Installation Instructions and Details

Similar documents
Installation Instructions and Details

Installation Instructions

Installation Instructions

Installation Instructions

Wall Installations. Chapter 16 Wall Installations 16. 1

INSTALLATION GUIDE. Table saw or circular saw with fine-tooth blade, caulking gun, rule/tape, drill, file, hammer, plumb line/level, ridge/support.

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

VERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL

ENGINEERED WOOD INSTALLATION GUIDE: The Cardinal Collection

INSTALLATION MANUAL STORAGE

LuxCore Installation Instructions

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings

Mach Wall Installation Instructions

Panel Grille Suspended Ceiling Installation Guide

Installation Instructions Palladium Square Edge Panels

Installation Instructions

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Engineered Hardwood Flooring Installation Instructions

Wood Molding Installation Guide

Harvest (8094) Mystic (8078) Niagara (8095) Shenandoah (8057) 2 DURATA MORTARLESS STONE DURATA FLAT KIT PROFILE #:

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

Ideal supports for dry vertical adhesion are: Ideal supports for wet applications are:

Tape Measure Metal Clippers Screw Bit Set With Extensions

INSTALLATION INSTRUCTIONS

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

Installation Guide. Aspect Stone Peel & Stick Tile. proper surface preparation is essential for a successful project. Installations Methods

Metallaire Installation Instructions

Installation Guide (888)

English Professional Installation Guidelines

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

Install Windsor Corners

Install Instructions. SCR-48N Crash Rail. Please read these instructions thoroughly prior to beginning the SCR-48N Crash Rail installation!

Make every component count.

Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE

Chapter 22 - Cabinets & Vanities

DURACRYL WALL INDEX INTRODUCTION TOOLS AND MATERIALS REQUIRED FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

SINKS AND LAVATORIES. Steps to completion: These items are essential for installing all sinks:

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

3" [76.0mm] HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

INSTALLATION. Installation Guide. Installing Bamboo Flooring on Top of a Wood Subfloor

INSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories

WoodWORKS Channeled Plank

Installation Instructions FOR INTERLOCKING ENGINEERED HARDWOOD (P.1)

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

Traditional Undermount: S Method (Undermount):

Wallgard 1,3 product

Chapter 19. Interior Finish Work

INSTALLATION INSTRUCTIONS

Wilsonart Decorative Edge Fabrication Manual

INSTALLATION. GlUElEss CliCK BamBoo installation GUidE. Introduction. Tips for a successful installation

Installation Instructions for Engineered Wood Flooring

ARTISTIC FINISHES. The Artistic Touch TM. Installation and Maintenance Guide. Copyright 1999 Artistic Finishes, Inc. All rights reserved.

Storing, Handling, and Cleaning dekō Markerboards Storing Markerboards. Handling. Cleaning

3.1 Continuous top and bottom lock 3.2 Engineered nailing hem 3.3 Temperature markings

CONTENTS OVERVIEW. For a complete set of CAD drawing details, please visit LaminatorsInc.com. 1 Essential Equipment. 1 Essential Supplies

Installation Instructions for Viking Hearth Engineered Wood Flooring

ANCHOR PLATE ATTACHMENT STEEL STUD FRAMING OR FURRING CONSTRUCTION WITH ACCESS FROM PANEL SIDE ONLY

Comfort Designs with Swan Solid Surface

Installation Guide. brighter. lighter.

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General

WOODWORKS Walls. Installation Instructions WALL

CABINET INSTALLATION INSTRUCTIONS

Installation Instructions. Conventional Wainscot Wall Padding Panels MODEL # RWC25321 RWC26321 RWC253X1 RWC263X1 RWC25321 RWC25XXX RWC26XXX

Installation Instructions Stainless Steel Wall Panels

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

WET AREA PANELLING. Designer Walls. Fast

L u m b e r M e l a m i n e H a r d w o o d P l y w o o d A r c h i t e c t u r a l P a n e l s C o l o r e d C a u l k P a r t i c l e B o a r d E

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

INSTALLATION GUIDE FOR MAZAMA MULBERRYWOOD HARDWOOD FLOORING

Installation Guide. Tools Recommended:

INSTALLATION INSTRUCTIONS

Titan Installation Instructions

General Sizes: 2 x 2 and 2 x 4 Lay-In (grid) ceilings tiles; 2 x 2 and 2 x 4 Glue-Up tiles.

PANEL INSTALLATION GUIDE

Swanstone Wall Kits and Panels

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

How to Mitre Mouldings

CABINET INSTALLATION Please read prior to installation.

Installation Guide (888)

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-30: DOOR GENERAL. Door 56-30: DOOR. 1. General

NEO ANGLE BASE. Model Numbers

Installation Manual for Thermo Panel

Panel Installation Instructions

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

CRASH RAIL INSTALLATION HEIGHT

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

Chapter 14. Wall Sheetrock

WoodTrac Direct Mount Ceiling System

TONGUE & GROOVE NAIL-DOWN INSTALLATION INSTRUCTIONS

Locker Installation Guide. Lockers Available From CES Company Phone: Fax:

Wet Area Panelling. Linear Series

metalworks Plank Assembly and Installation Instructions 2.1 Read this entire document before proceeding with installation.

Prior to installation, the installer assumes all responsibility for final inspection and quality of the product

A. Provide all finish carpentry needed for a complete and proper installation.

Frameless Inline Door QCI5248

Landscape Collection

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

Transcription:

Installation Instructions and Details HIGH-HUMIDITY: Marlite Modules panels are subject to the effects of moisture. DO NOT USE IN KITCHEN, REST ROOMS, OR OTHER HIGH-HUMIDITY AREAS. TOOLS REQUIRED: Regular carpentry tools, such as a level, block plane, sanding block, drill, table saw or circular saw with fine toothed carbide blade, chalk line, hack saw, tape measure, file, miter box, and square. CAUTION: Be sure to use the proper safety guards required when cutting panels. Also wear safety glasses or face shields and hand protection. NOTE Metal trim may produce sparks when cutting. Take proper precautions for dust removal. WALL PREPARATION: Structural walls should be finished with building completely closed. Walls must be thoroughly dry before panels are applied. Panels must be applied over a smooth, solid, flat backing such as plaster, drywall or plywood. On exterior walls a vapor barrier should be used between backer and studs to discourage warping. Protect existing surfaces with drop cloths. PREPARATION /HANDLING TIPS: Open cartons and carefully inspect all panels. Due to texture and manufacturing techniques, some panels may vary in color, consistency, and pattern. Panels must be stored in a dry environment. Store panels flat and off concrete floors. CONDITIONING: All panels shall be allowed to equalize to the moisture and temperature in the room environment prior to installation. To ensure product performance, a temperature range of 60º-80ºF and a humidity range of 35-55% must be maintained during storage, installation and product life cycle. FABRICATION: Always cut panels face up with a fine-toothed carbide-tipped blade using a table saw or face down with a portable power saw using a fine-toothed carbide-tipped blade to assure a clean-cut edge. ADHESIVE REQUIRED: Marlite Brand C-109 Low VOC adhesive is the adhesive recommended. This adhesive is a solvent based material and local code restrictions may require substitution. Any adhesive substitution must have the manufacturer s approval. Clean tools with mineral spirits. Read caution label on adhesive package before use. CLEANUP: Marlite Modules Panels are easily cleaned with a soft cloth, slightly damp (not wet) cloth and mild cleaners such as Pine Sol, Lemon Fresh Lestoil, or Mr. Clean Adhesive can be cleaned from the face of panels using mineral spirits. ALWAYS TEST THINNERS ON A PIECE OF SCRAP MATERIAL BEFORE USING ON WALLS. Statements expressed in this technical bulletin are the recommendations for the application of Marlite brand products as outlined and illustrated under normal conditions of installation. The recommendations provided in the bulletin represent our best judgment based on our experience with normal applications. Unless prior approval is obtained in writing from Marlite, any deviation from these recommended procedures shall be at the sole risk of the installers. Carefully inspect all panels. If a panel is defective, notify the Marlite Service Center nearest you at once. Failure to do so shall be at the sole risk of the installer. For technical assistance, or if you have any questions regarding your order, contact; Marlite Customer Service, 202 Harger Street, Dover, OH 44622 800-377-1221 E-mail info@marlite.com

NOTE! This is a general detail page. Not all details apply to every installation. 1. PANELS 2. TRIM 23 1/2 (Varies with panel spec d.) 23 (Varies) Grain Direction (typical) 23 (Varies) 23 1/2 (Varies) MT-560 Outside corner Trim (10 length) MT-570 Edge/Inside Corner Trim (10 length) 3. LAYOUT See architectural elevation or elevation provided to determine layout and location of panel. To preplan a balanced layout, top & bottom panels should be equal in height and end panels should be equal in width (See Illustration). Marlite Modules Panels are random in texture and typical in color: this is intentional and to be expected. Care should be taken during installation to create a pleasing layout.

4. INSTALL TRIM Check plans for proper treatment of all perimeter conditions. Install outside corner trim first. Next, dry fit edge trim by coping to fit profiles previously installed (miter-cut at intersections of edge trim). DO NOT ALLOW TRIM FLANGES TO OVERLAP. Secure edge trim to subwall by applying a bead of adhesive to the back of the trim flange and press into place. Avoid a heavy layer of adhesive to prevent squeeze-out and clean up problems. Use 2 strips of masking tape at 24 O/C for the length of the flange to hold until the adhesive cures. Outside Corner Trim Install this wall to corner before continuing on the adjacent wall. Notch Edge Trim 1 1/4 as shown Notch Edge Trim 1 1/4 as shown Notch Edge Trim 1 1/4 as shown Butt this edge into adjacent wall Edge Trim. 5. DRY FIT PANELS Trim panels as required. Dry fit before applying adhesive to be sure size is correct. (See layout, Step 3) Locate the top of the first panel. Snap a level chalk line at this height for the length of the installation. Take measurements from chalk line to base trim along the wall. This dimension cannot exceed panel face dimension. Adjust the line if necessary. Scribe the bottom of the panel as required. Repeat these steps to create a vertical chalk line. 6. INSTALL PANELS When working from left to right, start at the bottom left edge and install so that the tongue is on the top and right side.

7. ADHESIVE Pre-fit panels. Make all cutouts for outlet boxes, switches, etc. Apply a bead of Marlite Brand C-109 Low VOC Adhesive approximately 6 on center the full width of the panel as shown. Press and knead panels repeatedly to be certain of contact with the wall at all points. Fan the panel by pressing and pulling from the wall. This releases the adhesive solvents, thus allowing adhesive to set up more quickly. 8. ACCESSORIES (not provided)

9. OTHER Inside Corners other than 90 deg. will use 2 pc. of Edge trim. Outside Corners other than 90 deg. will use 2 pc. of Edge trim. Form # MM15-09091 Dover, Ohio 44622 Copyright 2009 Effective-09-20-2009 www.marlite.com info@marlite.com Marlite, Inc.