STANDARD 3-PIECE CULTURED MARBLE PANEL INSTALLATION GUIDE

Similar documents
Installation Instructions for Mincey Marble Manufacturing s Standard 3-Piece Panels [Not Extending to the Ceiling]

Wall Panel Installation

Product number TS-CS/12 x 12. Please read the following before attempting to install your new 12 x 12 Contemporary cast marble panel system

Installation Instructions for Mincey Marble Manufacturing s 6 x 24 - Stacked - IL Panel System. Product number TS-VS/6 x 24 - Stacked - IL

Product number: TS-CS/6 x 24 - TB - S

Before You Begin... TOOLS & PRODUCT INVENTORY

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

BARRIER FREE SHOWER PAN INSTALLATION INSTRUCTIONS

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Installation Instructions for Mincey Marble Manufacturing s 30 Wall Mount Accessories Ledge. Product number: SS-03-30

675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure

FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274

Installation Instructions

Installation Instructions for easy to install Texture Plus faux wall panels

Frameless Inline Door With Return QCI5263

Comfort Designs with Swan Solid Surface

Product number: FR-03

DURACRYL WALL INDEX INTRODUCTION TOOLS AND MATERIALS REQUIRED FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

A-935 RODA WALL MOUNT HINGES

Frameless Inline Door QCI5254

tile redi redi DOOR Redi Swing SERIES: CONFIGURATION: MOUNTING PACKAGE:

3/8 FRAMELESS BYPASS SLIDING SHOWER ENCLOSURE

60 DIRECT-TO-STUD SHOWER WALL SET

Frameless Heavy Glass Door with Wall Mount Hinges

Curium 19.4H Installation Instructions & Parts List

Frameless Inline Door QCI5248

Frameless Fixed Panel Slider QCI5279

SHELTON THERMOSTATIC SHOWER PANEL

Frameless Fixed Panel Slider

Ideal supports for dry vertical adhesion are: Ideal supports for wet applications are:

FRAMED PANEL / DOOR / PANEL CONTINUOUS HINGE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Frameless Bypass Slider

Frameless Door QCI5284

DURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

Frameless Bypass Slider

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

INSTALLATION INSTRUCTIONS

Mach Wall Installation Instructions

Curium 19H Installation Instructions & Parts List

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

CAELI THERMOSTATIC SHOWER PANEL

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Model 5400H / 7000H Illustrated Installation Instructions

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Double Frameless Swing Door QCI5247

Deluxe Continuous Hinge Framed Door & Inline Panel with Return Panel Shower Enclosure

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

Radon 07 Installation Instructions & Parts List

Dubnium 11 Installation Instructions & Parts List

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

Low Base 3, 4 and 5-Piece Showers with SnapJoint 3/4/5 LBS SJ

INSTALLATION INSTRUCTIONS. Deluxe Continuous Hinge Inline Door & Panel Shower Enclosure QCI5230

COMPOSITE SIDING INSTALLATION GUIDE

Wall Installations. Chapter 16 Wall Installations 16. 1

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Installation Instructions

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

FIXED PANEL SLIDER QCI5241

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

694 SERIES NEO-ANGLE PIVOT SHOWER ENCLOSURE

Balustrade Systems / Installation Instructions

Installation Instructions

TUB SHOWER Framed Sliding Enclosure

Gallium 03 Installation Instructions & Parts List

Installation Instructions for Mincey Marble Manufacturing s. Windowsill Line and Edge Options

340 & 350 SERIES BATH ENCLOSURES

Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.

HANDRAIL HEIGHT PER LOCAL CODE AUTORITY

300C6 CONTINUOUS HINGE SEMI-FRAMELESS DOOR KIT

INSTALLATION GUIDE Hisense Laser TV Display Screen

Frameless Inline Door QCI5288

ENIGMA AIR ENCLOSURE

UNIT No. 1415NP / 1715NP / 1815NP INFINITY FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE WITH NO INLINE POST

SHOWER ENCLOSURE INSTALLATION

UNIT No FRAMELESS PIVOT SHOWER DOOR

ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE

VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS

SENTINEL SERIES 110 SINGLE HUNG WINDOWS

Desk/Wall-Mount Rack

SHOWER DOORS INSTALLATION INSTRUCTIONS SHOWER DOORS: LBSDD Version 4.0

Chapter 16. Underlayment and Finish Stairs

INSTALLATION INSTRUCTIONS. UNIT No. 160/760 THIN-LINE SHOWER ENCLOSURE

Xenon 05 Installation Instructions & Parts List

Two Panel Frameless Bypass Door

Chapter 19. Interior Finish Work

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

CALLAS THERMOSTATIC SHOWER SET

Pocket Door Installation Instructions

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

installation manual m y w a l l a r t. c o m

UNIDOOR X (STYLE L1)

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

INSTALLATION INSTRUCTIONS 960 RODA GLASS TO GLASS HINGES ANGLED FRAMELESS PANEL / DOOR / PANEL CELESTA DRESDEN TRESOR

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

Chapter 1. Beam and Sill Plates

SHOWER ENCLOSURES INSTALLATION INSTRUCTIONS SHOWER ENCLOSURES:

340 & 350 SERIES DELUXE FRAMELESS BYPASS

Transcription:

STANDARD -PIECE CULTURED MARBLE PANEL This installation guide applies to all standard -piece panel systems extending to the ceiling where each wall is manufactured in one piece. PH 70.59.55 F 70.59.559 PAGE 0F 7

STANDARD -PIECE CULTURED MARBLE PANEL -PIECE PANEL DIMENSIONS GENERAL NOTES 0 60 0 MODERN SERIES Prior to starting the installation, please read the notes below as they will help plan your installation and avoid unnecessary breakage. Architectural Concepts is not liable for breakage due to mishandling or improper installing. 96 x 4 TILE. The shower pan should always be set in place, prior to the wall substrate being installed. The shower pans have attached flange to prevent leakage. The wall substrate shall at least cover the thickness of the flange so the panel system remain flush against the wall and prevent the panels to bow out at the bottom. To ensure panels to install properly, provide additional piece of wall substrate if flanges are not completely covered. SEE DETAIL IN STEP FOR ILLUSTRATION.. Handling the material in extremely cold temperatures requires extreme caution, as the panels are more fragile in extremely cold temperatures. When possible, store all material in a heated area at least 4 hours prior to being handled for installation.. If installing grab bars blocking shall be placed in the desired location prior to the wall substrate being installed. Once panel is installed, all screw holes shall be predrilled through the panel, so the screw can pass freely through the panel and into the blocking. The holes shall be drilled slightly larger than the screw, to avoid any part of the threads coming in contact with the panel. The panels are not designed to support the tension placed on the bar. Tighten all screws with caution as the panels can be cracked or broken if the screw is over tightened. 4. If installing a tile pattern panel system, please follow all instructions closely. The grout joints will not align from panel to panel, unless they are installed exactly as instructed. This is the single item that creates the largest number of customer complaints and requires the purchase of additional material. In ALL cases, where the joints are misaligned, the material was installed in a manner other than the one explained in this installation guide. Generally, panels must be cut on all sides in order to be installed correctly. 5. If planning to install the panel system over existing tile, make sure the tile is free of mold and mildew and that all tiles are still well adhered to the substrate. Follow all standard instructions for cutting and installing, with the exceptionof the adhesive to be used. When installing against existing tile, use only 00% Silicone. The Silicone will provide better adhesion to the tile than will construction adhesive. PH 70.59.55 F 70.59.559 PAGE 0F 7

STANDARD -PIECE CULTURED MARBLE P A N E L Installation Installation ma Installation manu M AT E R I A L S / T O O L S N E E D E D PROVIDE SAW HORSE AND PLACE 4 s ON TOP TO SUPPORT PANELS BEING CUT OR DRILLED COMMERCIAL GRADE HOT GLUE GUN. USE COMMERCIAL GRADE 5 GLUE STICKS FOR MEASURING ON FRONT OF PANELS. USE ACETONE TO REMOVE PENCIL MARKS ONCE INSTALLED 0 DIAMOND HOLE SAW FOR DRILLING FOR PLUMBING FITURES MASONRY BLADE 0 0 4 LEVEL VARIOUS DRILL BIT SIZES CONSTRUCTION ADHESIVE FOR APPLYING PANELS TO THE SUBM6x0 (x) STRATE M6x0 (x) 0 FOR EAN UP FOR APPLYING 00% SILICONE PANELS TO EISTING TILEM6x0 AND FOR ALL PANEL TO PANEL AND PANEL TO TUB OR PAN SEAMS SANDPAPER (USE 0 GRIT TO CREATE A SLIGHT BEVEL ON ALL CUT EDGES) M6x (x4) x LATE CAULKING FOR ALL ENDS WHERE THE PANEL IS AGAINST DRYWALL OR CEILING VERIFY SHOWER PAN IS LEVELED FRONT TO BACK AND SIDE TO SIDE. MA TOLERANCE IS +/- /4. NOTIFY ARCHITECTURAL CONCEPTS IF TOLERANCE IS OVER /4 OUT OF LEVEL IN ANY DIRECTION x5(x4) 0(x7) x5(x4) PANEL SHOWER PAN 60 MIN SILICONE JOINT INTEGRAL FLANGE M5x0 (x 4) ST5.5x LOCATE A HORIZONTAL CONTROL LINE () WHICH WILL BE USED THROUGHOUT THE INSTALLATION TO SURE PANELS FIT AS DESIGNED. MEASURE FROM THE BOTTOM OF THE BACK PANEL TO THE CENTER OF THE GROUT LINE OSEST TO 60. ONCE MEASUREMENT IS MADE, SUBTRACT / FROM THAT MEASUREMENT. / IS FOR ADJUSTMENT. 0m m STUD WALL L O C AT E C O N T R O L L I N E S 0m m 0m m GREEN BOARD x5(x4) ST5.5x (x)m6x0 (x4) L E V E L S H O W E R PA N M5x0 (x 4) DRY/EAN RAGS M6x0 (x4) 0m NOTE: m SEE GENERAL NOTE #, PAGE PH 70.59.55 F 70.59.559 M6x0 (x) 0 FOR INFORMATION REGARDING INTEGRAL FLANGE. 0 PAGE 0F 7

M6x0 (x4) 0mm M5x0 ( x5(x4) STANDARD -PIECE CULTURED MARBLE PANEL Installation man CONTINUED LOCATE VERTICAL EAMPLE: IF GROUT LINE MEASUREMENT IS 60 /4, THEN SUBTRACT /. THIS EQ. EQ. WILL Installation GIVE A MEASUREMENT OF TO manual PLACE A MARK ON THE WALL. ONCE A MARK IS PLACED, USE THE LEVEL TO DRAW A LEVEL LINE ACROSS THE BACK WALL. THIS LINE WILL BE THE CONTROL LINE () 0 0 LOCATE THE VERTICAL LINE BY MEASURING FROM THE SAME HEIGHT AS THE HORIZONTAL TO THE CENTER THE CENTER OFTHE WALL FROM TOP OF PAN TO THE CEILING. THIS WILL ESTABLISH WHERE THE SIDE PANELS WILL END. M6x0 (x4) = MEASUREMENT TAKEN M6x0 (x) ST5.5x OF THE BACK WALL FROM LEFT TO RIGHT AND MARK THE CENTER. USE THE Installation LEVEL AND DRAW A PLUM LINE DOWN m M6x0 (x) x5(x4) M5x0 (x 4) 0 4 FITTING BACK PANEL M6x0 (x4) M5x0 (x 4) 0mm ST5.5x (x) M x5(x4) 0(x7) USING THE AS THE GUIDE, MEASURE FROM THE TOP OF THE SHOWER PAN UP TO THE ON THE BACK WALL ON THE LEFT SIDE, RIGHT SIDE, AND MIDDLE. ALSO, MEASURE FROM THE TOP OF THE SHOWER PAN TO THE CEILING IN THE SAME THREE LOCATIONS. = MEASUREMENT TAKEN USE THE VERTICAL TO LOCATE THE WIDTH. MEASURE FROM THE TOP, BOTTOM, AND MIDDLE, ON BOTH THE LEFT SIDE AND THE RIGHT SIDE OF THE VERTICAL. = MEASUREMENT TAKEN 0mm PH 70.59.55 F 70.59.559 m 0mm PAGE 4 0F 7

STANDARD -PIECE CULTURED MARBLE PANEL 5 CUT THE BACK PANEL TRANSFER THE MEASUREMENTS FROM STEP 4 TO THE FRONT SIDE OF THE BACK PANEL. USE THE GROUT LINE WHERE THE LINE WAS OBTAINED IN STEP THAT MEASURES OSEST TO 60 AS IT WILL BE EASY TO TRANSFER ALL ESTABLISHED POINTS USING THIS GROUT LINE AS THE. FIRST, MEASURE FROM THE DOWN AND PLACE A MARK AT EACH ESTABLISHED POINT. THEN TAKE A STRAIGHT EDGE AND PENCIL TO CONNECT THE DOTS. THEN MEASURE FROM THE LINE JUST CREATED (AND NOT FROM THE BOTTOM OF THE PANEL) UP TO THE TOP OF THE PANEL AND PLACE A MARK AT EACH ESTABLISHED POINT. THEN TAKE A STRAIGHT EDGE AND PENCIL TO CONNECT THE DOTS. ONCE ALL MEASUREMENTS ARE ESTABLISHED, CHECK ALL MEASUREMENTS. ONCE ALL MEASUREMENTS ARE VERIFIED TO BE CORRECT AND TRANSFERRED CORRECTLY, BEGIN CUTTING THE PANEL. TO CUT THE PANEL, FIRST MAKE SURE THE PANEL IS WELL SUPPORTED BY 4 S, PLACED ON THE SAW HORSES. ONCE THE PANEL IS SUPPORTED CUT ALONG THE ESTABLISHED LINES USING A CIRCULAR SAW WITH A MASONRY BLADE. IF CUTTING OFF MORE THAN ½ OF MATERIAL, MAKE SURE TO SUPPORT THE MATERIAL THAT IS BEING REMOVED TO AVOID THE MATERIAL BREAKING OFF BEFORE THE CUT HAS BEEN COMPLETED. IF THE MATERIAL BREAKS OR SNAPS BEFORE THE CUT IS COMPLETE, IT COULD BREAK INTO THE PANEL, CAUSING THE PANEL TO BE UNUSABLE. BEGIN BY CUTTING PANEL AT THE BOTTOM. DEPENDING ON WHETHER THE WALLS & PAN ARE OUT OF PLUMB DETERMINES HOW MUCH TRIMMING WILL BE NECESSARY. TRIM EACH SIDE OF THE PANEL TO FIT THE SHOWER OPENING 6 INSTALLING BACK PANEL WHEN POSSIBLE, DRY FIT THE PANELS TO MAKE SURE OF A PROPER FIT, BEFORE APPLYING ADHESIVE TO THE WALL. ONCE A CONFIRM FIT, WIPE DOWN BOTH THE WALL AND BACK, UNFINISHED SIDE OF THE PANEL WITH ACETONE TO MAKE SURE BOTH ARE FREE OF DUST AND DEBRIS. THEN APPLY A GENEROUS AMOUNT OF ADHESIVE IN HEAVY CIRES AS ILLUSTRATED. IF USING LARGE TUBES, THE BACK WALL SHOULD REQUIRE AND EACH SIDEWALL SHOULD REQUIRE ½ TUBE OF ADHESIVE EACH. THE AMOUNT OF ADHESIVE SUGGESTED IS BASED ON A NORMAL INSTALLA- TION WITH SMOOTH, FLAT WALLS. SITE CONDITIONS COULD REQUIRE ADDITIONAL ADHESIVE. ONCE THE ADHESIVE IS APPLIED TO THE WALL, PUT THE PANEL IN PLACE, FIRMLY PRESSING INTO THE WALL TO DISTRIBUTE THE ADHESIVE. ONCE THE PANEL IS INSTALLED, ADD BRACING IN PLACE AS ILLUSTRATED, OR WHERE NECESSARY, TO FIRMLY HOLD THE PANEL IN PLACE, ALLOWING THE ADHESIVE TO DRY. CONSTRUCTION ADHESIVE PANEL BRACING 00% SILICONE PAGE 5 0F 7 PH 70.59.55 F 70.59.559

M6x0 (x4) M5x0 (x 4) M6x0 (x) x 0mm 0mm STANDARD -PIECE CULTURED MARBLE PANEL ST5.5x (x) x5(x4) 0(x7) M 7 FOR SIDE PANEL LOCATE THE IN THE SAME MANNER AS STEP. CUT THE SIDE PANEL 0 0 ONCE THE IS ESTABLISHED, LOCATE THE SIDE PANEL MEASUREMENTS IN THE SAME MANNER AS THE BACK PANEL (SIM TO STEP 4). Installa 0 M6x0 (x) TRIM SIDE PANELS FROM THE INSIDE EDGE WHERE THEY WILL BUTT UP TO THE BACK WALL OF SHOWER NOTE: IF INSTALLING TRIM, INSTALL BEFORE INSTALLING SIDE PANELS. INSTALL TRIM, USING 00% SILICONE AND HOT GLUE. MAKE SURE TRIM IS LEVEL, MEASURING FROM TOPS OF THE PANELS TO THE FLOOR (IF APPLICABLE) LEFT PANEL M6x0 (x4) RIGHT PANEL TRIM THE BOTTOM OF THE PANELS AS NEEDED M5x0 (x 4) OUTSIDE EDGES ARE FACTORY FINISHED ENDS, DO NOT TRIM OUTSIDE EDGES OF PANELS ST5.5x (x) x5(x4) 0(x7) 9 DRILL HOLES FOR PLUMBING 0 FINISHED EDGE 0 0mm ONCE THE PANELS HAVE BEEN CUT TO FIT, BEGIN LOCATING ALL PLUMBING FITURES AND DRILL THE CORRESPONDING HOLES IN THE PANEL. TO LOCATE THESE HOLES, MEASURE UP FROM THE EDGE OF THE PAN, AND OVER FROM THE FINISHED EDGE OF THE SIDE PANEL, TO THE CENTER OF THE INSTALLED FITURE AND TRANSFER THOSE MEASUREMENT ONTO THE PANEL. DETERMINE THE SIZE HOLE TO BE DRILLED AND CAREFULLY DRILL THE HOLE IN THE SPECIFIED LOCATION. NOTE: DO NOT PUT ETREME PRESSURE ON THE DRILL, AS THE PANEL MAY BREAK WHEN THE BIT COMPLETES THE HOLE. TYPICALLY, IT IS REQUIRED TO DRILL ONE HOLE FOR THE SHOWER CONTROL VALVE AND ONE HOLE FOR THE SHOWERHEAD. LEFT PANEL EDGE OF PAN M6x0 M6x0 (x4) (x4) M5x0 M5x0 (x 4) (x 4) 0 INSTALLING SIDE PANEL M6x0 M6x0 (x) (x) ST5.5x ST5.5x (x) (x) CONSTRUCTION ADHESIVE THE SIDE PANELS WILL INSTALL IN THE SAME METHOD USED TO INSTALL THE BACK PANEL. REFER TO STEP 6 FOR INSTRUCTIONS. 00% SILICONE x5(x4) x5(x4) PH 70.59.55 F 70.59.559 0(x7) 0(x7) PAGE 6 0F 7

STANDARD -PIECE CULTURED MARBLE PANEL 0 CONTINUED SOAP DISHES ONCE ALL PANELS HAVE BEEN INSTALLED, THEY SHOULD BE BRACED AS ILLUSTRATED, OR WHERE NECESSARY, TO MAKE SURE THE PANELS REMAIN IN PLACE WHILE THE ADHESIVE CURES. WHILE THIS ILLUSTRATION SHOWS SIMPLE BRACING, ADDITIONAL BRACING MAY BE REQUIRED BASED ON JOB SITE WALL CONDITIONS. WHILE THE BRACES SHOULD HOLD FIRMLY AGAINST THE PANELS, ECESSIVE PRESSURE COULD DAMAGE OR CRACK THE PANELS. USE CAUTION WHEN PLACING THE BRACING. INSTALL SOAP DISHES ON PANELS. IF USING CAST MARBLE, CERAMIC OR CHROME PLATED WIRE SOAP DISHES, SHAMPOO SHELVES OR FOOT RESTS. PANEL BRACING CAULK JOINTS AFTER THE ADHESIVE HAS HAD TIME TO DRY (4 HOURS), REMOVE THE BRACING AND CAULK ALL OF THE JOINTS WHERE MARBLE TOUCHES MARBLE WITH 00% SILICONE THAT OSELY MATCHES THE COLOR OF THE MARBLE. CAULK THE CAST MARBLE PANEL TO THE SUBSTRATE WITH PAINTABLE LATE CAULK. 00% SILICONE PAINTABLE CAULK PAGE 7 0F 7 PH 70.59.55 F 70.59.559