Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions : The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Concrete/ Stucco Canopy 1 2 3 4 5 GRE 7 25 25 SF CHIMNEY Brick Chimney - Concrete/ Mortar Liner 1 2 3 4 5 GRE 7 70 70 LF Assessment Date: 4/19/2013 Page 1 of 15
CORNICE Cornice - Masonry Projecting/Limestone 1 2 3 4 5 GRE 6 1,086 362 1,448 LF $33,311 $33,311 DOORS Exterior Steel Door Transom Lite ENTRANCE Concrete Exterior Stairs Entrance Controls - Audio and Video Power Door Operator and Controls Stair Handrails FOUNDATION 1 2 3 4 5 GRE 6 20 GRE 6 3 1 2 3 4 5 GRE 6 40 GRE 6 2 GRE 6 4 GRE 6 30 20 EA $6,607 3 EA $849 $7,456 40 LF $4,290 2 EA $2,860 4 EA 30 LF $7,150 Masonry Foundation 1 2 3 4 5 GRE 7 905 905 SF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 1 2 3 4 5 GRE 6 2 GRE 6 21 2 EA $1,001 2 $4,505 $5,506 Assessment Date: 4/19/2013 Page 2 of 15
LINTELS Lintels - Brick Lintels - Steel Lintels - Stone 1 2 3 4 5 GRE 7 278 GRE 7 446 GRE 7 202 278 LF 446 LF 202 LF PARAPET Coping - Stone Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height 1 2 3 4 5 GRE 6 619 23 GRE 7 23 GRE 7 95 GRE 7 524 642 LF 23 LF 95 LF 524 LF ROOF SYSTEM Exterior Downspouts Interior Downspouts Metal Roof Modified Bitumen Roof Roof Structure: Heavy Timber Roof Structure: Steel with Clay Tile Arch 1 2 3 4 5 GRE 7 262 GRE 6 22 289 GRE 6 147 GRE 6 9,304 13,562 GRE 7 9,304 3,709 262 LF 311 LF $2,360 147 SF $1,110 22,866 SF $205,763 9,304 SF 13,709 SF $209,232 SUPERSTRUCTURE Heavy Timber Steel with Clay Tile Arch 1 2 3 4 5 GRE 7 37,216 GRE 7 32,113 37,216 SF 32,113 SF Assessment Date: 4/19/2013 Page 3 of 15
WALLS Brick Stone - Cast Stone - Cut 1 2 3 4 5 GRE 6 37,483 5,192 GRE 6 592 GRE 6 1,810 42,675 SF $247,635 592 SF $8,466 1,810 SF $25,883 $281,984 WINDOWS Curtain wall - Insulated panel Window - Guards wire guard Windows - Decorative Windows - Sash Aluminum Windows - Sash Aluminum Double-pane EXTERIOR 1 2 3 4 5,134 GRE 6 1,905 02 GRE 7 420 GRE 6 4,916 2,108 1,134 SF 1,905 SF 102 SF 420 SF 7,024 SF $42,179 $42,179 $586,818 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency Battery Packs - Toilets Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Public Announcement System Security System - CCTV 1 2 3 4 5 GRE 6 1 GRE 6 10,402 GRE 6 8,516 GRE 6 1,818 GRE 6 33 GRE 6 6 GRE 6 6 GRE 6 26 GRE 6 4 GRE 6 69,329 GRE 6 69,329 $1,430 10,402 SF $4,462 8,516 SF $4,506 1,818 SF $780 33 EA $3,539 6 EA $644 6 EA $644 26 EA $6,060 4 EA $932 69,329 SF $41,639 69,329 SF $99,140 Assessment Date: 4/19/2013 Page 4 of 15
Security System - Intrusion detection MAIN SERVICE GRE 6 69,329 69,329 SF $64,441 $228,218 Main Electrical service 2000 to 3000 A 120/208/3PH 1 2 3 4 5 POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 120/240-120/208 ELECTRICAL 1 2 3 4 5 GRE 7 21 GRE 7 3 2 3 EA $228,218 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller PUMP ROOM ASSEMBLY Fire Pump 25-50hp Jockey Pump 1 2 3 4 5 GRE 6 69,329 GRE 6 32,113 1 2 3 4 5 BLU 5 1 GRE 6 1 69,329 SF $24,785 32,113 SF $39,033 $18,590 $82,408 $15,015 $744 $15,759 Assessment Date: 4/19/2013 Page 5 of 15
SPRINKLER SYSTEM 1 2 3 4 5 Dry Sprinkler System BLU 5 69,329 69,329 SF $292,464 Sprinkler Heads BLU 5 69,329 69,329 SF $19,828 $312,292 FIRE PROTECTION $410,460 MECHANICAL AIR CONDITIONING Window A/C AIR HANDLING SYSTEMS Air Handling Package - Multi Zone - Steam 15,001 to 20,000 cfm Air Intake - Built Up Air Handling Multi Zone Built Up Air Handling - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 15,001 to 25,000 cfm Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft Single Zone Built Up Air Handling - Steam 4,000 to 8,000 cfm Single Zone Built Up Air Handling Auxiliaries - Steam 4,000 to 8,000 cfm BOILER SYSTEMS Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler greater than 200 HP Boiler Auxiliary - Steam Boiler greater than 200 HP Chemical Feeder - Steam Boiler Combustion Dampers Feed Water Pumps and Tank - Steam Boilers 1 2 3 4 5 GRE 6 64 1 2 3 4 5 BLU 5 1 1 YEL 4 300 1 2 3 4 5 1 1 GRE 6 1 GRE 6 2 GRE 6 1 64 EA $13,728 $13,728 $92,950 2 EA $27,599 $92,950 $32,890 300 LF $793,650 $25,740 $7,150 $1,072,929 2 EA $328,757 2 EA $36,179 $300 2 EA $572 $8,437 Assessment Date: 4/19/2013 Page 6 of 15
$374,245 MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Steam - Steel or Galvanized TEMPERATURE CONTROL Pneumatic System Thermostats - Direct Digital Control (DDC) Thermostats - Pneumatic Zone Dampers VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM MECHANICAL PLUMBING HOT WATER Hot Water Heater - Electric less than 50 KW 1 2 3 4 5 BLU 5 1 1 BLU 5 200 BLU 5 200 1 2 3 4 YEL 4 69,329 9 5 5 BLU 5 19 15 1 2 3 4 5 GRE 6 1 GRE 6 2 BLU 5 1 2 1 2 3 4 5 GRE 6 6 2 EA $29,315 200 LF $6,507 200 LF $9,896 $45,717 69,329 SF $495,702 19 EA $17,661 15 EA $9,867 34 EA $18,175 $541,405 $501 2 EA $858 3 EA $2,746 $1,573 $5,677 $2,053,702 6 EA $8,408 $8,408 Assessment Date: 4/19/2013 Page 7 of 15
PIPING Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping 1 2 3 4 5 GRE 7 69,329 YEL 4 69,329 GRE 7 69,329 YEL 4 69,329 YEL 4 69,329 GRE 7 69,329 GRE 7 69,329 GRE 7 69,329 BLU 5 69,329 BLU 5 69,329 BLU 5 69,329 69,329 SF 69,329 SF $44,613 69,329 SF 69,329 SF $31,725 69,329 SF $37,673 69,329 SF 69,329 SF 69,329 SF 69,329 SF $42,630 69,329 SF $32,716 69,329 SF $24,785 $214,143 PUMPS Domestic Booster Pump duplex PLUMBING INTERIOR ADMINISTRATIVE SUITES 1 2 3 4 5 GRE 6 1 $3,146 $3,146 $225,698 Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Tile/Sheet Flooring - Wood Lighting - Pendant/Surface Walls - Plaster/Drywall 1 2 3 4 5 GRE 6 608 2,377 GRE 7 608 GRE 6 622 921 GRE 7 834 GRE 6 5 36 GRE 6 4,599 3,626 2,985 SF $1,721 608 SF 1,543 SF $889 834 SF 41 SF $33 8,225 SF $10,851 $13,495 Assessment Date: 4/19/2013 Page 8 of 15
DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Transom Window 1 2 3 4 5 04 GRE 7 4 GRE 7 85 GRE 7 61 104 EA 4 EA 85 SF 61 SF GYMNASIUM / AUDITORIUM Ceiling - Plaster/Drywall Flooring - Wood Lighting - Metal Halide/Sodium Vapor Lighting - Pendant/Surface Stage Curtain Walls - Plaster/Drywall 1 2 3 4 5 GRE 7 2,818 GRE 7 2,818 0 GRE 7 4 GRE 7 4,599 2,818 SF 2,818 SF 10 EA 4 EA 4,599 SF KITCHEN Ceiling - Lay-In Flooring - Tile/Sheet Lighting - Lay-In Wall - Plaster/Drywall LUNCHROOM Ceiling - Lay-In Flooring - Tile/Sheet Lighting - Lay-In Serving Line 1 2 3 4 5 GRE 6 600 GRE 6 600 GRE 6 7 GRE 6 905 1 2 3 4 5 GRE 6 1,265 GRE 6 1,265 GRE 6 20 GRE 6 16 600 SF $1,716 600 SF $858 7 SF $5 905 SF $2,135 $4,714 1,265 SF $2,713 1,265 SF $1,809 20 SF $14 16 LF $686 Assessment Date: 4/19/2013 Page 9 of 15
Wall - Plaster/Drywall MDF/IDF GRE 6 1,329 1,329 SF $3,136 $8,359 Finishes Ventilation and Cooling 1 2 3 4 5 53 153 SF MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room 1 2 3 4 5 BLU 5 2,787 GRE 6 4 2 BLU 5 3,444 163 GRE 7 3,434 2,787 SF $31,564 6 SF $19 3,607 SF $39,005 3,434 SF $70,589 STAFF RESTROOM Accessories Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete Flooring - Tile Ceramic/Porcelain Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall 1 2 3 4 5,991,991 0 GRE 7 30,961 7 7 0 BLU 5 12 6 GRE 7 2 GRE 7 21 GRE 7 2,837 GRE 6 132 928 1,991 SF 1,991 SF 10 EA 30 SF 1,961 SF 17 EA 17 EA 10 SF 18 SF $51 2 EA 2 2 EA 1,837 SF 1,060 SF $311 Assessment Date: 4/19/2013 Page 10 of 15
Wall - Structural Glazed Tile Wall - Tile Ceramic/ Porcelain Water Closet THEATER GRE 6 238 1,132 GRE 7 794 GRE 7 26 1,370 SF $1,702 794 SF 26 EA $2,065 Stage Lighting System Stage Platform 1 2 3 4 5 GRE 7 438 438 SF VERTICAL CONVEYANCE Elevator - Roped Holeless Hydraulic Stage Lift 1 2 3 4 5 VOCATIONAL SHOP Work Sink INTERIOR 1 2 3 4 5 7 17 EA $99,222 ROOM CASEWORK Casework 1 2 3 4 5 GRE 6 94 74 168 LF $3,361 $3,361 CEILING Lay-In/Drop 1 2 3 4 5 GRE 7 4,708 4,708 SF Assessment Date: 4/19/2013 Page 11 of 15
Plaster/Drywall CHALK BOARD GRE 6 4,452 17,608 22,060 SF $12,605 $12,605 1 2 3 4 5 Chalk Board YEL 4 298 298 LF $36,222 $36,222 CLASSROOM Eye Wash Station Laptop Charging Station Science Lab Elements 1 2 3 4 5 GRE 7 2 GRE 7 2 GRE 7 2,158 2 EA 2 EA 2,158 SF CORRIDORS Carpet Pendant/Surface Plaster/Drywall Single Water Cooler Stair Handrails Student Lockers Tile/Sheet Flooring 1 2 3 4 5 GRE 6 1,618 GRE 6 2,417 9,053 GRE 6 12,601 13,145 GRE 7 9 GRE 6 684 26 GRE 6 2,971 6,643 1,618 SF $2,314 11,470 EA $1,728 25,746 SF $29,732 9 EA 684 LF 126 EA 9,614 SF $4,249 $38,022 CORRIDORS CEILING Plaster/Drywall 1 2 3 4 5 GRE 6 2,417 9,053 11,470 SF $6,843 $6,843 Assessment Date: 4/19/2013 Page 12 of 15
FLOOR Carpet Tile/Sheet Wood 1 2 3 4 5 GRE 6 1,638 GRE 7 9,458 5,672 1,638 SF $2,342 9,458 SF 15,672 SF $2,342 LIGHTING Lay-In Pendant/Surface 1 2 3 4 5 52 GRE 6 42 290 152 EA 332 EA $3,003 $3,003 MARKER BOARD Marker Board 1 2 3 4 5 GRE 6 12 290 302 LF $343 $343 STAIRS Tile WALL 1 2 3 4 5 GRE 6 326 326 SF $2,461 $2,461 Plaster/Drywall ROOM 1 2 3 4 5 GRE 6 2,993 43,961 46,954 SF $7,062 $7,062 $112,266 Assessment Date: 4/19/2013 Page 13 of 15
SITE CIVIL/DRAINAGE Site Manhole 1 2 3 4 5 GRE 7 9 9 EA FENCING Chain Link Ornamental Iron 1 2 3 4 5 BLU 5 5 GRE 7 383 5 LF $179 383 LF $179 LANDSCAPE Asphalt Play Area/Hardscape Parkway trees Planting Beds/ Areas 1 2 3 4 5,630 1 GRE 6 813 1,630 SF 1 813 SF PARKING LOT Asphalt Concrete Curbs Trash Enclosure Vehicular Screening 1 2 3 4 5 BLU 5 4,495 2,714 GRE 7 230 GRE 7 410 60 7,209 SF $15,056 230 LF 410 SF 160 LF $15,056 PLAYGROUND Playground Equipment - School Age 5-12 Playground Surfacing - Poured Surface 1 2 3 4 5,871 1,871 SF Assessment Date: 4/19/2013 Page 14 of 15
SIDEWALKS Internal Walks Perimeter Sidewalks 1 2 3 4 5 GRE 6 62 58 GRE 6 5,998 120 LF $585 5,998 SF $11,322 $11,907 SIGNAGE Marquee - Free Standing Back Lighted SITE Campus Need ² ³ 1 2 3 4 5 GRE 6 1 $27,141 $3,743,524 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 4/19/2013 Page 15 of 15