TOOLS REQUIRED: HARDWARE INCLUDED: 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS

Similar documents
13MM FLAT WRENCH FOR LEVELING THE GLIDES OF STRUCTURE 6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME

6MM ALLEN KEY FOR ROOF CLIPS PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME SPIRIT/LASER LEVEL TO LEVEL THE UNIT

Assembly Instructions Nevins Phone Booth

Assembly Instructions Nevins Phone Booth

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

Heavy-Duty Bypass Track System

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Assembly Instructions

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

WAREHOUSE HANGER INSTALLATION INSTRUCTIONS R H INS T A L L A TIO N INS T R U C TIO N S

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S ROD IRON SCROLL HANGER R H

Shetland Stalls Installation Instructions

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

CABINETRY Assembly Instructions

PAK Drum Roll Top Assembly Instructions. Note: 2 people will be required to assemble roll top

Kawasaki Teryx 750 Cab Kit* Caution: Before using this product, read this manual and follow all Safety Instructions.

Oxford Stalls Installation Instructions

Important Loading Information. Tools Required. Meridian Lateral Files Instructions

INSTALLING YOUR NEW SPRING LIFT ARM KIT

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

Dublin Stalls Installation Instructions

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

installation guide ICON classic benching

Linear Hook- on Worksurfaces

Independent Containment System (ICS)

3 D Printer Enclosure Assembly Instructions

Desk/Wall-Mount Rack

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

Installation Instructions. Oakmont Folding Doors

Footer & Base Plate Assembly. installation guide. ILINE power/data beam

Glass Front Sauna Room Assembly Manual

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

Extra Wide Designer Lockers Series Installation Instructions

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

Sentinel Electronic Safe Installation Guide

MAKO TM CASH DISPENSER

Sit Down Table Assembly Instructions

Interra Installation Manual

MobileTrak5 Installation Instructions

ROS-APT Caucus Plinth Table with Trough Note: Details apply, however the actual configuration of your table may vary from what is depicted here.

Qwik-Fence Installation Instructions

FlexFrame - Storage Components and Skins

Product must be installed as shown using the screws and brackets provided. Use of incorrect hardware could result in damage to the product.

D3976 RECESSED EXIT INSTALLATION INSTRUCTIONS

OXYGEN INSTALLATION. Revision date

End of Row Doors. Revision Number 1

Privacy Wall Glass Selections - Polished Edge Slider Door

Installation Manual for the Rockmeister Roof Ladder

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

LAN Locker Adjustable Shelves

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

Gambrel Barn Construction Manual 8x8 through 16x24 Units

Before Assembling the Storage Wall

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

33/3527A. Devices covered by these instructions: 33/3527A-F (Fire) Surface Vertical Rod Exit Device

ZAPF PANEL SYSTEM ASSEMBLY INSTRUCTIONS. It is recommended that the components be installed in the sequence of this assembly manual.

INSTALLATION INSTRUCTIONS

Mount to the Wall INSTALLATION MANUAL

COCKPIT CORNER UNIT WARNING. Illustration 1. Read all instructions and review illustrations before installing. Tools required for assembly:

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

Calf-Tel Pen System Assembly Instructions

Jenny Legs Assembly Instructions

Kai Installation Instructions

Privacy Wall & Glass Selections Pivot-Hinged Door (For products manufactured after September 14, 2009)

Assembly Instructions

TrendWall Floor-To-Ceiling Panels Installation Instruction

INSTALLATION INSTRUCTIONS KK-K9-C12-K CHEVY IMPALA

RBP-1215B-RX DODGE RAM QUAD CAB RX3

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

ASSEMBLY INSTRUCTIONS FOR STORETTE STA42

Heavy Duty Ceiling Tilt Mount Installation Manual

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

6625 WEST WILSHIRE BLVD. OKLAHOMA CITY, OK (405) FAX (405)

compile system INSTALLATION GUIDE Updated January 2019

Clearview Railing System Installation Instructions

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

southpaw enterprises, inc.

Bulkhead Model Number and

mila-wall (Series100) General Operating Instructions page 1 of 15

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

======================================================================================== ( DR / DR) JK WRANGLER MOD RACK

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

IDR assembly instructions:

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

HOMECREST STYLE SLING 3J300 Installation Instructions

Deck Mount Installation with Bench

Exponents Bench Cushion

Installation Manual. Solid Plastic Toilet Partitions. IN CANADA & AREAS OTHER THAN U.S.A.: IN THE U.S.A.:

Paramount Enclosure. Installation Guide

D. Drill Bolt Holes Through Topper Shell and Bed Rails

F l a t S c r e e n A R M S I n s t a l l a t i o n

ASSEMBLY INSTRUCTIONS MANUAL

Showpiece Cabinet Integrated Stand For 32" - 52" LCD HDTV

Medium HoneyBadger Chase Rack Installation Instructions

ESA-100 Fixed Sidelite/Non Breakout

Transcription:

1 TOOLS REQUIRED: RATCHET WITH 5MM HEX BIT FOR CORNER SCREWS ON TOP TRAVERSE BEAMS 13MM FLAT WRENCH FOR LEVELING THE STRUCTURE RUBBER MALLET FOR INSERTING PANELS 8MM HEX BIT WITH EXTENSION FOR HEX BOLT SCREWS 1/8 DRILL BIT FOR DOOR HOLES 6MM ALLEN KEY FOR ROOF CLIPS CORNER SQUARE TO ALIGN FRAME PHILLIPS HEAD BIT FOR SCREWS FOR DOOR FRAME FLAT PALLET KNIFE TO FACILITATE PANEL INSTALL SPIRIT LEVEL TO LEVEL THE UNIT HARDWARE INCLUDED: SCREWS FOR DOOR 8MM HEX BOLT SCREWS TO SECURE PANELS TO FRAME COVERS FOR DOOR FRAME HOLES BOTTOM FEET FILLERS

2 MAIN ELEMENTS OF SKELETON FRAME: TOP TRAVERSE BEAMS VERTICAL POSTS SQUARE FLOOR BASE STANDARD PHONE CUBE PANELS: TECH ACOUSTIC PANEL (DESK POWER) GLASS DOOR GLASS PANEL STANDARD ACOUSTIC PANEL Fabric faces are applied to both sides of each Acoustic Panel. Tech Panel includes a conduit for power wiring to go through and T-nuts for the Desk installation.

3 1 INSTALL FABRIC ONTO ACOUSTIC PANELS FABRIC FACES Fold the rubber edges inside and start at each corner for both fabric faces. ACOUSTIC PANEL Insert them into the grooves of the frame of the panel. Push in all around until the fabric face is flush with the outer frame. FOR THE TECH PANEL: After installing the fabric face onto the Tech panel, cut X s in fabric with a knife to expose the 4 T-nuts and hole in panel for conduit opening.

2 INSTALL GASKET STRIPS ON PANELS Install the gasket strips on both vertical sides of each panel. The rubber gasket should be cut an inch shorter than the sides of the panel on the top and bottom. 4

LOCATION OF THE TECH PANEL FOR DESK AND POWER The Desk and Power Tech Panel is commonly installed on the side adjacent to the door hinges (left side), but can also be installed on the rear or the right side. POWER CUTOUT IN TOP TRAVERSE BEAM One of the top traverse beams in each size (1026 and 1028) will have a cutout for power wiring to go through this beam and the Tech panel. (REAR WITH CUTOUT) 1026mm The 1026 marked beams will be installed on the door side (Front) and opposite rear side. Desk and Power can be installed on the rear. The 1028 marked beams will be installed on the sides (left and right) of the cube. If the desk is to be installed on either left or right, the beam with the cut out must be installed on the side the Desk and Power will be installed. 1026mm (NO CUTOUT) 5

3 ASSEMBLE THE SKELETON FRAME TOP TRAVERSE BEAMS TO VERTICAL POSTS CONNECTION DETAIL Assemble two parallel sides first by connecting and securing two vertical posts with a 1026 top traverse beam in the form of a goal post as shown above. USE RATCHET WITH 5MM HEX BIT Partially tighten the screws firmly using a Ratchet with 5mm hex bit. Screws will be tightened firmly later at step 9 Connect the opposite goal posts using the 1028 beams. 6

4 LOCATE WHERE PHONE CUBE IS TO BE INSTALLED COUNTERSINK FACE UP Lay down the square floor base in the exact desired location for the telephone cube. Ensure that the door side is also in the side desired and that the square base is placed on the correct face up, with countersink holes facing up. 7

5 PLACE SKELETON ON FLOOR BASE & LEVEL THE UNIT The level glides of the Vertical Posts go into the outer holes of the skeleton base. Using the 13mm Flat Wrench, raise the glides so there is more vertical space to install the panels and for easier access to the Hex Nut for final leveling. 6 INSTALL POWER SOURCE CABLE IN TECH PANEL IF POWER IS COMING FROM THE FLOOR IF THE POWER SOURCE IS LOCATED ABOVE (FROM CEILING) DISREGARD THIS STEP GST GST TOP APPROX 33FT LONG 3 PIN BOTTOM 3 PIN Insert and feed the GST end of the cable up the conduit from the bottom of the panel. 8

7 INSTALL THE PANELS INTO SKELETON FRAME Before installing the panels raise the adjustable glides on the underside of the panel so that the top of panel is close to the underside of top traverse beam. This will facilitate securing the panel to the skeleton frame. PER STEP 6 If the source of power is coming from the floor, feed the GST cable through the top traverse beam s power cutout. Insert the Tech Panel from the bottom on an angle, then fit the sides and top into the skeleton frame Use a flat pallet knife to facilitate the process. 9

7 INSTALL THE PANELS CONT.. Secure the panel with two Hex Bolt screws on top of the beam. USE 8MM HEX BIT WITH EXTENSION Repeat the process with the other two panels. 10

8 INSTALL THE DOOR PANEL Before installing the door remove the protective piece of wood from the bottom of the door. Remove the level glides in order to remove the piece of wood. Install the level glides back onto the door when finished. USE 8MM HEX BIT WITH EXTENSION Install the door panel. Secure the door frame with two hex bolt screws as previously done with the other panels. Install the door handles onto the door. Ensure the handles are positioned as pictured facing the from of the glass door. Check that the door latch clicks when closing the door. 11

12 9 ENSURE UNIT IS SQUARED Square all corners and firmly tighten all of the corner screws and hex bolts located on top of the panels and door. Check that diagonal measurements from the inside are equal all around. 10 FINAL LEVEL OF STRUCTURE Adjust the panel glides and Vertical Post glides to ensure that the whole structure is level in all directions. 11 SECURE THE DOOR PANEL x3 There are 3 holes on the door frame as highlighted in the images above. For each hole, drill a 1/8th inch pilot hole through the center of the hole through the vertical post of the skeleton frame and install the screws provided. Cover the holes with the provided covers. Ensure that the door does not swing out too hard or too fast after installing the screws. Test the door latch again after installing these screws and ensure it clicks when closing the door.

13 12 INSTALL THE ROOF The LED light should be directly above where the desk and power will be, with the motion sensor on the opposite side. Place the roof on top of the structure. Insert Roof Clips into the top traverse beams in the locations circled in the image above. Turn the lower part 90 degrees with your finger and then tighten the screw in order to secure the roof.

14 13 INSTALL WIRING FOR DESK POWER IN TECH PANEL GST TO GST 6FT CABLE FEMALE GST MALE GST Feed the MALE GST end of the cable from the top down through the cutout of the top traverse beam into the conduit and out of the hole in the Tech Panel.

15 14 INSTALL DESK ONTO TECH PANEL Screw the threaded rods provided in the Desk Kit into the Tech Panel. Install the desk onto the threaded rods on the Tech Panel. Secure with lock nuts provided. 15 INSTALL NETBOX POINT POWER UNIT ONTO DESK Follow the instructions provided with the Netbox Point to install.

16 CONNECT ALL WIRING Connect the desk power, source, and ventilation system GST cables into the GST Triple tap extension. VENTILATION SYSTEM (FEMALE) DESK/POWER (FEMALE) POWER SOURCE (MALE) GST TRIPLE TAP EXTENSION IF POWER FROM THE FLOOR 3 PIN IF POWER FROM THE CEILING 3 PIN 16

17 INSTALL FEET FILLERS Insert the square shaped foam fillers into the space between the base and the bottom of the vertical posts. Then Insert the smaller rectangular pair onto each side of the bottom of the door frame. Some irregular floors might require foam filler strips under all 3 panels with exception of the door. 17