34 Washtenaw Ave Chicago, IL 04 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item with identical rank and total the quantity into a single line, regardless of item location (for location data, see the detailed report). Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a -point scale: rank means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank or ) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main 93 2,000 $42,92 Addition 92 2 3,30 $94,20 Addition 2 92 2,000 $44,993 Addition 3 9 2,0 $34,2 SITE $43,32 Campus Total 9,0 $2,3, Building: Main Category: Building Exterior Entrance Entrance Control - Audio and Video 2 EA $,3 Exterior Doors - Exterior Steel Door EA $4 Exterior Doors - Exterior Wood Door 4 EA 4 $,290 Exterior Stairs - Concrete LF $,2 Ramp Handrail - Steel_Ramp Handrail 0 LF $,43 Ramps - Concrete 0 LF $2,09 Stair Handrail - Steel_Stair Handrail 20 LF $,0 Foundation Lighting Foundation - Concrete 220 LF Superstructure - Concrete,000 SF Exterior Lighting - Parapet or Roof Mounted 2 EA $,03 Exterior Lighting - Wall Mounted EA $2,3 Exterior Lighting - Wall Mounted EA $29 ROGERS Page of 30 Assessment Date: /4/20
Building: Main Category: Building Exterior Roof System 34 Washtenaw Ave Chicago, IL 04 Chimney - Brick Chimney- Concrete/ Mortar Liner LF $,0 Coping - Stone 30 LF $,2 Downspouts - Interior Downspouts 90 LF $2,99 Parapet - " - 30" Height 330 LF $3, Parapet - Parapet > 30" 30 LF $,9 Roof - Metal 0 SF $2,00 Roof - Modified Bitumen,000 SF $, Roof Structure - Steel with Clay Tile Arch,0 SF Walls Windows Cheek-Wall - Concrete 330 SF $3,34 Exterior Walls - Brick 4,20 SF $2,9 Exterior Walls - Stone-Cast SF $,4 Guard - Guards perforated 3 SF $0,3 Lintels - Stone LF Windows - Sash Aluminum Double-pane 2, SF $9,9 Building Exterior Subtotal: $2,49 Building: Main Category: Electrical System Emergency System Automatic Transfer Switch 2 EA $ Emergency A/C Power - Corridors and Stairs 3, SF $,042 Emergency Battery Packs - Corridors and Stairs 2 EA $2,430 Emergency Battery Packs - Students Toilets 4 EA $0 Exit Signs - Corridors and Stairs EA 2 $3,23 Security System - Intrusion Detection,000 SF $4, Main Service Power Distribution Independent Electrical Service for emergency power EA $2,92 Main Electrical Service - 000 A 20/2/3PH EA $4, PA System,000 SF $,22 Lighting and Power Panels - 00 A 2 EA $9 ROGERS Page 2 of 30 Assessment Date: /4/20
Building: Main Category: Electrical System Power Distribution 34 Washtenaw Ave Chicago, IL 04 Lighting and Power Panels - 00 A 3 EA Lighting and Power Panels - Above 00 A 3 EA Main Distribution Panels - 0-00 amp 3 EA Transformers - 20/2-20/20 2 EA Electrical System Subtotal: $2, Building: Main Category: Safty System Fire Alarm Fire Alarm Strobe Lights,000 SF Fire Alarm_System,000 SF Safty System Subtotal: Building: Main Category: Mechanical System Air Handling Systems Air Handling Unit- Built Up-Multi Zone- Steam Coils - 200-3000 cfm EA $, Air Intake EA Auxiliaries - 200-3000 cfm EA $, Return Duct Work - Indoor- Vertical Shaft and Ducts 0 LF Zone Dampers 32 EA $2, Boiler Systems Boiler Auxiliary- Scotch Marine- Steam High Pressure Boiler - 0-300 HP 2 EA $,99 Chemical Feed System EA Combustion Dampers 2 EA Condensate Pump EA $2,02 Feed Water Pumps and Tank EA $2,4 on Condensing- Fire Tube- Scotch Marine- Steam- High Pressure Boiler - 0-300 HP 2 EA $,99 Piping - Condensate Pipe- Steel 0 LF $23 Piping - Steam Pipe- Steel 0 LF $23 Steam Traps 2 EA $3,0 Vacuum Pump EA $2,4 ROGERS Page 3 of 30 Assessment Date: /4/20
Building: Main Category: Mechanical System Boiler Systems 34 Washtenaw Ave Chicago, IL 04 Heating Devices Temperature Control Ventilation Wall Heater - Electric 4 EA $ DDC System,000 SF $2,32 Thermostats - DDC EA Exhaust Fans- Indoor - 0-000 CFM 2 EA $, Mechanical System Subtotal: $2,49 Building: Main Category: Plumbing System Hot Water Gas Heater - 0000-300000 BTU/HR 2 EA $20 Piping Pumps Domestic Piping-Cold Water from Risers to Fixtures,000 SF Domestic Piping-Cold Water Horizontal Lines,000 SF Domestic Piping-Cold Water Risers,000 SF $2,94 Domestic Piping-Hot Water from Risers to Fixtures,000 SF Domestic Piping-Hot Water Horizontal Lines,000 SF Domestic Piping-Hot Water Return Lines,000 SF Domestic Piping-Hot Water Return Risers,000 SF $2,2 Sanitary Piping,000 SF $4,43 Storm Piping,000 SF $3,9 Vent Piping,000 SF $0,4 Pumps - Domestic Booster Pump-Duplex EA Pumps - Sump-Duplex EA $,3 Plumbing System Subtotal: $4,23 Building: Main Category: Classrooms ROGERS Page 4 of 30 Assessment Date: /4/20
34 Washtenaw Ave Chicago, IL 04 Kindergarten (3 rooms) Office ( room) Pre School ( room) AC Units 3 EA $,4 Casework 42 LF $,0 Ceiling - Plaster/Drywall 2,43 SF $,49 Chalk Board 0 LF 4 $9 Doors - Transom Window 32 SF $42 Doors - Wood Doors inclu hw 4 EA $, Floor - Wood 2,43 SF $,293 Lighting - Pendent/Surface 9 EA Marker Board 0 LF Storage/ Closet SF $99 Walls - Plaster/Drywall 3,0 SF $0, Work Sink 2 EA $ AC Units EA $49 Casework 0 LF $23 Ceiling - Plaster/Drywall 304 SF $,02 Doors - Transom Window SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Carpet 304 SF $4 Lighting - Pendent/Surface EA Storage/ Closet 4 SF $29 Walls - Plaster/Drywall SF $,99 Work Sink EA $39 AC Units EA $49 Casework LF $202 Ceiling - Plaster/Drywall 9 SF $2,34 Chalk Board LF 4 $ Doors - Transom Window SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Wood 9 SF $4, Lighting - Pendent/Surface 20 EA $2,4 Marker Board 0 LF $,0 Storage/ Closet 4 SF $29 Walls - Plaster/Drywall,04 SF $2, Work Sink EA $39 (4 rooms) AC Units 4 EA $,92 ROGERS Page of 30 Assessment Date: /4/20
Building: Main Category: Classrooms (4 rooms) Special Education ( room) 34 Washtenaw Ave Chicago, IL 04 Casework 32 LF $0 Ceiling - Plaster/Drywall 2, SF $9,2 Doors - Transom Window 32 SF $42 Doors - Wood Doors inclu hw 4 EA $, Floor - Wood 2, SF $9, Lighting - Pendent/Surface 0 EA Marker Board 42 LF Storage/ Closet 30 SF $2 Walls - Plaster/Drywall 4,3 SF $2,0 AC Units EA $49 Ceiling - Plaster/Drywall 20 SF $900 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet 20 SF $20 Lighting - Pendent/Surface EA Marker Board LF Walls - Plaster/Drywall 04 SF $2,29 Classrooms Subtotal: $4,4 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Mechanical/ Service Rooms AC Unit EA $49 Ceiling - Plaster/Drywall 342 SF $,4 Doors - Transom Window SF $3 Doors - Wood Doors inclu hw EA $30 Floor - Tile 342 SF $4 Lighting - Pendent/Surface EA Power Distribution 20 EA Storage/ Closet 0 SF $3 Walls - Plaster/Drywall 92 SF $2,42 Work SInk EA $0 Air Tunnel 99 SF $4,32 ROGERS Page of 30 Assessment Date: /4/20
Building: Main Category: Rooms (Other Than Classrooms) Mechanical/ Service Rooms 34 Washtenaw Ave Chicago, IL 04 Crawl Space - Unfinished,0 SF $3,0 Janitor's Closet SF $4 Mechanical/ Service Rooms,3 SF $9,443 Storage Room 90 SF $4,22 Restroom Accessories,002 SF $9,2 Ceiling - Plaster/Drywall,002 SF $3,4 Doors - Transom Window 2 SF $44 Doors - Wood Doors inclu hw 4 EA $4,9 Doors - Wood Doors inclu hw EA $4, Floor - Tile Ceramic/ Porcelain 9 SF $2,02 Floor - Tile/Sheet 44 SF $44 Floor Drain 4 EA $4,23 Lavatory 0 EA $3,9 Lighting - Pendent/Surface 22 EA Partitions 2 EA $3,3 Urinals 0 EA $3,30 Walls - Concrete Block 320 SF $93 Walls - Plaster/Drywall 90 SF $2, Walls - Structural Glazed Tile 2,9 SF $, Walls - Tile Ceramic/ Porcelain SF $4 Water Closet EA $,3 Rooms (Other Than Classrooms) Subtotal: $,9 Building: Main Category: Building Interior Corridor Ceiling - Plaster/Drywall 3,2 SF $9,92 Doors - Transom Window 20 EA $2,032 Doors - Wood Doors include hw 4 EA $, Drinking Fountains - Double Fountain 2 EA $2 Drinking Fountains - Single Fountain 2 EA $2,30 Drinking Fountains - Single Fountain EA $2 Floor - Tile/Sheet 3,2 SF $,49 ROGERS Page of 30 Assessment Date: /4/20
Building: Main Category: Building Interior Corridor 34 Washtenaw Ave Chicago, IL 04 Lighting - Pendent/Surface 4 EA Student Lockers - One Tier EA $,9 Walls - Plaster/Drywall 4,0 SF $,9 Walls - Structural Glazed Tile,02 SF $,0 Stairs Ceiling - Plaster/Drywall 44 SF $3,20 Floor - Terrazzo 22 SF $2, Handrails 20 LF $,0 Lighting - Pendent/Surface 4 EA Stairs - Terrazzo 0 LF $44 Walls - Plaster/Drywall, SF $3,4 Walls - Structural Glazed Tile 490 SF $,42 Building Interior Subtotal: $0,34 Total Building Cost $42,92 Building: Addition Category: Building Exterior Entrance Entrance Control - Audio and Video EA $02 Exterior Doors - Exterior Steel Door 4 EA $,922 Exterior Doors - Exterior Wood Door 3 EA 4 $,4 Exterior Doors - Transom Lite EA $33 Exterior Stairs - Concrete 30 LF $4, Exterior Stairs - Concrete 0 LF $,3 Exterior Stairs - Steel or Aluminum LF $23 Power Door Operator and Controls EA Ramp Handrail - Steel_Ramp Handrail 0 LF $93 Ramps - Concrete LF $,23 Stair Handrail - Steel_Stair Handrail 0 LF $93 Foundation Foundation - Concrete 4 LF Superstructure - Concrete 3,30 SF ROGERS Page of 30 Assessment Date: /4/20
Building: Addition Category: Building Exterior Lighting 34 Washtenaw Ave Chicago, IL 04 Exterior Lighting - Parapet or Roof Mounted 2 EA $4,30 Exterior Lighting - Parapet or Roof Mounted EA $3 Exterior Lighting - Wall Mounted 4 EA $,0 Roof System Walls Windows Coping - Stone LF $2,0 Downspouts - Interior Downspouts 2 LF $,44 Parapet - " - 30" Height 20 LF $9,99 Parapet - Parapet < " Height LF $,3 Parapet - Parapet > 30" 20 LF $, Parapet - Parapet > 30" 3 LF Roof - Modified Bitumen,30 SF $0,09 Roof Structure - Steel / Metal Deck/ Concrete Topping,30 SF Cheek-Wall - Concrete 20 SF Cheek-Wall - Stone 0 SF $,2 Exterior Walls - Brick 3,30 SF $9,92 Exterior Walls - Stone-Cast 0 SF Clerestory - Glass Double-Pane 40 SF $4,2 Guard - Guards perforated 90 SF $2,3 Guard - Guards wire guard 20 SF $2,2 Lintels - Steel 0 LF Lintels - Stone LF Windows - Insulated Panel 0 SF Windows - Louver SF $299 Windows - Sash Aluminum Double-pane,03 SF $,2 Building Exterior Subtotal: $322, Building: Addition Category: Electrical System Emergency System Emergency A/C Power - Auditoium and Aisle Lighting 2,443 SF $,293 Emergency A/C Power - Corridors and Stairs,9 SF $ ROGERS Page 9 of 30 Assessment Date: /4/20
Building: Addition Category: Electrical System Emergency System 34 Washtenaw Ave Chicago, IL 04 Emergency A/C Power - Multipurpose Room 2,39 SF $9 Emergency Battery Packs - Auditoium and Aisle Lighting 3 EA $2,33 Emergency Battery Packs - Corridors and Stairs EA $,20 Emergency Battery Packs - Multipurpose Room 3 EA Emergency Battery Packs - Students Toilets 4 EA $0 Exit Signs - Auditoium EA 2 $4,34 Exit Signs - Corridors and Stairs EA 2 $3, Exit Signs - Multipurpose Room EA 2 $3,23 Security System - Intrusion Detection 3,30 SF $3,0 UPS - Less than 30 KW EA Main Service Power Distribution PA System 3,30 SF $4,43 Lighting and Power Panels - 00 A EA Lighting and Power Panels - Above 00 A 4 EA Electrical System Subtotal: $2, Building: Addition Category: Safty System Fire Alarm Fire Alarm Strobe Lights 3,30 SF Fire Alarm_System 3,30 SF Safty System Subtotal: Building: Addition Category: Mechanical System Air Conditioning Condensing Unit- Roof Mounted - Less than tons EA Air Handling Systems Air Handling Unit- Package Single Zone- Indoor- Steam Coils - 00-000 cfm EA $3,30 Air Handling Unit- Package Single Zone- Indoor- Steam Coils - 00-2000 cfm EA $3,30 ROGERS Page 0 of 30 Assessment Date: /4/20
Building: Addition Category: Mechanical System Air Handling Systems 34 Washtenaw Ave Chicago, IL 04 Air Intake 2 EA Indoor Return Fans- Centrifugal Inline - Less than 000 CFM EA $,22 Boiler Systems Heating Devices Temperature Control Unit Ventilation Ventilation Condensate Pump EA $2,02 Piping - Condensate Pipe- Steel 0 LF $23 Piping - Steam Pipe- Steel 0 LF $23 Steam Traps 4 EA $,9 Wall Heater - Electric EA $33 DDC System 3,30 SF $,9 Electric Thermostat EA Thermostats - DDC EA Unit Ventilators- Floor Mounted- Steam Heating Coils Only 3 EA $3,43 Exhaust Fans- Roof Mounted - 00-00 CFM EA $92 Type II Exhaust Hood- Warming Kitchen EA $920 Mechanical System Subtotal: $42,3 Building: Addition Category: Plumbing System Piping Domestic Piping-Cold Water from Risers to Fixtures 3,30 SF Domestic Piping-Cold Water Horizontal Lines 3,30 SF Domestic Piping-Cold Water Risers 3,30 SF $2,34 Domestic Piping-Hot Water from Risers to Fixtures 3,30 SF Domestic Piping-Hot Water Horizontal Lines 3,30 SF Domestic Piping-Hot Water Return Lines 3,30 SF Domestic Piping-Hot Water Return Risers 3,30 SF $,949 Sanitary Piping 3,30 SF $2,44 Storm Piping 3,30 SF $,9 ROGERS Page of 30 Assessment Date: /4/20
Building: Addition Category: Plumbing System Piping 34 Washtenaw Ave Chicago, IL 04 Vent Piping 3,30 SF $9, Plumbing System Subtotal: $3,00 Building: Addition Category: Classrooms Computer Lab ( room) AC Units 2 EA $99 Casework LF $202 Ceiling - Plaster/Drywall SF $2,44 Chalk Board 20 LF 4 $,3 Charging Station EA $4 Doors - Steel Doors incl hw EA $30 Floor - Tile/Sheet SF $ Lighting - Pendent/Surface 20 EA Storage/ Closet SF $3 Walls - Plaster/Drywall,339 SF $3,9 Walls - Structural Glazed Tile 4 SF $44 Kindergarten ( room) AC Units EA $49 Casework LF $202 Ceiling - Plaster/Drywall 2 SF $2,44 Doors - Wood Doors inclu hw EA $30 Floor - Tile 2 SF $, Lighting - Pendent/Surface 2 EA Marker Board 20 LF Storage/ Closet 4 SF $29 Walls - Plaster/Drywall,30 SF $3,0 Work Sink EA $39 Classrooms Subtotal: $9, Building: Addition Category: Rooms (Other Than Classrooms) ROGERS Page 2 of 30 Assessment Date: /4/20
Building: Addition Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 34 Washtenaw Ave Chicago, IL 04 Ceiling - Plaster/Drywall SF $ Ceiling - Plaster/Drywall 2 SF $99 Doors - Wood Doors inclu hw 2 EA 2 Floor - Concrete 4 SF $ Floor - Tile/Sheet 4 SF $4 Lighting - Pendent/Surface EA Power Distribution 4 EA Storage/ Closet 22 SF $0 Walls - Plaster/Drywall,00 SF $2,3 Work SInk EA $0 Auditorium & Theater Gymnasia Kitchen Ceiling - Plaster/Drywall 2,443 SF $20,3 Doors - Steel Doors incl hw 2 EA 2 Doors - Wood Doors inclu hw 2 EA 2 Floor - Concrete,44 SF $2 Floor - Tile/Sheet,002 SF $,003 Lighting - Lay-in 3 EA Main Floor Seating 20 EA $4,2 Sound System EA $0,2 Stage 4 SF $3,2 Stage Curtain 4 EA Stage Lighting System EA Stage-Stairs - Asphalt LF $44 Storage/ Closet 0 SF $0 Walls - Plaster/Drywall 2,9 SF $3, Walls - Structural Glazed Tile,33 SF $4,200 Ceiling - Lay-in 2,39 SF $,9 Doors - Wood Doors inclu hw EA $,0 Floor - Concrete Epoxy/ Painted 2,39 SF $,2 Lighting - Lay-in 20 EA Scoreboards EA $2,4 Walls - Concrete Block 2,239 SF $,4 Walls - Structural Glazed Tile,322 SF $4,9 Ceiling - Plaster/Drywall 4 SF $2,2 ROGERS Page 3 of 30 Assessment Date: /4/20
Building: Addition Category: Rooms (Other Than Classrooms) Kitchen 34 Washtenaw Ave Chicago, IL 04 Doors - Wood Doors inclu hw EA $30 Floor - Tile Ceramic/ Porcelain 4 SF $,299 Lighting - Pendent/Surface 9 EA Serving Line 20 LF $,90 Storage/ Closet 2 SF $, Walls - Plaster/Drywall 2 SF $,0 Walls - Structural Glazed Tile 2 SF $2,0 Library Locker/Shower Room MDF_IDF AC Unit EA $49 Casework 0 LF $, Ceiling - Plaster/Drywall 3 SF $2,92 Doors - Wood Doors inclu hw 2 EA 2 Floor - Carpet 3 SF $, Lighting - Pendent/Surface 20 EA Storage/ Closet 22 SF $0 Walls - Plaster/Drywall, SF $4,30 Accessories 34 SF $2 Ceiling - Plaster/ Drywall 34 SF $44 Doors - Wood Doors inclu hw EA $30 Floor - Tile/Sheet 34 SF $34 Lavatory EA $320 Lighting - Pendent/Surface 3 EA Student Lockers - One Tier 4 EA $3 Walls - Plaster/Drywall SF $, Water Closet EA $33 AC Unit EA $49 Doors - Wood Doors inclu hw EA $30 Finishes 0 SF $ Ventilation and Cooling EA $, Mechanical/ Service Rooms Crawl Space - Unfinished,0 SF $3,0 Janitor's Closet 30 SF $2 Mechanical/ Service Rooms 4 SF $,04 ROGERS Page 4 of 30 Assessment Date: /4/20
Building: Addition Category: Rooms (Other Than Classrooms) Mechanical/ Service Rooms 34 Washtenaw Ave Chicago, IL 04 Storage Room 0 SF $430 Restroom Accessories 29 SF $2,39 Ceiling - Plaster/Drywall 29 SF $,02 Doors - Wood Doors inclu hw 2 EA 2 Floor - Tile Ceramic/ Porcelain 29 SF $29 Floor Drain 2 EA $2, Lavatory 2 EA $39 Lighting - Pendent/Surface EA Partitions 3 EA $9 Urinals 2 EA $2 Walls - Plaster/Drywall 444 SF $,22 Walls - Structural Glazed Tile 9 SF $2,04 Water Closet 3 EA $,00 Rooms (Other Than Classrooms) Subtotal: $20,29 Building: Addition Category: Building Interior Corridor Ceiling - Plaster/Drywall,90 SF $2,9 Doors - Steel Doors incl hw 2 EA 2 Floor - Tile/Sheet,9 SF $,02 Lighting - Pendent/Surface 2 EA Student Lockers - One Tier 3 EA $,20 Walls - Plaster/Drywall 2,4 SF $,020 Walls - Structural Glazed Tile 2,3 SF $,4 Building Interior Subtotal: $32,0 Total Building Cost $94,20 Building: Addition 2 Category: Building Exterior ROGERS Page of 30 Assessment Date: /4/20
34 Washtenaw Ave Chicago, IL 04 Entrance Foundation Lighting Roof System Walls Windows Exterior Doors - Exterior Steel Door 2 EA $9 Exterior Doors - Exterior Wood Door 2 EA 4 $,4 Exterior Stairs - Concrete LF $,23 Foundation - Concrete 300 LF Superstructure - Concrete,000 SF Exterior Lighting - Parapet or Roof Mounted 3 EA $,0 Exterior Lighting - Wall Mounted 2 EA $ Coping - Stone 3 LF $2,044 Downspouts - Interior Downspouts 3 LF $4,4 Parapet - " - 30" Height 2 LF $0, Parapet - Parapet > 30" 0 LF $,03 Roof - Modified Bitumen,9 SF $,30 Roof Structure - Steel / Metal Deck/ Concrete Topping,9 SF Exterior Walls - Brick,00 SF Exterior Walls - Precast Panel Wall 290 SF $,949 Exterior Walls - Stone-Cast 0 SF Guard - Guards perforated 20 SF $3,320 Lintels - Steel 3 LF Lintels - Stone 3 LF Windows - Decorative 0 SF Windows - Sash Aluminum Double-pane 2,0 SF $,23 Building Exterior Subtotal: $39, Building: Addition 2 Category: Electrical System Emergency System Emergency A/C Power - Corridors and Stairs 4,2 SF $,39 Emergency Battery Packs - Corridors and Stairs 4 EA $2,3 Emergency Battery Packs - Students Toilets 4 EA $0 Exit Signs - Corridors and Stairs EA 2 $,000 ROGERS Page of 30 Assessment Date: /4/20
Building: Addition 2 Category: Electrical System Emergency System 34 Washtenaw Ave Chicago, IL 04 Security System - Intrusion Detection,000 SF $3, Main Service Power Distribution PA System,000 SF Lighting and Power Panels - 00 A EA Lighting and Power Panels - Above 00 A 2 EA Electrical System Subtotal: $4, Building: Addition 2 Category: Safty System Fire Alarm Fire Alarm Panel EA $, Fire Alarm Strobe Lights,000 SF Fire Alarm_System,000 SF Safty System Subtotal: $, Building: Addition 2 Category: Mechanical System Air Handling Systems Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils - 00-2000 cfm EA $, Air Intake EA Auxiliaries - 00-2000 cfm EA $, Reheat Boxes - Reheat Boxes with Steam Coil 3 EA Return Duct Work - Indoor- Vertical Shaft and Ducts 00 LF Zone Dampers EA $9,3 Boiler Systems Piping - Condensate Pipe- Steel 0 LF $23 Piping - Steam Pipe- Steel 0 LF $23 Steam Traps 2 EA $,9 ROGERS Page of 30 Assessment Date: /4/20
Building: Addition 2 Category: Mechanical System Heating Devices 34 Washtenaw Ave Chicago, IL 04 Radiators - Steam 4 EA $, Temperature Control DDC System,000 SF Thermostats - DDC EA Mechanical System Subtotal: $3,9 Building: Addition 2 Category: Plumbing System Piping Domestic Piping-Cold Water from Risers to Fixtures,000 SF Domestic Piping-Cold Water Horizontal Lines,000 SF Domestic Piping-Cold Water Risers,000 SF $2,9 Domestic Piping-Hot Water from Risers to Fixtures,000 SF Domestic Piping-Hot Water Horizontal Lines,000 SF Domestic Piping-Hot Water Return Lines,000 SF Domestic Piping-Hot Water Return Risers,000 SF $2,4 Sanitary Piping,000 SF $3,2 Storm Piping,000 SF Vent Piping,000 SF $0,02 Plumbing System Subtotal: $2,43 Building: Addition 2 Category: Classrooms (9 rooms) AC Units 9 EA $4, Casework LF $2,4 Ceiling - Plaster/Drywall, SF $22,390 Chalk Board 20 LF 4 $,3 Doors - Wood Doors inclu hw 9 EA $2,09 Floor - Tile, SF $4, Lighting - Pendent/Surface 0 EA Marker Board 2 LF ROGERS Page of 30 Assessment Date: /4/20
Building: Addition 2 Category: Classrooms (9 rooms) 34 Washtenaw Ave Chicago, IL 04 Storage/ Closet 4 SF $29 Walls - Plaster/Drywall 0,00 SF $2, Classrooms Subtotal: $,0 Building: Addition 2 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Mechanical/ Service Rooms AC Unit 2 EA $99 Ceiling - Exposed 92 SF $, Ceiling - Plaster/Drywall 2 SF $,03 Doors - Steel Doors incl hw EA $30 Doors - Wood Doors inclu hw 4 EA $, Floor - Carpet SF $3 Floor - Concrete 34 SF $3 Floor - Concrete Epoxy/ Painted 3 SF $33 Lighting - Pendent/Surface 2 EA $ Lighting - Pendent/Surface 2 EA Power Distribution EA Storage/ Closet 4 SF $29 Walls - Concrete Block,20 SF $3,3 Walls - Plaster/Drywall,93 SF $,20 Air Tunnel,0 SF $,4 Boiler Room 0 SF $3,32 Janitor's Closet SF $2 Mechanical/ Service Rooms 2, SF $, Storage Room 2 SF $, Restroom Accessories 420 SF $3,4 Ceiling - Plaster/Drywall 420 SF $,43 Doors - Wood Doors inclu hw EA $,0 Floor - Tile Ceramic/ Porcelain 420 SF $9 Floor Drain 3 EA $3, Hand Dryer EA $230 ROGERS Page 9 of 30 Assessment Date: /4/20
Building: Addition 2 Category: Rooms (Other Than Classrooms) Restroom 34 Washtenaw Ave Chicago, IL 04 Lavatory 3 EA $99 Lighting - Chandelier, Incandescent EA $2 Lighting - Pendent/Surface EA Partitions 4 EA $, Walls - Plaster/Drywall 34 SF $,0 Walls - Structural Glazed Tile 2 SF $2,02 Water Closet EA $,0 Rooms (Other Than Classrooms) Subtotal: $,04 Building: Addition 2 Category: Building Interior Corridor Ceiling - Plaster/Drywall 4,44 SF $2,29 Doors - Wood Doors include hw 2 EA 2 Drinking Fountains - Single Fountain EA $,0 Drinking Fountains - Single Fountain EA $2 Floor - Terrazzo 0 SF Floor - Tile/Sheet 4,39 SF $2,39 Lighting - Lay-in EA Lighting - Pendent/Surface 49 EA Student Lockers - One Tier 23 EA $2,344 Walls - Plaster/Drywall 2,34 SF $0, Walls - Structural Glazed Tile 2,933 SF $9,22 Stairs Vertical Conveyance Ceiling - Plaster/Drywall 92 SF $, Floor - Terrazzo 0 SF $2 Handrails 0 LF $433 Lighting - Pendent/Surface 2 EA Stairs - Terrazzo 22 LF $ Walls - Plaster/Drywall SF $,490 Walls - Structural Glazed Tile 2 SF $ Elevator - Lula EA $, ROGERS Page 20 of 30 Assessment Date: /4/20
Building: Addition 2 Category: Building Interior 34 Washtenaw Ave Chicago, IL 04 Building Interior Subtotal: $93,4 Total Building Cost $44,993 Building: Addition 3 Category: Building Exterior Entrance Exterior Doors - Exterior Steel Door 2 EA $9 Ramp Handrail - Steel_Ramp Handrail 0 LF $20 Foundation Lighting Roof System Walls Windows Foundation - Concrete 300 LF Superstructure - Concrete,0 SF Exterior Lighting - Parapet or Roof Mounted 3 EA $,0 Exterior Lighting - Wall Mounted 2 EA $ Coping - Stone 300 LF Downspouts - Interior Downspouts 0 LF $,92 Parapet - " - 30" Height 300 LF $,9 Roof - Modified Bitumen,90 SF $,4 Roof Structure - Steel / Metal Deck/ Concrete Topping,90 SF Exterior Walls - Brick,0 SF Exterior Walls - Stone-Cast SF Guard - Guards perforated SF $,20 Lintels - Steel 0 LF Lintels - Stone 0 LF Windows - Sash Aluminum Double-pane 2,9 SF $2,0 Building Exterior Subtotal: $23,23 Building: Addition 3 ROGERS Page 2 of 30 Assessment Date: /4/20
Category: Electrical System Emergency System 34 Washtenaw Ave Chicago, IL 04 Emergency A/C Power - Corridors and Stairs 2,22 SF $4 Emergency Battery Packs - Corridors and Stairs EA $,03 Emergency Battery Packs - Students Toilets 4 EA $0 Exit Signs - Corridors and Stairs 2 EA 2 $,09 Security System - Intrusion Detection,0 SF $3,90 Main Service Power Distribution PA System,0 SF Lighting and Power Panels - 00 A 3 EA Lighting and Power Panels - Above 00 A EA Electrical System Subtotal: $,4 Building: Addition 3 Category: Safty System Fire Alarm Fire Alarm Strobe Lights,0 SF Fire Alarm_System,0 SF Safty System Subtotal: Building: Addition 3 Category: Mechanical System Air Handling Systems Air Handling Unit- Built Up- Single Zone w/ Air Tunnel- Steam Coils - 00-000 cfm EA $4,34 Air Intake EA Auxiliaries - 00-000 cfm EA $4,34 Reheat Boxes - Reheat Boxes with Steam Coil EA $,30 Return Duct Work - Indoor- Vertical Shaft and Ducts 90 LF Zone Dampers 3 EA Boiler Systems Piping - Condensate Pipe- Steel 0 LF $23 Piping - Steam Pipe- Steel 0 LF $23 Steam Traps EA $23, ROGERS Page 22 of 30 Assessment Date: /4/20
Building: Addition 3 Category: Mechanical System Boiler Systems 34 Washtenaw Ave Chicago, IL 04 Heating Devices Temperature Control Radiators - Steam EA $,94 Wall Heater - Electric 2 EA $2 DDC System,0 SF $,3 Thermostats - DDC 3 EA Mechanical System Subtotal: $0,2 Building: Addition 3 Category: Plumbing System Piping Domestic Piping-Cold Water from Risers to Fixtures,0 SF Domestic Piping-Cold Water Horizontal Lines,0 SF Domestic Piping-Cold Water Risers,0 SF $2,22 Domestic Piping-Hot Water from Risers to Fixtures,0 SF Domestic Piping-Hot Water Horizontal Lines,0 SF Domestic Piping-Hot Water Return Lines,0 SF Domestic Piping-Hot Water Return Risers,0 SF $2, Sanitary Piping,0 SF $3,93 Storm Piping,0 SF $3,2 Vent Piping,0 SF $0,202 Plumbing System Subtotal: $42,329 Building: Addition 3 Category: Classrooms ( rooms) AC Units 2 EA $,94 Casework 3 LF $3,4 Ceiling - Plaster/Drywall,9 SF $2,20 Chalk Board 0 LF 4 $4,90 Doors - Wood Doors inclu hw EA $3,3 ROGERS Page 23 of 30 Assessment Date: /4/20
Building: Addition 3 Category: Classrooms ( rooms) 34 Washtenaw Ave Chicago, IL 04 Floor - Tile,9 SF $,3 Lighting - Pendent/Surface 220 EA Marker Board LF Storage/ Closet 4 SF $32 Student Lockers - One Tier 2 EA $,4 Walls - Plaster/Drywall 3,3 SF $3, Work Sink EA $4,9 Science ( room) AC Units EA $49 Casework LF $4 Ceiling - Plaster/Drywall 33 SF $2,3 Chalk Board LF 4 $34 Doors - Wood Doors inclu hw EA $30 Eye Wash Station EA $33 Floor - Tile/Sheet 33 SF $34 Fume Hood EA $ Lighting - Pendent/Surface 20 EA Marker Board 32 LF Science Lab Elements 33 SF $4,9 Storage/ Closet SF $3 Walls - Plaster/Drywall,32 SF $3, Work Sink 2 EA $ Classrooms Subtotal: $2,3 Building: Addition 3 Category: Rooms (Other Than Classrooms) Mechanical/ Service Rooms Air Tunnel,29 SF $,99 Crawl Space - Unfinished,44 SF $4,2 Janitor's Closet 20 SF $43 Mechanical/ Service Rooms 9 SF $,9 Storage Room 30 SF $2 Restroom Accessories,02 SF $9,42 ROGERS Page of 30 Assessment Date: /4/20
Building: Addition 3 Category: Rooms (Other Than Classrooms) Restroom 34 Washtenaw Ave Chicago, IL 04 Ceiling - Plaster/Drywall,02 SF $3, Doors - Side-lite 2 SF $2, Doors - Wood Doors inclu hw EA $2, Floor - Tile Ceramic/ Porcelain,02 SF $2, Floor Drain 4 EA $4,23 Hand Dryer 3 EA $90 Lavatory EA $2, Lighting - Lay-in EA 4 $,9 Lighting - Pendent/Surface EA Partitions 2 EA $3,3 Urinals EA $2,0 Walls - Plaster/Drywall,42 SF $3,933 Walls - Structural Glazed Tile,0 SF $,2 Water Closet 4 EA $4,04 Rooms (Other Than Classrooms) Subtotal: $0,3 Building: Addition 3 Category: Building Interior Corridor Ceiling - Plaster/Drywall 2,0 SF $2,4 Drinking Fountains - Single Fountain 2 EA $ Floor - Terrazzo SF Floor - Tile/Sheet 2,0 SF $,2 Lighting - Pendent/Surface 3 EA Student Lockers - One Tier 9 EA $,29 Walls - Plaster/Drywall 2,232 SF $9,94 Walls - Structural Glazed Tile 2,4 SF $, Stairs Ceiling - Plaster/Drywall 92 SF $, Floor - Terrazzo 0 SF $2 Handrails 0 LF $433 Lighting - Pendent/Surface 2 EA Stairs - Terrazzo 22 LF $ Walls - Plaster/Drywall 9 SF $2,39 ROGERS Page 2 of 30 Assessment Date: /4/20
Building: Addition 3 Category: Building Interior Stairs 34 Washtenaw Ave Chicago, IL 04 Walls - Structural Glazed Tile 3 SF $, Vertical Conveyance Elevator - Elevator- Machine Roomless EA $9,23 Building Interior Subtotal: $,0 Total Building Cost $34,2 SITE Category: Site Civil/Drainage Fencing Landscape Parking Lot Civil/ Drainage - Catch Basin 2 EA $3,2 Civil/ Drainage - Site Drain EA $30 Civil/ Drainage - Site Manhole EA Fencing - ew Standard Ornamental 0 LF $2,42 Benches 9 EA $3,0 Irrigation 0,200 SF $,00 Landscape - Grass 00,90 SF $3,09 Landscape - Hardscape- Asphalt,0 SF $3,3 Landscape - Hardscape- Concrete,0 SF $9,3 Lighting - Pole Mounted 2 EA $3,00 Parkway trees EA $0, Planting Beds/ Area,0 SF $,00 Play Area - Asphalt/ Hardscape 4,93 SF $,92 Retaining Wall - Concrete 20 SF $, Retaining Wall - Concrete 0 SF $9,3 Trash Receptacles 3 EA $93 Concrete Curbs 30 LF $,03 Concrete Curbs LF $,3 Interior Plantings 20 LF $,0 ROGERS Page 2 of 30 Assessment Date: /4/20
34 Washtenaw Ave Chicago, IL 04 SITE Category: Site Parking Lot Playground Sidewalks Signage Surface - Asphalt 4,000 SF $20, Surface - Asphalt 9,0 SF $23,22 Surface - Concrete 0 SF $2 Trash Compactor EA Trash Enclosure - Chain Links 93 SF $,423 Vehicular Screening 20 LF $9,44 Equipment - Combo 3-2 EA $,092 Surface - Poured Surface 0 SF 4 $239 Surface - Poured Surface, SF $,9 Sidewalks - Internal Walks, LF $2,20 Sidewalks - Perimeter Sidewalks,90 SF $3,9 Flag Pole - Building Mounted Flag Pole EA Marquee - Building Mounted Back Lighted w/ LED EA Marquee - Free Standing Back Lighted EA Monument - Building Mounted Cut Letter Sign EA Site Subtotal: $43,32 Total Site Cost $43,32 Campus Total ² ³ $2,3, ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. ROGERS Page 2 of 30 Assessment Date: /4/20
Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. 34 Washtenaw Ave Chicago, IL 04 Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. ROGERS Page 2 of 30 Assessment Date: /4/20
34 Washtenaw Ave Chicago, IL 04 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Kindergarten Kindergarten Kindergarten Office Pre School Special Education Office st Floor st Floor st Floor st Floor st Floor 02 03 0 02. 04 202 203 20 203. 02 03 0 A 04 202 203 20 A 0 99,044 304 9 0 99 0 99 20 2 4 0 20 02 20 20 02 2 2 2 Addition Computer Lab Kindergarten Kindergarten st Floor 20 0 20 0 2 20 20 Addition 2 st Floor st Floor st Floor st Floor 09 3 4 20 209 2 23 09 3 4 20 209 2 23 33 02 02 0 02 33 02 33 3 20 20 20 20 20 20 20 2 Addition 3 st Floor st Floor st Floor st Floor st Floor st Floor 9 20 2 2 2 29 9 20 2 2 2 29 23 0 09 0 9 34 0 0 9 0 2 20 20 2 2 ROGERS Page 29 of 30 Assessment Date: /4/20
34 Washtenaw Ave Chicago, IL 04 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Addition 3 Science 220 2 220 2 9 33 20 2 ROGERS Page 30 of 30 Assessment Date: /4/20