Laminate goes Wall. Installation documentation for wall panelling with gekko-system and Extravagant from CLASSEN.

Similar documents
Cleaning. This instruction will cover installation of the following units Codes:

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

PEAK OAK OAK FLOORING, OAK DOORS & WROUGHT IRONWARE

INSTRUCTION FOR WALL-FIXING OF VANITY UNIT GAYA

A Generic Sauna Room Assembly Manual

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Portofino Installation Guide

DO NOT HESITATE TO CONTACT US TO BE GUIDE DURING THE INSTALLATION OF SQUAREDECKO PRODUCTS

ASS 70 FD folding / sliding door. Installation Guide

Installation Guide. Deckorum. Composite Decking

compile system INSTALLATION GUIDE Updated January 2019

*** All chrome surfaces should be cleaned using a clean damp cloth. *** No abrasive cleaning agents or materials should be used.

PLEATED SHADE ARCH INSIDE MOUNT GETTING STARTED. A few simple tools are required: STANDARD HARDWARE

Closet Wall Drawer Unit

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE

Ultra Fast Delivery SGL Toilet Cubicle Pack Fitting Instructions

Deauville Installation Guide

Log cabins. Pentagon log cabin models ASSEMBLY INSTRUCTIONS. Recommended tools Cordless screwdriver

method of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

INSTALLATION INSTRUCTIONS DANUBE ACRYLIC NEO ANGLE

TREX TRANSCEND RAILING

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals

CLASSIC RANGE PLUS RANGE CREATE RANGE - PHOTO WALL

IMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

INTRODUCTION Tools Required Laminate Washroom Products... 4 DUCT PANELS Fixing the Frame: Fixing the Shadow Panels...


STORAGE & SHELVING SYSTEM - INSTALLATION GUIDE

PRIVACY FENCE WITH SCALLOPED PICKET INSTALL INSTRUCTIONS

GARDEN SHED BRIGHTOLN

129 KITCHEN BASE CABINET 480

ASS 70 FD folding/sliding door installation guide

Left Unit. G. Shelf 1 pc. Small Cam Lock 6 pcs.(+1 extra) Cam Lock Screw 2 pcs.(+1 extra) Cam Lock Screw 6 pcs.(+1 extra)

PVCu FOLD & SLIDE DOOR OUTWARD OPENING

Vertical Slider Section Detail

Bi-fold Door Installation Instructions

COMPONENTS AND BOX CONTENTS

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

Wall Installations. Chapter 16 Wall Installations 16. 1

Closet System Installation Manual

Xenon 05 Installation Instructions & Parts List

For assembly see instructions in carton

TONNEAU INSTALLATION INSTRUCTION

Dubnium 11 Installation Instructions & Parts List

Instalation rules decustik D+ acoustic panels Installation rules for walls and ceilings

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual

Wall mounting with holding profile

North East Toilet Cubicles Ltd.

POOL ENCLOSURES LEIA & ALVA. Assembly manual

GROWING BETTER THROUGH DESIGN LEAN-TO. Lean-To. Assembly Instructions 04/02

PRIVACY FENCE WITH LATTICE INSTALLATION INSTRUCTIONS

BOTHWELL ALUMINUM PLANK AND DECK SYSTEM USERS MANUAL AND GUIDELINES

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

INSTRUCTIONS FOR ASSEMBLY. 110x110 h TRADITIONAL SAUNACABIN

SMART SYSTEMS VISOGLIDE+ INSTALLTION GUIDE

SHOWERLUX HELPLINE: TEL: SHOWERLUX (UK) Ltd.

GREENHOUSE EXTENSION 6 X4

GRID PANEL SYSTEM Installation Instructions

Installation Guide. deckorum Composite Decking

Slider Door Installation Instructions

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

Vanity Installation Instructions

Constable Oak Extension Dining Table

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

mila-wall (Series100) General Operating Instructions page 1 of 15

COMPONENTS AND BOX CONTENTS

How To Measure Your Finished Opening

Assembly Instruction. 9,2 m² Grillkota

Pantry IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratches or oth

Glass Front Sauna Room Assembly Manual

INSTALLATION INSTRUCTIONS

ASSEMBLY INSTRUCTION CONTENT

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual. Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B

IN00571 (Iss 2) L Shaped Bath Screen. Instruction suitable for both Right and Left Hand Fixing.

Deauville Installation Guide

Gallium 03 Installation Instructions & Parts List

Assembly and Installation Guide

Siding Systems NOVIKSTONETM FS FIELDSTONE INSTALLATION GUIDE

Robert Bosch GmbH. Wall organiser

Barnside Pantry IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratch

v1.0 ASSEMBLY GUIDE Edgar Tall Chest of Drawers

Vinyl Sliding Glass Door Assembly Instructions

Pivot Frame Mounting Instructions

Argon 02 Installation Instructions & Parts List

Linda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE

TIMBER / ALT BLIND MEASURING

[320] LAYING PRINCIPLE: CREATION 30 CLIC

IMPORTANT NOTES ABOUT YOUR FLOORING PLEASE READ BEFORE INSTALLING INSTALLATION & MAINTENANCE FOR ENGINNERED HERRINGBONE

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Rainelle Sauna Installation & Owner s Manual

Sliding Door Enclosure. Telephone Cleaning. Please retain this manual after installation for future reference and maintenance.

LAWN AND GARDEN GREENHOUSE

Installation Instructions - Model V4JSD 1

PDF created with pdffactory Pro trial version Wood characteristics - 1 -

Installation Instructions

CLASSIC RANGE PLUS RANGE PHOTO WALL. Pre-installation check-list

The Nantucket Legacy Arbor

Curium 19H Installation Instructions & Parts List

Installation Instructions. Walk-in Shower Screen. with 180 Return Panel

Transcription:

Laminate goes Wall The new panelling system for walls and ceilings from CLASSEN. Installation documentation for wall panelling with gekko-system and Extravagant from CLASSEN.

Important information: Installing wall panelling with gekko-system according to the following instructions is only possible with laminate panels equipped with the CLASSEN megaloc quick-lock system. Before beginning work, read through the instructions and each installation step carefully. Take particular care that the wall to be panelled is well dried off. Thanks to the fixing gekko-system, no special preparation of the walls or ceiling is necessary. However, the area to be panelled should be reasonably even. As the laminate panels are fitted with a gap of approx. 8 cm to the wall, air can freely circulate behind the panelling. However, it is important to make sure that there is no air locked in when panelling to avoid mould forming, especi ally on outer walls. Please therefore do not use sealants, e.g. silicone. The following installation example is performed in offset style. Although it is the most complex way of panelling, it has the most attractive appearance.

1 1) Begin by measuring the full wall width and mark the middle of the wall. 2 2) Now position a plank such that the side of the panel without the visible blue clip (groove) lies exactly at the marked middle of the wall with the right hand side of its decorative covering face. The side with the blue locking clip (tongue) faces to the left. 3 3) Now mark the right and left sides of the panel. The edges of the decorative covering face always serve as a marking point. The groove and tongue sides of the locking system are not taken into account when marking because they will later lie on top of the fixing rails. Now find the middle point between the two markings and mark this point too. You have now defined the basic spacing of the fixing rails for the horizontal direction. 4 4) Now measure the height of the panelling surface.

5a Half plank length Approx. Approx. Approx. 30.25 cm 30.25 cm 30.25 cm 22 cm etc. 5) Work out the necessary amount of profile and the intervals between the fixing profiles: calculate how many full planks you can use from the middle to the left corner of the wall (the plank width is given on the laminate packaging) and what extra length may remain. If you consider the middle of the wall as a mirror axis, you can easily transfer your measurements to the right half. 5b Full plank: 60.5 cm Plank cut: 52.25 cm Results from the dimensions of a half plank 30.25 cm + difference cut 22 cm Difference cut: 22 cm (Fig. 5a) Calculation and installation example: this applies for both the right and left sides. Assumed distance from the marked middle of the wall to the left corner: 385cm (results in a total width of 770cm). The width of the laminate plank used here is 60.5 cm. This results in 385:60.5 = 6.36, i.e. 6 full planks for the half wall, 12 for the full wall. 22cm remains to the corner. Difference: 60.5x6 = 363; 385-363=22. This results in the following order for the fixing profiles beginning from the corners going towards the middle: first profile 8mm from the corner, the following with a 22cm interval and from there always with the calculated basic interval of half a plank width to the middle. The same applies to the other half of the wall. Working out the number of profiles: Total number of planks required for a complete row with difference cuts, in our case 14 planks (resulting from the left and right sides going out from the middle) x 2-1 = 27 profiles. (Fig. 5b) When fitting the first row of panels later, we began with 22 cm and a full panel. We shortened the second panel to 22 cm + half plank length (30.25cm) i.e. a total of 52.25 cm. This produces the offset look of the panelling. This applies for the panels both at the left and the right corners. 6 6) Once you have measured the height of the wall and have worked out the number of required fixing profiles, you can begin cutting the fixing profiles to size.

7 7) Beginning from the middle and going out to the left and to the right, install each fixing rail at the calculated basic interval of half a plank length. Mark the positions of the profile screw holes on the wall. 8 8) Depending on the subsurface, drill raw plug holes with a hammer drill (6 mm) and insert 6 mm raw plugs. 9 9) Using a hand screwdriver or, preferably, an electric screwdriver, fix the profiles with screws. 10 10) Using a cut plank for the difference compensation, measure the 8 mm gap from the corner of the wall and the gap to the plank end on the left and the right before fitting the two fixing rails. The rails at the left corner of the wall are not to be fixed yet - they aid the adjustment of the finishing edge after installing the first row of planks.

11 11) Now measure the edging profiles and cut them to size such that the end is in the middle of a fixing profile wherever possible. Also cut a corresponding second profile piece to size for the upper edging. Adjust the profiles - use a spirit level where necessary. 12a 12b 12) Fitting an installation clip and fixing the edging profile: (Fig. 12a) Set the clip in at an angle and twist it with the help of a screwdriver into the position shown in Fig. 12b Now, push the clip down and fix the edging profile as shown in Fig. 12c 12c

13 13) In the same way as just described, fix the installation clips to install the first row of planks. 14 14) Beginning at the right, the installation of the first row of panelling starts with the difference cut, leaving 8 mm expansion spacing from the corner of the wall. The side with the blue locking clip always faces the left corner of the wall. When cutting the difference compensation piece to size, take special care that the tongue side with the locking clip (for a starting end on the right) and the groove side (for use as a row end on the left) remain undamaged. 15a 15b 15) Position the next plank at a 30 angle (Fig. 15a), pivot it in and press it down into the connection. (Abb. 15b) As can be seen from Fig. 15c, the installation clip is now simply pushed down and the plank is locked in place. When you have installed the first row, fix after final adjustment the two last profiles in the left corner of the wall and install the remaining difference cut there to finish the first row.

15c 16a 16b 16) To install the next row, begin by installing the installation clips again as already described in point 15. As can be seen from Fig. 16a, insert the plank with the longitudinal tongue side into the lower row. Then push the plank to the end connection and connect it by pushing solidly with the flat of your hand. (Fig. 16b and 16c) Finish once again by fixing with the installation clips (see Fig. 15c). Do the same for all the following rows. 16c

17 17) Staircase layout with locked panelling. 18a 18b 18) To install the last row, first fit the edging profile as described in Fig. 12c, but this time inverted 180 such that the clips are upside down. (Fig. 18a) Push the installed profile strip as far up as possible. Now you can begin with the installation of the last row. To do this, insert the planks as already described, but this time the fixing takes place with the edging profile alone. With the fixing of each panel, press the profile a little bit further into the newly installed panel. (Fig. 18b) This procedure is continued panel by panel until the row is finished. 19 19) Wall with finished panelling.