installation guide 1 GUIDE#: PWB-wwpontoon-pol-004

Similar documents
installation guide 1 GUIDE#: pwb-wwtowv1-pol-003

installation guide 1 GUIDE#: pwb-assault-001

installation guide 1 GUIDE#: pwb-assault-004

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CONTOURED LIGHT BAR APPLICATION: CHEVY EQUINOX/ GMC TERRAIN PART NUMBERS: ,

INSTALLATION INSTRUCTIONS


8mm x 25mm "Z" Bolt Plates. (2) Tube Spacers. (2) 12mm Bolt Plates w/ Nut

Kai Installation Instructions

GRILLE GUARD SPRINTER VAN (EXCLUDES X4) INCLUDES MERCEDES, FREIGHTLINER AND DODGE PARTS LIST:

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

WARNING. Failure to observe these instructions could lead to severe injury or death.

INSTALLATION INSTRUCTIONS

Grand Slam 370 Installation Instructions

ShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort

Monster Tower Phone: U.S. Hwy 411 S. HS1. Installation Instructions and Owner s Manual CAUTION

CRITICAL INFORMATION:

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION MANUAL FRONT. See pages 2 and 3 of this manual for configuration options. Level of Difficulty. Product Photo (center section only)

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

INSTALLATION INSTRUCTIONS GRILLE GUARD RAM 1500 PART # 5058/5058-2

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

INSTRUCTIONS INSTRUCCIONES CONSIGNES

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART

HOME GYM Owner s Manual

RBP-1215B-RX DODGE RAM QUAD CAB RX3

CTTR Tire Rack Required tools

INSTALLATION INSTRUCTIONS

Star Trac Turbo Trainer Assembly & Setup

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR

2-Door EXO-Top Roof Rack System

INSTALLATION INSTRUCTIONS

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

Grand Slam 380 and Grand Slam 380XL Installation Instructions

INSTALLATION INSTRUCTIONS 6 OVAL BENT END SIDEBARS DODGE RAM 1500, CREW CAB PART#: /241533B

Krypt Pro Air EXPLODED VIEW OF THE PRO AIR TOWER

INSTALLATION INSTRUCTIONS

CONTROLS KIT FOR ALL # & # HARLEY DAVIDSON SPORTSTER MODELS

INSTALLATION INSTRUCTIONS

BIFOLD FUTON FRAME TRINITY ARM. Seat Rails and Slats x 1. *Note: Use 4pc of 100mm Bolts and 4pc of 60mm Bolts to attach the arms to the Stretchers.

IN-BED FRAME MOUNT INSTALLATION INSTRUCTIONS

Installation Instructions: Bumper (Part # SB76850) XJ Jeep Cherokee XRC Rear Bumper

INSTALLATION INSTRUCTIONS

Sliding Crosscut Table installation guide

4-Door EXO-Top Roof Rack System

U.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK

model tsa-sa48 Sliding Crosscut Table installation guide

INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART #

Installation Instructions:

INSTALLATION INSTRUCTIONS GRILLE GUARD CHEVY TAHOE / AVALANCHE 1500/ SUBURBAN 1500 PART # /502795

HILGARD Part Number Spectrum Lane ~ Missoula MT ~

(2) 25mm x 20mm x 5mm Adhesive Backed Foam Pads. 100mm x 50mm x 1.0mm Adhesive Backed Foam. (2) Spacer Plates. Passenger/Right Side Frame Mounting

Installation Instructions Kit, Base Rail Bracket Part # 31413

INSTALLATION MANUAL WEEKENDER STEEL LADDER RACK

WEAR SAFETY GLASSES WHEN INSTALLING THIS KIT.

Warnings. Description. Prior to Installation Tools Needed

Please read and understand the OnBoard Timpani Cart Owner s Manual before using the Timpani Cart.

SAM. Model: STV-C65 LCD Mobile Visualized Stand Instruction Manual. Weight Capacity: 1251bs / 56.7kg Suits LCD Flat Panel Display: 42"-55" Page 20

INSTALLING YOUR NEW SPRING LIFT ARM KIT

SEAT-361 E-Z-Go RXV RHOX Seat Kit Installation Instructions

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

INSTRUCTIONS INSTRUCCIONES CONSIGNES

INSTALLATION INSTRUCTIONS GRILLE GUARD FORD ESCAPE

CHEVY/GMC SuperRail Mounting Kit #4423

TRAKFAST REPAIR MANUAL DANGER TOOL DISASSEMBLY ALWAYS TAKE THE FOLLOWING PRECAUTIONS BEFORE ANY SERVICE OR ROUTING MAINTENANCE IS PERFORMED:

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

CHEVY/GMC SuperRail Mounting Kit #3117

INSTALLATION INSTRUCTIONS SIDE BAR FORD ESCAPE & MAZDA TRIBUTE PART #

Installation Instructions TMW Antenna Tower Mount for 4ft (1.2m) Antennas.

O-Sullivan King 4 Poster Bed O-Sullivan Queen 4 Poster Bed Parts and Hardware List

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

Lab Style Table Frame Part No Assembly Guide Automation Technology

INSTALLATION INSTRUCTIONS

Installation Instructions

May 14, Installation Manual

CABANA / PAVILION ASSEMBLY ALUMINUM FRAME MODELS

Pickup Box Utility Rack Package Installation (Instruction ID: )

Installation Instructions

INSTRUCTIONS INSTRUCCIONES CONSIGNES

Installation Instructions

Installation Manual Roof Zone Ladder Rack

w w w. h d o n l i n e s h o p. d e VRSCF RIGID SADDLEBAGS GENERAL PREPARATION -J04704 REV Kit Number Models Tools and Supplies Required

FORD RANGER Onwards SLIMLINE II RACK (1255MM x 1358MM)

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16

17MAY18 U.S. RACK, Inc Falcon Drive, Madera, CA

Installation Instructions Kit, Base Rail Bracket Part # 31413

Required and optional* components/fastener torque spec

PRORAC CONTRACTOR SERIES UNIVERSIAL STEEL TRUCK / CAP RACK INSTALLATION INSTRUCTIONS

U.S. RACK, Inc Falcon Drive, Madera, CA

4" Oval Nerf Bar. Part No. A1007S/B. PARTS LIST: Qty Part Description Qty Part Description

Thank you for purchasing our product! *Please read these instructions and follow them step by step.*

Installation Instructions

Installing A Carver Bimini Top

Installation Instructions

Transcription:

f250 pontoon WAKEBOARD tower installation guide INSTALLATION SUPPORT 1

important information This WakeWorks tower fits Pontoon boats with 96 to 102 inch wide beam widths. This measurement is taken from the Port to Starboard mounting points. Do not fold the tower without having the top section securely fastened to the side sections with the fasteners provided. Lubricate the telescopic side section tubes that slide in and out of the top section during installation. We recommend using a light grease to help the tubes slide together without binding. Do not fold the tower by yourself. Do not assemble tower on the ground and then try to install it on the boat. Do not use impact drivers to install any hardware. Torque set screws to 35ft-lbs Torque shoulder bolts 50 ft-lbs Torque tower foot all-thread to 65 ft-lbs We recommend using red Loctite threadlocker on the threads of all fasteners that will not be adjusted while lowering or raising the tower. Check the top section for burrs before installing side sections to prevent the scratching and marking of tubes. WakeWorks does not cover damage caused by burrs during installation. Two types of mounts are provided. One is a top mount and the other is an under mount. Please select the most appropriate mount for your pontoon boat. Please leave the foam wrap on the tower until the installing is complete. Please note that when towing your boat you may notice what appears to be movement in your tower. It is important to understand that the boat is also moving on the trailer and that this movement can be visually deceiving. cleaning Frequently wash your tower with soap and water. As required, use Mothers Mag & Aluminum polish to restore your tower to its original finish. warning BE CAREFUL when assembling this product. We CANNOT be liable for any burring or scratching that may occur when sliding sections in and out of each other. NEVER modify this product in any way. NEVER climb, stand or ride on this product. NEVER tow watersport tubes or inflatable s with this or any other WakeWorks Wakeboard Tower. ALWAYS use caution with approaching bridges or overpasses. ALWAYS inspect this product for loose bolts, fittings or damage before each use. Always carefully CONSULT the user manual for proper installation, maintenance and usage. WakeWorks is not liable for personal injury or property damage from the use of this or any other WakeWorks product. 2

PARTS LIST Aluminum Under mount stainless steel top mount PORT lower SIDE 4x 4x 1x starboard side port side STARBOARD lower side 1x 1x 1x navigation light (shipped separately) front corner top section 1x 1x 2x rear corner 1/2-13 Socket Head cap 1/2 shoulder bolt 2x 16x 4x (1.375 in length) (1.25 in length) 3

PARTS LIST 0.375-16 Button Head Cap (3 in length) nylon folding washer 0.375 flat washer 2x 8x 8x 0.375 nylon lock nut 8x pop up cleat (shipped separately) 2x cleat spacer (shipped separately) 2x 0.19-24 flat Head Cap (0.625 in length) (shipped separately with pop up cleat) 4x 4

EXPLODED OVERVIEW NOTE: lubricate parts with a light grease before assembly this tower is supplied with 2 different types of mounts. 1 - under mount 2 - Top mount select the mount that best fits your pontoon boat. note: the under mount is shown in this diagram. 5

step 1 select the most appropriate mount to use. section view top mount - designed to fit underneath the play pen rail. under mount - designed to be installed under the deck. 6

step 2 select the mounting position note: do not assemble the tower at this stage. using only the lower side section of the tower, determine the mounting position of each mount and mark this same position on both sides of the boat. ensure that the mounting locations will provide a square and well aligned tower installation. XX 7

step 3 installing the mounts remove the furniture and other items from the location where the mounts will be installed. important: check the underside of the deck to make sure that there are no electrical wires, fuel lines, fuel tanks, or other items that me be damaged while drilling or screwing the mount into position. part a - to be installed on the top side of the deck. several mounting holes are provided to allow flexibility with the installation. We recommend installing the mount with at least 4 bolts (2 per row). If more bolts can be used then this is also acceptable. part B - to be installed on the underside of the deck. under mount designed to be installed under the deck. top mount designed to fit underneath the play pen rail. 8

step 3 - under mount specific 8.25 9.50 4.50 5.75 7.00 1.38 3.13 use the dimensions provided to mark and drill the first hole. Once the first hole is drilled then Part A (the stainless steel top plate) can be used as a guide to mark the remaining mounting holes. 4.38 5.63 6.88 8.13 when drilling through the boat deck to install the mount we recommend using a 5/16 drill bit. it is recommended that red loctite threadlocker is used when assemblying these fasteners. this line represents the edge of the boat deck. 9

step 3 - top mount specific 1.075 2.275 3.475 4.675 5.875.786.289 use the dimensions provided to mark and screw the mounting plate to the deck of the boat. 1.489 2.689 3.889 5.089 this line represents the edge of the boat deck. 10

step 4 install the lower side sections install each lower side section using the bolts provided. it is recommended that you use red loctite threadlocker while assembling these fasteners. top mount under mount 11

step 5 installing the side sections instal each side section using the shoulder bolts provided. the nylon washers should be placed between the fittings in the front joints. this will create space between the aluminum parts to allow the tower to fold. A step 6 NOTE: lubricate parts with a light grease before assembly installing the top section Insert the front and rear corner tubes into the top section. be careful not to insert them too far as the sliding motion may cause the tubes to scratch. once the parts are loosely together, the corner tubes can then be attached to the side sections with the 1/2 bolts provided. During this process try to keep the top section as centered as possible. *** IMPORTANT NOTES *** - LUBRICATE TELESCOPIC PARTS WITH A LIGHT GREASE BEFORE SLIDING TOGETHER. - GREASE WILL NOT PREVENT THE SMALLER DIAMETER TUBE FROM BEING SCRATCHED BY THE TOP SECTION TUBE DURING INSERTION SO BE VERY CAREFUL NOT INSERT THE SIDE SECTION TUBE ANY FURTHER THAN THE FINAL INSTALLATION WIDTH. 12

step 7 drilling the top section once the top section is in place and centered on the tower and boat, it will then be time to drill through the corner tubes so that the fasteners can be installed to securely fasten the parts together. use the pre-drilled holes in the top section as the template for drilling through the corner tubes. a 27/64 drill bit is recommended. A step 8 fastening the top section install the 0.375 button head bolts, washers and nuts to secure the top section and corner tubes in place. we recomend using red loctite threadlocker on the nuts and bolts when assembling these components. K 13

step 9 folding the tower to fold the tower forward, disconnect the two rear legs from the lower side sections by removing the two shoulder bolts. Once these bolts are loose the tower will be able to fold forwards. Once folded forwards the tower will rest on the playpen railing. We suggest inserting a soft pad between the parts in the area where the tower makes contact with the boat so that it prevents scratching or marking of both the boat and the tower. 14

step 10 wiring the tower you will notice that all of the fittings have wiring holes drilled in them. these wiring holes allow the wires to run right through the tower and remain completely hidden. note: If you will be folding your tower from time to time it is recommended that you consider the wiring path so that it can allow for the tower to fold. In some cases the wires may need to exit and enter the tubes around the fittings or even include wiring connectors. step 11 navigation light installation THE NAVIGATION LIGHT IS SHIPPED SEPARATELY. IT IS DESIGNED TO BE INSTALLED ON THE TOP OF THE TOW POINT. FOR A CLEAN WIRING INSTALLATION THE WIRES SUPPLIED CAN BE PASSED THROUGH THE CENTER OF THE TOW POINT, ALONG THE INSIDE OF THE TOP SECTION AND DOWN INSIDE THE LEG TUBE. THE WIRES WILL NEED TO EXIT THE LEG TUBE JUST ABOVE THE FITTINGS AND THEN BE PASSED OVER THE FITTINGS BEFORE ENTERING BACK INTO THE SIDE RAIL TUBE. FINALLY THE WIRES WILL EXIT THE SIDE RAIL TUBE THROUGH THE MOUNTING FOOT FITTING AND THEN ENTER THE DECK OF THE BOAT (THROUGH A HOLE THAT WILL NEED TO BE DRILLED) SO THAT THEY CAN BE CONNECTED TO A SWITCH AND POWER SOURCE. NOTE: THE TOWER IS NOT SUPPLIED WITH PRE-DRILLED WIRING HOLES AS EACH CUSTOMER MAY HAVE A DIFFERENT WIRING REQUIREMENT DEPENDING ON HOW THEY FOLD THEIR TOWER OR THE ACCESSORIES THAT THEY WILL MOUNT TO THE TOWER. navigation light (shipped separately) 15

step 12 cleat installation lift and rotate the top section of the cleat to allow the fasteners to pass through the installation holes. Install the cleat on top of the cleat spacer using the fasteners provided. we recommend using red loctite threadlocker when installing these fasteners. Questions? www.wakeworks.com 16