GSFC CONFIGURATION MANAGEMENT MANUAL

Similar documents
Engineering Drawing System

Engineering Drawing System

DRAWING PROCESS EXTERNAL DRAWINGS

TOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection

Controlling Changes Lessons Learned from Waste Management Facilities 8

Chapter 1 General Design Information

19 and 20 November 2018 RC-4/DG.4 15 November 2018 Original: ENGLISH NOTE BY THE DIRECTOR-GENERAL

(AMMA) American Maritime Modernization Association

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

SECTION SUBMITTAL PROCEDURES

January, 2014 Page 1 of 5

pg. 1 JMS Editors Guide

NEVADA DEPARTMENT OF TRANSPORTATION Addendum 3 to RFP July 28, 2017

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

CIRRUS AIRCRAFT FAI INSTRUCTION

MANAGEMENT DIRECTIVE CONTRACTOR ALERT REPORTING DATABASE (CARD)

Fasteners. Massachusetts Institute of Technology Kavli Institute for Astrophysics and Space Research (MKI) Dwg. No Revision D March 24, 2015

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES

This specification describes the general requirements for Engineering Services provided to Vale.

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

DEPARTMENT OF DEFENSE HANDBOOK STANDARD MICROCIRCUIT DRAWINGS

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

National BIM Standard - United States Version 3

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

Rulemaking Hearing Rules of the Tennessee Department of Health Bureau of Health Licensure and Regulation Division of Emergency Medical Services

COMMERCIAL ITEM DESCRIPTION SPLICE CONNECTORS

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Pan-Canadian Trust Framework Overview

LIFE SAFETY DIVISION GUIDELINE. Subject: BDA Radio Amplification Checklist Date initiated: Date revised:

For the purposes of this document, the Engineering Consultant shall be referred to as the Engineer.

Recommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7)

Screw-Thread Standards for Federal Services, Inspection Methods for Acceptability of UN, UNR, UNJ, M and MJ Screw Threads

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

Attitude Determination and Control Specifications

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

NOT MEASUREMENT SENSITIVE

East Central College

NASA s Detailed Response to the James Webb Space Telescope Independent Comprehensive Review Panel Report

MSFC ENGINEERING DOCUMENTATION STANDARD

Seychelles Civil Aviation Authority SAFETY NOTICE. Coding and registration of Seychelles 406 Mhz Emergency Locator Transmitters (ELTs)

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

The Algorithm Theoretical Basis Document for the Atmospheric Delay Correction to GLAS Laser Altimeter Ranges

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

Section 3 Opportunities

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

SECTION ADMINISTRATIVE REQUIREMENTS

Translation University of Tokyo Intellectual Property Policy

Cloud Based Plan Review Process (Applicant)

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

Sampling procedures for inspection by attributes Introduction to the ISO 2859 series of standards for sampling for inspection by attributes

SECTION PROJECT MANAGEMENT AND COORDINATION

Section Meetings Section Material and Equipment. None Required

MIL-STD-882E: Implementation Challenges. Jeff Walker, Booz Allen Hamilton NDIA Systems Engineering Conference Arlington, VA

General Support Technology Programme (GSTP) Period 6 Element 3: Technology Flight Opportunities (TFO)

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

Brad Luke. Director Peddle Thorp Auckland

Charter of the Regional Technical Forum Policy Advisory Committee

submittals 1s e c t i o n

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017


QUALITY CONTROL INSTRUCTIONS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

AWS C3.9M/C3.9:2009 An American National Standard. Specification for Resistance Brazing

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Allied Radio Matrix for Emergency Response (ARMER) Standards, Protocols, Procedures

INFORMATION SHEET. : Properties Subject to the Slope and Seismic Hazard Zone Protection Act (SSPA) Ordinance

BIM/VDC on TAA Projects:

Other Transaction Authority (OTA)

CubeSat Design Specification

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Quality Control and Quality Assurance Guide

ISO INTERNATIONAL STANDARD. Technical product documentation Digital product definition data practices

SPECIAL SPECIFICATION 8802 Radio Communication Tower Inspection, Maintenance, and Repair

Supplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011

esa Space Station Electromagnetic Emission and Susceptibility Requirements International Space Station Revision C May 31, 1996 SSP Revision C

Construction Phase Project Management and Documentation

CARRA PUBLICATION AND PRESENTATION GUIDELINES Version April 20, 2017

A. Section includes administrative and procedural requirements for project record documents, including the following:

Internal Controls: The Basics National Grants Management Association May 17, 2017

MORGAN STATE UNIVERSITY PROCEDURES ON PATENTS AND TECHNOLOGY TRANSFER APPROVED BY THE PRESIDENT NOVEMBER 2, 2015

Fault Management Architectures and the Challenges of Providing Software Assurance

Working Drawing Manual

Heading back to Mars with a thermal control system developed using NX

INSTALLATION & TESTING OF UNDERGROUND PRIMARY AND SECONDARY POWER CABLES PRIOR TO ENERGIZATION

Result of ESF Study Background and Draft Conclusions

1. Land survey Work. 2. Civil and Structural engineering services.

APPENDIX AVAILABLE ON REQUEST. Research Report 154

UDS OVERVIEW Uniform Drawing System

SECTION D BIM COORDINATION DRAWINGS - CONTRACTORS

Transcription:

GSFC-CM-001 Effective Date: 05/03/2007 Expiration Date: 05/03/2008 National Aeronautics and Space Administration Goddard Space Flight Center Greenbelt, MD 20771 GSFC CONFIGURATION MANAGEMENT MANUAL Responsible Office: 400 / FLIGHT PROJECTS DIRECTORATE CHECK THE FPD CONFIGURATION MANAGEMENT WEB PAGE AT

GSFC-CM-001 Page 2 of 6 FOREWORD This document is the first release of GSFC-CM-001, which is designed to eventually contain GSFC s detailed requirements for configuration management. It is implemented by GID 1410.1 and shall be updated as defined therein. This first version is limited in content to: 1. The high-priority changes determined to be necessary as a result of the Genesis failure; and 2. The process for assignment of GSFC drawing numbers, as previously described in 500-PG- 8700.2.3. This elevates the drawing number assignment process to a Center-level requirement. This manual implements a key recommendation of the GSFC Configuration Management Process Evaluation Team: Revise and strengthen GPR 1410.2 to become a top-level requirements document for the Center. Remove the specific details of configuration management, placing them in a new Configuration Management Manual. This manual will continue to evolve, and changes to it will be controlled by a Configuration Change Board chaired by Code 400. Changes will be based on evolving Center and Agency requirements and continual improvement. CHECK THE FPD CONFIGURATION MANAGEMENT WEB PAGE AT

GSFC-CM-001 Page 3 of 6 1. GENERAL REQUIREMENTS The following requirements apply to space flight product, suborbital product, and associated ground support equipment. For purposes of this release only, the term CM procedures may include existing organizational CM procedures, supplemented by GID 1410.1 and this GSFC CM Manual. The following requirements shall be followed in addition to the existing CM requirements specified in organizational CM procedures. In the event of a discrepancy between the requirements herein and existing procedures, the requirements herein shall take precedence. 1.1 Selection of Configuration Items The process of selection and identification of items that require configuration control shall be clearly described, by type, as part of organizational CM procedures. Those documents and products that ensure product verification and validation shall be under configuration control, and no exceptions or changes shall be allowed without proper CM processing. 1.2 Configuration Control Boards Organizations shall define, as part of their CM procedures, the roles of lead systems engineers (from the Applied Engineering and Technology Directorate) and Systems Assurance Managers (from the Office of Systems Safety and Mission Assurance, or an equivalent from Code 803 for Wallops) as standing members of the Configuration Control Board. 1.3 Verification and Implementation CM procedures shall describe a clear and concise process for ensuring that approved configuration changes are properly and adequately verified and implemented. Configuration change requests shall not be closed until proper implementation is verified and documented. 2. REQUIREMENTS FOR DESIGN DRAWINGS 2.1 Definitions a. Design Drawings Those drawings and associated data that communicate the detailed design requirements for the manufacture of end item products, as well as their assembly, installation, inspection, and/or test. b. GSFC Design Drawings Design drawings prepared by GSFC design personnel or contractors on GSFC drawing format using GSFC drawing numbers. c. Contractor Design Drawings Drawings that a non-gsfc entity, e.g., a contractor, a vendor, or another organization such as a university, uses to design and deliver a finished product to

GSFC-CM-001 Page 4 of 6 GSFC in accordance with the terms of a contract. These drawings shall bear the entity s name, address, federal code identification, and drawing number. 2.2 General Requirements a. All GSFC design drawings shall be developed consistent with the requirements of the GSFC design drawing standards. See GID 1410.1. b. All GSFC design drawings shall have drawing numbers assigned as described in section 4 herein. c. All approved GSFC Design Drawings shall be maintained as records. d. CM procedures shall include: (1) Computer Aided Design (CAD) software selection and interface requirements, including file naming conventions; (2) Description of the Drawing Control Process including the locations where CAD files and drawings reside and how to access the latest versions. This process shall also cover contractor-provided drawings and files that do not use the GSFC drawing format and numbering conventions, even though access may be limited; (3) Description of the Drawing Release Process including specific review and approval signature requirements based on drawing classification. Identification of specific disciplines and individuals shall be the responsibility of the mission systems engineer, who shall, in collaboration with product design leads, establish and maintain a table/matrix of names and disciplines for drawing signoff/approval; (4) Description of the Drawing Change Process which identifies the approval process based on change classification. As in the Drawing Release Process, identification of specific disciplines and individuals shall be the responsibility of the mission systems engineer, who shall, in collaboration with product design leads, establish and maintain a table/matrix of names and disciplines for Drawing Change approval; (5) Verification of CCB-approved change requests that require drawing changes. The CCB shall specify required disciplines to verify that the intended changes were appropriately incorporated into the drawing(s); and (6) Archiving requirements for drawings and CAD files. All above configuration management requirements shall be included in GSFC contracts as described in GID 1410.1. 3. GSFC DESIGN DRAWING STANDARDS 3.1 GSFC drawing standards are maintained as described in GID 1410.1. 3.2 All GSFC design organizations and associated contractors at all GSFC locations shall adhere to the GSFC drawing standards when developing drawings on GSFC format for in-scope flight hardware and associated ground support equipment.

GSFC-CM-001 Page 5 of 6 4. ISSUE AND MANAGEMENT OF GSFC DRAWING NUMBERS 4.1 GENERAL The Drawing Number Block Requests Web site shall be the single point for assignment of drawing numbers for engineering drawings to be produced on GSFC drawing format by GSFC personnel and support contractors. The system is maintained and operated by the Applied Engineering and Technology Directorate (AETD). Access to the drawing number Web site is limited to individuals listed in the GSFC LISTS database. Configuration managers shall coordinate drawing number requests for their organizations. 4.2 DRAWING NUMBER REQUEST PROCEDURE To obtain a block of GSFC design drawing numbers, users access the system through the GSFC Online Applications System Entrance at the Web address: http://gdms.gsfc.nasa.gov/gdms/pls/frontdoor. This site can also be accessed from the Goddard Directives Management System. Users shall log in with their GDMS User ID and password. Logging in as a Guest does not allow access to the site. Once logged in, select Drawing Number Block Requests to request an appropriate block of numbers. On the Drawing Number Block Request screen, users designate the size of the requested block of numbers, their organizational code, and a project name for the requested number(s). A payload name and a subsystem name should also be entered where applicable. Default block sizes that may be requested are 10, 25, 50 or 100 drawing numbers. Requests for blocks of more than 100 drawing numbers shall be approved by the AETD. After the request is submitted, a block of numbers is allocated to the requester, and a confirmation e-mail is sent to that individual. 4.3 RESPONSIBILITIES The CM of drawing numbers becomes the responsibility of the organization to whom they are assigned. This includes drawing title assignment, management of release status, management of change (EO and revision) status, and storage of released originals. Reassignment of the numbers to group subsections or individuals, other contractors or subcontractors, or other programs or projects shall be controlled, recorded, and maintained by the organization s configuration manager.

GSFC-CM-001 Page 6 of 6 CHANGE HISTORY LOG Revision Effective Date Description of Changes - 05/03/2007 Initial Release