FORMAT: TO BE PREPARED ON VENDOR S FORMAT IN ACCORDANCE WITH VENDOR S PDDS SYSTEM.

Similar documents
DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

ISO INTERNATIONAL STANDARD. Technical product documentation Digital product definition data practices

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

(R) Aerospace First Article Inspection Requirement FOREWORD

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

SECTION SUBMITTAL PROCEDURES

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

East Central College

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES

UK Broadband Ltd Spectrum Access Licence Licence Number: Rev: 4: 11 January 2018

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

Unofficial Translation

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION 2 GENERAL REQUIREMENTS

The BioBrick Public Agreement. DRAFT Version 1a. January For public distribution and comment

WORLD INTELLECTUAL PROPERTY ORGANIZATION GENEVA STANDING COMMITTEE ON THE LAW OF TRADEMARKS, INDUSTRIAL DESIGNS AND GEOGRAPHICAL INDICATIONS

CMW DELIVERABLES SPECIFICATION Version 1.0

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

QUALITY ASSURANCE SPECIFICATION

UK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

00-General Drawings. Doc. no.: NA-00-STS002

The ASME Y14 Policies

DRAWINGREQUIREMENTS FOR DEVICE CONNECTOR DRAWINGS

Working Drawing Manual

Digital Product Definition Data Practices

AutoCAD Standards University of California, Santa Cruz Physical Planning & Construction

NOT MEASUREMENT SENSITIVE

A. Section includes administrative and procedural requirements for project record documents, including the following:

Arqiva Limited - Spectrum Access 28GHz Licence Company Registration no: First Issued 30 January Licence Number: /01/17

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

Engineering Drawing System

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

DEPARTMENT OF DEFENSE

Engineering Drawing System

Provläsningsexemplar / Preview

TERMS AND CONDITIONS. for the use of the IMDS Advanced Interface by IMDS-AI using companies

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Road signs Specifications

PROCEDURE FOR PROCESSING WORKING DRAWINGS

SECTION IDENTIFICATION FOR ELECTRONIC SAFETY AND SECURITY

NOT MEASUREMENT SENSITIVE

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

SIGN PERMIT APPLICATION

SFF-8609 Rev 1.0. SFF specifications are available at or ftp://ftp.seagate.com/sff SFF-8609.

STANDARD IDENTIFICATION MARKING. Prepared by. UTC Aerospace Systems Interiors Fairfield, CA CAGE Code ORIGINAL DATE: UNKNOWN

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

GENERAL DESCRIPTION OF THE CMC SERVICES

Listing Report: AB Reissue Date: 01/21/16 This report is subject to annual review

A POLICY in REGARDS to INTELLECTUAL PROPERTY. OCTOBER UNIVERSITY for MODERN SCIENCES and ARTS (MSA)

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

SF Certified International Shipping Customer Agreement V1.0

STANDARD SPECIFICATION FOR CONTRACTOR'S DRAWING AND DATA TRANSMITTAL CONTRACTOR S DRAWING AND DATA TRANSMITTAL STANDARD SPECIFICATION FOR

ETSI EN V7.0.1 ( )

CHAPTER A-10 DRAWINGS

LAW ON TECHNOLOGY TRANSFER 1998

In practice, the question is frequently raised of what legislation applies to clamping devices that are intended to be used on machines.

THE KENYA POWER AND LIGHTING CO. LTD. SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT

Answer: Qualification statement should be provided with the bid.

Section Meetings Section Material and Equipment. None Required

ASME Geometric Dimensioning and Tolerancing Professional Certification Applicant Information Handbook

ETSI EN V1.1.1 ( )

DETAIL SPECIFICATION SHEET ADAPTER, HYDRAULIC BLEEDER VALVE, AIRCRAFT WHEEL BRAKE

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Item designation in electrotechnology

The Green Dot Standards of Use

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

PARTICIPATION AGREEMENT between THE REGENTS OF THE UNIVERSITY OF CALIFORNIA and INSERT PARTNER'S CORPORATE NAME

View Terms and Conditions: Effective 12/5/2015 Effective 6/17/2017

Working Drawing Procedure

HANDBOOK ON INDUSTRIAL PROPERTY INFORMATION AND DOCUMENTATION

UDS OVERVIEW Uniform Drawing System

Seychelles Civil Aviation Authority SAFETY NOTICE. Coding and registration of Seychelles 406 Mhz Emergency Locator Transmitters (ELTs)

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

ATI Evaluation Service A Division of Architectural Testing Certification Services Code Compliance Research Report

AS Australian Standard STEEL WIRE FOR TENDONS IN PRESTRESSED CONCRETE. This is a free 5 page sample. Access the full version online.

SECTION SUBMITTAL PROCEDURES

Electronic Plan Review. City of Mesquite, TX. eplan Review Standards Document

1 SERVICE DESCRIPTION

South African Distribution Code

Specification D data models

LARAMIE COUNTY PLANNING & DEVELOPMENT OFFICE 3966 Archer Pkwy Cheyenne, WY Phone (307) Fax (307)

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Checklist for Minor Plan Modification

Working Party 5D. Radiocommunication Study Groups 参考資料 2

Geometry Controls and Report

Transcription:

QUALITY REMARK: MED STANDARD REMARK F04 GUIDE FOR PREPARATION OF MASTER ENVELOPE DEFINITION (MED) BY DESIGN VENDORS. MED INCLUDES PRODUCT DEFINITION DATA SETS (PDDS) (FORMALLY KNOWN AS DRAWINGS) AND MODELS. 1.0 SCOPE THIS GUIDE DEFINES THE REQUIREMENT FOR USE BY VENDORS IN THE PREPARATION OF A MASTER ENVELOPE DEFINITION(MED) IN CONJUCTION WITH THE GE PREPARED DESIGN PROCUREMENT DEFINITION(DPD). THIS GUIDE ALSO CONTAINS THE VENDOR S REQUIREMENT FOR MAINTAINING AND CONTROLLING CHANGES TO THE MED. 2.0 DEFINITIONS DESIGN PROCUREMENT DEFINITION (DPD): A GE PREPARED PRODUCTION DEFINITION DATA SET (PDDS) THAT INVOKES THE GE DESIGN SPECIFICATION AND ESTABLISHES THE PROCUREMENT IDENTITY FOR THE ITEM. THE DPD INVOKES THE VENDOR PREPARED MASTER ENVELOPE DEFINITION (MED) AS THE CONTROLLING DOCUMENTATION FOR THE GRAPHICALLY DISPLAYED REQUIREMENTS. MASTER ENVELOPE DEFINITION (MED): A VENDOR PREPARED AND MAINTAINED PRODUCT DEFINITION DATA SET (PDDS) (IN ACCORDANCE WITH THE VENDOR S PDDS SYSTEM AND CERTAIN GE ACCEPTABILITY REQUIREMENTS) AND MODEL THAT CONTROLS THE EXTERNAL ENVELOPE BOUNDRIES AND DETAILS OF THE PHYSICAL INTERFACE (INCLUDING APPLICABLE INTERFACE FEATURES SUCH AS ELECTRICAL CONNECTOR RECEPTACLES). IT SHALL BE UNDER GEAE APPROVED CHANGE CONTROL AS DEFINED IN THE APPLICABLE DESIGN SPECIFICATION (AND IMPLEMENTED IN ACCORDANCE WITH APPLICABLE OPERATING PROCEDURES). GE AVIATION SHALL HAVE THE UNRESTRICTED RIGHT TO USE, COPY, AND DISCLOSE THIS PDDS AND MODEL. 3.0 MED PREPARATION REQUIREMENTS FORMAT: TO BE PREPARED ON VENDOR S FORMAT IN ACCORDANCE WITH VENDOR S PDDS SYSTEM. GOVERNING DOCUMENT: VENDOR S PDDS SYSTEM FOR MED S SHALL COMPLY WITH ASME Y14.5-2009 LEGIBILITY: MED S PDDS SHALL HAVE CLEAR LEGIBILITY OF THE LETTERING FONTS AND DELINEATION AFTER IMAGING, WITH SPECIAL ATTENTION ON COMPUTER GENERATED LETTERING. THIS WILL BE APPROVED BY GE AVIATION. 4.0 MED CONTENT REQUIREMENTS THE MED PDDS SHALL INCLUDE THE FOLLOWING:

(a) TOLERANCED DIMENSIONAL CONTROL OF THE MOUNTING INTERFACES AND OTHER HARD POINT INTERFACES, SUCH AS PORTS AND CONNECTORS. (b) A MODEL REFERENCED ON THE MED PDDS WHICH DEFINES THE COMPLETE NOMINAL ENVELOPE. (c) LIMITS OF TRAVEL, REMOVAL ENVELOPE, SERVICE POINTS, AND WHEN APPLICABLE, PART NUMBERS FOR FASTENERS AND THE ASSOCIATED TORQUE VALUES. (d) THE MARKING LOCATION AND WHEN APPLICABLE, REQUIREMENT FOR SERIALIZATION. THE PROCUREMENT IDENTITY IS BASED UPON THE DPD PDDS, NOT THE MED PDDS; THEREFORE, THE MARKING SHALL INCLUDE THE VENDOR PART IDENTIFICATION NUMBER, BUT NOT THE MED PDDS NUMBER. (e) COMPLETE COMPATIBILITY WITH THE VENDOR S ASSEMBLY PDDS, UPON WHICH THE VENDOR S PART IDENTIFICATION NUMBER THAT IS SPECIFIED ON THE DPD PDDS IS BASED. (f) THE FOLLOWING LEGEND ABOVE THE TITLE BLOCK: GE AVIATION SHALL HAVE THE UNRESTRICTED RIGHT TO USE, COPY, AND DISCLOSE THIS PRODUCT DEFINITION DATA SET AND THE ASSOCIATED MODEL(S) REFERENCED HEREIN. (g) THE FOLLOWING MAXIMUM ENVELOPE GENERAL NOTE: THE MODEL(S) REFERENCED ON THIS PRODUCT DEFINITION DATA SET ESTABLISHES THE NOMINAL EXTERNAL SHAPE OF THE ITEM(S). UNLESS OTHERWISE DIMENSIONED, THE MAXIMUM SPATIAL ENVELOPE FOR THE ITEM(S) EXTENDS.13 BEYOND THE BOUNDARIES OF THE MODEL(S). (h) UNLESS ALLOWED BY CONTRACT, AN MED PDDS AND ANY ASSOCIATED MODELS SHALL BE PREPARED IN SUCH A MANNER TO HAVE AN EXPORT STATUS OF "NO LICENSE REQUIRED (NLR)", I.E., AN MED SHALL NOT CONTAIN LICENSE REQUIRED (LR) DATA. EXPORT NOTATIONS SHALL NOT CONFLICT WITH GOVERNMENT JURISDICTION AND EXPORTABILITY LAWS. AN MED SHALL INCLUDE AN EXPORTABILITY NOTE. FOR EXAMPLE: THIS PRODUCT DEFINITION DATA SET CONTAINS TECHNICAL DATA WHICH IS CONTROLLED UNDER THE EXPORT ADMINISTRATION REGULATION. ANY TRANSFER TO A NON-US PERSON OR EXPORT FROM THE UNITED STATES SHALL BE IN ACCORDANCE WITH THE EXPORT ADMINISTRATION REGULATION. DIVERSION CONTRARY TO US LAW IS PROHIBITED. 5.0 MED COMPATIBILITY REQUIREMENTS VENDOR PDDS: THE MED SHALL BE KEPT CURRENT WITH THE DESIGN STATUS OF THE VENDOR S PDDS, WHICH ESTABLISHES THE VENDOR S PART IDENTIFICATION NUMBER. DESIGN PROCUREMENT DEFINITION: THE MED SHALL BE KEPT CURRENT WITH THE DPD.

INTERFACE DEFINITION: A GE AVIATION APPROVED AND ISSUED MED IDENTIFIED ON A DPD ESTABLISHES THE DEFINITIVE INTERFACES. 6.0 PDDS APPROVAL REQUIREMENTS GE AVIATION APPROVAL 1. PRIOR TO ISSUANCE, VENDOR SHALL SUBMIT COPY TO GEAE ENGINEERING FOR REVIEW. 2. AFTER ALL GE COMMENTS ARE RESOLVED, VENDOR SHALL SUBMIT A FINAL PRINT FOR APPROVAL. 3. GEAE SOURCING OR AN AGREED UPON PARTY WILL NOTIFY VENDOR OF GE APPROVAL FOR ISSUANCE. THE VENDOR IS NOT PERMITTED TO ISSUE THE MED PRIOR TO RECEIVING GEAE APPROVAL, WHICH IS OBTAINED FROM GE SOURCING, ENGINEERING, ETC. VENDOR APPROVAL 1. AFTER NOTIFICATION OF GE AVIATION APPROVAL, VENDOR SHALL ISSUE MED INTO THEIR RELEASE SYSTEM WITH ALL REQUIRED VENDOR APPROVALS ON ALL DRAWING GRAPHIC SHEETS (DGS), AND IMPLEMENT THE REQUIRED DISTRIBUTION, WHICH INCLUDES IMMEDIATE COPIES TO GE AVIATION. 2. GEAE S COPY MUST BE IN A FORM OF AN ELECTRONIC IMAGE. REGARDLESS OF TYPE, THE MEDIA MUST MEET RASTERIZATION REQUIREMENTS (SEE 3.0 FOR LEGIBILITY). PDDS INTEGRITY: THE PDDS LOCATED IN THE VENDOR DATABASE, COMPUTER, ETC. MUST BE 100% COMPATIBLE WITH THE GEAE ISSUED COPY WITH NO EXCEPTIONS. 7.0 MED MODEL REQUIREMENTS FOR A VENDOR MODEL, THE FOLLOWING APPLIES: (a) THE MODEL SHALL REPRESENT THE NOMINAL EXTERNAL SHAPE OF THE COMPONENT. (b) WHEN THE ITEM IS AN ASSEMBLY WITH REPLACEABLE COMPONENTS, THE MODEL SHALL BE STRUCTURED SUCH THAT THE REPLACEABLE COMPONENTS ARE MODELED AS INDEPENDENT COMPONENT FILES. (c) MODELS SHALL NOT CONTAIN INTERNAL OR NON-VISIBLE FEATURES, E.G. INTERNAL PASSAGES. (d) MODELS SHALL INCLUDE MARKING LOCATION INFORMATION, E.G., PART NUMBER MARKING, FLOW ARROWS, SAFETY WARNINGS, TO ENSURE MARKING WILL BE VISIBLE WHEN INSTALLED ON AN ENGINE.

(e) MODELS SHALL CONSIST OF SOLID BODIES AND WHEN POSSIBLE, MODELS SHALL BE TRANSFERRED IN NX FORMAT. WHEN THE VENDOR CANNOT PROVIDE MODELS IN NX FORMAT, MODELS SHALL BE TRANSFERRED IN THE VENDOR S NATIVE DESIGN FORMAT ALONG WITH A COPY IN THE STANDARD FOR THE EXCHANGE OF PRODUCT MODEL DATA (STEP) FORMAT. (f) AS NEEDED, ADDITIONAL MODELS SHOWING LIMITS OF TRAVEL, REMOVAL ENVELOPE AND SERVICE POINTS SHALL BE PROVIDED. VENDOR MODELS SHALL BE UNIQUELY NAMED TO ESTABLISH A HISTORY RECORD OF THE MODELS RECEIVED BY GE AVIATION. THE MODEL SHALL BE NAMED AS FOLLOWS: (a) THE MED PDDS NUMBER SHALL BE USED AS THE MODEL NAME. (b) INCLUDE A REVISION. REVISION MAY BE SEQUENTIAL, CONSIST OF A DATE, E.G., YYMMDD, OR FOLLOW VENDOR S SYSTEM SCHEMA. (c) THE NAME AND REVISION SHALL ONLY CONTAIN ALPHA-NUMERIC CHARACTERS, DASHES, AND UNDERSCORES. (d) THE CHARACTER LENGTH OF THE NAME AND REVISION SHALL BE A MAXIMUM OF 32 CHARACTERS. (e) THE EXCHANGED FILENAME SHALL BE <MODEL NAME>_<REVISION>.<EXTENSION>. (f) WHEN A MODEL HAS BEEN SHARED WITH GE AVIATION, IT MAY NOT BE REVISED WITHOUT A CORRESPONDING NAME OR REVISION CHANGE, AND THE MED PDDS SHALL BE UPDATED ACCORDINGLY. (g) WHEN A MODEL IS REVISED, THE VENDOR SHALL PROVIDE GE AVIATION THE UPDATED MODEL FILE WITHIN 14 DAYS. 8.0 MED CHANGE CONTROL DESIGN SPECIFICATION: THE MED SHALL BE UNDER CHANGE CONTROL IN ACCORDANCE WITH THE GE DESIGN SPECIFICATION. GE PRIOR APPROVAL: ALL CHANGES TO A MED SHALL BE SUBMITTED TO GE FOR PRIOR APPROVAL AND ARE EXCLUDED FROM THE DESIGNATED VENDOR DESIGN CHANGE PROGRAM. THE MED IS A GE/VENDOR CO-RESPONSIBLE DRAWING AND SHALL NOT BE CHANGED BY EITHER PARTY WITHOUT THE OTHER S APPROVAL. CHANGE INITIATION: THE VENDOR MAY REQUEST A CHANGE TO A MED BY SUBMITTING A RDC TO GEAE CONFIGURATION CONTROL. GE MAY ALSO REQUEST CHANGES TO A MED BY IDENTIFYING THE CHANGE AND REQUESTING THE VENDOR TO SUBMIT A RDC.

CHANGE APPROVAL: AFTER RECEIVING GE APPROVAL OF A RDC, THE VENDOR SHALL UPDATE THE MED, ADVANCE THE REVISION LETTER, AND IF REQUESTED, SUBMIT A PRINT FOR GE REVIEW. AFTER GE APPROVAL, THE VENDOR SHALL ISSUE THE DRAWING AND IMPLEMENT THE REQUIRED DISTRIBUTION INCLUDING GEAE S COPY. AGAIN, THE VENDOR IS NOT PERMITTED TO ISSUE THE MED PRIOR TO RECEIVING GEAE SOURCING APPROVAL WHICH IS OBTAINED FROM GE ENGINEERING, ETC. 9.0 RIGHTS TO DATA UNRESTRICTED, NON-PROPRIETARY: THE VENDOR SHALL FURNISH, ON AN UNRESTRICTED, NON- PROPRIETARY BASIS, THE MED PDDS AND MODEL(ORIGINAL ISSUE PLUS ALL SUBSEQUENT REVISIONS). STATEMENTS: NO STATEMENTS OF ANY KIND THAT COULD BE INTERPRETED AS PROPRIETARY RIGHTS ARE PERMITTED ON THE MED PDDS OR IN MODEL. ANY STATEMENT OF THIS NATURE MUST BE REMOVED IN ITS ENTIRETY PRIOR TO ISSUING AT THE VENDOR S LOCATION AND SUBSEQUENTLY AT GEAE.