (quantity of curbs needed) the divide by 231 (in³ in a gal.) to get the number of gallons needed to fill the curb. Note: One gal. pourable sealer = 231 in³ One 1 2 gal. pouch = 115.5 in³ One 28 oz cartridge = 50 in³ One 10.1 oz cartridge = 4.18 in³ Always figure 2" depth of ChemCurbs. Less invalidates warranty. A corner curb adds two inches to a straight curb on each end. Examples: Four 12" Straights + Four 2" Corners Form a square 16" x 16" x 2" deep. Multiply 16" x 16" x 2" = 512 in³ Divide 512 in³ by 231 = 2.21 gal Four 6" Straights + Four 2" Corners Form a square 10" x 10" x 2" deep. Multiply 10" x 10" x 2" = 200 in³ Divide 200 in³ by 231 = 0.86 gal 7.5" round Curb + two 12" Straights Form an oval 19.5" x 7.5" x 2" deep. Multiply 19.5" x 7.5" x 2" = 285 in³ Divide 285 in³ by 231 = 1.23 gal 7.5" round Curb + two 6" Straights Form an oval 13.5" x 7.5" x 2" deep. Multiply 13.5" x 7.5" x 2" = 202.5 in³ Divide 202.5 in³ by 231 = 0.88 gal 5" round Curb + two 12" Straights Form an oval 17" x 5" x 2" deep. Multiply 17" x 5" x 2" = 170 in³ Divide 170 in³ by 231 = 0.73 gal 5" round Curb + two 6" Straights Form an oval 11" x 5" x 2" deep. Multiply 11" x 5" x 2" = 110 in³ Divide 110 in³ by 231 = 0.48 gal To figure volume of a round curb: multiply (radius squared x 3.14 x depth) x (quantity of curbs needed) then divide by 231 (in³/gal) to get the number of gallons needed to fill the curb. 5" round Curb Form a diameter 5" x 2" deep. Multiply 2.5" squared x 3.14 x 2" = 39.27 in³ Divide 39.27 in³ by 231 = 0.17 gal 7.5" round Curb Form a diameter 7.5" x 2" deep. Multiply 3.75" squared x 3.14 x 2" = 88.31 in³ Divide 88.31 in³ by 231 = 0.38 gal Date: Sep 30, 2016 2 of 16 Drawn by: Christian Appold

M-1 APPLICATION TO THE BOTTOM OF THE CHEMCURB SECTIONS Apply 1 4" diameter beads of M-1 as shown, to the bottom of each ChemCurb section. DO NOT TOOL THE M-1 BEADS SMOOTH! Apply 1 4" diameter beads of M-1 as shown, to the bottom of each ChemCurb section. DO NOT TOOL THE M-1 BEADS SMOOTH! Apply 1 4" diameter beads of M-1 as shown, to the bottom of each ChemCurb section. DO NOT TOOL THE M-1 BEADS SMOOTH! 3 of 16

SECTION VIEW A A 16" 1" minimum between pipe and ChemCurb 1" minimum between pipes M-1 Structural Sealant all around. At least 3" above penetration(s). 2" 2" Roof Surface Apply M-1 Structural Sealant SECTION A-A SCALE 1 : 4 Apply M-1 Structural Sealant Prime this surface as needed 4 of 16

STANDARD CHEMCURB DETAIL Pourable Sealer when installing on granulated membranes. On all other membranes, PRO PACK Pourable Sealer can be used. Prime penetrations wth M-1, extending up 3" from 5 of 16

L - SHAPED CONFIGURATION Mitre cut inside corners as necessary. ALWAYS WEAR SAFETY GLASSES WHEN CUTTING SECTIONS. Pourable Sealer when installing on granulated membranes. On all other membranes, PRO PACK Pourable Sealer can be used. M-1, extending up 3" from 6 of 16

H - BEAM PENETRATION Pourable Sealer when installing on granulated membranes. On all other membranes, PRO PACK Pourable Sealer can be used. OPTION: An additional bead of 1-Part Pourable Sealer can be applied over top of the external bead of M-1 to lock in granules on granulated roof membranes. M-1, extending up 3" from 7 of 16

CABLE SUPPORT PENETRATION Pourable Sealer when installing on granulated membranes. On all other membranes, PRO PACK Pourable Sealer can be used. M-1, extending up 3" from OPTION: An additional bead of 1-Part Pourable Sealer can be applied over top of the external bead of M-1 to lock in granules on granulated roof membranes. 8 of 16

SOLAR PANEL MOUNT Solar Panel Mount shall be mechanically secured to the decking in a manner at eliminates movement. 5" Diameter M-1, extending up 3" from Pourable Sealer when installing on granulated membranes. On all other membranes, PRO PACK Pourable Sealer can be used. OPTION: An additional bead of 1-Part Pourable Sealer can be applied over top of the external bead of M-1 to lock in granules on granulated roof membranes. 9 of 16

MACHINERY SCREEN Pourable Sealer when installing on granulated membranes and around high movement details. M-1, extending up 3" from Angle iron or support members shall be fabricated out of structural steel that is secured to the structural supports or decking in a manner that reduces structural movement as much as possible. OPTION: An additional bead of 1-Part Pourable Sealer can be applied over top of the external bead of M-1 to lock in granules on granulated roof membranes. DRW 10 of 16 #: CL-CC-02

VERTICAL WALL PENETRATIONS Trowel application of DuraLink flush with the top of the ChemCurb. DuraLink Structural Sealant for External bead of DuraLink required. DuraLink, extending out 3" from DRW 11 of 16 #: CL-CC-02

ANGLE IRON PENETRATION Pourable Sealer when installing on granulated membranes and around high movement details. Angle iron or support members shall be fabricated out of structural steel that is secured to the structural supports or decking in a manner that reduces structural movement as much as possible. M-1, extending out 3" from OPTION: An additional bead of 1-Part Pourable Sealer can be applied over top of the external bead of M-1 to lock in granules on granulated roof membranes. DRW 12 of 16 #: CL-CC-02

SLOPED ROOF PENETRATION Fill ChemCurbs on sloped roofs with DuraLink low modulus sealant. DuraLink, extending up 3" from DuraLink Structural Sealant for External bead of DuraLink required. DRW 13 of 16 #: CL-CC-02

PENETRATION NEAR WALL FLASHING Mitre cut inside corners as necessary. ALWAYS WEAR SAFETY GLASSES WHEN CUTTING SECTIONS. Prime roof cant with M-1 Structural Sealant before filling. Pourable Sealer when installing on granulated membranes and around high movement details. On all other membranes, PRO PACK Pourable Sealer can be used. M-1, extending out 3" from OPTION: An additional bead of 1-Part Pourable Sealer can be applied over top of the external bead of M-1 to lock in granules on granulated roof membranes. DRW 14 of 16 #: CL-CC-02

HOT STACK PENETRATION (200 F to 400 F) Fill ChemCurbs with DuraSil SL silicone for low slope applications or DuraSil Non Sag silicone for sloped roof applications. DuraSil Silicone for DuraSil silicone, extending up 3" from base of penetration. External bead of DuraSil silicone required. DRW 15 of 16 #: CL-CC-02

Apply ChemLink TPO Primer with a brush to the surface of the TPO membrane. Primer shall extend from the base of the pentration(s) to 1" beyond the outside perimeter of the ChemCurb. TPO MEMBRANE Allow TPO primer to dry before installing the ChemCurb. TPO M-1, extending up 3" from Pourable Sealer or PRO PACK Pourable Sealer. DRW 16 of 16 #: CL-CC-02