Geolam 4G Trim. Installation and maintenance guide. Facade trim, sunshades, screens and other architectural accents

Similar documents
Geolam Architectural Trim

FABRICATION MANUAL CCM Copper Composite You discover why ALPOLIC Copper composite material (CCM) is the building material of the future as soon as

All Terrain Flares 2014 Chevy Silverado

NATURA PRO Product Information Leaflet 1

How to operate (folding)

Agricultural Mechanics and Technology Power Tool Safety Rules

IM-2 SE UNDERPINNER.!!! For your safety!!! Read the instructions manual carefully SAP: 0

CHAPTER 52 ELECTRICAL POWER TOOLS

IMPORTANT: WILL NOT FIT COUNTRYMAN MODELS

Jass.Performance Low Profiles Installation Manual

MODELS 49 RA 49 RAZ 49 RAC

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

Assembly Instructions

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS

Parts List. Description. Installation Instructions

PLEASE READ INSTRUCTIONS THOROUGHLY BEFORE PROCEEDING

Metroboard Pulley Replacement Procedure

Installation Instructions

Elite Series Fender Flares

Technical Documentation

INSTALLATION GUIDE DECKING.

ASSEMBLY INSTRUCTIONS

Assembly Instructions

LEGENDS RETRACTABLE DOOR SCREENS

INSTALLATION INSTRUCTIONS FOR & Chevy CUT OUT FLARE

INSTALLATION AND CARE INSTRUCTIONS

OVER THE RANGE MICROWAVE OVEN INSTALLATION INSTRUCTIONS

Installation Guide. brighter. lighter.

8" BENCH SHEAR INSTRUCTIONS. Item #20198

CHAINSAW SHARPENER MODEL: ECSS-1

G. Building the Cab, Cab Roof and Cab Boiler Extension Page 14 and Backhead.

CALME Installation Manual

Ford Ranger / Bronco II Set Part # Rev B 5-04


Install Instructions. SCR-48N Crash Rail. Please read these instructions thoroughly prior to beginning the SCR-48N Crash Rail installation!

IDR assembly instructions:

CINTRALUX ALU BARREL VAULT EP 10/10

INSTALLATION GUIDE MICROWAVE OVEN UPMC3084ST. MFL _00

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

4.4 PUMP MAINTENANCE MODELS: DB, DC, DF, DG, DJ, DL

DECKING INSTALLATION GUIDE

Bolt-On/Rugged Fender Flares GMC Sierra 1500/2500/3500 (14-ON) Important: Please read instructions entirely before installing this product.

LEGENDS RETRACTABLE DOOR SCREENS

Tools for Plumbing. Introduction

Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework.

3" [76.0mm] HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

GREEN WORLD LUMBER GENUINE MAHOGANY DECKING INSTALLATION GUIDE

WET AREA PANELLING. Designer Walls. Fast

Door Knocker Installation By Bill Shayler

KEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM

Aluminum Clad Wood Window Field Mulling and Stacking Instructions

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

installation guide 1 GUIDE#: pwb-assault-001

Toyota FJ Cruiser 2006-Up Set Part # Revision A

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

COMPOSITE RAILING INSTALLATION

Various other types of drilling machines are available for specialized jobs. These may be portable, bench type, multiple spindle, gang, multiple

Before returning this product to the store of purchase

method of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT

Installation Instructions 1500/1500W/G Wall Guard Important

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

Installation Instructions

INSTALLATION INSTRUCTIONS GRILLE GUARD 09-ON DODGE RAM PART #

SecuAnch Roof Anchor System

136 PLYWOOD DESK 522

Pow-R-Feed Systems Service Manual

FABA. Installation Instructions. Conductor Bar System. Publication #FABA-03 3/1/04 Part Number: Copyright 2004 Electromotive Systems

VIEWpanel Technical Manual

Cabonyx Installation Manual

HANDRAIL HEIGHT PER LOCAL CODE AUTORITY

Quick Fit Installation Guide Retractable Screen - Single Door

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

POP BLIND RIVET NUTS.

Installation Guide. Resysta Flooring. 15 Years Guarantee. swell-free crack-free splinter-free rot-free. Version 1 / July 2010 / English.

Transform Cable Rail MUST be installed on 4" x 4" wooden posts sleeved with Transform post sleeves to support cable tension!

Splashback Installation Instructions

Installation Instructions

HOLZSTAR KGZ 305 E Mitre saw with pull function for versatile and mobile use

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

INSTALLATION INSTRUCTIONS

COMPOSITE SIDING INSTALLATION GUIDE

Storing, Handling, and Cleaning dekō Markerboards Storing Markerboards. Handling. Cleaning

Wet Area Panelling. Linear Series

P a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s

PROPELLER SHAFT PR 3 COMPONENTS

Window Pod Installation

JK FRONT FENDER FLARE INSTALLATION INSTRUCTIONS

How to make a template to mount your plaque to a surface

Horizontal Cable Systems

1. Begin by rolling your window up all the way 2. Remove your door and window handles by unscrewing the flat head set screws behind each handle.

HALLMARK DECKING INSTALLATION MANUAL

OPERATIONS MANUAL. Featuring:

Modular Bi-File Lateral

Giraud Tool Company, Inc.

installation guide 1 GUIDE#: pwb-assault-004

Transcription:

Installation and maintenance guide Geolam 4G Trim Facade trim, sunshades, screens and other architectural accents Soléo Palissandre, Japon 2009 Geolam : a stunning alternative to hardwood architectural trim Geolam is a fourth generation (4G) co-extruded aluminum and wood plastic composite for architectural trim. These profiles exhibit the strength, stability, and versatility of aluminum with the warmth and aesthetic of natural wood. Light and easy to install and requires minimum maintenance. Its cavity structure means it is stronger and lighter than hardwood and many other wood/plastic composites. It can be recycled, and is manufactured using environmentally friendly processes.

CUTTING THE PROFILES Use motorized tools and specialized aluminum-cutting chip saws when cutting Geolam 4G Profiles. Do not use grinders or chainsaws for cutting. Not using a suitable aluminum-cutting chip saw could result in deformation, cracks and/or peeling of the product. Aluminium Saw Blade Base Metal: Tool Steel Chips: Carbide Teeth: Minimum 2 teeth per centimeter Cutting Speed Maximum 2 meters per minute Cutting Direction To cut, pull the product in the same direction as the saw rotation, as shown in the illustration below. Cutting in the opposite direction may cause the product to move, which may produce an untidy cut in addition to being dangerous for the operator. Rotational Direction Rotational Direction Cutting Direction Cutting Direction 2

DRILLING HOLES IN PROFILES Use drills for use with metal or timber and make the holes with a tabletop drilling machine or a motorized screwdriver. Drilling holes through both sides of the material may result in the formation of burrs or chips when the drill exits the rear side. Therefore, test the machine on scrap material before starting work. If burrs do appear, drill through from both sides independently. Depending on how the burrs are formed, the surface layer could be chipped to reveal the aluminum core beneath. 3

INSTALLATION OPTIONS The Geolam 4G trim benefits from the stability and lightness of the aluminum core. The gridless installation options on the subst ructure complete the advantages of this unique product. Blind rivet nut A blind rivet nut before and after the establishment. The region without the thread is getting tightened during the installation and forms the counter-hol der. This allows a concealed installation and the preparation of the profiles at the factory. This will reduce the time spent on the construction site. Example of finalized assembly. Drill a hole in the desired location of the profile, the size is the dimension of the outer diameter of the screw nut, plus the specified tolerance. Check the diameter of the aperture, the blind nut should fit snugly. Screw the blind nut on the tool, enter and im plement the tool in order to secure the nut to the profile. The nut is in place, the profile can be screwed to a support or to another section. Rivet Equivalent to the previous installation, it is possible replacing an assembly screwed by a riveted joint. In this case the assembly is not removable. Example of finalized assembly. Thanks to the aluminium core, the profiles have sufficient allowance so they may also be direc tly screwed. 4

INSTALLATION OPTIONS cont/ Bolt nuts, in-pull nuts and turn nuts Bolt Nut Turn-nut, In-Pull Nut Fix bolt-nuts, in-pull nuts, and turn-nuts firmly in place recommended at 3.5Nm. Over-tightening may result in deformities, cracks and/or peeling appearing on the surface layer. Consult a local building code for joint span and bolt size requirement. Fixing the product in place with tapping screws or drill screws is not recommended. Nails must also not be used for fixing. Check the strength requirement prior to fixing to joint. BENDING THE PROFILES Do not bend the product in environments of 20 C or lower. Do not allow the product to reach a temperature exceeding 60 C. Do not allow oil, water or other liquids to come into contact with the work. Thoroughly wipe away all soiling from the bending machine before starting work. Do not use material that has been bent and then re-straightened. 5

SANDING THE PROFILES All profiles are delivered facing the same direction they were sanded in. Mount the profiles facing the same direction in order to keep an identical aspect across all profiles. Or, mount profiles facing different directions in order to achieve different shades caused by sun beams reflecting from different angles. Refer to the marks inside the profiles that indicate the direction of sanding. POST INSTALLATION MAINTENANCE Clear away all cutting dust with an air blower, and make sure the dust does not get caught between products when they are stacked. Remove all post-processing burrs with sandpaper. Remove all soiling with a neutral detergent such as soap water. If a neutral detergent does not successfully remove the soiling, or when differences in luster caused by rubbing exist, use #24 to #40 sandpaper. Rub in a single direction (lengthwise) and finish it so that it looks the same as other surfaces. THE LINEAR THERMAL EXPANSION COEFFICIENT The linear thermal expansion coefficient for Geolam profiles is the same as for aluminium: 2.3 x 10-5 mm (20-100 C). Geolam profile expansion (per meter) = expansion coefficient x temperature difference ( C) x product length (mm). Thus, for a temperature difference of 40 C a Geolam profile expands by 0.92 mm per meter. STORAGE Do not position the product in an upright position but store it indoors on a flat area. Cover the product with a protective sheet if it must be stored outdoors to prevent contact with water. However, the product must not be completely sealed-in when covered with a protective sheet. 6

Soleo 10 TRIM 5 End Caps Provide a clean finish. 2 1 /16 Soleo 11 TRIM 2 1 1 /4 Careo 10 TRIM 3 7 /16 3 7 /16 Careo 10 end caps presently in design and test phase Geolam, Inc. North America: 9 Shorncliffe Ave., Toronto, ON Canada M4V 1S9 Toll free: 1-877-627-3530 Tel: 416-548-7450 info@geolaminc.com 7