CS3 represents manufacturers of products for use in the municipal waterworks industry.

Similar documents
INSTALLATION INSTRUCTIONS. March 2016 FOR FURTHER QUESTIONS, PLEASE CALL

Utility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles

Standard Specifications

SECTION MANHOLES

SECTION PRECAST CONCRETE SECTIONAL MANHOLES

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

SAUSALITO-MARIN CITY SANITARY DISTRICT MISCELLANEOUS UPGRADES PROJECT. Addendum No. 2

Pipe Product Catalog Table of Contents

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

Manholes Table of Contents

ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

Plan Review and Standards

SECTION PUBLIC UTILITY MANHOLES AND STRUCTURES. 2. Modular precast concrete pump wetwell. 5. Manhole bedding and cover materials.

SECTION FUEL OIL SYSTEM (PLUMBING)

MH Table of Contents Standard Title/Scope Page Table of Contents SCE Public

STRUCTURES FOR SANITARY AND STORM SEWERS

Created from more than 25 years of experience.

STEEL PIPE GUIDERAIL 01/01/

EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL

CONCRETE MANHOLES.

NCCER Progress Blvd, Alachua, Florida Phone: (888)

Appendix C Construction Details

General Information...SA1-SA4

AVK PENSTOCK SOLUTIONS PENSTOCK SOLUTIONS

ADDENDUM NO. 3 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

SECTION PRECAST CONCRETE STRUCTURES

INVICTA PENSTOCK SOLUTIONS PENSTOCK SOLUTIONS

ALUMINUM PIPE GUIDERAIL 01/01/

SECTION 39 - MANHOLES TABLE OF CONTENTS

DISTRIBUTION VAULT 8' x 14' x 9'-4" DEEP TRAFFIC FLAT WALL WITH 5' x 8' OPENING

F-5-1a. Concrete Bollards (Detail 1 of 2) WEIGHT: 166kg. WEIGHT: 227kg. WEIGHT: 113kg. WEIGHT: 212kg

SECTION MANHOLES

Presented by: Brent Bode, P.E., Tetra Tech, Inc. Low Energy, Non Shear WAS Thickening Alternatives and Design for Grand Rapids, MI WWTP

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

Portable Hacksaws for Tough Duty

SECTION CHAIN LINK FENCING AND GATES AND SOFTBALL BACKSTOP

Thru Wall Floor Seals For New Installation

BP Brine Pro Brine Maker. Parts List. This Parts List is for BP-2000 brine makers with serial numbers beginning with and higher.

City of Cape Coral Utilities Department

STRATUS SHELTER. Take bike parking to new heights

Barofor Round System (polyester coated) Panels, Posts, Accessories

5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.

Pioneers in Gate Design

SECTION METAL FABRICATIONS

This addendum forms a part of the Contract Documents dated: August 10, 2012.

PENSTOCK VALVES. Performance through Excellence

HUSSEY GAY BELL SAVANNAH, GEORGIA

World Class Fabrication and Machining Parts to Finished Assemblies

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

PENSTOCKS Sluice Gates

Standard Details Index NWTP Improvements and MF System Installation

1.1 SUMMARY. A. This Section includes the following: 1. Loose steel lintels. 2. Shelf angles. 3. Metal floor plate. 4. Pipe bollards.

TO O L K IT. Public Bike Repair

SYARIKAT BEKALAN AIR SELANGOR SDN BHD

Midwest Roadside Safety Facility

Bol FEATURES: SPECIFICATIONS: 8' 24' Round Tapered and Straight Wood Poles STRUCTURA INC. FIXTURE TYPE: PROJECT NAME:

Rodney Hunt. A GA Industries Company Glydaseal Gates

Series 80 In-Line Mounted Centrifugal Pumps

MEDIUM DUTY CAST IRON SLIDE GATES SERIES 20-10C

TENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018

GENERAL ISOMETRIC LAYOUT

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

Portable Hacksaws for Tough Duty

MAY J. Collins Engineering Associates, LLC San Jose Blvd. Jacksonville, Florida 32223

INSTRUMENT MOUNTING STANDS PRODUCT CATALOG Continuous Tray Support System for Instrumentation and Controls

Item 550 Chain Link Fence

SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SYARIKAT BEKALAN AIR SELANGOR SDN BHD

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.

This specification describes the minimum requirements for piping systems for the following service:

Important Notices. Manway Lockout Point

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

SECTION METAL CASTINGS AND FABRICATIONS

STANDARD SPECIFICATIONS SECTION PRECAST CONCRETE 1.2 REQUIREMENTS FOR MANUFACTURERS AND SUPPLIERS BEFORE DELIVERY

APPENDIX FENCE GENERAL NOTES

A. Radius elbows with a construction radius of 1.5 the duct width are preferred to square elbows.

NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION ON-SITE WATER PROTECTION BRANCH

H O O P RAC K. Simple Security

H O O P RAC K. Simple Security

Downtown Rack. Custom logo option available

REPAIR CLAMP PARTS H fax: MULTIPLIER

R/V L ATALANTE D SHEET METAL WORKS SHIP REPAIRS In your fixed prices, you shall include the paint treatment after sheet metal works.

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

S W E RV E RAC K. Simple Security. Simple Stability.

PART MATERIALS. Section Fencing Materials. Description

Single 180 Double 180 Triple. 180 Quad

1 ZSI Product Experience Examples

Grease Interceptor Design Checklist

REQUEST FOR BIDS WELL #4 ABANDONMENT

Dewatering. Deep Wells Vacuum Wellpoints Eductor Wells Artesian Conditions System Design Water Treatment.

Testing. Material testing will be according to applicable AASHTO, ASTM or Department methods as specified.

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

Safe and secure Dero

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

Today s Service Station

**************************************************************************************************

SECTION III SUBMITTALS AND APPROVALS

Stop Gates & Stop Logs. Series 500. ine. Manufacturing high quality gates since 1977

B. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.

Transcription:

Brian Drexel & Rob Grier WWW.CS3WATERWORKS.COM Established in 2000, CS3 Waterworks is a Florida Based company with offices in Orange Springs Florida and Savannah Georgia. CS3 represents manufacturers of products for use in the municipal waterworks industry. Treatment Plant Equipment influent screens, odor control, flow control, dewatering equipment, sludge feed pumps, storage tanks, pump stations and disinfection products. Distribution & Collection components valves of all types and for all applications. Pump stations & odor control. CS3 Metalfab fabricate stainless steel components such as riser pipes, fittings & pipe supports

CENTURY Pump Station The 100 Year Solution

WHY CENTURY? OR OR

CENTURY V-Series Packaged Pump Stations

HDPE anti-flotation collar HDPE encapsulated concrete base Optional HDPE Hopper bottom CENTURY V-Series Packaged Pump Stations SRTP wetwell Skid Resistant HDPE top Water level control instrumentation Watertight penetrations Base elbows and guide rails Discharge piping and valves Submersible pumps Vents Aluminum Access Hatch Optional Davit Crane

SRTP Wetwell Profile SRTP Diameter (Ft.) SRTP Thickness (In.) 4 2.75 5 3.45 6 4.15 7 4.45 8 4.8 9 5.15 10 5.5 11 6.2

CENTURY Fabrication Overview

CENTURY HS-20 Load Rated Top

Finite Element Analysis (FEA)

Pump Station Design GENERAL INFORMATION REQUIRED FLOW RATE GPM TOTAL DYNAMIC HEAD - TDH TOS, INVERTS VEHICULAR OR PEDESTRIAN RATED PUMP MANUFACTURER PREFERENCE FORCE MAIN DIAMETER GRINDER OR SOLIDS PASSING MIN HYDRAULIC CAPACITY AVAILABLE SITE ELECTRICAL (Voltage/Phase)

Rapid Design Support 2-3 Days for full submittals

Anti-buoyancy design included

CENTURY V-Series Packaged Pump Stations

CENTURY V-Series Packaged Pump Stations

Century Pump Station Easy Installation

Century Pump Station Easy Installation 6ft Diameter x 19.5ft Deep Duplex Station

Century Pump Station Easy Installation

CENTURY vs Precast Concrete w/out liner Representative Total Installed Cost Comparison (8 Dia. X 20 Deep Unit) CENTURY SRTP PUMP STATION MATERIALS SRTP Wetwell package, fully assembled one piece unit, delivered $ 40,800.00 Includes: SRTP vertical cylinder included HDPE encapsulated conrete base HDPE anti-flotation collar HDPE skid-resistant top included included included (2) 30" x 48" Aluminum hatch covers 300 psf loading included 10" HDPE 200 psi discharge piping with 10x8 reducers and 45 degree offset included Pump guiderails and brackets included Float bracket included Sloped hopper floor included HDPE conduit connections NPT included HDPE welded connections for discharge, conduit and vent included HDPE sutb with Kor N Seal boot or link seal for influent gravity connection included Mounting of customer-supplied pump base elbows included Concrete anti-flotation ballast ring $ 1,040.00 TOTAL = $ 41,840.00 LABOR Setting SRTP Wetwell Complete $ 4,000.00 Form & Pour concrete anti-flotation ballast ring $ 2,000.00 Set pumps and floats $ 375.00 TOTAL = $ 6,375.00 SRTP TOTAL MATERIALS AND LABOR $ 48,215.00 EXCAVATION & DEWATERING, PUMPS & CONTROL PANEL NOT INCLUDED Florida Based Project Summary 8'-0" Diameter x 20'-0" Deep Raw Sewage Duplex Lift Station 10 Discharge piping with 10" x 8" reducer, 45 deg. Offset penetrating through top 10 valve manifold discharge piping above grade 12 Gravity influent Pump Package: (2) 20 hp submersible pumps, including base elbows, floats, control panel Labor rate $3,000 per day based on crew of 3 plus superintendent, track excavator, general conditions Groundwater 2' below grade Total Installed Costs Precast Concrete w/out liner $51,540 CENTURY $48,215 PRECAST CONCRETE PUMP STATION (W/OUT LINER) MATERIALS Precast concrete structure base, section, and top, including interior liner and exterior coating, (2)- 30" x 48" Aluminum hatch covers 300 psf loading, gravity sewer influent connection, holes for discharge, conduit, and vent penetrations $ 25,000.00 Guiderails, guiderail brackets $ 1,300.00 Float Bracket $ 150.00 10" Ductile iron flanged vertical discharge piping with reducer and 45 degree offset, and 316SST flange hardware $ 7,900.00 10" Ductile iron vent stack with cap $ 400.00 Link Seals for discharge, vent, and conduit penetrations $ 570.00 Non-shrink grout for influent, discharge, vent and conduit penetrations, and base elbows $ 120.00 Sloped hopper floor concrete $ 200.00 High-solids epoxy paint for discharge piping and vent $ 300.00 316SST Anchor bolts for base elbows $ 200.00 TOTAL = $36,140.00 LABOR AND EQUIPMENT RENTAL Crane $ 2,500.00 Setting Precast wetwell structure $ 3,000.00 Install and grout Base elbows, guiderails, guiderail brackets, float bracket $ 1,500.00 Install 10" DIP discharge piping with link seals $ 2,400.00 Install 10" Vent with link seal $ 375.00 Install link seals and grout discharge, conduit, and vent penetrations $ 1,125.00 Pour sloped hopper floor $ 1,125.00 Finish paint 10" DIP discharge piping and vent (2 coats) $ 3,000.00 Set pumps and floats $ 375.00 TOTAL = $ 15,400.00 CONCRETE TOTAL MATERIALS, LABOR, RENTAL EQUIPMENT $ 51,540.00 EXCAVATION & DEWATERING, PUMPS & CONTROL PANEL NOT INCLUDED 100 YR WETWELL LIFE EXPECTANCY 25 YR WETWELL LIFE EXPECTANCY (MAX.)

CENTURY vs Precast Concrete w/liner Liner Adder Cost & Other Considerations (8 Dia. X 20 Deep Unit) CENTURY Pump Station Precast w/ Epoxy or Polymer Liner Precast w/ HDPE Liner TYPICAL LINER $ ADDER: Add'l Material Cost Per FT2 $0 (SRTP) $5.00/ft2 ADDER $14.00/ft2 ADDER Add'l Labor Cost - time None 3-5 days*** (weather dependent) 5-7 days *** (weather dependent) Total Add l Cost for 8 x20 Unit $0 (SRTP) $5,500 to $7,500 $12,500 to $14,500 GENERAL: Surface Prep Required None Abrasive Blast Required Abrasive Blast Required Application method None - product is SRTP 3-layer sprayed or rolled embedded attachment to concrete Product Hazard None Considered Hazardous Per OSHA 29CFR None Installation Hazard No additional hazards Confined Space Hazard Confined Space Hazard on rehabs Installer Requirements no special requirements authorized only authorized only PERFORMANCE: Leak Prevention Yes - 100% monolithic with stubouts Yes* (not including connection points) Yes** (not including connection points) H2S Protection Yes Yes Yes Abrasion resistant Yes Yes Yes Bacterial Resistant Yes Yes Yes Chemical Resistant Yes Yes Yes Pump Station connection points must be sealed with liner. Liner must be installed properly. Liner warranty is contingent on surface preparation. ** HDPE Liner requires special connection fitting for leak prevention *** Larger Wetwells installed in sections require joints to be sealed post installation Total Installed Costs (8 Dia. X 20 Unit) Precast Concrete w/ liner $57,040 to $66,040 CENTURY $48,215

CENTURY vs Precast Concrete Life Cycle Cost Comparison (8 Dia. X 20 Deep Unit) GENERAL: CENTURY Pump Station Precast w/out Liner Precast w/ Epoxy or Polymer Liner Precast w/ HDPE Liner Wetwell Life Expectancy 100 years 25 years 50 years (Liner replaced every 10 years max.) 50 years (Liner replaced every 10 years max.) 100 YR Lifecycle Cost*: Initial Installed Cost $51,590 $55,148 $61,033 $68,523 Liner Replacements 0 0 8 8 Liner Replacement Cost** $0 $0 $280,068 $636,518 Complete PS Replacements 0 3 1 1 Complete PS Replacement Cost** $0 $923,868 $286,291 $321,425 Total 100 YR Life Cycle Costs $51,590 $979,015 $627,392 $1,026,466 * Assumes 7% Engineering Fees ** Assumes 3% annual inflation rate; Does not include downtime costs for bypass pumping.

Embodied Energy and CO2 Comparison SRTP vs Concrete Equivalent 10 diameter x 20 Deep Pump Station HDPE is 1.83 times more energy efficient than concrete Carbon footprint of HDPE is 7.6 times less than concrete

CENTURY Pump Station Overview The 100 Year Solution