CONCURRENT ENGINEERING READINESS ASSESSMENT OF SUB-CONTRACTORS WITHIN THE UK CONSTRUCTION INDUSTRY

Similar documents
SPICE: IS A CAPABILITY MATURITY MODEL APPLICABLE IN THE CONSTRUCTION INDUSTRY? Spice: A mature model

Construction value management revisited: the designer's role

COMPETITIVE ADVANTAGES AND MANAGEMENT CHALLENGES. by C.B. Tatum, Professor of Civil Engineering Stanford University, Stanford, CA , USA

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INNOVATION

An Exploratory Study of Design Processes

DESIGN OF AN INNOVATION PLATFORM FOR MANUFACTURING SMES

THE AGILITY TRAP Global Executive Study into the State of Digital Transformation

Technology and Innovation in the NHS Scottish Health Innovations Ltd

Implementation of the integrated emerging contractor development model: Towards enhanced competition for small construction firms

CCG 360 o stakeholder survey 2017/18

Best Practices for Technology Transition. Technology Maturity Conference September 12, 2007

THE INTELLIGENT REFINERY

European Charter for Access to Research Infrastructures - DRAFT

INVESTMENT IN COMPANIES ASSOCIATED WITH NUCLEAR WEAPONS

Gerald G. Boyd, Tom D. Anderson, David W. Geiser

Outsourcing R+D Services

DEFENSE ACQUISITION UNIVERSITY EMPLOYEE SELF-ASSESSMENT. Outcomes and Enablers

Manufacturing Readiness Assessment Overview

Measurement of the quality and maturity of the innovation process: methodology and case of a medium sized Finnish company

Committee on Development and Intellectual Property (CDIP)

Delivering Subsea Solutions Using a Systems Engineering Approach

BIM EXECUTION PLAN IN CZECH REPUBLIC

Technology Transfer: An Integrated Culture-Friendly Approach

Contribution of the support and operation of government agency to the achievement in government-funded strategic research programs

Terms of Reference. Call for Experts in the field of Foresight and ICT

White paper The Quality of Design Documents in Denmark

BG6 Design Framework for Building Services

Protection of Privacy Policy

INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN ICED 03 STOCKHOLM, AUGUST 19-21, 2003

Sustainable Society Network+ Research Call

Promoting Innovative thinking within Construction

Technology and Manufacturing Readiness Levels [Draft]

Level 1 before Level 2 - an Irish BIM mandate

Getting the evidence: Using research in policy making

INNOVATION : STATE OF PLAY MINING INDUSTRY SURVEY 2017

SECTION SUBMITTAL PROCEDURES

BIM AND 4D PLANNING: AN EMPIRICAL STUDY OF THE INDUSTRY UPTAKE AND ISSUES AFFECTING THEIR WIDESPREAD USE

LINKING PROCESS MAPPING AND TECHNOLOGY: A CASE STUDY OF TEAMWORK 2001

Our Corporate Responsibility pages 2016

Chief Nuclear Inspector s Inspection of NNB GenCo Ltd. s Supply Chain Management Arrangements for the Hinkley Point C Project

Development of the Strategic Research Agenda of the Implementing Geological Disposal of Radioactive Waste Technology Platform

ECO INNOVATION IN SMALL TO MEDIUM SIZED ENTERPRISES:

INFORMATION VISUALISATION IN CONSTRUCTION INDUSTRY; A QUALITY PERSPECTIVE

TERMS OF REFERENCE. 30 Calendar-days = 1 person month (Average 50% in Egypt) Deputy Team Leader of Industrial Business Services at GIZ PSME Project

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

Economic and Social Council

Brad Luke. Director Peddle Thorp Auckland

Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Organizational Perspective and Technical Requirements

Public Sector Indicators of Innovation. Louise Earl Science, Innovation and Electronic Information Division Statistics Canada

WORKSHOP INNOVATION (TECHNOLOGY) STRATEGY

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

EUROPEAN MANUFACTURING SURVEY EMS

Gender pay gap reporting tight for time

East Central College

ISO Transition Update Question and Answers

FINAL ACTIVITY AND MANAGEMENT REPORT

Globalisation increasingly affects how companies in OECD countries

5 TH MANAGEMENT SEMINARS FOR HEADS OF NATIONAL STATISTICAL OFFICES (NSO) IN ASIA AND THE PACIFIC SEPTEMBER 2006, DAEJEON, REPUBLIC OF KOREA

DEVELOPMENT OF AN INTEGRATED BIM AND LEAN MATURITY MODEL

Statement of Corporate Intent

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012

COMMERCIAL INDUSTRY RESEARCH AND DEVELOPMENT BEST PRACTICES Richard Van Atta

Jerome Tzau TARDEC System Engineering Group. UNCLASSIFIED: Distribution Statement A. Approved for public release. 14 th Annual NDIA SE Conf Oct 2011

THE NATIONAL SHIPBUILDING RESEARCH PROGRAM

A new role for Research and Development within the Swedish Total Defence System

Funding excellence in innovation. Eurostars Application Assessment Guidelines. Version 2.0 March 2012

User Experience Specialist

Technology Evaluation. David A. Berg Queen s University Kingston, ON November 28, 2017

Preservation Costs Survey. Summary of Findings

INTERDISCIPLINARY, BIM-SUPPORTED PLANNING PROCESS

Lean construction in small medium sized enterprises (SMEs) : an exploration of the highways supply chain

Technology Insertion: A Way Ahead

Goals, progress and difficulties with regard to the development of German nuclear standards on the example of KTA 2000

Catalysing Innovation in the Water Sector

Click to edit Master Intro Title

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session

Why, How & What Digital Workplace

1. Introduction and About Respondents Survey Data Report

IBI GROUP S TOP 10. Smart City Strategy Success Factors

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

Concurrent Engineering

SECTION SUBMITTAL PROCEDURES

L internazionalizzazione delle imprese italiane. Il caso Walter Tosto in Romania. Intervista a Luca Pierfelice, Chief Financial Officer di Tosto Group

CONCURRENT ENGINEERING

The secret behind mechatronics

WEB-BASED QUALITY CONTROL OF PRECAST CONCRETE

PRINCIPLES AND CRITERIA FOR THE EVALUATION OF SCIENTIFIC ORGANISATIONS IN THE REPUBLIC OF CROATIA

SURVEY ON USE OF INFORMATION AND COMMUNICATION TECHNOLOGY (ICT)

ISO in the Construction and Manufacturing Companies: A Case Study from the Construction Industry of Hyderabad and Karachi, Pakistan

SR&ED for the Software Sector Northwestern Ontario Innovation Centre

Winners of the McRock IIoT Awards 2018 Announced

Mapping the Design Criterion Framework for Museum Exhibition Design Project

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Ariel corporation, mount Vernon, ohio, UsA

WORKSHOP ON BASIC RESEARCH: POLICY RELEVANT DEFINITIONS AND MEASUREMENT ISSUES PAPER. Holmenkollen Park Hotel, Oslo, Norway October 2001

MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY

Task on the evaluation of the plasma response to the ITER ELM stabilization coils in ITER H- mode operational scenarios. Technical Specifications

Value Paper. Are you PAT and QbD Ready? Get up to speed

Transcription:

CONCURRENT ENGINEERING READINESS ASSESSMENT OF SUB-CONTRACTORS WITHIN THE UK CONSTRUCTION INDUSTRY Malik M. A. Khalfan 1, Chimay J. Anumba 2, and Patricia M. Carrillo 3 Department of Civil & Building Engineering, Loughborough University, Loughborough, Leics., LE11 3TU, UK A vital part of the corporate strength of any organization is the ability to respond to changing market needs rapidly, and effectively. Time-to-market has become a crucial measure of an organization s business performance. Increasing demands for accelerated deliveries at a lower cost has put pressures on projects and processes within most industries. Therefore, with increasing competition, companies that want to survive in the market place have to improve in four key areas: product costs, product quality, time-to-market (from order to delivery), and customer satisfaction. One way to do this is to adopt a Concurrent Engineering (CE) approach to project delivery. CE is a way of working which enables the delivery of better, cheaper, faster products, using right-first-time methods and team working to enable concurrent consideration of all key lifecycle issues. It is evident that by adopting CE, the software and manufacturing industries have significantly improved their business processes. There is also increasing awareness of the benefits of adopting CE in the Construction Industry. CE has the potential to make construction projects less fragmented, improve project quality, reduce project duration and reduce total project cost. For a targeted and effective implementation, it is recommended to carry out a readiness assessment of an organization prior to the adoption of CE. Therefore, this paper discusses the adoption of CE within the construction industry, highlights the need of CE readiness assessment, and presents the details of the assessment of subcontracting organizations within the UK construction industry using a new CE readiness assessment tool for the construction industry, the BEACON Model. Key words: concurrent engineering,, readiness assessment, sub-contractors INTRODUCTION Concurrent Engineering (CE), sometimes called simultaneous engineering or parallel engineering, has been defined in several ways by different authors. The most popular one is that by Winner et al. (1988), who state that concurrent engineering is a systematic approach to the integrated, concurrent design of products and their related processes, including manufacture and support. This approach is intended to cause the developers, from the outset, to consider all elements of the product life cycle from conception through disposal, including quality, cost, schedule, and user requirements. In the context of the construction industry, Evbuomwan and Anumba (1998) define Concurrent Engineering as an attempt to optimize the design of the project and its construction process to achieve reduced lead times, and improved quality and cost by the integration of design, fabrication, construction and erection activities and by 1 M.M.A.Khalfan@lboro.ac.uk 2 C.J.Anumba@lboro.ac.uk 3 P.M.Carrillo@lboro.ac.uk Khalfan, M M A, Anumba, C J and Carrillo, P M (2001) Concurrent engineering readiness assessment of sub-contractors within the UK construction industry. In: Akintoye, A (Ed.), 17th Annual ARCOM Conference, 5-7 September 2001, University of Salford. Association of Researchers in Construction Management, Vol. 1, 741-50.

Khalfan, Anumba, and Carrillo maximizing concurrency and collaboration in working practices. This is in sharp contrast with the traditional approach to construction project delivery. In order to introduce aspects of CE in the construction project delivery process, various research efforts have been undertaken. A detailed account of these efforts is compiled and presented by Kamara et al. (2000). They have concluded that an important aspect of CE implementation in the construction industry, which is often overlooked, is the need to carry out readiness assessment of the construction supplychain for CE implementation. Therefore, in order to carry out the assessment for CE implementation, the construction industry needs a specific readiness assessment model, which has been developed by Khalfan and Anumba (2000a). Therefore, this paper discusses the need for CE readiness assessment, presents a new CE readiness assessment model for the construction industry, the BEACON (Benchmarking and REadiness Assessment for the Implementation of Concurrent Engineering in CONstruction) model, and describes in detail the results of the model s use in the assessment of sub-contracting organizations within the UK construction industry. CE READINESS ASSESSMENT As discussed in the previous section one approach which has been successfully used to improve CE implementation planning is to conduct a readiness assessment of an organization prior to the introduction of CE. This helps to investigate the extent to which the organization is ready to adopt Concurrent Engineering (Componation and Byrd, 1996), and to identify the critical risks involved in its implementation within the company and its supply chain. CE Readiness Assessment has been successfully used for planning CE implementation in several industry sectors, notably manufacturing and software engineering. It is therefore imperative that, for CE implementation in the construction industry to deliver the expected benefits, readiness assessment of the construction industry should be undertaken. There are several tools and models, which are being used for readiness assessment of organizations for Concurrent Engineering. A comparison of these models and tools was presented by Khalfan and Anumba (2000c). After analysing the comparison matrix, it was concluded that the RACE model would be the most appropriate for use as the Readiness Assessment Tool for Concurrent Engineering in the construction industry. However, the RACE model requires adaptation and modification for this purpose because, essentially, it was developed for other industries such as manufacturing and software engineering industry. Thus, it needs to be tailored to the requirements of the construction industry and the people working within the industry. Therefore, a CE readiness assessment model has been developed by the authors for assessing the construction industry. This includes both a People and a Project element these are considered key aspects of CE. The new model named BEACON Model is shown in Figure 1 and described briefly in the next section. THE BEACON MODEL The BEACON Model (see Figure 1) is divided into four quadrants or sections to represent four elements or aspects of the model, which are Process, People, Project, and Technology. The first quadrant contains five critical process factors used to assess the process maturity level of a construction organization. The second quadrant contains four critical people factors used to assess the team level issues within the organization while the third quadrant is comprised of three critical project factors used 742

Concurrent Engineering to assess the client s requirements and design related issues. The fourth quadrant presents five technology related critical factors used to characterize the introduction and utilization of advanced tools and technology within the organization. The key advantage of the model is that it does not only include the process and the technology aspects as covered in other models but also introduces two new dimensions, people and project elements. These elements were covered to a limited extent in existing readiness assessment models and tools but were not adequately emphasized. TECHNOLOGY Information Sharing Integration Task Management Systems PROCESS Process Focus Organisational Framework Co-ordination Strategy Deployment Communication Agility Client Focus AD-HOC REPEATABLE Teams in an Organisation CHARACTERISED Discipline Quality Assurance MANAGED OPTIMISING Team Leadership and Management PROJECT Facility Design Team Formation and Development PEOPLE Figure 1: The BEACON Model The rationale behind including the people and the project elements is that both of them are as critical to CE as the process and the technology elements and should be distinguished (Ainscough and Yazdani, 1999; Al-Ashaab and Molina, 1999; Brooks and Foster, 1997; Chen, 1996; Crow, 1994; Khalfan and Anumba, 2000b; Lee and Young, 1994; Love and Gunasekaran, 1997; Martin and Evans, 1992; Paul and Burns, 1997). This is one of the novel features in the BEACON model. For all of the elements, five levels have been adopted from the RACE model (CERC, 1992), which indicate the level of maturity of an organization with respect to the quality of project development process, team-working, completed project itself, and technology employed within the organization. These five levels are Ad-hoc, 743

Khalfan, Anumba, and Carrillo Repeatable, Characterized, Managed, and Optimizing and are described in Table 1. The Ad-hoc Level indicates that an organization is unfamiliar with CE practices or is not ready to adopt CE, whereas the Optimizing Level shows that the organization is ready to adopt CE or is already practising CE within its project delivery process. A model-based questionnaire (called the BEACON Questionnaire) has been developed for use in assessing construction organizations. The assessment scale has five possible options: Always, Most of the Time, Sometimes, Rarely, and Never, corresponding roughly to five maturity levels (Note: Refer to Khalfan (2000) for a detailed description of the development of the BEACON model). Table 1: BEACON Model Maturity Levels (adopted from RACE model) Maturity Level Ad-hoc Description This level is characterized by ill-defined procedures and controls, and by confused and disordered teams that do not understand their assignment nor how to operate effectively. Informal interaction with the client is observed, management of the project development process is not applied consistently in projects, and modern tools and technology are not used consistently. Repeatable Standard methods and practices are used for monitoring the project development process, requirements changes, cost estimation etc. The process is repeatable. There are barriers to communicate within the project development team. Interaction with the client is structured but it is only at the inception of the project. Minimal use of computer and computer-based tools. Characterized Managed The project development process is well characterized and reasonably well understood. A series of organizational and the process improvements have been implemented. Teams may struggle and fall apart as conflicts are addressed but a team begins to respect individual differences. Most individuals are well aware of client s requirements but client is not involved in the process. Moderate use of proven technology for increasing group effectiveness. The project development process is not only characterized and understood but is also quantified, measured, and reasonably well controlled. Tools are used to control and manage the process. The uncertainty concerning the process outcome is reduced. Work is accomplished by the project development team and conflicts are addressed. Client is involved throughout the process. Appropriate utilization of available technology and computer-based tools. Optimizing A high degree of control is used over the project development process and there is a major focus on significantly and continually improving development operations. Team performance is regularly measured, and performance measures are continuously validated. Client is a part of project development team from inception and all project decisions are prioritized based on client s needs. Optimal utilization of appropriate plant and technology and technologymediated group work is observed. CE READINESS ASSESSMENT OF SUB-CONTRACTING ORGANIZATIONS In order to assess the CE readiness assessment of the UK construction industry, sample case studies were carried out by using the BEACON Model. For the purpose of the case studies, the industry was divided into five categories: clients, consultants, contractors, sub-contractors, and material suppliers. This paper only focuses on the results of the case studies, which were carried out within sub-contracting organizations. Twelve sub-contracting organizations, ranging from small-sized to large, were sent the BEACON questionnaire and 25% of them responded and are 744

Concurrent Engineering referred as Organizations A, B, and C in this section. The assessment of subcontracting organizations was important because they are doing most of the construction work on construction sites, and have multi-disciplinary and multi-skill teams for this purpose. Therefore, it was necessary to assess their readiness for collaborative and concurrent working practice. Most of the respondents commented that the people element is the most important and the technology element the least important element from their organizational point of view. A summary of the assessment results is also complied in tabular form and presented in Table 2, which shows percentages of all elements for each organization. The percentages for each factor within the elements were calculated after assessing the questionnaire responses for each organization. (Note: Refer to Khalfan (2000) for details on how the results were generated). A brief account of all the sample case studies is presented in the following sub-sections with the readiness assessment results, which are plotted on the BEACON Model diagram for each organization. Table 2: A summary of the Assessment Results of Sub-Contracting Organizations Organizations Elements Organization A (%) Organization B (%) Organization C (%) Process Element 63.69 93.96 82.46 Management Systems 73.08 96.15 80.77 Process Focus 65.38 96.15 86.54 Organizational Framework 70 87.5 87.5 Strategy Deployment 52.5 95 82.5 Agility 57.5 95 75 People Element 66.93 91.2 85.26 Team Formation and Development 75 95 90 Team Leadership and Management 68.75 90.63 93.75 Discipline 71.88 100 90.63 Teams in an Organization 52.08 79.17 66.67 Project Element 65.83 98.32 92.40 Client Focus 61.38 97.73 88.64 Quality Assurance 75 100 96.88 Facility Design 61.11 97.22 91.67 Technology Element 50.71 91.55 86.08 Communication 75 90 85 Co-ordination 27.78 97.22 91.67 Information Sharing 40.91 81.82 72.73 Integration 65.63 90.63 90.63 Task 44.23 98.08 90.38 Case Study 1: Organization A Organization A is a medium-size sub-contracting company with over 200 employees and over 16m annual turnover. The respondents commented in the questionnaire that the people element is the most important and the technology element is the least important element from the organization s point of view. The assessment result is plotted on the BEACON Model diagram shown in Figure 2. This shows that Organization A is in the managed level except for some of the critical factors, which indicates the characterized level for the organization. This concludes that the organization A is not ready to adopt CE. The areas, which need attention, are task support, co-ordination support, and information sharing within technology element, strategy deployment and agility within process element, and teams in an organization within people element. 745

Khalfan, Anumba, and Carrillo TECHNOLOGY Information Sharing Integration Task Management Systems PROCESS Process Focus Organisational Framework Co-ordination Strategy Deployment Communication Agility Client Focus AD-HOC REPEATABLE Teams in an Organisation CHARACTERISED Discipline Quality Assurance MANAGED OPTIMISING Team Leadership and Management PROJECT Facility Design Team Formation and Development PEOPLE Figure 2: CE Readiness of Organization A Case Study 2: Organization B Organization B is another medium-sized sub-contracting company with over 450 employees and with over 60m annual turnover. Responses to the questionnaire indicate that the process element is the most important and the technology element is the least important element from the organization s point of view. The assessment result is plotted on the BEACON Model diagram shown in Figure 3. The results show that the organization B is in the optimizing level except for a few critical factors, which are in the managed level. This concludes that Organization B is ready to adopt CE and has already adopted CE approach in almost all of the critical factors within all elements. Areas require improvements are teams in an organization within people element, and information sharing within technology element. 746

Concurrent Engineering TECHNOLOGY Information Sharing Integration Task Management Systems PROCESS Process Focus Organisational Framework Co-ordination Strategy Deployment Communication Agility Client Focus AD-HOC REPEATABLE Teams in an Organisation CHARACTERISED Discipline Quality Assurance MANAGED OPTIMISING Team Leadership and Management PROJECT Facility Design Team Formation and Development PEOPLE Figure 3: CE Readiness of Organization B Case Study 3: Organization C Organization C is a large contracting organization with sub-contracting activities with over 3,500 employees and with over 1.4b annual turnover. According to the background information in the questionnaire, the people element is the most important and the technology element is the least important element from the organization s point of view. The readiness assessment result is plotted on the BEACON Model diagram shown in Figure 4. The assessment result shows that some critical factors are at the optimizing level while the rest are at the managed level. This concludes that the Organization C is also ready to adopt CE and has already adopted CE approach in some of the critical factors within the elements. The areas, which need improvements, are information sharing within the technology element, client focus within the project element, agility within the process element, and teams in an organization within the people element. TECHNOLOGY Integration Task Management Systems PROCESS Process Focus Organisational 747

Khalfan, Anumba, and Carrillo Figure 4: CE Readiness of Organization C DISCUSSION After analysing the results of the readiness assessment case studies of the participating sub-contracting organizations, it could be seen that the larger sub-contracting companies are better prepared to adopt CE than medium-sized firms, which need improvements in most of the critical areas. It is evident from the case studies that the technology element is the weakest element in all sub-contracting organizations and needs attention in order to improve communication, co-ordination, integration, and information sharing among the employees, and between the organization and other members of the construction supply chain. Above all, the average assessment result for sub-contractors shows that subcontractors are at the optimizing level of CE readiness except for some of the critical factors under the process, people, and technology elements, which are at the managed level. This concludes that the subcontracting organizations are ready to adopt CE and have already adopted aspects of CE in some areas. The areas, which need to be improved, are co-ordination support and information sharing within the technology element, agility within the process element, and teams in an organization within the people element. The conduct of the assessment of sub-contracting organizations met with a number of difficulties: securing senior management input to the survey/assessment; targeting key/appropriate personnel to respond; and ensuring that the responses reflect the true picture within each organization and are not designed to paint a better picture than what actually happens in an organization. Another issue, which must be taken into account, is if a 748

Concurrent Engineering manager at the middle level filled in questionnaire, there is a possibility that he would not have an idea of the whole organizational structure and systems with respect to the questionnaire and would not be able to respond confidently. It has also been noticed that responses given may be biased in order to give a better image of the organization even they knew that the name of their organization would not be mentioned and kept confidential. SUMMARY AND CONCLUSIONS This paper has discussed the importance of CE readiness assessment and presented the BEACON Model, which has been developed for use as a CE readiness assessment tool for the construction industry. It has also presented the results of sample CE readiness assessment of three sub-contracting organizations within the UK construction industry. The following conclusions can be drawn from the case studies: The BEACON Model can be successfully used as a CE readiness assessment tool for the construction industry; There is also a need to carry out similar sample case studies in other sectors within the construction industry such as clients, consultants, contractor, etc., to get a complete picture of the industry; The model can act as a useful tool for self-assessment on the four key elements: process, people, project, and technology even for contracting organizations not considering the implementation of CE; From the results of the assessment, it can be stated that the large participating subcontracting companies are better prepared to implement CE than medium-sized participating companies, which need improvements to get ready; The technology element is the weakest element and requires attention and improvement in all participating sub-contracting organizations; and The assessment of the sub-contracting organizations, using the model, will enable the development of guidelines for the effective and more appropriate implementation of CE in construction. REFERENCES Ainscough, M. S. and Yazdani, B. (1999) Concurrent Engineering within British Industry, Proceedings of Advances in Concurrent Engineering (CE99), Bath, UK, pp. 443-448. Al-Ashaab, A. and Molina, A. (1999) Concurrent Engineering Framework: A Mexican Perspective, Proceedings of Advances in Concurrent Engineering (CE99), Bath, UK, pp. 435-442. Brooks, B. M. and Foster, S. G. (1997) Implementing Concurrent Engineering, Concurrent Engineering The Agenda for Success, Medhat, S. (Ed.), Research Studies Press Ltd. CERC, 1992, Process Issues in Implementing Concurrent Engineering, Submitted by: CE Research Centre, West Virginia University, October 1992. Chen, G.(1996) The Organizational Management Framework for Implementation of Concurrent Engineering In the Chinese Context, Advances in Concurrent Engineering, Proceedings of 3 rd ISPE International Conference on Concurrent Engineering: Research and Applications, University of Toronto, Ontario, Canada, 26-28 August 1996, pp.165-171. 749

Khalfan, Anumba, and Carrillo Componation P. J. and Byrd Jr., J. (1996) A Readiness Assessment Methodology for Implementing Concurrent Engineering, Advances in CE, Proceedings of 3 rd ISPE International Conference on Concurrent Engineering: Research and Applications, University of Toronto, Ontario, Canada, 26-28 August 1996, pp.150-156. Crow, K. A., 1994, Building Effective Product Development Teams, DRM Associates. Evbuomwan, N. F. O. and Anumba, C. J. (1998) An Integrated Framework for Concurrent Life-cycle Design and Construction, Advances in Engineering Software, 1998, Vol. 5, No. 7-9, pp.587-597. Kamara, J. M.; Anumba, C. J. and Evbuomwan, N. F. O. (2000) Developments in the Implementation of Concurrent Engineering in Construction, International Journal of Computer Integrated Design and Construction, Vol.2, No.1, February 2000, pp.68-78. Khalfan, M. M. A. and Anumba, C. J. (2000a) Readiness Assessment for Concurrent Engineering in Construction, Proceedings of the Bizarre Fruit 2000 National Conference of Postgraduate Research in the Built and Human Environment, Salford, UK, 9-10 March, 2000, pp. 42-54. Khalfan, M. M. A. and Anumba, C. J. (2000b) Implementation of Concurrent Engineering in Construction - Readiness Assessment, Proceedings of the Construction Information Technology 2000 Conference, Reykjavik, Iceland, 28 30 June 2000, Vol. 1, pp. 544-555. Khalfan, M. M. A. and Anumba, C. J. (2000c) A Comparative Review of Concurrent Engineering Readiness Assessment Tools and Models, Concurrent Engineering 2000 (CE 2000) Conference, Lyon, France, 17 20 July 2000, pp. 578-585. Khalfan, M. M. A. (2000) First Year PhD Research Report on the BEACON project, Department of Civil and Building Enginering, Loughborough University, UK. Lee, R. J. V. and Young, R. I. M. (1994) Design for Manufacture: An approach to Software in a Concurrent Engineering Environment, Proceedings of Factory 2000, 4th International Conference on Advanced Factory Automation, York, 1994, pp. 593-600. Love, P. E. D. and Gunasekaran, A. (1997) Concurrent Engineering in the Construction Industry, Concurrent Engineering: Research and Applications, Vol.5, No.2, June 1997, pp.155-162. Martin A. and Evans S. (1992) Project Planning in a Concurrent Engineering Environment, Proceedings of 3rd International Conference on Factory 2000, York, UK, July 1992, pp. 298-303. Paul, J. and Burns, C. (1997) Implementing a Business Process Re-engineering Programme, Concurrent Engineering The Agenda for Success, Medhat, S. (Ed.), Research Studies Press Ltd. Winner, R. I.; Pennell, J.P.; Bertrend, H. E. and Slusarczuk, M. M. G. (1988) The Role of Concurrent Engineering in Weapons System Acquisition, IDA Report R-338, Institute for Defence Analyses, Alexandria, VA. 750