Vie_SCHED_V22. Sun Jing 1 and David Mayer. Shanghai Astronomical Observatory

Similar documents
(The basics of) VLBI Basics. Pedro Elosegui MIT Haystack Observatory. With big thanks to many of you, here and out there

Dynamic Observing with the AuScope VLBI array

VieVS Analysis of a single session

Status and future plans for the Vienna VLBI Software VieVS

Scheduling VLBI satellite observations with VieVS. Andreas Hellerschmied

EVGA Meeting March 7 th 2013

EVGA Meeting March 7 th 2013

VLBI2010: In search of Sub-mm Accuracy

Global GPS-VLBI Hybrid Observation. Younghee Kwak

Very Long Baseline Interferometry. Richard Porcas Max-Planck-Institut fuer Radioastronomie, Bonn

Very Long Baseline Interferometry

VLBI2010 Current status of the TWIN radio telescope project at Wettzell, Germany

High Speed Data Transmission and Processing Systems for e-vlbi Observations

Current State and Future Developments of the IVS and Geodetic VLBI. H. Schuh, D. Behrend, A. Niell, B. Petrachenko, and R.

Technology Development in Chinese VLBI Network

Observing the APOD satellite with the AuScope VLBI network

Very Long Baseline Interferometry (VLBI) Lecture I. H. Schuh, L. Plank

VLBA TEST MEMO NO. Report on Pie Town in ATD-5. J. Ray, J. Ryan, C. Ma. k D. Shaffer GSFC VLBI Group February 24. Summary:

ATCA Antenna Beam Patterns and Aperture Illumination

November SKA Low Frequency Aperture Array. Andrew Faulkner

Broadband Delay Tutorial

LOFAR: Special Issues

A report on KAT7 and MeerKAT status and plans

Chapter 3 Solution to Problems

Subdaily station motions from Kalman filtering VLBI data

Prototype Software-based Receiver for Remote Sensing using Reflected GPS Signals. Dinesh Manandhar The University of Tokyo

Practical Radio Interferometry VLBI. Olaf Wucknitz.

Time and Frequency Distribution Overview and Issues Rob Selina

Practical Radio Interferometry VLBI. Olaf Wucknitz. Bonn, 21 November 2012

BRAND EVN EVN) Joint Research Activity in RadioNet4 Gino Tuccari & Walter Alef plus partners

Observing Modes and Real Time Processing

VERY LONG BASELINE INTERFEROMETRY

PoS(11th EVN Symposium)113

Practical Radio Interferometry VLBI. Olaf Wucknitz.

VLBI and DDOR activities at ESOC

VLBI Post-Correlation Analysis and Fringe-Fitting

Volume 82 VERY LONG BASELINE INTERFEROMETRY AND THE VLBA. J. A. Zensus, P. J. Diamond, and P. J. Napier

Phase calibration in prototype VLBI2010 systems

L- and S-Band Antenna Calibration Using Cass. A or Cyg. A

Cormac Reynolds. ATNF Synthesis Imaging School, Narrabri 10 Sept. 2008

RADIOMETRIC TRACKING. Space Navigation

Planning (VLA) observations

RADIOMETRIC TRACKING. Space Navigation

RFI: Sources, Identification, Mitigation. Ganesh Rajagopalan & Mamoru Sekido & Brian Corey

The TWIN-Radiotelescopes Wettzell;

Critical Evaluation of the Motorola M12+ GPS Timing Receiver vs. the Master Clock at the United States Naval Observatory, Washington DC.

Multi-frequency AGN Survey with KVN Finding more high-frequency sources & Maximizing the KVN uniqueness

Pointing Calibration Steps

System Failure Operational Recovery

Atmospheric propagation

Astrometric Analysis & ICRF3

EVLA Scientific Commissioning and Antenna Performance Test Check List

BRAND EVN (BRoad-bAND EVN) Joint Research Activity in RadioNet4 Gino Tuccari & Walter Alef plus partners

Imaging Simulations with CARMA-23

Introduction to Radio Astronomy. Richard Porcas Max-Planck-Institut fuer Radioastronomie, Bonn

VERY LONG BASELINE INTERFEROMETRY

Korea Astronomy and Space Science Institute 2. National Institute of Information and Communications Technology 3. Ajou University 4.

Fundamentals of the GBT and Single-Dish Radio Telescopes Dr. Ron Maddalena

VLBI processing at ESOC

Broadband VLBI System GALA-V

Results from LWA1 Commissioning: Sensitivity, Beam Characteristics, & Calibration

Worst-Case GPS Constellation for Testing Navigation at Geosynchronous Orbit for GOES-R

New Zealand evlbi. Tim Natusch,Sergei Gulyaev, Stuart Weston, Hiroshi Takiguchi

Characterizing Atmospheric Turbulence and Instrumental Noise Using Two Simultaneously Operating Microwave Radiometers

Very Long Baseline Interferometry

Wide-Band Imaging. Outline : CASS Radio Astronomy School Sept 2012 Narrabri, NSW, Australia. - What is wideband imaging?

THE APPLICATION OF RADAR ENVIRONMENT SIMULATION TECHNOLOGY TO TELEMETRY SYSTEMS

Guide to observation planning with GREAT

To print higher-resolution math symbols, click the Hi-Res Fonts for Printing button on the jsmath control panel.

Trimble Business Center:

Spectral Line Observing

Co-location on Ground and in Space; GGOS Core Site

Evolution of the Capabilities of the ALMA Array

A Feasibility Study of Techniques for Interplanetary Microspacecraft Communications

Large Impedance Ground Plane Reference Station Antenna: Basics of Design and Field Test Results

"Internet Telescope" Performance Requirements

LBA Operations. Cormac Reynolds, Chris Phillips, Phil Edwards + LBA Team 19 November 2015 CSIRO ASTRONOMY & SPACE SCIENCE

Random Phase Antenna Combining for SETI SETICon03

Introduction to Radio Astronomy!

EVLA Memo 105. Phase coherence of the EVLA radio telescope

TEST RESULTS OF A HIGH GAIN ADVANCED GPS RECEIVER

Wave Sensing Radar and Wave Reconstruction

GNSS: orbits, signals, and methods

THE KAROO ARRAY TELESCOPE (KAT) & FPA EFFORT IN SOUTH AFRICA

Radio Interferometry. Xuening Bai. AST 542 Observational Seminar May 4, 2011

THE NASA/JPL AIRBORNE SYNTHETIC APERTURE RADAR SYSTEM. Yunling Lou, Yunjin Kim, and Jakob van Zyl

NJDEP GPS Data Collection Standards for GIS Data Development

GBT Spectral Baseline Investigation Rick Fisher, Roger Norrod, Dana Balser (G. Watts, M. Stennes)

Australasian Geodetic VLBI Network. Oleg Titov (Geoscience Australia)

INTERFEROMETRY: II Nissim Kanekar (NCRA TIFR)

Antennas and Propagation

Radio Astronomy: SKA-Era Interferometry and Other Challenges. Dr Jasper Horrell, SKA SA (and Dr Oleg Smirnov, Rhodes and SKA SA)

Propagation effects (tropospheric and ionospheric phase calibration)

KaVA Status Report for 2016A

Exploiting Link Dynamics in LEO-to-Ground Communications

EVLA Antenna and Array Performance. Rick Perley

IV. Antenna Basics 39

JCMT HETERODYNE DR FROM DATA TO SCIENCE

Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array

Memo 65 SKA Signal processing costs

Transcription:

Vie_SCHED_V22 Sun Jing 1 and David Mayer 1 Shanghai Astronomical Observatory

Introduction VLBI2010 goals: 1 mm position and 0.1 mm/year velocity measurement accuracy on global baselines, continuous measurements (7d/week) of station positions and EOP, turnaround time to initial geodetic results of less than 24 hours. antenna size slew speed sensitivity frequency range recording rate data transfer Parameter VLBI2010 system Current VLBI system ~ 12 m dish, twin antennas 360 deg/min SEFD 2500 ~ 2 14 GHz 8 16 Gbps e-transfer, e_vlbi disk shipping when required 5 100 m dish ~ 20 200 deg/min SEFD 200 15000 S/X band 128, 256 Mbps usually disk shipping, some e-transfer VIE_SCHED 2

Purpose of a scheduling program (1) real VLBI experiment VIE_SCHED SKD & VEX file SKD & VEX file Station Drudge Correlator procedure file:.prc snap file:.snp Log file FS VIE_SCHED 3

feedback Purpose of a scheduling program (2) simulation research VIE_SCHED NGS file VIE_SIM Monte Carlo Simulatior wzd clocks wn ss NGS file VIE_LSM EOP Clock, residuals Station coordinates Troposphere, residuals Baseline length, residuals VIE_SCHED 4

Algorithms and models for a scan Scan time period during which a network of stations observes the same source Calculation of scan start time earliest possible start time for a new observation T 1e end time of previous observation T slew slew time required for the slew from the previous source to the new one SOURCE time for settling down TAPETM tape IDLE idling CALI calibration the maximum of start times of participating antennas is taken as the scan start time for ambiguous position shortest way from previous scan VIE_SCHED 5

Algorithms and models for a scan Calculation of scan length antenna sensitivity characterized by System Equivalent Flux Density (flux density corresponding to system temperature) elevation dependence is applied scan length k Boltzmann's constant T sys system temperature A eff effective collecting area of the antenna η - processing factor F obs observed source strength B bandwidth N ch number of channels CORSYNCH correlators extra time to synchronise up VIE_SCHED 6

Algorithms and models for a scan Conditions of a valid scan important criterion: source has to be up at participating station during the observation Horizon mask (mask.cat) describes the surrounding mountains... Vie_sched performs several checks to validate the scan at least 2 stations participate the source is visible at all stations (every 5 sec the position of the source is calculated) at stations with AZEL mount the cable wrap is checked enough time for slewing waiting time for the join scan does not exceed the user-specified maximum limit all baselines have to meet the user-specified SNR targets scan length is between the specified limits availability of the antenna is checked (downtime for maintenance or other observation program as intensive sessions...) VIE_SCHED 7

Station-based scheduling strategy Classical approach to achieve uniform sky coverage at each station (needed for decorrelation of zwd, clocks and station height) Definition of a uniform sky coverage: The sky above the antenna is divided in three different elevation segments: low, middle, and high elevation observations. The middle segment is divided into four azimuthal segments and the low segments into eight parts. Radio sources from the same segment should not be observed within a certain time interval. Time window of sky coverage should correspond to the sapling interval of the estimated parameters VIE_SCHED 8

Declination [deg] Source-based scheduling strategy The source based strategy comes up with the more global station distribution and fast moving antennas The schedule program selects radio sources from the catalogue independently of the sky distribution at individual stations Different subnets are formed throughout the session in order to optimize geometry and number of observations 90 70 50 30 10-10 -30-50 -70-90 0 90 180 270 360 Right Ascension [deg] one source scheduled each time two sources scheduled simult. four sources scheduled simult. VIE_SCHED 9

Sky Coverage [%] Declination [deg] Sky Coverage [%] Strategies for automatic scheduling Source-based strategy Station-based strategy 90 70 50 30 10-10 -30-50 -70-90 0 90 180 270 360 Right Ascension [deg] All 64 segments on celestial sphere are scheduled. 16-station test VLBI2010 network 100 99.8 99.6 99.4 99.2 99 0 2 4 6 8 10 12 14 16 Station Index 8-station typical IVS R1 network 100 99.8 99.6 At least 99.7% sky coverage at stations is achieved. 99.4 99.2 99 1 2 3 4 5 6 7 8 Station Index VIE_SCHED 10

Fill-in mode Vie_SCHED schedules sub-configurations either with source-based or station-based strategy It can happen that there is still more than one station idling because of visibility or other restrictions Fill-in mode schedules for the idling stations another source (only one scan): as many stations as possible sky coverage criterion is applied if there are found two scans with the same number of idling stations scan with the earliest start time is chosen the fill-in scan should not end too much later than the scan from normal scheduling mode VIE_SCHED 11

Fill-in mode VIE_SCHED 12

Twin telescopes at one site (1) Same troposphere above the twin telescopes; (2) Same H-maser clock connecting them. Mode1 : Maintenance Mode3 : Continuous observations full availability continuous observations, without any temporal gaps Mode2 : Same source observations Mode4 : Multidirectional observations increase the sensitivity and decrease on-source time counteract the troposphere effect for calibration more observations and better sky coverage strengthen the geometry VIE_SCHED 13

Output files The structure of VIE_SCHED within VieVS VieVS CATALOGS COMPILE VIE_SCHED_V22 source.cat, flux.cat, antenna.cat, position.cat, equip.cat, mask.cat, modes.cat, freq.cat, rx.cat, loif.cat, rec.cat, hdpos.cat, tracks.cat, pram.txt, down.txt, snrmin.txt and psource.txt DATA LEVEL5 temporary mat files SCHED YYMMMDDVA_V001 YYMMMDD-skdsum.txt YYMMMDD.skd YYMMMDD.vex TRF trf_sched.txt CRF crf_sched.txt VIE_SCHED 14

Input files (VieVS/CATALOGS) Catalog system files controlled and maintained at GSFC available via ftp://gemini.gsfc.nasa.gov/pub/sked They can be used directly (without manual changes) in VieVS. VIE_SCHED 15

Input files (VieVS/CATALOGS) Local control files (1) param.txt file PARA.WAVEL(1) PARA.WAVEL(2) PARA.CHANUM(1) PARA.CHANUM(2) PARA.RATE1A PARA.RATE2A PARA.MARGEL1 PARA.MARGEL2 PARA.MIN_SRCRP PARA.SOURCE [sec] PARA.TAPETM PARA.IDLE PARA.CALIBRATION PARA.MAXSLEWTIME PARA.MAX_WAIT Wavelength of X band [meter] Wavelength of S band [meter] Num of channel for X band Num of channel for S band Acceleration of AZ/HA axis [deg/s^2] Acceleration of EL/DC axis [deg/s^2] Marge for AZ/HA axis [deg] Marge for EL/DC axis [deg] The interval that the same source won't be observed twice [min] Time for the antenna to settle down after slewing and before observation start time Time for the tape after slewing and before observation start time [sec] Time allowed for idling after slewing and before observation start time [sec] Time allowed for calibration after slewing and before observation start time [sec] Maximum time to allow an antenna to slew [sec] Maximum time to wait for the slow antenna [sec] VIE_SCHED 16

Input files (VieVS/CATALOGS) Local control files (1) param.txt file PARA.CORSYNCH Time to allow the correlator to synchronize tapes [sec] PARA.MAX_SCAN Maximum allowable scan time [sec] PARA.MIN_SCAN Minimum allowable scan time [sec] PARA.FILLINMODE If use fill-in mode (0/1/2/12) PARA.FILLENDT Maximum time for the end time of fill-in scan [sec] PARA.SCREEN If print processing information on screen (1/0) PARA.MIN_STANUM Minimum subnet scheduled at one time PARA.SKYDT The interval for calculation of sky coverage [min] PARA.MIN_SRC2ANG Minimum angle between two sources observed simultaneously [deg] PARA.SORTNUM Num of subconfigurations found with station-based strategy for further consideration PARA.FORSI if check for source structure study [1/0] PARA.UPSTA increase the opportunity for scheduling PARA.DOWNSTA decrease the opportunity for scheduling PARA.SRCFRINGE source used for fringe check VIE_SCHED 17

Input files (VieVS/CATALOGS) Local control files (1) param.txt file (2) down.txt file VIE_SCHED 18

Input files (VieVS/CATALOGS) Local control files (1) param.txt file (2) down.txt file (3) snrmin.txt file VIE_SCHED 19

Input files (VieVS/CATALOGS) Local control files (1) param.txt file (2) down.txt file (3) snrmin.txt file (4) psource.txt file VIE_SCHED 20

Input files (VieVS/CATALOGS) Local control files (1) param.txt file (2) down.txt file (3) snrmin.txt file (4) psource.txt file (5) tagalong.txt VIE_SCHED 21

How to run VIE_SCHED start VieVS as usual VIE_SCHED 22

How to run VIE_SCHED Scheduling GUI VIE_SCHED 23

How to run VIE_SCHED Select the stations or use a predefined network. This is usually done according to the master file. VIE_SCHED 24

How to run VIE_SCHED Change the start times of the session and its duration. The start and end times are also contained in master file. VIE_SCHED 25

How to run VIE_SCHED Set the SNR targets. VIE_SCHED 26

How to run VIE_SCHED Specify the observing mode for twin telescopes if there are twin telescopes in the network. VIE_SCHED 27

How to run VIE_SCHED Give the parameters for scheduling. VIE_SCHED 28

How to run VIE_SCHED Specify the type of output files (NGS file, SUM file, or SKD/VEX file). VIE_SCHED 29

How to run VIE_SCHED Specify the strategy used for scheduling. VIE_SCHED 30

How to run VIE_SCHED New options in the scheduling GUI save a selected stationlist load previously saved schedling parameters load new catalogs from the Goddard server and delete content of LEVEL5 folder VIE_SCHED 31

How to run VIE_SCHED Run options for VIE_SCHED VIE_SCHED 32

Thank you for your attention! problems? questions? mail to david.mayer@tuwien.ac.at David Mayer works within FWF-Project P23143 Integrated VLBI. VIE_SCHED 33