Chapter 25. Lighting Plans

Similar documents
TURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3

TURNPIKE DESIGN HANDBOOK (TDH) PLANS PRODUCTION PART 3

TURNPIKE DESIGN HANDBOOK (TDH) DESIGN CRITERIA PART 3

SECTION PANELBOARDS

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

ELPT 1429 RESIDENTIAL WIRING

B. Manufacturers: Square-D, G.E. or Westinghosue.

.1 Applicability: These criteria shall be applied as follows:

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

Electrical Wiring: Commercial, Seventh Canadian Edition

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

Lighting Design. Debra A. Kennaugh, P.E. Lighting Design by Debra A. Kennaugh, P.E. A SunCam online continuing education course

Wiring of the Main Distribution Panelboard

Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

Construction Electrician/Industrial Electrician/Power Electrician Common Core Level 2

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

Section. DEVELOPMENT STANDARDS City of Ellensburg ILLUMINATION STANDARDS

POWER SERVICE DETAILS

State of Florida Department of Transportation. FDOT Traffic Plans. Signing & Pavement Markings (CE ) Signalization (CE ) Lighting

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

Quality Control Checklist - Design Drawings

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades

Chapter 23. Signing and Pavement Marking Plans

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

DESIGN CHECKLIST INTRODUCTION

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

SECTION CABLE TRAYS

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY

Regal Series Recessed Flatwalls

Article 250 Grounding & Bonding

MPA Project No. M495-C1 Refrigerated Container Storage Improvements Project Location: Conley Terminal, Boston, MA

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL

Ohio Department of Transportation Office of Roadway Engineering January 18, 2013

Take for instance this circuit:

Article 225: Outside Branch Circuits And Feeders

American Electrical Institute

SPECIAL SPECIFICATION LIGHTNING PROTECTION SYSTEM

Chapter 1 Electrical Theory and Part C Series Parallel and Code Questions Multiwire Branch Circuits Unit 1 Electrician s Math

ADDENDUM NO. 2 PROJECT: COURTLAND PUMP STATION CONTRACT: IFB NO COM.00030

TEACHER ASSESSMENT BLUEPRINT ELECTRICAL CONSTRUCTION TECHNOLOGY. Test Code: 5171 Version: 01

NEC 2014 Code Changes

SECTION COMMUNICATIONS COPPER BACKBONE CABLING

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

City of Palm Coast. 160 Cypress Point Parkway, Suite B-106 Palm Coast, FL Tel (386)

Update: July 20, 2012

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

Datawave Magnetic Synthesizer

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS

REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS. September 2017 Revision Letter August 2017 Revision Letter February 2017 Revision Letter

Residential Construction Checklist Single and Two Family Construction

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms

OREGON DEPARTMENT OF TRANSPORTATION

ECET 211 Electric Machines & Controls Lecture 3-1 (Part 1 of 2) Motor Transformers and Distribution Systems

TABLE of CONTENTS ############################# Revised Rule Revised Rule 91.3-B 14. Revised Rule 92.1-F(2). 15

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights

SECTION ELECTRICAL IDENTIFICATION

This specification describes the minimum requirements for drawings for Electrical and Instrumentation.

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit.

SECTION EQUIPMENT WIRING

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

Single-Family Dwelling Submittal Requirements

SOLAR PV MICROINVERTER/ACM STANDARD PLAN - COMPREHENSIVE Microinverter and ACM Systems for One- and Two- Family Dwellings

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

PROVINCE.OF BRITISH COLUMBIA. ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL

STANDARD COMMENTS 2016 ELECTRICAL PLAN REVIEW CHECK LIST

PMA ONLINE TRAINING. Commercial Drawings. One Hour Continuing Education

SECTION DISTRIBUTION SWITCHBOARDS

2014 NEC Changes Part 1

Busbar and Modular Wiring Systems

SECTION VI SCOPE OF WORK

Iec Electrical Symbols

EFCOG BEST PRACTICE # 211. Best Practice Title: Managing Hazards of Multiwire Branch Circuits Installed Before the 2008 NEC

SECTION VI SCOPE OF WORK

Electrical Schematic Symbols Chart

Grounding and Bonding

SECTION DISTRIBUTION SWITCHBOARDS

Electrical Occupations

SECTION STEEL LIGHTING STANDARDS. 1. Electrical conduit and fittings; Section

Washington County Road Engineering Plan Submittal/Review Checklist

Customer Requirements RF Antenna Installations

Continued from Part 1 Rules 1 25.

KidsAbility Guelph Hub Renovation ADDENDUM #2 Project No.:

CONTINUING EDUC ATION

Thank you for your interest in the Electrical Technician program. Following is the application process:

Transcription:

Chapter 25 Lighting Plans The following are changes, additions or deletions to the January 2014, Topic #625-000-008, Plans Preparation Manual (PPM), for use on Turnpike projects only. 25.1 General Replace the third paragraph with the following The Lighting Plans shall be assembled as follows: 1. Key Sheet 2. Tabulation of Quantities 3. Lighting General Notes 4. Legend Sheet * 5. Pole Data * 6. Underdeck Luminaire Data * 7. Sign Luminaire Data * 8. Layout Sheets (as applicable) 9. Plans Sheets 10. Underdeck Lighting Plan Sheets 11. Underdeck Lighting Section/Details Sheet 12. Load Center Schematic One-Line Diagram, Power Riser Diagram, Service Point Details, Panelboard Schedules, and Grounding Details Sheet(s) 13. Power Riser Diagram and Panelboard Schedules (for projects with box girders) Sheet(s) 14. Miscellaneous Details Sheet (as applicable) 15. Foundation Details - High Mast (if required) 16. Boring Data Sheets - High Mast (if required) * Sheets may be combined based on project size. 25.3 Tabulation of Quantities and Standard Notes 25.3.1 Lighting General Notes Sheet A lighting general notes sheet shall be provided (see the latest Lighting Guide Drawings). All notes shall be modified as necessary to make them project specific and to describe any special considerations and directions to the Contractor. Remove general notes that do not apply. A note indicating not all notes are applicable or similar is not acceptable. Lighting Plans 25-1

25.3.2 Pay Items Provide pay item notes below Tabulation of Quantities Table on first sheet only or reference the location of the pay item notes in all Tabulation of Quantities Tables (if not shown on the first sheet). 25.4 Pole Data and Legend Sheet Add the following to the list in paragraph 2 7. Pole Number 8. Tilt angle (in degrees) for pole-top luminaires 9. Aiming angle and direction/orientation for each luminaire on high mast poles Note: When a pole has two arms, then the number "two" shall be placed under the respective arm and luminaires column. Pole numbering shall be coordinated and follow the maintenance scheme The following information shall be given for each sign luminaire: 1. Sign Panel 2. Circuit Number 3. Roadway Station and Offset 4. Arm Length 5. Tilt angle (in degrees) 6. Luminaire Wattage 7. Luminaire Placement (Configuration, Sign Size, Spacing Dimensions) The following information shall be given for each underdeck luminaire: 1. Luminaire Name 2. Circuit Number 3. Roadway Station and Offset 4. Luminaire Wattage 5. Mounting Height 6. Pay Item Number Provide a tilt angle convention detail for all fixtures types that are tilted. The Legend section of this sheet should include the following information: Add the following Lighting Plans 25-2

1. Provide a separate and unique symbol for each condition. Basically, a separate symbol is needed for each bid item number used on the tabulation of quantities. Do not use the same light pole luminaires symbol for two different mounting heights or two different mounting types. 2. Provide symbol with proper description for the conduit and pull boxes that are embedded in the bridge structures or traffic barrier walls. 3. Remove any symbols that are not applicable. A note indicating not all symbols are applicable or similar is not acceptable. 25.5.2 Required Information Modify the second paragraph as follows The lighting layout shall be shown on the plan format. This shall be accomplished by symbols which represent poles, underdeck luminaires, pull boxes, conduit, service points and all necessary light fixtures or electrical devices to be part of the project design. A flag or note shall be used to identify conduit runs. Add the following The lighting plan sheet that shows the load center shall show, label and identify the power company point of service and shall also show the routing of the service feeder from the power company service pole to the load center. The plan shall show the branch circuit conduit runs from the last light pole to the load center with a wiring call-out identifying the circuit designations in addition to the conductor sizes and quantities (in cross section). The phase, neutral, and ground conductors shall be clearly identified. Provide a detailed description of the load center to include the following information: 1. Load Center designation. 2. Station and offset of the load center. 3. Full description of the service voltage. 4. Service Type (Overhead or Underground). An underdeck lighting plan sheet shall be prepared for each underdeck lighting location. This plan sheet shall be drawn to scale with the scale used properly identified, shall use the bridge plan as background with the intensity reduced, and shall also indicate the electrical work associated with bridge mounted signs if applicable. The plan shall show the location of the embedded junction boxes, conduits and associated electrical work with proper notation to indicate what items are incidental to the bridge. A separate section/detail sheet shall be prepared to show all necessary mounting details and associated hardware needed for the installation of the underdeck luminaires. All widening, resurfacing, and All Electronic Tolling (AET) projects shall show existing light fixture locations. 25.7 Box Girder Maintenance Lighting and Power Plan Lighting Plans 25-3

Sheet(s) FDOT Design Standards Index No. 21240 shall be used as a guide in the preparation of the box girder lighting/power plans. The Box Girder Maintenance Lighting Notes are minimum requirements that shall be maintained and met except as revised hereafter. A sheet shall be prepared for each box girder. This sheet shall show the internal lighting, receptacles, switches, load centers, life safety devices, and wiring needed for maintenance. The sheet shall be drawn to scale and shall provide a list or table identifying the quantity of each electrical item within each box girder. A panelboard schedule shall be provided for the distribution panelboard and for each mini power center. 25.8 Load Center Schematic One-Line Diagram, Power Riser Diagram, Service Point Details, Panelboard Schedules, and Grounding Details Sheet(s) Provide a detailed design of the load center to include the following information: 1. Load Center designation. 2. Station and offset of the load center. 3. Full description of the service voltage. 4. Service Type (Overhead or Underground). 5. Indicate whether the enclosure will be pole mounted or pedestal mounted. 6. Indicate the enclosure NEMA rating. 7. Whether a photocell is required. 8. Power distribution riser diagram with short circuit values. 9. Conductor ampacities (sizes) and insulation type. 10. Circuit interrupting devices and fault current interrupting capability. 11. Location and characteristics of surge protective devices. 12. Main and distribution equipment, control devices, locations and sizes. 13. Load computations. 14. Grounding and bonding shall indicate at a minimum the following: A. Type and location of grounding electrodes. B. Bonding requirements. C. Testing requirements. D. Conductor material type, size and protection requirements. E. Connections of separate grounding systems, bonded, and use requirements. 15. A note requiring shop drawings for all the electrical equipment associated with the load center. The load connected to each branch circuit breaker and the overall total load connected. Lighting Plans 25-4

16. If future luminaires are included in the branch circuit conductor size, the affected lighting plans shall be provided with a proper note defining the number of future luminaires include. 25.9 Lighting Design Analysis Report (LDAR) A Lighting Design Analysis Report (LDAR) shall be provided (LDAR guidelines can be found at the link below). LDAR guidelines shall be modified as necessary to make them project specific and to describe any special considerations. http://design.floridasturnpike.com/prod_design/lightelect/doc/ldar_template.pdf Lighting Plans 25-5