GOLDEN RULES FOR EASIFIX INSTALLATION

Similar documents
PRECAST EASIFIX GLASS BLOCK PANELS

340 & 350 SERIES BATH ENCLOSURES

340 & 350 SERIES DELUXE FRAMELESS BYPASS

Curium 19.4H Installation Instructions & Parts List

Dubnium 11 Installation Instructions & Parts List

Thank you for your order

Liniar Window. installation guide

Side Light Frame Pack Assembly Instructions

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

Side Light Frame Pack Assembly Instructions

Radon 07 Installation Instructions & Parts List

Monaco Installation Guide - Surface Profiles - vjun16

FIXED MOUNTING SHUTTERS INSTALLATION

DUALCASE VERSATILE ALUMINIUM SIGN SYSTEM

Curium 19H Installation Instructions & Parts List

UNIDOOR-X TUB DOOR TUB DOOR INSTALLATION NSTRUCTIONS. MODEL #s D58580-##

MIRAGE-X / BELLA. Shower Door Installation Instructions

Installation Instructions

Storefront Installation Guide

Mechanical Stone Hanging System. Installation Guide

Hinge Door + Inline Panel + Return Panel

Monaco Installation Guide - Surface Profiles

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

Platinum Swing Panel Installation Instructions

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

Greenhouse Assembly Instructions

B A T H R O O M G L A S S

Wall Profiles 2 Pozi Screwdriver. Wall Profile Covers 4 Sealant. Large Panel and Thin Panel Assemblies Sealant Gun

Installation - Sub Cills

Unit No. 6150, 7150 Deluxe Framed Sliding Tub/Shower Enclosure

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND

YSG 40/50/50T Window Wall System Installation Manual

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE 6150A-7150A

Gallium 03 Installation Instructions & Parts List

340D & 350D SERIES FRAMELESS BYPASS BATH ENCLOSURES

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today

The following instructions will guide you through the installation of your new vinyl railing.

FRAMED SLIDING DOOR FOR TUB OR SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

Installation Guidelines

Frameless Inline Door With Return QCI5263

INSTALLATION INSTRUCTIONS

Unit No. 4400, 4500 Classic Frameless Sliding Tub/Shower Enclosure INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

INSTALLATION GUIDE DUOFUSE SLAT WALL SYSTEM

FRENCH LINEA PANEL SHOWER PANEL INSTALLATION INSTRUCTIONS

Hinge Door + Side Panel

1 p

Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE

ALL SEASON PATIO COVER

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

Installation Instructions

INSTALLATION GUIDE. Biowood Outdoor Wall Panel BWWPO20018 Shiplap 8x6 Deep. Green Resources Material Australia Pty Ltd

340D / 350D SERIES FRAMELESS BYPASS BATH ENCLOSURES

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

1040 & 1050 SERIES HEAVY FRAMELESS BYPASS BATH ENCLOSURE

Xenon 05 Installation Instructions & Parts List

Gardman Lean-to Greenhouse Assembly Instructions

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

mistley PELE Installation Guide vapr16 Mistley Bathroom Glass Limited No 4 One Mistley Quayside, High Street, Mistley, Essex CO11 1AL England

Table and Furniture Base Fittings Plinth Adjusting Fittings

GENERAL INSTALLATION GUIDELINES

PANATRIM AND UNITRIM.

Vanity Installation Instructions

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

GENERAL INSTALLATION GUIDELINES

INFINITY-Z SHOWER DOOR / TUB DOOR INSTALLATION INSTRUCTION. MODEL #s 01-Chrome

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

Allora ALCOVE ENCLOSURE INSTALLATION BEFORE INSTALLATION CHECK THAT YOUR ALLORA SHOWER ENCLOSURE SYSTEM IS UNDAMAGED

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5232

640S & 650S SERIES FRAMED BYPASS BATH ENCLOSURES

PRIME SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

e-lite fabrication/assembly and Installation instructions

HOW TO CREATE AN OPENING IN BRICKWORK.

FIB-R-MAX STANDARD SINGLE DOOR

DUTCH GABLE FREESTANDING CARPORT

FRAMED PANEL / DOOR / PANEL CONTINUOUS HINGE SHOWER ENCLOSURE INSTALLATION INSTRUCTIONS

MANHOLES PART I: GENERAL. A. Precast Concrete Manholes

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

Downtown Rack. Custom logo option available

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233

Step-by-Step Installation Instructions for

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER 4400A-4500A

Chalk Line. #4 Phillips Driver Bit. Cable Cutters

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

UNIDOOR X (STYLE L1)

CAVALIER. Shower Door Installation Instructions

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

Swerve Rack CUSTOM RACKS AVAILABLE

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

ATLANTIS RAIL Contact Information

FLEX 48 x 72 / 60 x 72

SecuAnch Roof Anchor System

Frameless Inline Door QCI5254

YCW 750 IG Inside Glazed Curtain Wall System Installation Manual

Deauville Installation Guide

Linear Drain Installation Guide

Transcription:

GOLDEN RULES FOR EASIFIX INSTALLATION Golden rules - essential guidelines that need to be considered prior to preparation of the opening and before beginning installation of glass blocks. Glass block walls are self supporting, but not load bearing. Therefore similar to doors and windows, support above should be provided in the form of a lintel. For best integral strength, glass blocks should be installed into a four sided pre-prepared opening. This opening can be timber, brick, steel, concrete or blockwork. Glass blocks expand and contract with temperature change. Then Easifix system allows for its own expansion and contraction because the extrusion is manufactured from exterior grade PVC and blocks are bonded together using silicone with high elasticity properties. Glass blocks should not be installed when the surrounding temperature is 5 O C and falling or 30 O C and rising. Openings must be square and perpendicular and made to suit glass block modules. It is important to remember that glass blocks should not be cut like masonry bricks or tiles. A glass block panel should never be freestanding. To secure panel into opening using Easifix, stainless steel anchor brackets and horizontal Easifix spacer, placed on every row acts as reinforcement. Maximum panel size recommended when constructing with Easifix for internal use only up to 9m 2. (Vertical dimension not to exceed 3m). Easifix cannot be used in fire rated situations. Easifix can only be used for straight walls in conjunction with 80mm glass blocks. USING THE EASIFIX INSTALLATION SYSTEM EASIFIX ACCESSORIES EASIFIX EXTRUSION The Easifix extrusion is designed to replicate the profile of a mortar joint where the hollow of two glass blocks meet. Easifix spacers are manufactured in 2 lengths : 2.4m - horizontal and 185mm (nominal) - vertical. EASIFIX ANCHOR BRACKETS Two number Easifix anchor brackets are used, one at each end of each course and locate into the Easifix extrusion, holding each horizontal spacer in place. Easifix extrusion (highlighted) is placed between blocks and held with two, 5mm beads of silicone. Easifix anchor bracket EASIFIX SLEEVE Easifix sleeve is a UPVC U channel which accommodates a timber insert and is used around the perimeter edge of an Easifix glass block panel. e.g. Easifix direct to End post (no sleeve) 4 pilot holes per anchor bracket need to be pre-drilled. 4 holes per anchor bracket x 11 blocks high x 2 sides = 88 pre-drilled holes. Hence Easifix sleeve! If Easifix is fitted into a timber stud wall and a clean line between the blocks and the plasterboard is required, it is permissable to screw the anchor brackets directly to the timber. 17

USING THE EASIFIX INSTALLATION SYSTEM PREPARATION OF OPENING STEP 1 STEP 2 Position 71 x 15mm planed timber into Easifix sleeve U channel, when mitre cutting ensure U profile sleeve is rigid as to avoid flexing. When fixing the sleeve to perimeter opening or end post fit at 600mm centres. If installing directly to stud walling or end post etc, sleeve and timber may not necessarily be required. Go directly to Step 3. Lay out blocks and Easifix spacers dry to ensure modules fit. Secure Easifix sleeve and timber horizontally and vertically to perimeter opening at 600mm centres ensuring it is both square and perpendicular. LAYING THE FIRST COURSE (fig.1) (fig.2) STEP 5 STEP 6 Take a 185mm length of spacer profile and silicon two beads of mastic on one side. Place over the anchor bracket. Silicon two beads of mastic to the easifix spacer profile. Fit first block. Take another piece of 185mm easifix, apply silicon and fit to exposed vertical of first block. Fit next block and repeat this process until first row is complete. Note : Easifix spacer must always separate blocks from Easifix sleeve or perimeter opening. (fig.1) Remember each row has to be secured with anchor brackets at each end of the horizontal spacer. It is advised to construct the first course and allow this to initially cure so that on returning to build consecutive courses it becomes easier building a firm bed. In ideal circumstances around 6-8 courses before the panel will wobble to much, dependent on the panel width. Back shuttering could be considered for additional support. At this point it is advised to stop building and allow the panel to set prior to completing construction. For loose build of glass blocks ensure enough time is set aside to fully build. 18

ANCHORING THE HORIZONTAL SPACER STEP 3 STEP 4 USING THE EASIFIX INSTALLATION SYSTEM Cut a 2.4m long length of easifix spacer fractionally shorter than the horizontal length of opening. Take two anchor brackets and bend prongs to a right angle using pliers. Insert prongs into holes of easifix spacer at each end. BUILDING THE PANEL Silicon two 5mm beads of mastic into the under-side of the easifix spacer, fit to base of opening. Screw fix anchor brackets in place. Tip: As well as siliconing the base spacer, it can be screwed to the base to secure it instantly. Ensure screws are countersunk, so screw head avoids contact with blocks. FINISHING, SEALING AND WEATHERPROOFING THE GLASS BLOCK PANEL STEP 8 STEP 7 Repeat previous steps to complete the next and following rows. When the wall is complete, grout using Colmef Vetromix mortar or a wide grout joint. Alternatively, caulk the joints with silicone. Ensure that the perimeter joint is raked back, cleaned and siliconed. If grouted over it may crack.! Restriction can result in block cracking. INITIAL CLEAN AND AFTER CARE MAINTENANCE Do not clean with any acidic products, the best product for cleaning is water. Polish each block with a soft cloth using good old elbow grease. Note : Clean face of block as work proceeds.the glass block installer should have left the glass block wall in a clean, unblemished condition. Requiring only periodical cleaning to maintain an excellent appearance. However, there may be a residue of cement on the glass surface left from mortar/tiling grout identified by whiteish bloom when dry. This may be removed by use of proprietary cement stain remover. (BAL HD Tar Cleaner) 19

EASIFIX PANEL KITS CALCULATING OPENING SIZES Calculating the opening size accurately is essential because glass blocks should not be cut like masonry bricks or tiles. The diagram demonstrates the principle of how to calculate an opening size based on using 190x190x80mm glass blocks and 4mm joints. The Easifix extrusion is designed to create glass block panels with a minimum joint width. The perimeter joint will be approximately 5mm and the diagram and photographical step by step guide shows the use of easifix sleeve, which is 22mm deep. Calculating opening sizes (Horizontal dimension) Take the width of the block (eg. 190mm) Add the width of the vertical spacer joint (4mm) Multiply by the number of blocks in the horizontal course (eg 4 No.) Add one more joint width (6mm) as for 4 blocks you will have 5 joints The final joint dimension is 6mm. This allows for 5mm at vertical end (4mm spacer and 1mm anchor bracket).the remaining 1mm (anchor bracket) to be added to the opposite vertical Easifix joint of 4mm. EXAMPLE 1: Using 4mm joints 190mm glass block : 190 4mm joint : + 4 194 Number of blocks : x 4 776 Add fifth joint of 6mm: 6 Opening size : 782mm Using Easifix sleeve As above but add a further 17mm to each end (the 782mm thickness of the sleeve) + (2 x 17mm) Opening size with Easifix sleeve: 816mm 782mm opening 816mm opening with Easifix sleeve 17mm 22mm Easifix to sleeve connection Calculating opening sizes (Vertical dimension) Take the width of the block (eg. 190mm) Add the width of the horizontal spacer joint (4mm) Multiply by the number of blocks in the vertical course (eg 3 No.) Add one more joint width (6mm) as for 3 blocks you will have 4 joints The final joint dimension is 6mm. In the case of the vertical height, no anchor brackets are used. The 6mm allows a slight tolerance to allow easier positioning of the top horizontal row of glass blocks. EXAMPLE 2: Using 4mm joints 190mm glass block : 190 4mm joint : + 4 194 Number of blocks : x 3 582 Add fourth joint of 6mm: 6 Opening size : 588mm If using easifix sleeve add 17mm to each end resulting in an additional overall dimension of 34mm to be added to the required perimeter opening size. 20 TERMS Easifix kits can only be used in conjunction with 190x190x80mm glass blocks. Easifix is not a fire-rated installation system. Rods & Mortar and Easifix kits and installation systems cannot be integrated. Grout/mortar is not supplied with Easifix kits as standard. To use Colmef Vetromix glass block mortar as a grout, for panels 1x1 to 6x6 order 1x10kg bag, for larger panels up to 12x12, order 2x10kg bags. ESL2400 Easifix sleeve and timber is supplied as standard with each kit. If not required, inform when ordering. Easifix minimum opening sizes shown include ESL2400 Easifix sleeve, used around the perimeter. If sleeve is not required, 17mm each side should be taken off the detailed sizes (34mm overall). Accessory fact sheets referring to fitting instructions are available in this A5 Complete guide to glass blocks or can be downloaded from www.glassblocks.co.uk/easifix

EF1/1 EF2/1 EF3/1 EF4/1 EF5/1 EF6/1 EF7/1 EF8/1 EF9/1 EF10/1 EF11/1 EF12/1 (234x234) (428x234) (622x234) (816x234) (1010x234) (1204x234) (1398x234) (1592x234) (1786x234) (1980x234) (2174x234) (2368x234) EF1/2 EF2/2 EF3/2 EF4/2 EF5/2 EF6/2 EF7/2 EF8/2 EF9/2 EF10/2 EF11/2 EF12/2 (234x428) (428x428) (622x428) (816x428) (1010x428) (1204x428) (1398x428) (1592x428) (1786x428) (1980x428) (2174x428) (2368x428) EF1/3 EF2/3 EF3/3 EF4/3 EF5/3 EF6/3 EF7/3 EF8/3 EF9/3 EF10/3 EF11/3 EF12/3 (234x622) (428x622) (622x622) (816x622) (1010x622) (1204x622) (1398x622) (1592x622) (1786x622) (1980x622) (2174x622) (2368x622) EF1/4 EF2/4 EF3/4 EF4/4 EF5/4 EF6/4 EF7/4 EF8/4 EF9/4 EF10/4 EF11/4 EF12/4 (234x816) (428x816) (622x816) (816x816) (1010x816) (1204x816) (1398x816) (1592x816) (1786x816) (1980x816) (2174x816) (2368x816) EF1/5 EF2/5 EF3/5 EF4/5 EF5/5 EF6/5 EF7/5 EF8/5 EF9/5 EF10/5 EF11/5 EF12/5 (234x1010) (428x1010) (622x1010) (816x1010) (1010x1010) (1204x1010) (1398x1010) (1592x1010) (1786x1010) (1980x1010) (2174x1010) (2368x1010) EF1/6 EF2/6 EF3/6 EF4/6 EF5/6 EF6/6 EF7/6 EF8/6 EF9/6 EF10/6 EF11/6 EF12/6 (234x1204) (428x1204) (622x1204) (816x1204) (1010x1204) (1204x1204) (1398x1204) (1592x1204) (1786x1204) (1980x1204) (2174x1204) (2368x1204) EF1/7 EF2/7 EF3/7 EF4/7 EF5/7 EF6/7 EF7/7 EF8/7 EF9/7 EF10/7 EF11/7 EF12/7 (234x1398) (428x1398) (622x1398) (816x1398) (1010x1398) (1204x1398) (1398x1398) (1592x1398) (1786x1398) (1980x1398) (2174x1398) (2368x1398) EF1/8 EF2/8 EF3/8 EF4/8 EF5/8 EF6/8 EF7/8 EF8/8 EF9/8 EF10/8 EF11/8 EF12/8 (234x1592) (428x1592) (622x1592) (816x1592) (1010x1592) (1204x1592) (1398x1592) (1592x1592) (1786x1592) (1980x1592) (2174x1592) (2368x1592) EF1/9 EF2/9 EF3/9 EF4/9 EF5/9 EF6/9 EF7/9 EF8/9 EF9/9 EF10/9 EF11/9 EF12/9 (234x1786) (428x1786) (622x1786) (816x1786) (1010x1786) (1204x1786) (1398x1786) (1592x1786) (1786x1786) (1980x1786) (2174x1786) (2368x1786) EF1/10 EF2/10 EF3/10 EF4/10 EF5/10 EF6/10 EF7/10 EF8/10 EF9/10 EF10/10 EF11/10 EF12/10 (234x1980) (428x1980) (622x1980) (816x1980) (1010x1980) (1204x1980) (1398x1980) (1592x1980) (1786x1980) (1980x1980) (2174x1980) (2368x1980) EF1/11 EF2/11 EF3/11 EF4/11 EF5/11 EF6/11 EF7/11 EF8/11 EF9/11 EF10/11 EF11/11 EF12/11 (234x2174) (428x2174) (622x2174) (816x2174) (1010x2174) (1204x2174) (1398x2174) (1592x2174) (1786x2174) (1980x2174) (2174x2174) (2368x2174) EF1/12 EF2/12 EF3/12 EF4/12 EF5/12 EF6/12 EF7/12 EF8/12 EF9/12 EF10/12 EF11/12 EF12/12 (234x2368) (428x2368) (622x2368) (816x2368) (1010x2368) (1204x2368) (1398x2368) (1592x2368) (1786x2368) (1980x2368) (2174x2368) (2368x2368) EASIFIX PANEL KITS MATRIX KITS INCLUDE: GBT CODE DESCRIPTION GBT CODE DESCRIPTION ESP2400 ESP185 DC794 Easifix profile - 2.40m Easifix profile - 185mm Dow Corning Silicon (clear)* MSSAB TIM2400 ESL2400 Anchor brackets Timber - 2.40m Easifix sleeve - 2.40m *If your glass block outlet does not stock Dow Corning, a high quality, low odour silicon should be used. (Glass Block Technology only endorses Dow Corning.) 21

USING THE PRECAST EASIFIX SYSTEM E A S I F I X Precast Easifix is a dry fix system and one of the simplest ways of installing glass blocks. A revolutionary two part U channel manufactured by Glass Block Solutions allows you to fit precast ready made glass block panels quickly and easily. Precast Easifix is an ideal product for bar fronts, counters, dividing walls, virtually any straight non fire rated glass block panel. Two types of panel are available: standard or interconnecting. Panels are finished with a 4mm grouted finish. 22

E A S I F I X GOLDEN RULES The dimensions of the Precast panel will be adapted to fit whole blocks only and may increase or decrease in size and change from the customer s original requirements. You/The customer must be made aware of this. Precast Easifix is only recommended for internal use. It should not be used externally. Precast Easifix can only be used to construct straight walls. Precast Easifix is not a fire rated glass block installation system. Precast Easifix can only be produced in conjunction with 80mm wide glass blocks. When signed drawings are received confirming acceptance of dimensions, orders cannot be cancelled or changed. The merchant/retailer/client will be liable to pay 100% of the invoice. If Precast Easifix is being used in wet areas, you/the client is responsible for waterproofing all edges, joins & mitres between the Precast Easifix panel & Precast Easifix aluminium U channel. Dow Corning silicon should be used. Precast Easifix should be installed in to four sided openings for maximum strength & restraint. The Plasterboard Cover Strip is not supplied as standard. When requesting a quotation you must specify whether you require the plasterboard cover strip for one side or two. Connecting joints of the Precast Easifix panels must be grouted immediately after installation. Matching mortar is supplied with connecting Precast Easifix panels. Precast Easifix panels should be lifted vertically into position by a minimum of two people. USING THE PRECAST EASIFIX SYSTEM MERCHANT / RETAILER HOW TO REQUEST A PRECAST EASIFIX QUOTE 1 2 3 Fill in your branch address and contact details and Customer Reference. Ensure that the usage of the panel is also entered on the enquiry form. e.g. panel in stud wall. Fill in the correct block type and ensure clear or colour and style is entered in the order form e.g. Cobalt Blue Flemish. PRICING AND WHAT TO DO NEXT: 1646mm Enter number of blocks high by number of blocks wide required or dimensions of opening to fit. Indicate if plasterboard cover strips are required. State required delivery address: site or branch etc. On completion, submit to GBT along with any drawings or plans. Precast Easifix quotation request pads can be downloaded from www.glassblocks.co.uk/precast a GBT will reply with a quotation and detailed drawings. QUOTE The quote will show the end user retail price. Contact GBT regarding relevant discounts. DRAWINGS Drawings will detail the channel dimensions along with any connecting joints. 1256mm b c d Example e 4 5 6 7 f Once your client has accepted the price and ordered : Fax/send purchase order and signed drawings to GBT/your distributor. Lead time for precast panels is approximately 6 weeks from date of receipt of deposit*, order and signed drawings. When the panels are produced GBT will notify the branch and request balance of payment*. GBT will only despatch panels, subject to confirmation by the branch regarding settlement of client payment and delivery terms. Panels can be delivered to branch or direct to site (by prior notification). *Dependent on pre-negotiated trading terms, for further assistance contact GBT or refer to proposal. 23

USING THE PRECAST EASIFIX SYSTEM PRECAST EASIFIX STEP BY STEP INSTALLATION GUIDE Marker indication grooves Step 1 : Position and screw in place first part of aluminium channel. Ensure that the screws are located to the relevant marker. (a) Step 4 : Position second piece of channel and screw bolts into pre-drilled holes. Note : Fit sides first, then top piece, then bottom. If the Precast Easifix is a vertically or horizontally connecting panel, grout the connecting joint, both sides with the grout supplied. (b) Step 2 : Vertically lift the first panel having placed plastic packers on base of aluminium (a) and slide into position. Temporarily secure in place using restraint anchors (b) supplied. Step 5 : If using plasterboard coverstrip carefully measure, mitre corners and slot into position. (c) Step 3 : Apply silicone to the connecting joint on the second panel (c). Carefully lift second panel in vertical motion onto plastic packers and slide up to first panel ensuring a neat joint at intersecting point. Note : Apply more silicone if required. Step 6 : Position plasterboard behind cover strip. 24