Philip Rogers Elementary School

Similar documents
Jackie Robinson Elementary School

Amos Alonzo Stagg Elementary School

John Milton Gregory Elementary School

Marcus Moziah Garvey Elementary School

Charles N Holden Elementary School

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

Jonathan Burr Elementary School

EPIC Academy High School

Alexander Graham Bell Elementary School

Everett McKinley Dirksen Elementary School

Daniel S Wentworth Elementary School

Wendell Smith Elementary School

Robert Fulton Elementary School

John Spry Elementary Community School

Andrew Carnegie Elementary School

Richard J Oglesby Elementary School

Rufus M Hitch Elementary School

Morton School of Excellence

University of Chicago Charter - Carter G Woodson

Disney II Magnet School

John Harvard Elementary School of Excellence

Cyrus H McCormick Elementary School

Disney II Magnet High School

Arthur E Canty Elementary School

Architecture, Construction, and Engineering Technical Charter

George W Tilton Elementary School

Academy for Global Citizenship Elementary School

University of Chicago Charter - NKO

Langston Hughes Elementary School

Urban Prep Academy for Young Men - West

Norman A Bridge Elementary School

William Penn Elementary School

Brian Piccolo Elementary Specialty School

Joseph E Gary Elementary School

George Washington Elementary School

Arthur A Libby Elementary School

George Washington High School

Amandla Charter High School

Phoenix Military Academy High School

Betty Shabazz Intl Charter - DuSable Leadership

KIPP Charter Bloom. Definitions EXTERIOR S Lowe Ave Chicago, IL Co-locating on This Campus: Hope HS and Kipp Chtr Bloom

Legacy Charter Elementary School

John F Kennedy High School

Henry H Nash Elementary School

Richard T Crane Medical Preparatory HS

John Hancock College Preparatory High School

Walt Disney Magnet Elementary School

Theodore Roosevelt High School

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

North Lawndale College Prep Charter - Collins

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

John L Marsh Elementary School

Emmett Louis Till Math and Science Academy 6543 S Champlain Ave Chicago, IL 60637

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Bowen High School. Definitions EXTERIOR E 89th St Chicago, IL Co-locating on This Campus: Bowen HS and Noble St Chtr-Orange

William Howard Taft High School

Friedrich Ludwig Jahn Elementary School 3149 N Wolcott Ave Chicago, IL 60657

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Multicultural Academy of Scholarship

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Hiram H Belding Elementary School 4257 N Tripp Ave Chicago, IL 60641

Lorenz Brentano Math & Science Academy ES 2723 N Fairfield Ave Chicago, IL 60647

Philip Rogers Elementary School 7345 N Washtenaw Ave Chicago, IL 60645

Harriet Beecher Stowe Elementary School 3444 W Wabansia Ave Chicago, IL 60647

Joseph Lovett Elementary School 6333 W Bloomingdale Ave Chicago, IL 60639

Johann W von Goethe Elementary School 2236 N Rockwell St Chicago, IL 60647

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

William H Seward Communication Arts Academy ES 4600 S Hermitage Ave Chicago, IL 60609

Franklin Elementary Fine Arts Center 225 W Evergreen Ave Chicago, IL 60610

Frederic Chopin Elementary School 2450 W Rice St Chicago, IL 60622

University of Chicago - North Kenwood/Oakland 1119 E 46th St Chicago, IL Co-locating on this campus are U OF C - NKO and ARIEL

Joseph E Gary Elementary School 3740 W 31st St Chicago, IL 60623

John Palmer Elementary School 5051 N Kenneth Ave Chicago, IL 60630

Perspectives - Math and Science Academy 3663 S Wabash Ave Chicago, IL 60653

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Ellen Mitchell Elementary School 2233 W Ohio St Chicago, IL 60612

James Shields Middle School 2611 W 48th St Chicago, IL 60632

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

Thomas Chalmers Specialty Elementary School 2745 W Roosevelt Rd Chicago, IL 60608

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

John Barry Elementary School 2828 N Kilbourn Ave Chicago, IL 60641

James Otis Elementary School 525 N Armour St Chicago, IL 60642

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

Manley Career Academy High School 2935 W Polk St Chicago, IL 60612

John Hancock College Preparatory High School 4034 W 56th St Chicago, IL 60629

SITE $1,539,659. Item - Type Quantity Unit Rank Cost. Entrance Control - Audio and Video 2 EA Exterior Doors - Exterior Wood Door 2 EA

James Monroe Elementary School 3651 W Schubert Ave Chicago, IL 60647

William J Onahan Elementary School 6634 W Raven St Chicago, IL 60631

Wendell Phillips Academy High School 244 E Pershing Rd Chicago, IL 60653

Charles Allen Prosser Career Academy High School 2148 N Long Ave Chicago, IL 60639

Francis W Parker Elementary Community Academy 6800 S Stewart Ave Chicago, IL Co-locating on this campus are AMANDLA and PARKER

William Howard Taft High School 6530 W Bryn Mawr Ave Chicago, IL 60631

OCPS Submittal Register for Product Data and Shop Drawing Reviews

PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS. room) Scalable bubble diagrams schedules describing programmatic

U of I Facilities Standards Updates for 2017

New Multi-Family Buildings & Additions Plan Intake Submittal Checklist. Project Name: Site Address:

BUILDING PLAN REVIEW REQUIREMENTS

RECAPP Facility Evaluation Report

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CHIMNEY Brick Chimney - Concrete/ Mortar Liner 5 6 7 GRE 7 54 54 LF DOORS Exterior Steel Door Exterior Wood Door Transom Lite 5 6 GRE 6 7 GRE 6 9 GRE 6 4 7 7 EA $2,312 9 EA $2,888 4 EA $1,133 $6,333 Assessment Date: 3/11/2013 Page 1 of 15

ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio and Video Ramp Handrails Stair Handrails Steel or Aluminum Stairs FOUNDATION 5 6 GRE 6 498 GRE 6 126 GRE 6 1 GRE 6 330 GRE 6 185 GRE 6 6 7 498 LF $53,411 126 LF $17,568 $1,430 330 LF 185 LF 6 LF $42 $72,451 Concrete Foundation 5 6 7,258 1,258 LF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 5 6 7 GRE 6 2 8 GRE 6 19 10 EA $1,001 19 EA $4,076 $5,077 LINTELS Lintels - Steel Lintels - Stone 5 6 7 GRE 7 444 GRE 7 489 444 LF 489 LF PARAPET Coping - Stone Parapet > 30" Height Parapet 16" to 30" Height 5 6 7,688 GRE 7 474,214 1,688 LF 474 LF 1,214 LF Assessment Date: 3/11/2013 Page 2 of 15

ROOF SYSTEM Interior Downspouts Modified Bitumen Roof Roof Structure: Steel with Clay Tile Arch 5 6 GRE 6 30 545 7 GRE 7 31,973 GRE 7 31,973 575 LF $3,218 31,973 SF 31,973 SF $3,218 SUPERSTRUCTURE Concrete 5 6 7 GRE 7 68,302 68,302 SF WALLS Brick Stone - Cast 5 6 7 GRE 7 41,197 GRE 7 2,516 41,197 SF 2,516 SF WINDOWS Curtain wall - Insulated panel Window - Guards perforated Windows - Casement Aluminum Double-pane Windows - Decorative Windows - Sash Aluminum Double-pane EXTERIOR 5 6 7 GRE 7 27 GRE 7 3,422,740 GRE 7 48 GRE 7 6,177 27 SF 3,422 SF 1,740 SF 48 SF 6,177 SF $87,077 Assessment Date: 3/11/2013 Page 3 of 15

ELECTRICAL EMERGENCY SYSTEM Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Emergency Battery Packs - Toilets Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Public Announcement System Security System - Intrusion detection MAIN SERVICE 5 6 GRE 6 22 GRE 6 3 GRE 6 10 GRE 6 4 GRE 6 22 GRE 6 3 GRE 6 68,302 GRE 6 68,302 7 22 EA $2,360 3 EA $322 10 EA $1,073 4 EA $932 22 EA $5,128 3 EA $699 68,302 SF $41,022 68,302 SF $63,487 $115,022 5 6 7 Main Electrical service 1000 A and below 120/208/3PH YEL 4 1 $96,096 $96,096 POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels less than 400 amp Transformers 120/240-120/208 Transformers 277/480-120/208 ELECTRICAL 5 6 7 GRE 7 2 GRE 7 2 GRE 7 2 2 EA 2 EA 2 EA $211,118 Assessment Date: 3/11/2013 Page 4 of 15

FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION ORA 3 68,302 5 6 7 GRE 7 49,098 68,302 SF $144,554 49,098 SF $144,554 $144,554 MECHANICAL AIR CONDITIONING Condensing - Roof Mounted less than 5 tons Window A/C 5 6 7 GRE 6 14 14 EA $3,003 $3,003 AIR HANDLING SYSTEMS Air Handling Package - Single Zone - Steam 12,001 to 20,000 cfm Air Handling Package - Single Zone - Steam less than 4,000 cfm Air Intake - Built Up Air Handling Air intake for all Air Handling s except built up AHU Multi Zone Built Up Air Handling - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 15,001 to 25,000 cfm Reheat Boxes With Steam Coils Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft BOILER SYSTEMS YEL 4 1 YEL 4 1 5 6 GRE 6 3 BLU 5 1 BLU 5 1 2 BLU 5 1 2 GRE 6 9 YEL 4 200 7 $75,790 $35,750 3 EA $4,290 $5,720 3 EA $115,544 3 EA $38,610 9 EA $9,395 200 LF $529,100 $814,199 5 6 7 Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler 151-200 HP YEL 4 2 2 EA $331,760 Boiler Auxiliary - Steam Boiler 151-200 HP YEL 4 2 2 EA $48,620 Assessment Date: 3/11/2013 Page 5 of 15

Chemical Feed System (Steam Boilers) Combustion Dampers Feed Water Pumps and Tank - Steam Boilers HEATING DEVICES Radiators - Steam Wall Heater - Electric MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Vacuum TEMPERATURE CONTROL GRE 6 1 YEL 4 2 YEL 4 1 YEL 4 11 5 6 GRE 6 15 5 6 GRE 6 2 BLU 5 1,200 BLU 5 1,200 BLU 5 1 2 7 7 $2,145 2 EA $11,154 $31,460 $425,139 1 $15,415 15 EA $1,544 $16,960 2 EA $1,430 1,200 LF $39,039 1,200 LF $59,374 3 EA $34,320 $134,163 Pneumatic System Thermostats - Pneumatic Zone Dampers 5 6 7 GRE 7 68,302 BLU 5 15 31 BLU 5 15 31 68,302 SF 46 EA $14,300 46 EA $17,089 $31,389 VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 500 to 1,500 cfm Type II Exhaust Hood - Warming Kitchen YEL 4 2 YEL 4 3 5 6 GRE 6 1 7 2 EA $11,154 3 EA $6,864 $930 $18,948 Assessment Date: 3/11/2013 Page 6 of 15

MECHANICAL $1,443,800 PLUMBING HOT WATER Hot Water Heater - Gas 150,000-300,000 BTU/HR 5 6 7 GRE 7 2 2 EA PIPING 5 6 7 Domestic Piping - Cold Water from Risers to Fixtures 68,302 SF $22,465 Domestic Piping - Cold Water Risers 68,302 SF $43,952 Domestic Piping - Hot Water from Riser to fixtures 68,302 SF $14,651 Domestic Piping - Hot Water Return Risers 68,302 SF $31,255 Domestic Piping - Hot Water Risers 68,302 SF $37,115 Domestic Piping Cold Water Horizontal lines 68,302 SF $163,112 Domestic Piping Hot Water Horizontal lines 68,302 SF $134,787 Domestic Piping Hot Water Return Lines 68,302 SF $78,137 Sanitary Piping BLU 5 68,302 68,302 SF $41,999 Storm Piping BLU 5 68,302 68,302 SF $32,232 Vent Piping BLU 5 68,302 68,302 SF $24,418 $624,123 PUMPS Domestic Booster Pump duplex Ejector Pump Sump Pump PLUMBING 5 6 7 GRE 6 1 GRE 6 2 $3,003 2 EA $2,717 $5,720 $629,843 Assessment Date: 3/11/2013 Page 7 of 15

INTERIOR ADMINISTRATIVE SUITES Ceiling - Exposed Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Concrete Flooring - Tile/Sheet Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall 5 6 GRE 6 346 7 GRE 6 713 395 GRE 6 713 GRE 6 346 GRE 6 573 GRE 6 20 6 GRE 6 205 542 GRE 6 2,849 205 346 SF $653 1,108 SF $2,019 713 SF $1,020 346 SF $1,633 573 SF $819 26 SF $14 747 SF $586 3,054 SF $6,722 $13,466 AUDITORIUM - DEDICATED Main Floor Seating Sound System Stage Curtains Stage Lighting System 5 6 7 GRE 7 260 GRE 6 8 260 EA 8 EA $90,605 $90,605 DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Transom Window DRINKING FOUNTAINS 5 6 GRE 6 31 BLU 5 149 6 GRE 6 360 7 3 $8,777 155 EA $72,012 360 SF $6,692 $87,482 Double Fountain Single Fountain 5 6 7 GRE 7 6 GRE 7 4 6 EA 4 EA Assessment Date: 3/11/2013 Page 8 of 15

GYMNASIUM / AUDITORIUM Ceiling - Lay-In Flooring - Tile/Sheet Lighting - Pendant/Surface Walls - Concrete Block Walls - Structural Glazed Tile 5 6 7 GRE 7 2,399 GRE 6 2,399 GRE 7 20,686,686 2,399 SF 2,399 SF $3,431 20 EA 1,686 SF 1,686 SF $3,431 KITCHEN Ceiling - Plaster/Drywall Flooring - Tile Quarry Lighting - Pendant/Surface Wall - Plaster/Drywall Wall - Structural Glazed Tile 5 6 GRE 6 605 7 GRE 7 605 8 GRE 7 502 GRE 7 502 605 SF $2,284 605 SF 18 SF 502 SF 502 SF $2,284 LIBRARY Casework Flooring Carpet Lighting - Pendant/ Surface LOCKER/SHOWER ROOM Lockers 5 6 GRE 6 80 GRE 6 997 GRE 6 20 5 6 GRE 6 4 7 7 80 LF $2,454 997 SF $1,426 20 SF $14 $3,894 4 EA $196 $196 Assessment Date: 3/11/2013 Page 9 of 15

LUNCHROOM Serving Line 5 6 7 8 18 LF MDF/IDF Finishes Ventilation and Cooling 5 6 7 07 107 SF MECHANICAL/SERVICE ROOMS Air Handling/ Mechanical Room Air Tunnels Boiler Room Crawl Space - Unfinished Janitor's Closet Mechanical/Service Rooms Storage Room 5 6 7 GRE 7 796,470,700 GRE 6 18,360 GRE 6 3 GRE 6 3,028 826 GRE 6 2,164 731 796 SF 1,470 SF 1,700 SF 18,360 SF $34,656 3 SF $14 3,854 SF $14,289 2,895 SF $10,212 $59,172 STAFF RESTROOM Accessories Ceiling - Plaster/Drywall Floor Drain Flooring - Terrazzo Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory 5 6 7 GRE 6 1,967 522 GRE 6 649 1,840 GRE 6 2 8 GRE 6 47 GRE 6 1,438 844 GRE 6 132 28 GRE 6 2 2 GRE 6 6 17 2,489 SF $15,189 2,489 SF $1,838 10 EA $601 47 SF $266 2,282 SF $3,660 160 SF $189 4 EA $434 23 EA $2,231 Assessment Date: 3/11/2013 Page 10 of 15

Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Water Closet THEATER GRE 6 11 37 GRE 6 3 20 GRE 6 6 10 GRE 6 160 GRE 6 2,207 1,853 GRE 6 2,054 2,740 GRE 6 5 29 48 SF $8 23 EA $538 16 EA $2,231 160 SF $458 4,060 SF $5,207 4,794 SF $14,686 34 EA $1,859 $49,394 Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Concrete Flooring - Tile/Sheet Lighting - Lay-In Stage Wall - Plaster/Drywall Wall - Structural Glazed Tile 5 6 7,241 GRE 6 1,241,241,241 60 GRE 6 633 GRE 7 2,537 GRE 7 2,537 1,241 SF 1,241 SF $10,612 1,241 SF 1,241 SF 160 SF 633 SF $2,688 2,537 SF 2,537 SF $13,301 VOCATIONAL SHOP Work Sink INTERIOR 5 6 7 GRE 6 6 8 14 EA $2,317 $2,317 $325,541 ROOM CASEWORK Casework 5 6 7 GRE 6 281 172 453 LF $10,046 $10,046 Assessment Date: 3/11/2013 Page 11 of 15

CEILING Plaster/Drywall 5 6 7 GRE 6 14,286 9,214 23,500 SF $40,449 $40,449 CHALK BOARD Chalk Board CORRIDORS 5 6 YEL 4 248 30 7 278 LF $31,002 $31,002 Pendant/Surface Plaster/Drywall Stair Handrails Structural Glazed Tile Student Lockers Terrazzo Tile/Sheet Flooring 5 6 7 GRE 6 2,166 9,663 GRE 6 3,425 16,259 GRE 6 256 GRE 6 3,425 GRE 6 555 GRE 6 1,186 GRE 6 4,663 5,492 11,829 EA $1,549 19,684 SF $8,081 256 LF 3,425 SF $24,489 555 EA $79,365 1,186 SF $6,716 10,155 SF $6,668 $126,868 CORRIDORS CEILING Plaster/Drywall 5 6 7 GRE 6 6,337 5,492 11,829 SF $17,943 $17,943 FLOOR Carpet Tile/Sheet Wood 5 6 7 GRE 7 304 GRE 6 14,695 2,541 GRE 6 5,960 304 SF 17,236 SF $21,014 5,960 SF $45,000 $66,014 Assessment Date: 3/11/2013 Page 12 of 15

LIBRARY_CEILING Plaster/Drywall LIBRARY_WALL 5 6 GRE 6 997 7 997 SF $2,823 $2,823 Plaster/Drywall GRE 6 1,661 1,661 $3,919 LIGHTING 5 6 7 $3,919 Pendant/Surface 5 6 7 GRE 6 395 251 646 EA $28,243 $28,243 MARKER BOARD Marker Board 5 6 7 GRE 6 386 252 638 LF $11,040 $11,040 STAIRS Terrazzo WALL 5 6 GRE 6 120 7 120 SF $1,359 $1,359 Plaster/Drywall ROOM 5 6 7 GRE 6 22,284 14,384 36,668 SF $52,579 $52,579 $392,285 Assessment Date: 3/11/2013 Page 13 of 15

SITE CIVIL/DRAINAGE Catch Basin Site Drain Site Manhole 5 6 7 GRE 7 9 3 9 EA 13 EA FENCING Ornamental Iron LANDSCAPE 5 6 GRE 6 1,021 7 1,021 LF $19,272 $19,272 Asphalt Play Area/Hardscape Benches Grass Irrigation Parkway trees Planting Beds/ Areas Retaining Wall - Concrete Trash Receptacles 5 6 GRE 6 21,659 7 GRE 7 8 GRE 7 96,287 GRE 7 76,621 GRE 7 27 GRE 6 4,302 GRE 7 402 GRE 7 4 21,659 SF $18,583 8 EA 96,287 SF 76,621 SF 27 EA 4,302 SF 402 SF 4 EA $18,583 PARKING LOT Asphalt Concrete Curbs Lights, Pole Mounted Parking lot interior plantings Trash Compactor 5 6 GRE 6 12,979 GRE 6 511 BLU 5 12 2 GRE 6 119 GRE 6 1 7 12,979 SF $11,136 511 LF $3,084 14 EA $50,336 119 LF $3,575 Assessment Date: 3/11/2013 Page 14 of 15

Trash Enclosure Vehicular Screening PLAYGROUND GRE 7 936 GRE 7 25 936 SF 25 LF $68,131 Playground Equipment - Combo 3-12 Playground Surfacing - Poured Surface SIDEWALKS 5 6 GRE 6 1 GRE 6 1,621 7 1,621 SF $4,288 $4,288 Internal Walks Perimeter Sidewalks 5 6 7 GRE 6 832 899 GRE 6 3,238 5,946 1,731 LF $7,852 9,184 SF $31,412 $39,264 SIGNAGE Flag Pole Marquee - Free Standing Back Lighted SITE Campus Need ² ³ 5 6 7 GRE 6 1 $149,539 $3,383,757 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 3/11/2013 Page 15 of 15