PID GOVERNOR FOR BLACK START

Similar documents
Study and modeling of Speed control of Hydraulic Governing System using PD and PID Controllers

AORC Technical meeting 2014

Step-Response Tests of a Unit at Atatürk Hydro Power Plant and Investigation of the Simple Representation of Unit Control System

A Real-Time Regulator, Turbine and Alternator Test Bench for Ensuring Generators Under Test Contribute to Whole System Stability

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM

Comparative Study of PID and FOPID Controller Response for Automatic Voltage Regulation

Load Frequency and Voltage Control of Two Area Interconnected Power System using PID Controller. Kavita Goswami 1 and Lata Mishra 2

Automatic Generation control of interconnected hydrothermal power plant Using classical and soft computing Technique

STABILITY IMPROVEMENT OF POWER SYSTEM BY USING PSS WITH PID AVR CONTROLLER IN THE HIGH DAM POWER STATION ASWAN EGYPT

Spacecraft Pitch PID Controller Tunning using Ziegler Nichols Method

CDS 101/110: Lecture 8.2 PID Control

Andrea Zanchettin Automatic Control 1 AUTOMATIC CONTROL. Andrea M. Zanchettin, PhD Winter Semester, Linear control systems design Part 1

Hydraulic Actuator Control Using an Multi-Purpose Electronic Interface Card

International Journal of Research in Advent Technology Available Online at:

each time the Frequency is above 51Hz. Continuous operation is required

Setting and Verification of Generation Protection to Meet NERC Reliability Standards

Robert W. Cummings - NERC Director of System Analysis and Reliability Initiatives William Herbsleb - Chairman of Frequency Response Standard Drafting

Design of Fractional Order Proportionalintegrator-derivative. Loop of Permanent Magnet Synchronous Motor

Lecture 5 Introduction to control

Advanced Motion Control Optimizes Laser Micro-Drilling

Dr Ian R. Manchester

Study on the Improvement of the Special Protection Scheme (SPS) in the Korean power system

Position Control of AC Servomotor Using Internal Model Control Strategy

The Effect of Fuzzy Logic Controller on Power System Stability; a Comparison between Fuzzy Logic Gain Scheduling PID and Conventional PID Controller

New Redundant Automatic Voltage Regulator (AVR) Solution

Position Control of a Hydraulic Servo System using PID Control

Position Control of DC Motor by Compensating Strategies

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II 5 - Reactive Power and Voltage Control

Design of an Intelligent Pressure Control System Based on the Fuzzy Self-tuning PID Controller

BSNL TTA Question Paper Control Systems Specialization 2007

ANNA UNIVERSITY :: CHENNAI MODEL QUESTION PAPER(V-SEMESTER) B.E. ELECTRONICS AND COMMUNICATION ENGINEERING EC334 - CONTROL SYSTEMS

Frequency Response Analysis and Design Tutorial

HISTORY: How we got to where we are. March 2015 Roy Boyer 1

System Stability and Virtual Synchronous Machines. Why we need grid forming converters, and the metrological challenges of incentivising them.

ADJUSTING SERVO DRIVE COMPENSATION George W. Younkin, P.E. Life Fellow IEEE Industrial Controls Research, Inc. Fond du Lac, Wisconsin

Course Outline. Time vs. Freq. Domain Analysis. Frequency Response. Amme 3500 : System Dynamics & Control. Design via Frequency Response

Optimal Control System Design

Phys Lecture 5. Motors

Improved Electronic Load Controller for Three Phase Isolated Micro-Hydro Generator

COMPUTATION OF STABILIZING PI/PID CONTROLLER FOR LOAD FREQUENCY CONTROL

POWER SYSTEM OSCILLATIONS

EVALUATION ALGORITHM- BASED ON PID CONTROLLER DESIGN FOR THE UNSTABLE SYSTEMS

POWER EXTENSION LIBRARY

Automatic Voltage Control For Power System Stability Using Pid And Fuzzy Logic Controller

Study of Effectiveness of Under-excitation Limiter in Dynamic Modeling of Diesel Generators

Transient stability improvement by using shunt FACT device (STATCOM) with Reference Voltage Compensation (RVC) control scheme

Review of Pole Placement & Pole Zero Cancellation Method for Tuning PID Controller of A Digital Excitation Control System

Readings: FC: p : lead compensation. 9/9/2011 Classical Control 1

Improvement of Power Quality Considering Voltage Stability in Grid Connected System by FACTS Devices

Andrea Zanchettin Automatic Control 1 AUTOMATIC CONTROL. Andrea M. Zanchettin, PhD Spring Semester, Linear control systems design

GOV/AVR Model Validation Process

Research Article Multi-objective PID Optimization for Speed Control of an Isolated Steam Turbine using Gentic Algorithm

Optimizing Performance Using Slotless Motors. Mark Holcomb, Celera Motion

A new approach for Tuning of PID Load Frequency Controller of an Interconnected Power System

(1) Identify individual entries in a Control Loop Diagram. (2) Sketch Bode Plots by hand (when we could have used a computer

NERC Requirements for Setting Load-Dependent Power Plant Protection: PRC-025-1

LARGE-SCALE WIND POWER INTEGRATION, VOLTAGE STABILITY LIMITS AND MODAL ANALYSIS

Generator Operation with Speed and Voltage Regulation

Implementation of Proportional and Derivative Controller in a Ball and Beam System

System Protection and Control Subcommittee

International Journal of Scientific & Engineering Research, Volume 6, Issue 6, June-2015 ISSN

Active Power Sharing and Frequency Control of Multiple Distributed Generators in A Microgrid

Fundamentals of Servo Motion Control

Classical Control Design Guidelines & Tools (L10.2) Transfer Functions

Power System Transient Stability Enhancement by Coordinated Control of SMES, SFCL & UPFC

Design of PI Controller using MPRS Method for Automatic Generation Control of Hydropower System

International Journal of Digital Application & Contemporary research Website: (Volume 2, Issue 8, March 2014)

LOAD FREQUENCY CONTROL FOR TWO AREA POWER SYSTEM USING DIFFERENT CONTROLLERS

International ejournals

ELEMENTS OF FACTS CONTROLLERS

PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON SCIENCE AND ENGINEERING

ANALYTICAL AND SIMULATION RESULTS

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link.

H6e - Hydro Turbine-Governor Model

5 Lab 5: Position Control Systems - Week 2

Power System Stability. Course Notes PART-1

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Simulation Programs for Load Shedding Studies: Expermintal Results

A Model Based Digital PI Current Loop Control Design for AMB Actuator Coils Lei Zhu 1, a and Larry Hawkins 2, b

Magnetic Levitation System

Different Controller Terms

Harmonizing the Changing Resource Mix Keeping the Grid Together

Application Example Document ID: SA Rev. - September 24, 2004

Load Frequency Control of Multi-Area Power Systems Using PI, PID, and Fuzzy Logic Controlling Techniques

Industry Webinar. Reactive Power Planning. NERC System Analysis and Modeling Subcommittee (SAMS) March 2017

Comparison of Tuning Methods of PID Controllers for Non-Linear System

CSE 3215 Embedded Systems Laboratory Lab 5 Digital Control System


CHAPTER 1 INTRODUCTION

Use of the Power System Outlook (PSO) and SMART 1 Programs to View PSLF Dynamic Simulation Data Files

ESB National Grid Transmission Planning Criteria

Testing model data usability Excitation Systems PSS Limiters

Energy-Based Damping Evaluation for Exciter Control in Power Systems

Chapter 5 Frequency-domain design

CHAPTER 4 PID CONTROLLER BASED SPEED CONTROL OF THREE PHASE INDUCTION MOTOR

Review of PI and PID Controllers

MTE 360 Automatic Control Systems University of Waterloo, Department of Mechanical & Mechatronics Engineering

CDS 101/110: Lecture 9.1 Frequency DomainLoop Shaping

IDENTIFICATION OF SYNCHRONOUS GENERATOR AND EXCITATION SYSTEM TRANSFER FUNCTIONS FOR Q-V CONTROL PURPOSE

EECE488: Analog CMOS Integrated Circuit Design Set 7 Opamp Design

Transcription:

PID GOVERNOR FOR BLACK TART Atsushi Izena,Naoto uzuki, Toshikazu himojo (Kyushu Electric Power Company Inc.) Kaiichiro Hirayama, Nobuhiko Furukawa, Takahisa Kageyama (Toshiba Corporation) Abstract The power system frequency during a black start period can be unstable because governor control constants of the hydro generators to be started first are generally designed to operate in the usual bulk power system. This paper reports on the power system frequency stability in a smallscale power system with hydro generators at the time of a black start, with an emphasis on the results of our study using an improved for power system frequency stability and quick response to meet criteria. Keywords: black start, hydraulic generator,, governor control, analysis model, frequency control 1 INTRODUCTION The power system of Kyushu Electric Power Company Inc. or KEPCO, whose size is about 19 GW, belongs to the Western Japanese power system (110GW, 60Hz) and has a 500kV and 220kV grid system in a looped configuration. It is determined, when the KEPCO power system collapse occurs, to first start some hydro generators as an initial power. Then these hydro generators are synchronized with each other. However, governor control constants are generally designed under the condition that hydraulic generators operate in the usual bulk power system. And a power system at a black start is very small compared with the usual power system. In this situation the power system frequency during a black start period can be unstable, if the same governor control constants as for the usual bulk power system are still used. And due to such an unstable power system frequency, the power system restoration after the blackout may fail again. KEPCO specified governor performance criteria with frequency control for black starts as follows: as the rate of changes of load for frequencies [67]. Turbine speed changes are very small or negligible when hydro generators are synchronized with the largescale power system. In this case, D m of each hydro generator is not considered important for stability of the speed control system. In a smallscale power system like a black start power system, however, these Tw and D m greatly influence governor's control stability. Authors thus carried out field tests for analysis of such governor control stability and improved the analysis models of D m and servo system based on the field test results [8]. This paper reports on the results of our study using an improved for power system frequency stability and quick response to meet the criteria during black start operations, identifies some problems, and suggests a countermeasure. 2 MODELING OF GOVERNOR YTEM BAED ON FIELD TET 2.1 Governor Control tructure Figure 1 shows a block diagram from a governor control system to a hydraulic turbine supplying an isolated load at a black start. Figure 2 and Figure 3 show detailed block diagrams of the and hydraulic system. The servo system was shown in Figure 4 65F (peed reference) Governor ervo system Hydraulic system Turbine dynamics Turbine speed 1) The power system frequency must be settled within 50 seconds to shorten the restoration time at a black start 2) Its fluctuation must be kept within 1Hz (1.67%) responses of pumped storage hydraulic power turbines at a black start were studied and tested as to whether the governor could meet the above criteria. Generally speaking, tuning of governor control constants is well known [15]. Moreover, a field test for such a governor model was also carried out and reported. Water time constant Tw of hydraulic system is a function of water flow Q that flows into a tunnel and a penstock. Damping coefficient D m of turbine dynamics is calculated Figure 1: Governor system configuration with turbine dynamics 65F (peed reference) peed Figure 2: 1 Ti Kp K h T h 1T h Kdp Permanent ervo system 65P (Power reference) 15th PCC, Liege, 2226 August 2005 ession 24, Paper 5, Page 1

Kr Gate position Torque 1C 1 w T w 10.5C w T w T m D m Turbine speed (db) Total of servo system Auxiliary servo Gate servo T m =11.4, T w =1.7, D m =1.45,Kr=1.29 Figure 3: Hydraulic system and turbine dynamics Converter coil Frequency Auxiliary servo Distribution valve Gate servo signal Kc 1 1 1 1 Ka 1Tp Ta Td Tv Gate Rf Kd position Kg Figure 4: Frequency response test configuration using the actual servo system (under stopping of the turbine generator) 2.2 Frequency Response Test The of pumped storage hydraulic power turbine (250MW) to be used for a black start was studied as to whether the governor response could meet the above criteria. An open loop frequency response test was conducted to the actual servo system. ince this was of a digital type, PID constants and algorithms were given by software. Test signals with various frequencies were put into the through an analog input board. Figure 4 shows the configuration of the frequency response test. Figure 5 shows the frequency characteristic drawn using the measurement data, and Figure 6 shows the frequency characteristic calculated with the configuration shown in Figure 4 and from the measurement value (Table 1). The servo system constants seemed to be correctly calculated, because Figure 6 well agreed to Figure 5. 2.3 tep Response Test A step signal was put into the speed reference (65F) shown in Figure 1, and its transient response of the governor control system was measured. Figure 7 shows the results of a 1% step response test. Table 1 shows the servo system constants used in Figure 4. (db) Total of ervo system Auxiliary servo Gate servo (Hz) Figure 5: ervo system frequency characteristic of 250MW pumped storage hydraulic generatormeasured [pu] [cm] [pu] 1.005 0 1 0.995 0.99 4 3.8 3.6 3.4 0 0.13 0.12 0.11 0.1 0 5 10 5 5 10 10 15 15 15 20 20 20 25 25 25 30 30 30 35 35 35 40 40 40 (Hz) Figure 6: ervo system frequency characteristic of the 250MW pumped storage hydraulic generator calculated based on the measured data 45 45 45 Figure 7: Governor response test record at 1% step change Apparatus ymbol Unit Value Converter Tp sec 0.07 coil Kc cm/pu 1.0 Auxiliary Ta sec 0.02 servo Rf pu/cm 0.1 Distribution Td sec 0.01 valve Ka cm/cm 0.7 Kd cm/cm 0.33 Gate servo Tv sec 0.5 Kg cm/cm 0.21 Table 1: Measured value of servo system constants Moreover, the servo system constants in Figure 4 estimated through the frequency response test were used to simulate the 1% step response shown in Figure 8. It turns out that the simulation results well agreed to the test data. Therefore, it can be said that the governor control system model matches the characteristic of the actual control system with sufficient accuracy. The present governor control constants are shown in Table 2. ymbol Meaning Value K p Proportional gain. 1.5 T i Integral time constant 10 K h Differential gain 0.0 T h Differential time constant 0.0 K dp Permanent Droop 0.0 Table 2: Present governor control constants 15th PCC, Liege, 2226 August 2005 ession 24, Paper 5, Page 2

Figure 8: Governor response simulation at 1% step change 3 PUMPED TORAGE HYDRAULIC TURBINE GOVERNOR CONTROL YTEM FOR BLACK TART A governor control system of a hydro turbine consists of a governor, a servo system, a hydraulic system, and a turbine. The governor control system to be used for a black start was studied as shown below. 3.1 Evaluation of response for the pumped storage hydraulic turbine at a black start In order to send power to load stably at the time of a black start, the power system frequency must be stable, and controlled within small fluctuation even when load is increased stepwise up to 5% of the maximum generator capacity with governor control. KEPCO specified governor performance criteria with frequency control for black starts as follows: 1) The power system frequency must be settled within 50 seconds to shorten the restoration time at a black start 2) Its fluctuation must be less than 1Hz(1.67%) The PID constants in Table 2 were checked as to whether the simulated performance could meet the above criteria. Figure 9 was the simulation result of the power system frequency change when a generator load was increased stepwise from 60% to 65%. imilarly, Figure 10 is the simulation case from 80% to 85% load change. The minimum turbine speed of Figure 9 and Figure 10 were lower than 1.67% (1.0Hz) and exceeded the criteria. o those PID constants in Table 2 were not considered acceptable. Therefore, it is necessary to modify the present PID constants to new constants that can meet the criteria. 0db 180deg. Figure 10: Governor response to 5% stepwise load increase from generator 80% load 3.2 Improved PID Constants for Black tart New PID constants were contrived to improve the response to turbine speed changes quicker than that with the present PID constants. The improved PID constants based on the data of the servo system obtained by the field test are shown in Table 3. The dominant poles in the governor control system using them are shown in Table 4. ymbol Meaning Value K p Proportional gain. 2.5 T i Integral time constant 5.0 K h Differential gain 8.1 T h Differential time constant 1.27 K dp Permanent 0.0 Table 3: New governor control constants No Generator power Dominant poles Real part Imaginary part 1 40% 0.177 ±0.574 2 60% 0.061 ±0.425 3 80% 0.038 ±0.433 4 100% 0.065 ±0.391 Table 4: Dominant poles on improved PID constants Figure 11 is a bode diagram drawn on the same conditions as No.4 in the table 4. A phase margin is 40 degrees or more when a gain curve cuts across the 0db axis in Figure 11. Figure 9: Governor response to 5% stepwise load increase from generator 60% load Figure 11: Governor system frequency characteristic of pumped storage hydraulic generator under application to new designed PID constants 15th PCC, Liege, 2226 August 2005 ession 24, Paper 5, Page 3

The dominant pole with the current PID constants at generator power 100% is as follows. Dominant pole: 0.0896± j0.186 As shown above, the governor control system with the improved PID constants is stable at all the operating points of a generator, and it turns out that the response speed to turbine speed changes is improving as compared with the present PID constants. Figure 12 and Figure 13 show the results of the simulation corresponding to Figure 9 and Figure 10. Table 5 is the summary of the simulation results. The improved PID constants can satisfy the criteria of 1Hz or less. No Figure dip Criteria 1 Figure12 0.9875p.u(0.75Hz) 0.0167p.u(1Hz) 2 Figure13 0.985p.u(0.9Hz) Ditto Note; 1p.u=400rpm(60Hz) Table 5: ummary of simulation with improved PID constants Figure 12: Governor response to 5% stepwise load increase from generator 60% load with improved PID 3.3 tudy of Permanent Droop applied to Improved PID Constants If two or more s without permanent are used, generators cannot send power to load stably [8]. Permanent on a is mandatory used after a generator is connected to a power system. When permanent is used, as compared with the case where it is not used, a governor control loop becomes more stable but slow. Therefore, the design of PID constants to make the governor response quicker than that with the abovementioned new PID constants is attained. The newly designed PID constants are presented in Table 6. The dominant poles calculated with this design are then presented in Table 7. ymbol Meaning Value K p Proportional gain. 3.0 T i Integral time constant 3.0 K h Differential gain 8.1 T h Differential time constant 1.27 K dp Permanent 0.05 Table 6: Governor control constants with permanent Figure 14 is a bode diagram drawn under the condition of No.4 in Table 7. A phase margin is 30 degrees when a gain curve cuts across the 0db axis in Figure 14.This shows the speed control system is stable. Figure 15 shows the result of the simulation with the PID constants in Table 6. The simulation condition is same as Figure 13. No Generator Dominant poles power Real part Imaginary part 1 40% 0.183 ±0.573 2 60% 0.063 ±0.425 3 80% 0.069 ±0.371 4 100% 0.094 ±0.327 Table 7: Dominant poles on improved PID constants with permanent Comparing Figure 15 with Figure 13, 1) The overshoot to turbine speed in Figure 13 did not occur but it occurred in Figure 15 slightly. 2) The minimum turbine speeds are almost same. 3) The recovery times to 1p.u are almost same. As mentioned above, the turbine speed changes by step load application to the generator in Figure 13 and Figure 15 show almost the same motion. Figure 13: Governor response to 5% stepwise load increase from generator 80% load with improved PID 15th PCC, Liege, 2226 August 2005 ession 24, Paper 5, Page 4

0db governors, therefore, can meet the criteria that the maximum frequency drop is 1 Hz or less. The power system frequency was settled to the rated frequency within 50 seconds, proving that this improved PID constants could meet the criteria. 180deg. #1 WG without premanent Load1 #2 WG with permanent Figure 14: Governor system frequency characteristic of pumped storage hydraulic generator under application to PID constants in Table 6 with permanent #3 WG with permanent Load2 Figure 16: Three machines power system configuration with Frequency (turbine speed) Figure 15: Governor response to 5% stepwise load increase from generator 80% load with PID in Table 6 with permanent 3.4 Evaluation of Permanent Droop It is most effective that a hydraulic generator with the maximum capability carries out frequency control, PID governor without permanent, in a smallscale system like a black start. The with permanent makes an offset between a frequency reference and the power system frequency. Therefore, this governor cannot maintain the power system frequency to the rated frequency. Figure 16 is a smallscale power system configuration with three pumped storage hydraulic generators with s in restoration process from a blackout. One of them maintains the power system frequency constant, and the other two governors are with permanent in service. Figure 17 shows the simulation results to evaluate whether the power system frequency can be stable and recover within 1Hz when the total load of the power system in Figure 16 increased by 5% stepwise from the initial load. This simulation result showed that the power system frequency stayed within 0.8% (0.48Hz). These PID without with with Figure 17: Governor response to 5% stepwise load increase from generator 60% load (100% is a total generator capacity of three generators.) 15th PCC, Liege, 2226 August 2005 ession 24, Paper 5, Page 5

4 CONCLUION Generally speaking, tuning of governor control constants is well known. Moreover, a field test for such a governor model was also carried out and reported. But, a black start must be made from a smallscale power system. KEPCO plans to restore the power system using hydro plants as initial power sources. Fossil and nuclear power plants will then be started by receiving power from this smallscale power system. The frequency stability is most essential to restore the power system at the early stage of a black start. This depends heavily on the governor performances. Based on the field test and the new design, we have obtained adequate governor constants. KEPCO verifies the new governor constants satisfy the frequency fluctuation and response speed specifications. The hydraulic plants proposed are operating normally in the bulk power system. For that purpose, the two settings are needed the conventional setting for normal operation and the new setting for black start. It turns out that the KEPCO power system can be smoothly restored from a blackout with those governor constants. REFERENCE [1] IEEE recommended practice for preparation of equipment specifications for speed governing of hydraulic turbines intended to drive electric generators tric generators ANI/IEEE TD 1251988, 31 Oct. 1988 [2] Working Group on Prime Mover and Energy upply Models for ystem Dynamic Performance tudies Hydraulic turbine and turbine control models for system dynamic studies", Power ystems, IEEE Transactions on, Volume: 7 Issue: 1, Feb.1992, Page (s): 167 179 [3] Vournas, C.D.; Governor tuning and regulating capacity of hydroelectric units WECANEX 93. 'Communications, Comuters and Power in the Modern Environment.' Conference Proceedings, IEEE, 1718 May 1993,Page(s): 228 233 [4] Murphy, L.D.; Wozniak, L.; Whittemore, T.A.; A digital governor for hydrogenerators Energy Conversion, IEEE Transactions on Volume: 3 Issue: 4, Dec. 1988,Page(s): 780 784 [5] C.K.anathanan,"A Frequency Domain Method for Tuning Hydro Governors."IEEE Transaction on Energy Conversion, Vol.3, No.1, March 1998 [6] Louis N.Hannett, et.al, "Field Test to Validate Hydro Turbine Governor Model tructure and Parameters" IEEE Transactions on Power ystem, Vol.9, No.4, November 1994, Page(s): 1744 1751 [7] Mansoor,.P.; Jones, D.J.; Bradley, D.A.; Aris, F.C.; Jones, G.R.; tability of a pump storage hydropower station connected to a power system, Power Engineering ociety 1999 Winter Meeting, IEEE, Volume: 1, 31 Jan.4 Feb. 1999,Page(s): 646 650 vol.1 [8] K.Furukawa, et.al, Governor control study at the time of a black start, Power Engineering ociety 2004 General Meeting, IEEE, June 610. PEGM2004000448.PDF 15th PCC, Liege, 2226 August 2005 ession 24, Paper 5, Page 6