skypod INSTALLATION GUIDE Issue 2 CONTENTS 1. Preparing to install 3 2. Installation 4 3. Installing jack rafters Installation examples 11

Skypod. Pitched PVC-U skylights. Installation guide PITCHED PVC-U SKYLIGHTS ISSUE 1

skypod INSTALLATION GUIDE CONTENTS Issue 2 If in doubt at any stage NOW INCLUDES ACUTE BE SAFE WHEN WORKING AT HEIGHT

Skypod. Pitched PVC-U skylights. Installation guide PITCHED PVC-U SKYLIGHTS ISSUE 1

Skypod. Pitched PVC-U skylights. Installation guide PITCHED PVC-U SKYLIGHTS ISSUE 1

CONSERVATORY ROOF INSTALLATION GUIDE Issue

Eurocell conservatory roof system. Installation manual Issue 3

ENGINEERING STRENGTH INSTAL L AT I O N M A NUAL OUR STRENGTH IS OUR STRENGTH

NEW equinox INSTALLATION GUIDE Issue

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

Synseal assembly guide 2009:Synseal assembly guide /2/09 12:38 Page 1. Conservatory Roof Assembly Guide

NEW equinox INSTALLATION GUIDE Issue

Austin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions

This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

equinox INSTALLATION GUIDE Issue CONTENTS If in doubt at any stage BE SAFE WHEN WORKING AT HEIGHT

Roof Lantern. Installation Guide. Scan to view the installation guide on your mobile or tablet

INSTALL IN 2 DAYS. *Assumes 3-man fitting team. equinox. Tiled roof system. Installation guide ISSUE 1

utopia Window & Door Products Orangery Home Extension Products Conservatory Products Skylight Products

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

Section 1 Specifications..

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

Liniar Window. installation guide

Installation Guide Contemporary Alfresco V1.3 LU

Configurable, Insulated Electrical Housing System for Lighting Installation Guide

Installation Guide Simplicity Alfresco. V1.9 Lu070318

assembly guide effective from April 2005

GIRTS ON BACK OF BUILDING

Austin Standing Seam Awning with Overhead Braces Assembly and Installation Instructions. Assembly Instructions

SIMPLER BETTER FASTER

Curium 19.4H Installation Instructions & Parts List

Synseal assembly guide 2009:Synseal assembly guide /2/09 12:38 Page 1. Conservatory Roof Assembly Guide

Guardian warm roof conversion system. Installation Guide

Greenhouse Assembly Instructions

Gardman Lean-to Greenhouse Assembly Instructions

The Leka System Installation Guide

GROWING BETTER THROUGH DESIGN LEAN-TO. Lean-To. Assembly Instructions 04/02

Installation guide. Step-by-step instructions

Assembly Instructions

Conservatory roof system

CROSSBAR RAFTER ISOMETRIC

Office Partitions WARNING. Assembly Instructions. Customer Service A S S E M B LY HARDWARE H1 H2 H3 H4 H5 H8 H9 H10 H11 H12

DUTCH GABLE CARPORT RECOMMENDED INSTRUCTION MANUAL

Curium 19H Installation Instructions & Parts List

Assembly Instructions 10 X 10 Aluminum Frame Building

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

JASPER INSTRUCTIONS CODE: 0097 CODE: 0197 TOLL FREE/SANS FRAIS: _Jasper_11x11_Instructions_V1.2. Front Elevation.

for Flexi Sun Lite Planning the layout

Installation - Sub Cills

For Installer. Duration Windows. Assembly Guide Durafold 1000

ASS 70 FD folding/sliding door installation guide

ASS 70 FD folding / sliding door. Installation Guide

Dubnium 11 Installation Instructions & Parts List

Radon 07 Installation Instructions & Parts List

Capella Gutter & Soffit

SuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter

SLATE & SHINGLE INSTALLATION


COMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE

INSTALLATION INSTRUCTIONS

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

SMART SYSTEMS VISOGLIDE+ INSTALLTION GUIDE

Installation Guide. Bi-fold Doors

10 x 10 Flat Top Two Tone Pergola

Installation Instructions for Solar Snow Pad (SSP-T-3)

Monster Tower Phone: U.S. Hwy 411 S. HS1. Installation Instructions and Owner s Manual CAUTION

Installation Instructions for Vista Air Vertically Folding Walls

Panel Guard Installation For Adhesive Attachment

Ultraroof380 Cornice Installation

GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

MILANO INSTRUCTIONS CODE: 0093 TOLL FREE: _Milano_11x11_Instructions_V1.2. Front Elevation Plan View Footprint 12'-0" 11' "

INSTALLATION GUIDE SLIMLINE ROOF LANTERN

for Rigid Sun Lite Planning the layout

Gallium 03 Installation Instructions & Parts List

Mira Premium Series Bi-Parting French Sliding Patio Door Installation Instructions

Pickup Box Utility Rack Package Installation (Instruction ID: )

Assembly Guide. Conservatory Roof. 1. Before you start p2. 8. Sealing. 2. Box gutter. 9. Ridge top caps. 3. Eaves beam. 4. Rafters. 10.

On-Roof Mounting Sets for Flat-Plate Collectors

Renaissance. Assembly Instructions GREENHOUSE. for models BEFORE OPENING ANY OF THE BOXES PLEASE READ THESE INSTRUCTIONS 03/07

GROWING BETTER THROUGH DESIGN. Regent Royale Rosette Regal GREENHOUSE. Assembly Instructions 04/02

Installation Procedures

Series Sloped glazed Curtain wall. Installation Instructions

Installation Instructions

4-Door Rear XHD Armor Fenders

Pocket Door Installation Instructions

ultraframe Classic Installation Guide

PATIO INSTALLATION MANUAL

Connect Transit Shelter

INSTRUCTION GUIDE SANCTUARY CANOPY. C & A SUPPLIES LTD, Bidder Street, London E16 4ST tel: WEB:

Guardian ¾ Hip Ridge Skylight Installation Manual

FIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed)

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Lightline Movable Wall Installation Manual. Preliminary Draft #

Everbright E610 polycarbonate light panels Installation guidance

The Roofing Store TRS 9 35MM 78MM 150MM 78MM PRODUCT TECHNICAL DATA

INFINITE RANGE - HINGE DOOR

Roll-Fix Kit The complete dry hip kit RFIG

Transcription:

NEW skypod INSTALLATION GUIDE NOW INCLUDES ACUTE CONTENTS 1. Preparing to install 2 2. Installation 4 3. Installing jack rafters 10 4. Installation examples 11 If in doubt at any stage Please contact the customer services department from which you purchased the Skypod pitched PVC-U skylight from. 0800 988 3047 customercare@deeplas.co.uk

INSTALLATION GUIDE SURVEYING WARNING Good surveying is essential to ensure a trouble free successful installation and to avoid costly remakes caused by incorrect measuring. When surveying it is the surveyor s responsibility to determine that the structural openings and surrounding areas are in a state of good repair and provide the correct dimensions for manufacture. 1. PREPARING TO INSTALL 1.1 20 /35 Before unpacking the Skypod pitched skylight, you should review the supplied layout drawing (shown right). This will be located in the ancillary box. 20 /35 The dimensions shown on this plan are for the external face of the supporting upstand. Ensure these dimensions are consistent with the host building. The Skypod ring beam allows a 10mm tolerance per face if the overall width and length of the upstand perimeter are oversized. 2 SKYPOD INSTALLATION GUIDE

1.2 (available in branch) (available in branch) Fig. 2 The upstand corners should also be square. Check the difference between the diagonals to see if the ring beam overhang will need adjusting around the perimeter, as well as checking the diagonals to ensure the kerb is square (see Fig. 2). 3

2. INSTALLATION 2.1 Bead of silicone sealant 2.2 CRS824S/CRS8625S Glazing bar fixings Suitable fixing at 300-400mm centres Upstand min width 75mm Ensure the kerb is clean and free from debris, then run a silicone bead around the external edge as shown above. Ensure correct amount of glazing bar fixing studs are slid into the ring beam before any fixing commences. Position the ring beam so an equal overhang is achieved around perimeter and fix using suitable 5-6mm fixings at 300-400mm centres (starting and ending 100mm away from internal corner of the ring beam). 2.3 2.4 Run a bead of silicone sealant along the mitred edge of the ring beam to seal the corner joint, when the next ring beam is offered up. Fix the adjacent ring beam ensuring the joint is tight. Remove any excess sealant and secure corner using a steel corner cleat with 4-off 4.8x25 LG screws (supplied). 4 SKYPOD INSTALLATION GUIDE

2.5 CRS8211 Glazing stop CRS8628 Glazing stop screws CRS8201 End cap If access to the bar ends is limited, it is advisable to fit the glazing stops and end caps as shown (right) before fixing rafters to the ring beam. You can then proceed to loosely secure the side rafters to the ring beam using the threaded studs located down the ring beam. 2.6 2.7 Supporting the ridge, the rafter bars can be secured to the ridge using the threaded studs. Once opposing rafters have been secured the ridge should be self supporting. Using 2 x CRS8624S single studs, secure each hip to the spider casting. The body of the stud should locate between the retaining ribs on the lower casting face to stop the stud from spinning. 5

2.8 2.9 Locate the hips onto the external ring beam studs and loosely secure using fixing nuts. Fasten the central rafters to the spider using 1 x CRS8625S double stud and nuts. If jack rafters are present, please refer to Section 3: Installing Jack Rafters on page 10. 2.10 2.11 If not already fitted, clip in the eaves beam seals between the rafters and hips using a nylon mallet. Check the rafters are all square to the ring beam and ridge, and then tighten all roof fixing nuts. Locate the nylon bar through the spider and lock off using nuts and washers either side of the spider. The nylon bar should sit 5mm below the crest of the ridge profile. 6 SKYPOD INSTALLATION GUIDE

2.12 2.13 Sealant Position the spider bottom cap and fix using the decorative boss onto nylon threaded bar. Note the nylon bar may require trimming down in length. Fit the glazing end closures to the glass and run a bead of sealant between the profile and top pane of glass as shown above. Only use a suitable sealant with self cleaning glass. Soudal SMX 506 is recommended. 2.14 2.15 If not already fitted, fit the glazing bar end caps and glazing stops. Then peel back two inches of eaves beam seal tape film and fold to the outside. Insert glazing unit ensuring equal coverage and ensuring the glass is resting onto the glazing stops. Fit the foam bung and clamp plate and tighten M10 nut until the foam is firmly pressed down onto glazing. 7

2.16 2.17 Fit the rafter and hip top caps using a nylon mallet, then ensuring the glass is positioned correctly, peel the remaining eaves beam seal tape film away and press glazing down to ensure contact with eaves tape. Seal around perimeter of the foam bung where it intersects the ridge glazing seal, glass and glazing bar top caps. 2.18 2.19 Seal around rafter top caps to ridge glazing trim. Only use suitable sealant with self-cleaning glass. We recommend Soudal SMX 506. Seal the rafter top cap to hip top cap from the gasket intersection to foam bung. 8 SKYPOD INSTALLATION GUIDE

2.20 Using a suitable high-grab adhesive sealant, run a small bead on the perimeter edges of the top cap and a larger bead further inboard as shown. Recommended sealant is Soudal Fix All Crystal (available at Eurocell branches nationwide). Note: Do not run the sealant to the bottom edge around the hip/rafter area to ensure the sealant does not touch the glass. Always ensure hands are cleaned as to not contaminate self cleaning glass. 2.21 2.22 Splay the top cap and lower onto the ridge whilst checking the capping is positioned correctly over the rafter and hip top caps. The capping returns should clip under the ridge profile when positioned correctly. Ensure the capping is seated down correctly and remove any excess sealant from all edges. 9

3. INSTALLING JACK RAFTERS 3.1 CRS8502A Hip rafter CRS8209 Jack rafter tenon CRS8208 Jack rafter fixing 3.2 Seal jack rafter top cap to hip top cap using suitable sealant CRS8501A Jack rafter Sealant 4.8 x 16LG Locate the jack rafter tenon onto the jack rafter fixing bolt and adjust the lower nut to align gaskets, before tightening the the top nut. Then seal the jack rafter internally to the hip. Seal jack top capping joints. Only use suitable sealant with self-cleaning glass. We recommend Soudal SMX 506. 10 SKYPOD INSTALLATION GUIDE

4. INSTALLATION EXAMPLES 4.1 11