Pressure Vessel Assembly Instructions

Similar documents
1500HD Assembly & Operation Manual 1500 lb. Capacity Motorcycle Lift

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

Independent Containment System (ICS)

BHJ Products, Inc. Parts List & Instructions

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

Assembly Instructions 10 X 10 Aluminum Roof Support

By C.W. Woodson From the pages of Model Craftsman magazine June, 1937

IDR assembly instructions:

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

MAG-CONV Basic, 48, 48R & Midline Front Mount

Boat Lift Canopy Frame Assembly Instructions

AndyMark DART 12.

Oxford Stalls Installation Instructions

ROOF CURB INSTALLATION INSTRUCTIONS: VERTICAL STANDING SEAM PANEL

INSTALLING INVISIRAIL GLASS PANELS POST INFORMATION... 2 PRE-INSTALLATION... 2

INSTALLATION INSTRUCTIONS FOR PLASCORE NARROW STILE DOORS

SatNOGS. SatNOGS Rotator v3 Mechanical Assembly. This is the assembly guide for the third version of the SatNOGS Rotator.

F i t t i n g t h e N e w L a n d i n g G e a r t o Y o u r S k y J i b V 1

Jenny Legs Assembly Instructions

Tools: Sharpie, Square, Vise, Hack saw, Ruler, Punch, Hammer, File. 2. Cut the stock Place stock in vise and cut with hack saw

MSR/MSB Mechanical Setting Tool

w w w. h d o n l i n e s h o p. d e TIMKEN BEARING CONVERSION TOOL GENERAL INSTALLATION -J04672 REV Kit Number Models

Titan Series Awning Assembly and Installation Instructions

PORTABLE PULL TESTER

installation guide 1 GUIDE#: PWB-wwpontoon-pol-004

INSTRUCTION SHEET. PIECE INVENTORY - MOBILE BASES Refer to the diagram for part identification.

Castle Frame Assembly Table AT-8. Diagnostics Manual. Castle, Inc. Petaluma, CA

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Assembly Instructions

Power Train Lift Max. Capacity: 1,250 lbs.

Sliding Door Kit

Hydraulic Clamp Carrier. Installation & Operation Manual

Austin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

Installation Instructions for Bike Fixtation Public Work Stand and Floor Pump Manual RevH

EZ-Lock Assembly Manual

HILMA Quick Tool Change for Forging Applications

BY ALIEN TECHNOLOGIES CORP

Workbench Instructions for Assembly

Assembly Instructions

Installation Instructions - Model V4JSD 1

SERVICE INSTRUCTIONS Model 9670 Lubricant Pump

BHJ Products, Inc. Parts List & Instructions

CTTR Tire Rack Required tools

Form No Assembly & Operating Instructions for: SAFETY PRECAUTIONS

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

Zero Point Clamping System. ZERO lock BALL lock

Portable Platform Scale

MSR/MSB Mechanical Setting Tool

FitWork Walkstation Series 7 AdjusTables

Deluxe Frameless ByPass Bath Enclosures. 340 & 350 Series

Additional Information

SS1062, SS10621 & SS10621E Free Standing PWC & Fishing Boat Hoist SS1062 SS10621 SS10621E

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts

CleanBench Laboratory Tables

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications

Lockformer / 16 Gauge Speednotch

woodworkersjournal.com MATERIAL LIST

DEPTH-KIT-785 Seat Depth Extension

BARLOW TYRIE quality since Ref: x 3m - 12 x 10 Pavilion with Cabrio Folding Roof Step by Step Assembly Instructions

Roll In W/L Dock PAGE 1

Master Your Terrain (307) Extreme Duty ROCK RAILZ Jeep Cherokee. Installation Instructions

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

MINI-LATHE QUICK CHANGE TOOL POST

INSTRUCTIONS

SALICE AIR TEMPLATE KIT

V nyl Gazebo truct c it Assembly Instr ons

1-CYLINDER TORNADO LIFT INSTALLATION MANUAL

Assembly Instructions 10 X 10 Aluminum Frame Building

Otter Pro XT Cottage Installation and Set-Up Instructions

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents

LORON SERVICE MANUAL / PARTS LIST SINGLE DOUBLE PALLET HANDLER CONTENTS: PAGE 1 Lift Truck Requirements General Installation Procedures

Assembly of Deluxe and Ultimate Trays supplied as flat packs

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at:

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

Sliding Crosscut Table installation guide

Ford Pick Up Rear leaf Spring Kit Installation Instructions

Installation of the JD 900 Series Flex Grain Platform Auger Trough Liner Kit

Model No: TC10. Parts Information: Tyre Changer - Automatic

Range height adjustable assembly

Installation Instructions

Ruby 0-4-0T Kit Assembly Instructions

TERRACE / TERRACE CONCEPT Retractable Classic Roof / Double Rail System Step by Step Assembly Instructions

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY. 6 3/8" [161.9mm]

CAUTION INSTALLATION INSTRUCTIONS ! CAUTION. Heavy Duty Suspension Kits for Double Eye Springs. Safety Precautions: Inspection: Disassembly:

Plumbing Part II - Hand Pump

Track Rack. * Track Racks are not lockable

4832A Installation Sheet Part List

3,500/4,500lb. Vertical Cable Feighner Lift

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

How To Measure Your Finished Opening

model tsa-sa48 Sliding Crosscut Table installation guide

8' x 22' Cash Hut INSTALLATION INSTRUCTIONS

CAUTION INSTALLATION INSTRUCTIONS ! CAUTION. E-Z Flex Suspension Kits for Double Eye Springs. Safety Precautions: Inspection: Disassembly:

O-Sullivan King 4 Poster Bed O-Sullivan Queen 4 Poster Bed Parts and Hardware List

User Instructions Multiline Otter Scoreboard Caddy Assembly

OXYGEN INSTALLATION. Revision date

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

NUMBER: S.M. REF.: Listed in Table ENGINE: Series 50/50G DATE: October 2013 SUBJECT: MACHINING CYLINDER BLOCK COUNTERBORES

Quill Stop V2 Installation Guide 11/16/2014

Transcription:

Pressure Vessel Assembly Instructions 1) Measure aluminum tube outer diameter 2) Machine both end caps and only drill pilot holes for all hoes shown 3) Weld both end caps onto the aluminum tube and be sure to align the hole patterns on both end caps to be coaxial. Slight variations will be compensated by the hydraulic system, but line up the holes as well as possible, as shown in figure 1 below. 4) Drill and tap holes on end caps to full size. This sub assembly will now be referred to as the pressure vessel. 5) Machine all plates of 8 x1/2 6061 aluminum and 1 x3/4 7075 aluminum. 6) Assemble the four frame components of the 7075 aluminum bars 7) Assemble the 8 x1/2 6061 aluminum plates with the 7075 aluminum bars but do not attach the end plate on the 7075 aluminum bar frame side.

8) Machine and assemble the torque bar, hydraulic cylinders, and hydraulic piston. Be sure to include both o-rings on the piston and to place the 3/8 ball into both divots of the two pistons. 9) Orient the housing to a vertical position. Insert the pressure vessel into the partially constructed housing. 10) Bolt the fixed end cap to the end plate of the housing.

11) Bolt torque bar and hydraulic cylinder assembly to the pressure vessel. Support the pressure vessel from underneath to prevent deforming the vessel from the bending stresses until the last plexiglas sheet is in place. 12) Press fit the bronze bushing into the bore in the remaining end plate. Insert the shoulder bolt through the bushing and add a Belleville washer to the shoulder bolt, as shown in fig. xx.

13) Attach the end plate and then the side plexiglas plates to the remaining housing and screw the shoulder bolt into the torque bar. THE HEAD OF THE SHOULDER BOLT OUGHT NOT TO TOUCH THE BUSHING. Add a second Belleville washer only if necessary. 14) Assemble the top MiniTec frame subassembly as shown below. Be absolutely sure that the two ends of the 35 section are coplanar, or the assembly will not construct properly. Orientate the power lock fasteners of the cross beam so they are tightened from the side away from the plate s position. The plate will be inserted from the open side which is closest on the figure below. Remove two ½ x½ squares from two adjacent corners of the plate. Slide the 24 x24 polycarbonate plate into the groves of the profile, the notched side will protrude approximately ½ from the subassembly end.

15) Place one 23 section to cover the overhang of the polycarbonate plate from the subassembly. Attach the top frame subassembly to the four 34 sections. Be sure to keep the two threaded ends of the 34 away from the top level. It is recommended that this stage of the construction be completed upside down with the top subassembly on the ground. Add another 23 section to the other end of the frame. 16) Cut the 24 x48 polycarbonate sheet down to 24 x36 and notch all four corners ½ x½ to fit the frame as done with two sides of the 24 x24 plate. 17) Place the 24 x36 polycarbonate sheet into the four remaining MiniTec sections. Leave this subassembly on the ground and place the legs down through the powerlock fasteners. Adjust the four MiniTec sections on the ground to fit the legs. Raise the 24 x36 platform to a desired height. 18) Add casters to the four legs and mount the pressure vessel to the frame with the four M8 bolts and M8 square nuts. The vessel will be mounted to the two sections in the middle of the top platform. The completed assembly should resemble the figure below.

19) Machine the pressure gauge mount. 20) Attach associated nylon tube fitting to each hydraulic component according to table yy. Note that a 90 Elbow is placed between the pressure gauge and hydraulic pump so the pressure gauge is centered on the mounting plate. Component Right-side fitting Left-side fitting Top fitting Hydraulic Pump ¼ NPT 90 Elbow - - Pressure Gauge 1/8 NPT 90 Elbow 1/8 NPT Tee Brass ¼ to 1/8 adapter and pressure gauge Torque Valve ¼ NPT adapter ¼ NPT 90 Elbow - Vessel Valve ¼ NPT 90 Elbow ¼ NPT adapter - Vessel End Cap 1/8 extension and - - 1/8 NPT 90 Elbow Close Cylinder - 1/8 extension and - 1/8 NPT tee Far Cylinder - 1/8 extension and 1/8 NPT 90 Elbow - 21) Mount all hydraulics with fittings onto the hydraulics plate. Drill holes to fit the hydraulic layout. The recommended layout of the hydraulics is shown below. 22) Measure and cut nylon tubing to appropriate lengths for each connection. Be sure to leave enough length to be inserted into the tube fittings. 23) Detach hydraulics from the hydraulics plate and insert all of the nylon tubing into the appropriate nylon fitting. 24) Add hydraulic fluid to both cylinders, the pressure vessel, and tubing. Remove all air bubbles.